GREATER MUMBAI
SEWERAGE PROJECTS DEPARTMENT
VOLUME-I
UNIFIED SCHEDULE OF RATES FOR
SEWERAGE WORKS
2013
FOREWORD
Ever since it's establishment in 1888 by the erstwhile British rulers in India, in the last
125 years of the history of its existence Mumbai Municipal Corporation has catered
to every aspect of the citizen of Mumbai that can be conceived of. Think of Engineer
Victor Tulloch, who through his unparalleled immense efforts conceived the water
supply scheme fetching running over from distance of more than 100 km by
constructing a dam across river Tansa, to feed the population of Mumbai, then only a
few thousands in number. The items have changed with technological advancement
and the works like Roller Compacted Concrete Dam at Middle Vaitarna or numerous
underground tunnels for water supply and sewerage disposal, for example, have
become hallmark of MCGM's dedication to the citizen of Mumbai. The challenges
have always been daunting, nevertheless, always met with.
Every civilization be it 5000 years old Harrappan civilization on the bank of
Sindhu River, or Mumbai on the west coast of the Indian Ocean, require
infrastructure like water supply and sewerage system, storm water drainage system,
road, bridges, etc. and hospitals, markets, recreation centers etc. The exponentially
growing population of Mumbai and the technological explosion in the field of
engineering has made every aspect of contracting of works highly challenging.
M.C.G.M. is one of the largest local self government in the Asian Continent.
In observance of historic traditions of strong civic activism, with the change in time
and living conditions to match with the urbanization, M.C.G.M. has mainly focused in
providing variety of engineering services viz, storm water drain, sewerage, water
supply projects, roads, bridges, solid waste management, environmental services.
Beside this, the Corporation is also providing dedicated services in the Health sector
by establishing numbers of Major and Peripheral hospitals.
To update and modernize the mechanism being used for working on projects
from the stage of conceptualization upto execution, the need was realized to revise
prevailing Schedule of Rates along with specifications which were in operations
with various departments and being prepared individually as per their need and
used to revised at different span of time, resulting into various anomalies. Therefore,
to overcome all these, it was essential to revise the schedule of rates, not only with
simple mechanized revision, major changes to keep up with the pace of urbanization,
civilization, construction techniques / mechanization and voluminous developments
by restructuring items in the schedule as per requirements. This exercise would
provide comfort with field requirements and designs and will assist in effective
checks on creation of extra items during execution.
A conscious decision has been taken to keep pace with the changing time
and preparation of Unified Schedule of Rates is the first step forward in this direction.
Since long time, there have been demands made by the stake holders like Municipal
Engineers and Contractors about non-uniformity, anomalies and discrepancies in
various schedules of rates for work contracts of various departments of MCGM.
Every department had its own expertise and way of functioning which got reflected in
its independent schedule of rates, which, however, had no linkage with the fair
market schedules of other departments and resulting into extra items and fair rates.
In place of earlier 9 Schedule of Rates, the Unified Schedule of Rates is an effort &
seeks to rectify the defects, discrepancies and non uniformities which will provide,
not to mention about the ease and accuracy of estimation to the Engineers.
In view of the enormous and voluminous nature of work, keeping time
frame in perspective and above all, to ensure professionalism, the work of
preparation of Unified Schedule of Rates was awarded to the eminent consultants
M/s.Tata Consulting Engineers Ltd. M/s.Tata Consulting Engineers Ltd were directed
to conduct a thorough factual market research for major materials from
stockists/manufacturers/dealers and to study schedules of rates of Govt bodies like
C.P.W.D. and P.W.D. The new Rate Analysis are based on Factual Market research
done by M/s.Tata Consulting Engineers Ltd.
The anomalies in rate are minimized after extensive market research and
collection of quotations from reputed large scaled stockists/dealers, and also after
comparison with rates of CPWD, PWD etc.
The SOR is linked with its comprehensive specifications of basic important
activities so as to have clarity in execution. These specifications follow a chronology
of general scope of the item, material required, processing of material, construction
operation, finishing and mode of measurement.
All the rates are now linked to their detailed specifications and wherever
required, with drawings. Though there are about 12500 items, every item is now
given a Unique Code No. which will eliminate the repetition.
It has been our endeavour to include all the necessary modern materials and
technologies in SOR, for example, the concept of green building, which will go a long
way to have control on creation of extra items and fair rates. A salient feature of this
USR is 'Starring of items' specified, categorically which can be used only at certain
works or locations.
Another salient features is 'Dynamic Rate System' which will be based on
study of data base of quantities and bidding prices of awarded contracts on the basis
of which necessary corrections can be applied to the Unified Schedule of Rates at
specified intervals. The MCGM will be now in position to revise the Unified Schedule
of Rates every year after incumbency period of M/s.Tata Consulting Engineers Ltd of
one year, to work with and correct the system as and when necessary.
I hope this 'Unified Schedule of Rates' will be a milestone in civic governance
by MCGM. This self-contained publication shall be of great help and guidance to the
officers engaged in the project work of MCGM.
A.M.C. (Project)
Municipal Commissioner
SE SCHEDULE 2013
GENERAL NOTES
A. COMMON GENERAL NOTES
Buildings
SE SCHEDULE 2013
SE SCHEDULE 2013
Followed by Abbreviation code for each schedule of rate for eg H.E. for
Hydraulic engineering, SE for Sewerage, WSP for water supply and so on
and so forth.
The first item category in the list will be numbered as 1
The last part of the code will be a number starting with a to indicate the item
number in the master list.
The alpha numeric will be separated by (dash).
The code will look like: MA-SE-01
The Coding procedure for SOR is as follows:
Code will start from abbreviation for Department name HE or WSP or SP
The USR will be subdivided into chapters according to the item classification;
these chapters will be numbered as 1, 2, 3 ..
The items under the chapter will be numbered from 1
The sub items will be numbered as a, b, c .
The code will look like SE-1-1-a
Abbreviations to be used for Department
Sr. No.
Department
Abbreviation
Building works/Common
Schedule
CS
Roads
RW
RT
Bridges
BW
WSP
Hydraulic Engg.
