Sunteți pe pagina 1din 14

Location:

I. PREPARATION & EXCAVATION WORKS


Labor:
Construction Foreman

at

/day
Labor Cost

0.00
0.00

II. CONCRETE & MASONRY WORKS


Materials:
bag/s Portland Cement

at

/bag

0.00

3
3

m
pcs
pcs
pcs
pcs
pcs
pcs
pcs
kg
kg

/m

Gravel

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

/m
/pc
/pc
/pc
/pc
/pc
/pc
/pc
/kg
/kg
Material Cost

Whitesand
CHB #5
CHB #4
Reinforced Steel Bar, 10mm
Reinforced Steel Bar, 12mm
" x 4' x 8' Ordinary Plywood
Coco Lumber 2" x 2" x 12', 60 bdft
Coco Lumber 20" x 3" x 12', 72 bdft
Assorted Common Wire Nails
GI Tie Wire #16

Equipment:
unit Rental of Concrete Mixer

at

/day

0.00

at

/day
/day
/day
/day
/day
Labor Cost

0.00
0.00
0.00
0.00
0.00
0.00

SUB-TOTAL

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Labor:
Construction Foreman
Mason
Carpenter
Steel man
Laborer

III. CEILING WORKS


Materials:
at

Material Cost

Labor:
Construction Foreman
Mason
Carpenter
Steel man
Laborer

IV. DOORS & WINDOWS WORKS


Materials:
set Panel Door; 0.8 m x 2.1 m
set PVC Door; 0.6 m x 2.1 m
ft2
set
set
set
set

at

at

Steel Casement Windows


Door Hinges
Door lock
Aluminum Screen Door
Window Screen Protector

/day
/day
/day
/day
/day
Labor Cost

0.00
0.00
0.00
0.00
0.00
0.00

SUB-TOTAL

0.00

/set
/set

0.00
0.00

/ft2
/set
/set
/set
/set
Material Cost

0.00
0.00
0.00
0.00
0.00
0.00

/day
Labor Cost

0.00
0.00

SUB-TOTAL

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Labor:
Laborer

V. STEEL & TINSMITHRY WORKS


Materials:
lnm Pre-painted Roofing; GA 26
at
lnm Pre-painted Flashing; GA 26
pcs Angle Bar; 2" x 3/16"
pcs C-Purlins; 2" x 3" x 1.5 mm
pcs C-Purlins; 2" x 4" x 1.5 mm
pcs Reinforced Steel Bar, 10mm (sag rod)
tube Rubber sealant

/lnm
/lnm
/pc
/pc
/pc
/pc
/tube
Material Cost

Equipment:
unit Rental of Concrete Mixer

at

/day

0.00

at

/day
/day
/day
Labor Cost

0.00
0.00
0.00
0.00

Labor:
Tinsmith
Welder
Laborer

SUB-TOTAL
VI. TILE WORKS
Materials:
pcs
pcs
pcs
bag
kg

Floor Tiles; 40 x 40 cm
Glazed Tiles; 40 x 40 cm
Unglazed Tiles; 40 x 40 cm
Tile Adhesive
Tile Grout

at

0.00

0.00
0.00
0.00
0.00
0.00
0.00

/day
/day
Labor Cost

0.00
0.00
0.00

SUB-TOTAL

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

/pc
/pc
/pc
/bag
/kg
Material Cost

Labor:
Tile Setter
Helper

VII. PLUMBING & SANITARY WORKS


Materials:
set Water Closet with Fittings
set Lavatory with Fittings & P-trap
set Urinal with Fittings
pcs uPVC Pipe; 3/4" dia
pcs uPVC Elbow; 4" dia
pcs uPVC Tee; 4" dia
pcs uPVC Reducer; 1/2" & 3/4" dia
pcs PVC Pipe; 4" dia
pcs PVC Elbow; 4" dia
pcs PVC Tee; 4" dia
pcs Faucet (ordinary)
Other Plumbing Materials

at

/set
/set
/set
/pc
/pc
/pc
/pc
/pc
/pc
/pc
/kg
1000.00
Material Cost

Labor:
Plumber
Laborer

VIII. ELECTRICAL WORKS


Materials:
set Main Switch 60A
set Flourescent Lamp; 40W

at

at

/day
/day
Labor Cost

0.00
0.00
0.00

SUB-TOTAL

0.00

0.00
0.00

/set
/set

pcs
pcs
pcs
pcs
roll

CFL Lamp; 18W


Convenience Outlet
Switch; 2 gangs
Switch; 1 gang
Flexible Hose

2
roll 0.5 box THHN Wire; 3.5 mm
2
roll 0.5 box THHN Wire; 5.5 mm
pcs Utility Box
pcs Junction Box
roll Electrical Tape
Other Materials

