Documente Academic
Documente Profesional
Documente Cultură
Alan Lee
Norwich Union Risk Services.
Slideplc
1
Aviva
Risk Management
Management
Systems
Slide 2
Policy
Organising
Audit
Slide 3
Audit
Audit and
and review
review
Measure
Measure your
your performance
performance
Plan
Plan and
and set
set standards
standards
Organise
Organise your
your staff
staff
Set
Set your
your policy
policy
Slide 4
Policy
Statement
The Organisation
The Arrangements
Slide 5
Organisation
Arrangements
Aviva plc - Confidential
Competence
Control
Co-operation
Communication
Slide 6
Competence
Slide 7
Control
Lead by Example
Individuals Identified for Particular Tasks
-
Risk Assessments
- Inspections etc.
Employees Role
Level of Authority
Rules Enforced
Slide 8
Co-operation
Slide 9
Communication
Provide Information
Rules must be Communicated Clearly
Regular Discussions
Give Feedback for Ideas
Slide 10
Setting objectives
Risk assessment process-
Identify hazards
Assess risks
Decide upon controls
Implement controls and performance
standards
Develop a positive safety culture
Slide 11
Proactive monitoring
- Inspections / audits
Reactive monitoring
- Accident investigations /
accident book / absence
records
Slide 12
Policy
Organising
Planning and Implementation
Organising
Measure performance
Audit
Audit
Measure
Review
Slide 13
Risk Management
Practical Risk
Assessment
Slide 14
2
Aviva plc - Confidential
Risk Assessment
(Regulation 3) Management of H&SAW Regs.
Slide 15
Slide 16
the fitting out and layout of the workplace and work stations
the nature, duration and degree of exposure to physical,
biological and chemical agents
the form, range and use of work equipment and the way it is
handled
Practical Risk
Assessment
identify the hazards
evaluate the risks
implement the controls
Hazard
A hazard is a situation
with the
potential
for causing injury
Slide 19
Hazards
physical
chemical
biological
ergonomic
Live parts
Burning
Mechanical/machinery
Biological agent
Noise
Chemical exposure,
Other conflicts
Harmful substances,
Oxygen deficiency
Corrosive
Physical injury
Restricted access/egress
Solvent explosion
Compressed air
Steam
Drowning
Thermal
Ergonomic hazards
Vibration
Electricity
Water
Fire
Slide 21
Intoxication
Working at height
Risk
Likelihood
x
Consequences
Slide 22
Eliminate
Reduce
Inform
Control
PPE
Discipline
Slide 23
Likelihood
3
High
Medium
Low
1
Minor
Injury
Major
Injury
Death
Outcome
Risk Assessment
Risk = Likelihood X Consequence
Risk
Score
Likelihood
Remote - Would not happen in 5
years
Unlikely - Would not happen in 2-3
years
Likely- Would expect to happen
once a year
Very Likely - Could occur 2 or 3
times a year
A Certainty- likely to happen at any
moment
Slide 25
1
2
3
4
5
Consequences
Minor injury
Lost time injury/illness
Serious injury
disablement
Death
Multiple fatality
Aviva plc - Confidential
Risk Rating
Value
2025
1520
Risk
rating
Very High
Risk Control
Prevent activity.
High
Urgent action
provide additional
controls.
11-15 Medium Consider additional
controls as soon
possible.
7-11
Low
Non urgent action
required
1-7 Very Low No Action required
Slide 26
Slide 27
Slide 28
Method Statements
Slide 29
Risk Management
Other important
issues
Slide 30
3
Aviva plc - Confidential
10
Induction
Formal
On -the job
Verbal instruction
Records
Slide 31
CONTROL OF CONTRACTORS
competence
Joint Risk Assessment
Provide Information, Instruction and Training
Co-operation and Co-ordination
Management, Supervision and Monitoring of
contract works
Review of Contractor performance
Slide 32
11
Slide 34
12