HE
Sewerage Projects
SE
SWD
ME
10
Garden Works
GW
SE SCHEDULE 2013
SE SCHEDULE 2013
Star Rating:
In view of ambiguity related to choice of quality or grade of materials and subsequent
items of works to be used at Ward level projects, Centralised projects or Special projects
of and for smooth functioning during planning stage of a project, the new concept of Star
Rating has been introduced for building works depending on the life expectancy of
building, degree of occupancy of building and comfort to the end user. The buildings or
structures rated are as follows:
i.
Two Star **- Ward offices and Central dept. Offices, schools, Small Hospitals,
Primary Health Center, Fire Station, Crematorium, Slaughter Houses,
Markets, Swimming Pools, Zoos, Chowkies, Libraries, Staff quarters and
residential colonies, Public Toilets and Water tanks.
ii. Three Star ***- Super specialty Hospitals, Drama Theatres, MCGM Mayors
and Officers bungalow, Heritage Structures, Head Office and Engineers
Hub.
The items or work not marked as two star or three star are assumed to be
applicable for all the star buildings or structures mentioned above.
SE SCHEDULE 2013
Units
Abbreviation Symbol
Rmt
MT
Weight Kilogram
Kg
Length (Meter)
Length (Millimeter)
mm
Time
Day/Shift
Remark
Time (Hour)
Hr
Quantity (Numbers)
Each/Nos.
10
L.S
11
Volume
Cum
12
Sqm
Abbreviation
Remark
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
SE:
CS:
SP:
SW PIPES:
EW:
CW:
BoQ:
EO:
RCC:
MW:
CM:
NP:
HDPE PIPES:
OD:
ID:
Code for SP
Common Schedule
Sewerage Projects
Stoneware Pipes
Earth Works
Civil Works
Bill of Quantities
Extra Over
Reinforced Cement Concrete
Masonary Works
Cement Mortar
Non pressure
High Density Polyethylene Pipes
Outer Diameter
Internal diameter
SE SCHEDULE 2013
16
17
18
19
20
21
22
23
24
25
26
27
28
29
DWC:
R/R:
EHD:
CI:
SFRC:
ASTM:
MS:
MA:
GN:
HE:
HC:
BLD:
LB:
CR:
The final amount appearing in SOR is completely rounded off, no decimal digits are
considered.
The final amount for an item worked out in RA template is rounded upto two decimal places.
Chapter wise Notes, Assumptions and References
Chapter 1: EXCAVATION:
Items to be referred from Common Schedule. Shoring items are kept. Mild Steel plate
shoring is introduced
Chapter 2: Concreter:
Items Rate Updated
Chapter 3: Masonry:
Stone Pitching shifted to Road Schedule
Chapter 4: Plasterer:
Rate of items updated
Chapter 5: Pipe works:
Stoneware pipes of SP2 class added
SE SCHEDULE 2013
SE SCHEDULE 2013
INDEX
Sr.no
Chapter
code
Contents
Item Range
Page no
SE-1
SE-1-1 TO SE-1-6
1-2
SE-2
CONCRETOR
SE-2-1 TO SE-2-15
3-4
SE-3
MASONRY
SE-3-1 TO SE-3-17
SE-4
PLASTERER
SE-4-1 TO SE-4-13
SE-5
PIPES
SE-5-1 TO SE-5-16
7-10
SE-6
MANHOLES
SE-6-1 TO SE-6-27
11-19
SE-7
DROP ARRANGEMENT
SE-7-1 TO SE-7-14
20-21
SE-8
INSPECTION CHAMBER
SE-8-1 TO SE-8-8
22-23
SE-9
VENT SHAFTS
SE-9-1 TO SE-9-10
24
10
SE-10
IRON WORKS
SE-10-1 TO SE-10-14
25
11
SE-11
DESILTING
SE-11-1 TO SE-11-6
26
12
SE-12
MISCELLANEOUS
SE-12-1 TO SE-12-19
27-28
13
SE-13
MICROTUNNELING AND
PIPE JACKING
SE-13-1 TO SE-13-4
29-31
14
SE-14
HORIZONTAL
DIRECTIONAL DRILLING
AND PIPE INSTALLATION
SE-14-1 TO SE-14-2
32
Chapter -1
EXCAVATION AND ALLIED
WORKS FOR SEWERAGE
SE SCHEDULE 2013
Excavation and Allied Works for Sewerage
ITEM CODE
ITEM DESCRIPTION
UNIT
SE-1-1
SE-1-1-a
upto 1.5M
Cum
SE-1-1-b
Extra over above item SE-1-1-a for lift from 1.5m to 3.0m.
Cum
SE-1-1-c
Extra over above item SE-1-1-a for lift from 3.0m to 4.5m
Cum
SE-1-1-d
Extra over above item SE-1-1-a for lift from 4.5m to 6.0m
Cum
SE-1-1-e
Extra over above item SE-1-1-a for lift from 6.0m to 7.5m
Cum
SE-1-1-f
Extra over above item SE-1-1-a for lift from 7.5m to 9.0m
Cum
SE-1-1-g
Extra over above item SE-1-1-a for lift from 9.0m to 10.5m
Cum
SE-1-1-h
Extra over above item SE-1-1-a for lift from 10.5m to 12.0m
Cum
SE-1-1-i
Extra over above item SE-1-1-a for lift from 12.0m to 13.5m
Cum
SE-1-1-j
Extra over above item SE-1-1-a for lift from 13.5m to 15.0m
Cum
SE-1-1-k
Cum
SE-1-1-l
Cum
SE-1-1-m
Do. -- by chiselling.