/pc
/pc
/pc
/pc
/pc

0.00
0.00
0.00
0.00
0.00

/pc

0.00

/pc
/pc
/pc
/pc

0.00
0.00
0.00
0.00
0.00
0.00

1000.00
Material Cost

Labor:
Electrician
Laborer

IX. PAINTING WORKS


Materials:
gal Latex Paint Flat
gal Latex Paint Semi-gloss
gal Red Oxide Primer
gal QDE Paint
gal Paint Thinner
gal Concrete Neutralizer
Masonry Putty
Other Painting Materials

at

at

/day
/day
Labor Cost

0.00
0.00
0.00

SUB-TOTAL

0.00

/gal
/gal
/gal
/gal
/gal
/gal

Material Cost

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Labor:
Painter
Helper

* SUMMARY
I. PREPARATION & EXCAVATION WORKS
II. CONCRETE & MASONRY WORKS
III. CEILING WORKS
IV. DOORS & WINDOWS WORKS
V. STEEL & TINSMITHRY WORKS
VI. TILE WORKS

at

/day
/day
Labor Cost

0.00
0.00
0.00

SUB-TOTAL

0.00

0.00
0.00
0.00
0.00
0.00
0.00

VII. PLUMBING & SANITARY WORKS


VIII. ELECTRICAL WORKS
IX. PAINTING WORKS
DIRECT COST
10% PROFIT
10% OCM
12% VAT
ENG'G SUPERVISION
ESTIMATED TOTAL COST

0.00
0.00
0.00
0.00
0.00

0.00

SLAB
WALL

CONCRETE WALL or RETAINING WALL


Description No. of Set/s Length
1
2
3
4
5
Total

FOOTING

COLUMN

COLUMN

SLAB
Description No. of Set/s
1
2
3
4
5
Total

COLUMN
Description No. of Set/s
C1
2
C2
4
3
4
5
Total
COLUMN (Circular)
Description No. of Set/s
1
2
3
4
5
Total
FOOTING
Description No. of Set/s
F1
3
F2
3
3
4
5
Total

EAM

BEAM

Length

Width

Volumeset VOLUMETOTAL

Height

0.00
0.00
0.00
0.00
0.00
0.00

Width

0.00
0.00
0.00
0.00
0.00
0.00

Volumeset VOLUMETOTAL

Height

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

Length
3.6
4.4

Width
0.125
0.125

Height Volumeset VOLUMETOTAL


0.2
0.09
0.18
0.2
0.11
0.44
0.00
0.00
0.00
0.00
0.00
0.00
0.20
0.62

Pi
3.141593
3.141593
3.141593
3.141593
3.141593

Radius
0.3

Height

Length
0.6
0.8

Width
0.6
0.8

Height Volumeset VOLUMETOTAL


0.2
0.07
0.22
0.2
0.13
0.38
0.00
0.00
0.00
0.00
0.00
0.00
0.20
0.60

Volumeset VOLUMETOTAL
3

0.85
0.00
0.00
0.00
0.00
0.85

0.00
0.00
0.00
0.00
0.00
0.00

BEAM
GIRDER

Description No. of Set/s


1
2
3
4
5
Total
GIRDER
Description No. of Set/s
1
2
3
4
5
Total

Length

Width

Height

Volumeset VOLUMETOTAL
0.00
0.00
0.00
0.00
0.00
0

Length

Width

Height

0.00
0.00
0.00
0.00
0.00
0

Volumeset VOLUMETOTAL
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.20
Length LengthSUB
1.8
0
1.2
0
0.1
0
0
0
0
0

CEMENT MORTAR

0.40
0.15
Description No. of Set/s
WF2
2
WF2
1
WF2
2
4
0
5
0
Total
CEMENT MORTAR
Description No. of Set/s
1
2
3
4
5
Total

PLASTER

CHB

CONCRETE HOLLOW BLOCKS (CHB)


LengthCHB
WidthCHB
HeightCHB

CEMENT MORTAR (for Plastering)


Description No. of Set/s Length
1
2
3
4
5
Total

Length

Width

HeightSUB No. of Layers No. of CHB


Height
2.6
0
13
117
2.6
0
13
39
2.6
0
13
6.5
0
0
0
0
0
0
0
0
162.5

Height

Volumeset VOLUMETOTAL
0.00
0.00
0.00
0.00
0.00
0.00

Width

0.00
0.00
0.00
0.00
0.00
0.00

Thickness Volumeset VOLUMETOTAL


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Class

CEMENT

SAND

Class

CEMENT

SAND

Class
A

GRAVEL

9.0

0.5

0.5
SAND

1
GRAVEL

CEMENT

GRAVEL

9.0

0.5

0.5

0
SAY
SAND

CEMENT
5.58

SAY
SAND
0.31

5.58
CEMENT

FACTOR
SAND

CEMENT

SAND

Class
A

GRAVEL

CEMENT

CEMENT

CEMENT

9
Class

GRAVEL

SAY
SAND

0.31
SAY
SAND

CEMENT
5.4

SAY
SAND
0.3

5.4

0.3
SAY

Class

CEMENT

SAND

Class

CEMENT

GRAVEL

SAND

CEMENT

SAND

Class

CEMENT

SAND

GRAVEL

SAY:
No. of Layers
No. of CHB

Class

CEMENT

CEMENT

SAND

0
SAY
SAND

SAY
GRAVEL

0
SAY
GRAVEL

0
SAY
GRAVEL
0.62

0.62
SAY
GRAVEL

0
SAY
GRAVEL
0.6

0.6
SAY

GRAVEL

0
SAY
GRAVEL

Table 1. CONCRETE PROPORTION


Mixture
Class

Proportion

Cement in Bag
40 kg
50 kg

AA
A
B
C

1 : 1/2 : 3
1:02:04
1 : 2 1/2 : 3
1:03:06

12.0
9.0
7.5
6.0

9.5
7.0
6.0
5.0

Sand

Gravel

0.5
0.5
0.5
0.5

1.0
1.0
1.0
1.0