Cum
SE-1-1-n
Cum
RATE
Refer CS-EW1
Refer CS-EW2-a
Refer CS-EW2-b
Refer CS-EW2-c
Refer CS-EW2-d
Refer CS-EW2-e
Refer CS-EW2-f
Refer CS-EW2-g
Refer CS-EW2-h
Refer CS-EW2-i
Refer CS-EW3
Refer CS-EW6
Refer CS-EW4
Refer CS-EW5
SE SCHEDULE 2013
Excavation and Allied Works for Sewerage
ITEM CODE
UNIT
RATE
Cum
Refer CS-EW3
Cum
Refer CS-EW3
Rmt
136.00
Cum
CS-EW-8
Cum
CS-EW-9
SE-1-4
Sqm
369.00
SE-1-5
Sqm
1793.00
SE-1-6
Sqm
2814.00
SE-1-1-o
SE-1-1-p
SE-1-2
SE-1-3
ITEM DESCRIPTION
Excavation in road carriage ways,foot path,asphalt mixed
carpet of any type upto any depth,including all lifts and
depositing excavated materials in a radius of 150M as
specified and directed
Do. -do-- in plain or reinforced concrete road including cutting
of reinforcements manually or using pneumatic jack hammer
or by any other means,-do-doProviding watching fencing etc. to trench excavation per
running meter length of trench as per drawing and as directed
by Engineer.
Transporting surplus materials upto 3 Km. including levelling.
[Note : Prior Specific sanction of Head of Deptt. should be
taken if transportation is to be done at night i.e. between 8.00
pm. to 6 am.and the rate should be reduced by 10%] {This
item will be operated with the specific sanction of the
C.E./Chief Engineer and above}
[Note : Prior Specific sanction of Head of Deptt. should be
taken if transportation is to be done at night i.e. between 8.00
pm. to 6 am. and the rate should be reduced by 10%]
SE-1-3-a
Chapter -2
CONCRETOR
SE SCHEDULE 2013
Concretor
ITEM CODE
ITEM DESCRIPTION
UNIT
RATE
Cum
4652.00
-do- -do- for full encasement or cradle -do- -do-do- -do- in saddle block -do- -do-do- -do- M 15 c.c. In foundation including boxing, curing etc.
complete as specified and as directed.
Cum
Cum
5171.00
5002.00
Cum
5229.00
SE-2-5
Cum
5761.00
SE-2-6
Cum
6290.00
SE-2-7
SE-2-8
SE-2-9
do- -do- in saddle block -do- -do-do- -do- in arch work -do- -doProviding and laying M 20 c.c. In foundations -do- -do-do- -do- in sides and haunches and /or block coping -do- do-do- -do- in arch work -do- -doREINFORCED CONCRETOR
Note: 1. Wastage in cutting will not be paid for. Only steel
actually fixed in position will be paid by linear measurement
including hooks & bends. No payment will be made for binding
wires, pins be made for binding wires, pins, chairs and laps
and / or welding and this should be noted while quoting the
rates.
2. In working out the rates for .R.C.C. Items and steel
reinforcement, the basic rates for steel bars per tonne are
taken as mentioned in Basic Material Master, If steel is
controlled in future the necessary adjustment between the
controlled rate and the rates stated above will have to be
made.
3. Note of concretor: (b) is applicable here(controlled
concrete).
Cum
Cum
Cum
6118.00
6504.00
5766.00
Cum
7060.00
Cum
6502.00
SE-2-10
SE-2-11
`
SE SCHEDULE 2013
Concretor
SE-2-12
Cum
10607.00
SE-2-13
SE-2-14
SE-2-15
-do- without reinforcement -do- do-do- M20 RCC work-do- as per item no SE-2-12
-do- without reinforcement -do- do-
Cum
Cum
Cum
6808.00
10613.00
6813.00
Chapter -3
MASONRY
SE SCHEDULE 2013
Plasterer
ITEM CODE
ITEM DESCRIPTION
SE-4-1
SE-4-2
SE-4-3
SE-4-4
SE-4-5
SE-4-6
SE-4-7
SE-4-8
SE-4-9
SE-4-10
SE-4-11
SE-4-12
SE-4-13
UNIT
RATE
Sqm
156.00
Sqm
167.00
Sqm
240.00
Sqm
256.00
Sqm
311.00
Sqm
330.00
Sqm
189.00
Sqm
204.00
Sqm
300.00
Sqm
324.00
Sqm
400.00
Sqm
431.00
Kg
45.00
Chapter -4
PLASTERER
SE SCHEDULE 2013
Plasterer
ITEM CODE
ITEM DESCRIPTION
SE-4-1
SE-4-2
SE-4-3
SE-4-4
SE-4-5
SE-4-6
SE-4-7
SE-4-8
SE-4-9
SE-4-10
SE-4-11
SE-4-12
SE-4-13
UNIT
RATE
Sqm
156.00
Sqm
167.00
Sqm
240.00
Sqm
256.00
Sqm
311.00
Sqm
330.00
Sqm
189.00
Sqm
204.00
Sqm
300.00
Sqm
324.00
Sqm
400.00
Sqm
431.00
Kg
45.00
Chapter -5
PIPES
SE SCHEDULE 2013
Pipes
ITEM CODE
ITEM DESCRIPTION
Stoneware Pipes
Providing & laying stoneware pipes of SP2 class including
jointing with CM(1:1), filleting etc. complete as specified &
directed.
SE-5-1
SE-5-1-a
SE-5-1-b
SE-5-1-c
SE-5-2
SE-5-2-a
SE-5-2-b
SE-5-2-3
SE-5-3
SE-5-3-a
SE-5-3-b
SE-5-3-c
SE-5-4
SE-5-4-a
SE-5-4-b
SE-5-4-c
SE-5-5
SE-5-5-a
SE-5-5-b
SE-5-5-c
SE-5-6
SE-5-6-a
SE-5-6-b
SE-5-6-c
B
SE-5-7
SE-5-7-a
SE-5-7-b
SE-5-7-c
SE-5-7-d
UNIT
RATE
150mm dia
230mm dia
300mm dia
Rmt
Rmt
Rmt
460.00
730.00
1195.00
Rmt
Rmt
Rmt
404.00
683.00
1141.00
Each
Each
Each
233.00
571.00
1057.00
Each
Each
Each
338.00
860.00
1202.00
Each
Each
Each
580.00
1053.00
1480.00
Each
Each
Each
225.00
592.00
1117.00
Rmt
Rmt
Rmt
Rmt
687.00
986.00
1220.00
1534.00
SE SCHEDULE 2013
Pipes
ITEM CODE
SE-5-8
SE-5-8-a
SE-5-8-b
SE-5-8-c
SE-5-8-d
SE-5-8-e
SE-5-8-f
SE-5-8-g
SE-5-8-h
SE-5-8-i
SE-5-8-j
SE-5-8-k
SE-5-8-l
SE-5-8-m
SE-5-8-n
SE-5-8-o
SE-5-8-p
SE-5-8-q
SE-5-8-r
C
SE-5-9
SE-5-9-a
SE-5-9-b
SE-5-9-c
SE-5-9-d
SE-5-9-e
SE-5-9-f
SE-5-9-g
SE-5-9-h
SE-5-9-i
SE-5-9-j
SE-5-9-k
SE-5-9-l
SE-5-9-m
SE-5-9-n
SE-5-9-m
SE-5-10
SE-5-10-a
SE-5-10-b
SE-5-10-c
SE-5-10-d
SE-5-10-e
SE-5-10-f
ITEM DESCRIPTION
UNIT
RATE
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
1157.00
1754.00
1995.00
2184.00
2572.00
3096.00
4009.00
4986.00
6185.00
6808.00
8004.00
8629.00
11376.00
13910.00
16829.00
20099.00
21747.00
22596.00
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
753.00
1139.00
1721.00
2126.00
2674.00
3375.00
4354.00
5564.00
6849.00
8532.00
10785.00
13870.00
17572.00
22213.00
27423.00
Each
Each
Each
Each
Each
Each
982.00
1390.00
2633.00
3731.00
6362.00
7170.00
SE SCHEDULE 2013
Pipes
ITEM CODE
ITEM DESCRIPTION
SE-5-10-g
SE-5-10-h
SE-5-10-i
SE-5-10-j
SE-5-10-k
D
SE-5-11
SE-5-11-a
SE-5-11-b
SE-5-11-c
SE-5-11-d
SE-5-11-e
SE-5-11-f
SE-5-11-g
SE-5-11-h
SE-5-11-i
SE-5-12
SE-5-12-a
SE-5-12-b
SE-5-12-c
SE-5-12-d
SE-5-12-e
SE-5-12-f
SE-5-12-g
E
SE-5-13
SE-5-13-a
SE-5-13-b
SE-5-13-c
SE-5-14
SE-5-14-a
SE-5-14-b
SE-5-14-c
UNIT
RATE
Each
Each
Each
Each
Each
8078.00
9083.00
10093.00
11303.00
12711.00
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
548.00
819.00
1129.00
1490.00
2383.00
3026.00
5811.00
9433.00
14679.00
Each
Each
Each
Each
Each
Each
Each
724.00
1032.00
1555.00
2248.00
2534.00
3549.00
4465.00
Rmt
Rmt
Rmt
32.00
42.00
63.00
Rmt
Rmt
Rmt
11.00
16.00
32.00
SE SCHEDULE 2013
Pipes
ITEM CODE
ITEM DESCRIPTION
UNIT
RATE
SE-5-15
Rmt
Rmt
Rmt
Rmt
26.00
35.00
41.00
52.00
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
327.00
331.00
341.00
355.00
368.00
460.00
546.00
764.00
989.00
1331.00
1365.00
1365.00
2116.00
2116.00
2867.00
3009.00
3151.00
3363.00
SE-5-15-a
SE-5-15-b
SE-5-15-c
SE-5-15-d
SE-5-16
SE-5-16-a
SE-5-16-b
SE-5-16-c
SE-5-16-d
SE-5-16-e
SE-5-16-f
SE-5-16-g
SE-5-16-h
SE-5-16-i
SE-5-16-j
SE-5-16-k
SE-5-16-l
SE-5-16-m
SE-5-16-n
SE-5-16-o
SE-5-16-p
SE-5-16-q
SE-5-16-r
10
Chapter -6
MANHOLES
SE SCHEDULE 2013
Manholes
ITEM CODE
ITEM DESCRIPTION
UNIT
RATE
SE-6-1
Each
39023.00
m.depth
9895.00
Each
49372.00
m.depth
13101.00
m.depth
m.depth
m.depth
m.depth
14159.00
14280.00
16928.00
17646.00
Each
61119.00
SE-6-1-a
SE-6-2-b
SE-6-2-c
SE-6-2-d
SE-6-2-e
SE-6-2-f
SE-6-2-g
SE-6-3
SE-6-3-a
SE-6-3-b
Extra over above per metre depth above 1.5 M. and upto 2.3
M. depth -do- -doConstructing on sewer brick masonry conical manhole 1.5 M.
dia. at bottom and 0.56 M dia. at top including C.I.
Extra.Heavy Duty circular air tight frame and cover etc.
complete as per description in item No.SE-6-1 depth upt0 2.3
M.
Extra for above manhole per metre depth above 2.3M and
upto 5 M including safety chain and extra C.I steps on other
side of benching-do-doDo- -do- above 5 M & upto 9 M -do- -doDo- -do- above 9.M & upto 11 M -do- -doDo- -do- above 11M & upto 12 M -do- -doDo- -do- above 12 M and upto 14 M depth -do- -doConstructing on sewer brick masonary conical manhole 1.8M
dia. at bottom 0.56M dia at top, including C.I. Extra heavy Duty
airtight circular frame and cover etc. complete as per
description in Item No.SE-6-1 depth upto2.9 M
Extra for above manhole per metre depth above 2.9M and
upto 5 M including safety chain and extra C.I steps on other m.depth
side of benching-do-doDo- -do- above 5 M. and upto 9M -do- -dom.depth
11
21387.00
29362.00
SE SCHEDULE 2013
Manholes
ITEM CODE
ITEM DESCRIPTION
UNIT
RATE
SE-6-3-c
SE-6-3-d
SE-6-3-e
Do- -do- above 9 M. and upto 11M -do- -doDo- -do- above 11M and upto 12M -do- -doDo- -do- above 12 M and upto 14 M depth -do- -doConstructing on sewer brick masonary trapezoidal manhole
1.5M x 0.9M at bottom and 0.9M x 0.45M at top, including C.I.
EHD airtight rectangular frame and cover weighing minimum
225 kg . complete as per description in Item No.SE-6-1 depth
upto 1.2M
Extra for above manhole above 1.2M and upto 2.3M depth doConstructing on sewer brick masonary trapezoidal manhole
1.5M x 1.2M at bottom and 0.9M x 0.6M at top, including C.I.
EHD airtight rectangular frame and cover weighing minimum
270 kg . complete as per description in Item No.SE-6-1 depth
upto 1.2M
Extra for above manhole above 1.2M and upto 2.3M depth doConstructing on sewer brick masonry trapezoidal manhole
1.8M x 1.5 M at bottom and 0.9 M x 0.6M at top, including C.I.
EHD airtight rectangular frame and cover weighing minimum
270 kg . complete as per description in Item No.SE-6-1 depth
2.9 M
Extra for above manhole per metre depth above 2.9M and
upto 5 M including safety chain and extra C.I steps on other
side of benching-do-doDo- -do- above 5 M depth and upto 9 M depth -do- -doDo- -do- above 9M and upto 11M depth
-do- -doDo- -do- above 11 M and upto 12 M depth -do -doDo- -do- above 12 M and upto 14 M depth -do- -do-
m.depth
m.depth
m.depth
38910.00
45079.00
46903.00
Each
36869.00
m.depth
11716.00
Each
42572.00
Each
12511.00
Each
77276.00
m.depth
28116.00
m.depth
m.depth
m.depth
m.depth
39464.00
46361.00
68945.00
85426.00
SE-6-4
SE-6-4-a
SE-6-5
SE-6-5-a
SE-6-6
SE-6-6-a
SE-6-6-b
SE-6-6-c
SE-6-6-d
SE-6-6-e
12
SE SCHEDULE 2013
Manholes
ITEM CODE
SE-6-7
SE-6-7-a
SE-6-7-b
SE-6-7-c
SE-6-7-d
SE-6-8
SE-6-8-a
SE-6-8-b
SE-6-8-c
SE-6-8-d
SE-6-8-e
SE-6-9
ITEM DESCRIPTION
UNIT
RATE
Each
168169.00
Extra per metre depth of the above manhole -do- -do- as per
m.depth
above item -do- -do- from 4.5 to 9M depth.
Do- -do- above from 9M and upto 11M depth -do- -dom.depth
Do- -do- above from 11 M and upto 12 M depth -do -dom.depth
Do- -do- above 12 M and upto 14 M depth -do- -dom.depth
Constructing on sewer brick masonry scraper manhole 1.5M
x 1.5 M at bottom and 1.2 M x 0.9M at top, including C.I. EHD
airtight rectangular frame and cover weighing minimum 900 kg
. complete as per description in Item No.SE-6-1 depth 2.9 M
Extra for above manhole per metre depth above 2.9M and
upto 5 M including safety chain and extra C.I steps on other
side of benching-do-doDo- -do- above 5 M depth and upto 9 M depth -do- -doDo- -do- above 9M and upto 11M depth
-do- -doDo- -do- above 11 M and upto 12 M depth -do -doDo- -do- above 12 M and upto 14 M depth -do- -doConstructing on sewer brick masonry scraper manhole 1.8M x
1.5M at bottom and 1.2M x 0.9M at top , including C.I. EHD
airtight rectangular frame and cover weighing minimum 900 kg
etc. complete as per description in item No. SE-6-1 depth upto
2.9M
13
39765.00
51394.00
59098.00
59802.00
Each
116078.00
m.depth
23611.00
m.depth
m.depth
m.depth
m.depth
33055.00
38797.00
57623.00
60795.00
Each
123777.00
SE SCHEDULE 2013
Manholes
ITEM CODE
SE-6-9-a
SE-6-9-b
SE-6-9-c
SE-6-9-d
SE-6-9-e
SE-6-10
SE-6-10-a
SE-6-10-b
SE-6-10-c
SE-6-10-d
SE-6-10-e
SE-6-11
SE-6-11-a
SE-6-11-b
SE-6-11-c
SE-6-11-d
SE-6-12
SE-6-12-a
SE-6-12-b
SE-6-12-c
SE-6-12-d
SE-6-13
SE-6-13-a
SE-6-13-b
ITEM DESCRIPTION
Extra for above manhole per metre depth above 2.9M and
upto 5 M including safety chain and extra C.I steps on other
side of benching-do-doDo- -do- above 5 M and upto 9 M depth - do- -doDo- -do- above 9 M and upto 11M depth -do- -doDo- -do- above 11 M and upto 12 M depth -do -doDo- -do- above 12 M and upto 14 M depth -do- -doConstructing on sewer brick masonry scraper manhole 1.8M x
1.8M at bottom and 1.2M x 0.9M at top , including C.I.
Rectangular EHD airtight frame and cover weighing minimum
900 kg etc. complete as per description in item No. SE-6-1
depth upto 2.9M
Extra for above manhole per metre depth above 2.9M and
upto 5 M including safety chain and extra C.I steps on other
side of benching-do-doDo- -do- above 5 M and upto 9 M depth - do- -doDo- -do- above 9 M and upto 11M depth -do- -doDo- -do- above 11 M and upto 12 M depth -do -doDo- -do- above 12 M and upto 14 M depth -do- -doConstructing brick masonary scraper type manhole on sewer
2.4M x 1.5M at bottom and 1.2M x 0.9M at top built in brick
masonary in C.M. 1:3 -do- -do- as per item No. SE-6-8
including C.I. Rectangular EHD air tight frame and cover
(
weighing minimum 900 kg ), safety chain and extra C.I. steps,
depth upto 4.5M
Extra for above manhole per metre depth above 4.5M and
upto 9M depth.
-do- -do- 9 M to 11M depth
-do- -do- 11 M to 12M depth
Do- -do- above 12 M and upto 14 M depth -do- -doConstructing brick masonary scraper type manhole on sewer
2.4M x 2.4M at bottom and 1.2M x 0.9M at top built in brick
masonary in C.M. 1:3 -do- -do- as per item no. SE-6-8
including C.I. Rectangular EHD airtight frame and cover
weighing minimum 900 kg, safety chain and extra C.I. steps,
depth upto 4.5 M.
Extra for above manhole above 4.5M to 9M depth
-do- -do- 9 M to 11 M depth
-do- -do- 11 M to 12 M depth
Do- -do- above 12 M and upto 14 M depth -do- -doConstructing brick masonary scraper type manhole on sewer
3M x 2M at bottom and 1.2M x 0.9M at top built in brick
masonary in C.M. 1:3 -do- -do- as per item no. SE-6-8
including C.I. Rectangular EHD airtight frame and cover
weighing minimum 900 kg safety chain and extra C.I steps,
depth upto 4.5 M.
Extra for above manhole above 4.5M to 9M depth
-do- -do- 9 M to 11 M depth
14
UNIT
RATE
m.depth
25341.00
m.depth
m.depth
m.depth
m.depth
37327.00
47356.00
65603.00
68403.00
Each
126949.00
m.depth
27071.00
m.depth
m.depth
m.depth
m.depth
41599.00
55915.00
73583.00
76012.00
Each
196748.00
m.depth
38291.00
m.depth
m.depth
m.depth
51552.00
58722.00
61264.00
Each
228212.00
m.depth
m.depth
m.depth
m.depth
47025.00
59557.00
67892.00
70817.00
Each
246808.00
m.depth
m.depth
48857.00
62390.00
SE SCHEDULE 2013
Manholes
ITEM CODE
ITEM DESCRIPTION
UNIT
RATE
SE-6-13-c
SE-6-13-d
m.depth
m.depth
70556.00
74724.00
Each
254152.00
m.depth
m.depth
m.depth
m.depth
64468.00
82658.00
93505.00
99377.00
Each
25180.00
SE-6-14
SE-6-14-a
SE-6-14-b
SE-6-14-c
SE-6-14-d
SE-6-15
SE-6-15-a
Extra over above per metre depth above 1.5 M. and upto 2.3
m.depth
M. depth -do- -do-
9895.00
SE-6-15-b
35529.00
SE-6-15-c
SE-6-15-d
Each
Extra for above manhole per metre depth above 2.3M and
upto 5 M including safety chain and extra copolymer steps on m.depth
other side of benching-do-doDo- -do- above 5 M & upto 9 M -do- -dom.depth
15
13101.00
14159.00
SE SCHEDULE 2013
Manholes
ITEM CODE
SE-6-15-e
SE-6-15-f
SE-6-15-g
SE-6-16
SE-6-16-a
SE-6-16-b
SE-6-16-c
SE-6-16-d
SE-6-16-e
SE-6-17
SE-6-17-a
SE-6-18
SE-6-18-a
SE-6-19
SE-6-19-a
SE-6-19-b
SE-6-19-c
SE-6-19-d
SE-6-19-e
ITEM DESCRIPTION
Do- -do- above 9.M & upto 11 M -do- -doDo- -do- above 11M & upto 12 M -do- -doDo- -do- above 12 M and upto 14 M depth -do- -doConstructing on sewer brick masonary conical manhole 1.8M
dia. at bottom 0.56M dia at top, including SFRC EHD circular
frame and cover and copolymer steps etc. complete as per
description in Item No.SE-6-15 depth upto 2.9 M
Extra for above manhole per metre depth above 2.9M and
upto 5 M including safety chain and extra copolymer steps on
other side of benching-do-doDo- -do- above 5 M. and upto 9M -do- -doDo- -do- above 9 M. and upto 11M -do- -doDo- -do- above 11M and upto 12M -do- -doDo- -do- above 12 M and upto 14 M depth -do- -doConstructing on sewer brick masonary trapezoidal manhole
1.5M x 0.9M at bottom and 0.9M x 0.45M at top, including
SFRC. EHD airtight rectangular frame and cover and
copolymer steps complete as per description in Item No.SE-615 depth upto 1.2M
Extra for above manhole above 1.2M and upto 2.3M depth doConstructing on sewer brick masonary trapezoidal manhole
1.5M x 1.2M at bottom and 0.9M x 0.6M at top, including
SFRC. EHD rectangular frame and cover and copolymer
steps complete as per description in Item No.SE-6-15 depth
upto 1.2M
Extra for above manhole above 1.2M and upto 2.3M depth doConstructing on sewer brick masonry trapezoidal manhole
1.8M x 1.5 M at bottom and 1.2 M x 0.9M at top, including
SFRC EHD rectangular frame and cover . complete as per
description in Item No.SE-6-15 depth 2.9 M
Extra for above manhole per metre depth above 2.9M and
upto 5 M including safety chain and extra copolymer steps on
other side of benching-do-doDo- -do- above 5 M depth and upto 9 M depth -do- -doDo- -do- above 9M and upto 11M depth
-do- -doDo- -do- above 11 M and upto 12 M depth -do -doDo- -do- above 12 M and upto 14 M depth -do- -do-
16
UNIT
RATE
m.depth
m.depth
m.depth
14280.00
16928.00
17646.00
Each
47057.00
m.depth
21387.00
m.depth
m.depth
m.depth
m.depth
29362.00
38910.00
45079.00
46903.00
Each
22681.00
m.depth
11716.00
Each
27108.00
m.depth
12511.00
Each
61536.00
m.depth
28116.00
m.depth
m.depth
m.depth
m.depth
39464.00
46361.00
68945.00
85426.00
SE SCHEDULE 2013
Manholes
ITEM CODE
SE-6-20
SE-6-20-a
SE-6-20-b
SE-6-20-c
SE-6-20-d
SE-6-21
SE-6-21-1
SE-6-21-2
SE-6-21-3
SE-6-21-4
SE-6-21-5
SE-6-22
SE-6-22-a
ITEM DESCRIPTION
UNIT
RATE
Each
151296.00
Extra per metre depth of the above manhole -do- -do- as per
m.depth
above item -do- -do- from 4.5 to 9M depth.
Do- -do- above from 9M and upto 11M depth -do- -dom.depth
Do- -do- above from 11 M and upto 12 M depth -do -dom.depth
Do- -do- above 12 M and upto 14 M depth -do- -dom.depth
Constructing on sewer brick masonry scraper manhole 1.5M
x 1.5 M at bottom and 1.2 M x 0.9M at top, including SFRC
EHD rectangular frame and cover and copolymer steps.
complete as per description in Item No.SE-6-15 depth 2.9 M
Extra for above manhole per metre depth above 2.9M and
upto 5 M including safety chain and extra copolymer steps on
other side of benching-do-doDo- -do- above 5 M depth and upto 9 M depth -do- -doDo- -do- above 9M and upto 11M depth
-do- -doDo- -do- above 11 M and upto 12 M depth -do -doDo- -do- above 12 M and upto 14 M depth -do- -doConstructing on sewer brick masonry scraper manhole 1.8M x
1.5M at bottom and 1.2M x 0.9M at top , including SFRC
Rectangular EHD frame and cover and copolymer steps.
complete as per description in item No. SE-6-15 depth upto
2.9M
Extra for above manhole per metre depth above 2.9M and
upto 5 M including safety chain and extra co-polymer steps on
other side of benching-do-do-
17
39765.00
51394.00
59098.00
59802.00
Each
58097.00
m.depth
23611.00
m.depth
m.depth
m.depth
m.depth
33055.00
38797.00
57623.00
60795.00
Each
65796.00
m.depth
25341.00
SE SCHEDULE 2013
Manholes
ITEM CODE
ITEM DESCRIPTION
UNIT
RATE
SE-6-22-b
SE-6-22-c
SE-6-22-d
SE-6-22-e
Do- -do- above 5 M and upto 9 M depth - do- -doDo- -do- above 9 M and upto 11M depth -do- -doDo- -do- above 11 M and upto 12 M depth -do -doDo- -do- above 12 M and upto 14 M depth -do- -doConstructing on sewer brick masonry scraper manhole 1.8M x
1.8M at bottom and 1.2M x 0.9M at top , including SFRC.
Rectangular EHD frame and cover and copolymer steps
complete as per description in item No. SE-6-15 depth upto
2.9M
Extra for above manhole per metre depth above 2.9M and
upto 5 M including safety chain and extra copolymer steps on
other side of benching-do-doDo- -do- above 5 M and upto 9 M depth - do- -doDo- -do- above 9 M and upto 11M depth -do- -doDo- -do- above 11 M and upto 12 M depth -do -doDo- -do- above 12 M and upto 14 M depth -do- -doConstructing brick masonary scraper type manhole on sewer
2.4M x 1.5M at bottom 1.2M x 0.9M at top built in brick
masonary in C.M. 1:3 -do- -do- as per item No. SE-6-8
including SFRC. Rectangular EHD frame and cover and
copolymer steps, safety chain and extra steps, depth upto
4.5M
Extra for above manhole per metre depth above 4.5M and
upto 9M depth.
-do- -do- 9 M to 11M depth
-do- -do- 11 M to 12M depth
Do- -do- above 12 M and upto 14 M depth -do- -doConstructing brick masonary scraper type manhole on sewer
2.4M x 2.4M at bottom and 1.2M x 0.9M at top built in brick
masonary in C.M. 1:3 -do- -do- as per item no. SE-6-17
including SFRC Rectangular EHD frame and cover with
copolymer steps, safety chain and extra steps, depth upto 4.5
M.
Extra for above manhole above 4.5M to 9M depth
-do- -do- 9 M to 11 M depth
-do- -do- 11 M to 12 M depth
Do- -do- above 12 M and upto 14 M depth -do- -doConstructing brick masonary scraper type manhole on sewer
3M x 2M at bottom and 1.2M x 0.9M at top built in brick
masonary in C.M. 1:3 -do- -do- as per item no. SE-6-25
including SFRC Rectangular EHD frame and cover with
copolymer steps, safety chain and extra steps, depth upto 4.5
M.
Extra for above manhole above 4.5M to 9M depth
-do- -do- 9 M to 11 M depth
-do- -do- 11 M to 12 M depth
Do- -do- above 12 M and upto 14 M depth -do- -do-
m.depth
m.depth
m.depth
m.depth
37327.00
47356.00
65603.00
68403.00
Each
68967.00
m.depth
27071.00
m.depth
m.depth
m.depth
m.depth
41599.00
55915.00
73583.00
76012.00
Each
135810.00
m.depth
38291.00
m.depth
m.depth
m.depth
51552.00
58722.00
61264.00
Each
166985.00
m.depth
m.depth
m.depth
m.depth
47025.00
59557.00
67892.00
70817.00
Each
185870.00
m.depth
m.depth
m.depth
m.depth
48857.00
62390.00
70556.00
74724.00
SE-6-23
SE-6-23-a
SE-6-23-b
SE-6-23-c
SE-6-23-d
SE-6-23-e
SE-6-24
SE-6-24-a
SE-6-24-b
SE-6-24-c
SE-6-24-d
SE-6-25
SE-6-25-a
SE-6-25-b
SE-6-25-c
SE-6-25-d
SE-6-26
SE-6-26-a
SE-6-26-b
SE-6-26-c
SE-6-26-d
18
SE SCHEDULE 2013
Manholes
ITEM CODE
SE-6-27
SE-6-27-a
SE-6-27-b
SE-6-27-c
SE-6-27-d
ITEM DESCRIPTION
Constructing brick masonary scraper type manhole on sewer
3M x 3M at bottom and 1.2M x 0.9M at top built in brick
masonary in C.M. 1:3 -do- -do- as per item no.SE-6-25
including SFRC Rectangular EHD frame and cover with
copolymer steps, safety chain and extra steps, depth upto 4.5
M.
Extra for above manhole above 4.5M to 9M depth
-do- -do- 9 M to 11 M depth
-do- -do- 11 M to 12 M depth
Do- -do- above 12 M and upto 14 M depth -do- -do-
19
UNIT
RATE
Each
191756.00
m.depth
m.depth
m.depth
m.depth
64468.00
82658.00
93505.00
99377.00
Chapter -7
DROP ARRANGEMENT
SE SCHEDULE 2013
Drop Arrangement
ITEM CODE
ITEM DESCRIPTION
UNIT
RATE
SE-7-1
No
2,068
SE-7-1-a
SE-7-2
SE-7-2-a
SE-7-3
SE-7-3-a
SE-7-4
SE-7-4-a
SE-7-5
Extra over above per additional metre depth -do- -do- as per
m.depth
above item.
Do- -do- 230 mm dia stone ware pipe of SP2 class in vertical
No
drop upto 0.6M -do- -do- as per item SE-7-1
Extra over above per additional metre depth -do- -do- as per
m.depth
above item.
Do- -do- 300 mm dia stone ware pipe of SP2 class in vertical
No
drop of 0-6m -do- -do- as per item SE-7-1
Extra over above per additional metre depth -do- -do- as per
m.depth
above item.
Providing 160 mm dia HDPE pipes of PE-80 grade and PN-6
class in vertical drop of 0.6m including 160mm dia HDPE
pipes fixed in brick masonary of the manhole at required level
and providing 160mm dia HDPE right angled bend,
160mmx160mmx160mm HDPE double tee junction including
cutting and jointing as per detailed specifications,encased in
half brick thick masonary in cement mortar (1:3) all round the
pipes,double tee,bend and extra brickwork below bend upto
the foundation of the manhole and tapering portion of the
manhole plastering,plastering the exposed surfaces after
raking out the joints of the masonary to a depth of 20mm in
CM(1:2) 20mm thick and neat cement rendering so as to give
smooth surface,including plugging the openings etc complete
as directed and asper drawing in Dy CE(SP)P&D's office
No
1,460
4,012
2,252
5,157
2,839
3,874
Extra over above per additional metre depth -do- -do- as per
m.depth
above item
1,874
Do- -do- 200 mm dia HDPE pipes of PE-80 grade and PN-6
class in vertical drop of 0.6M -do- -do- as in item No.SE-7-4
5,416
20
No
SE SCHEDULE 2013
Drop Arrangement
SE-7-5-a
SE-7-6
SE-7-6-a
SE-7-7
SE-7-7-a
SE-7-8
SE-7-8-a
SE-7-9
SE-7-9-a
SE-7-10
SE-7-10-a
SE-7-11
SE-7-11-a
SE-7-12
SE-7-12-a
SE-7-13
SE-7-13-a
SE-7-14
SE-7-14-a
Extra over above per additional metre depth -do- -do- as per
m.depth
above item
2,837
Do- -do- 250 mm dia HDPE pipes of PE-80 grade and PN-6
class in vertical drop of 0.6M -do- -do- as in item No.SE-7-4
7,917
No
Extra over above per additional metre depth -do- -do- as per
m.depth
above item
3,373
Do- -do- 280 mm dia HDPE pipes of PE-80 grade and PN-6
class in vertical drop of 0.6M -do- -do- as in item No.SE-7-4
10,568
No
m.depth
Do- -do- 315 mm dia HDPE pipes of PE-80 grade and PN-6
class in vertical drop of 0.6M -do- -do- as in item No.SE-7-4
No
4,042
18,897
Extra over above per additional metre depth -do- -do- as per
m.depth
above item
4,239
Do- -do- 355 mm dia HDPE pipes of PE-80 grade and PN-6
class in vertical drop of 0.9M -do- -do- as in item No.SE-7-4
No
23,708
m.depth
6,727
No
27,428
Extra over above per additional metre depth -do- -do- as per
m.depth
above item
8,130
Do- -do- 450 mm dia HDPE pipes of PE-80 grade and PN-6
class in vertical drop of 0.9M -do- -do- as in item No.SE-7-4
31,886
No
Extra over above per additional metre depth -do- -do- as per
m.depth
above item
9,724
Do- -do- 500 mm dia HDPE pipes of PE-80 grade and PN-6
class in vertical drop of 1.2M -do- -do- as in item No.SE-7-4
35,922
No
Extra over above per additional metre depth -do- -do- as per
m.depth
above item
11,457
Do- -do- 560 mm dia HDPE pipes of PE-80 grade and PN-6
class in vertical drop of 1.2M -do- -do- as in item No.SE-7-4
40,454
No
Extra over above per additional metre depth -do- -do- as per
m.depth
above item
13,308
Do- -do- 630 mm dia HDPE pipes of PE-80 grade and PN-6
class in vertical drop of 1.2M -do- -do- as in item No.SE-7-4
45,931
No
Extra over above per additional metre depth -do- -do- as per
m.depth
above item
21
16,376
Chapter -8
INSPECTION CHAMBER
SE SCHEDULE 2013
Inspection Chambers
ITEM CODE
ITEM DESCRIPTION
UNIT
RATE
SE-8-1
No
24138.00
SE-8-1-a
SE-8-2
SE-8-2-a
SE-8-3
SE-8-3-a
SE-8-4
SE-8-4-a
Extra over above for every additional metre depth upto 2.5M m.depth
do- -do-etc. complete as specified and directed.
6914.00
28714.00
No
Extra over above for every additional metre depth upto 2.5M m.depth
do- -do- etc. complete as specified and directed.
Constructing brick masonary inspection chamber rectangular
0.75M x 0.75M and 0.6M deep -do- -do- as per description in
item no SE-8-1 including CI extra heavy duty air tight frame
No
and cover weighing minimum 275 kg complete as per plan
and directed
Extra over above for every additional metre depth upto 2.M do- -do-with necessary centering etc. all complete as per m.depth
direction.
Constructing brick masonary inspection chamber rectangular
0.6M x 0.6M and 0.6M deep -do- -do- etc. complete as per
description in item no SE-8-1 including CI extra heavy duty air
No
tight frame and cover weighing minimum 200 kg complete as
per plan and directed.
Extra over above for every additional metre depth upto 2.M do- -do-with necessary centering etc. all complete as per m depth
direction.
22
7907.00
26668.00
7923.00
22592.00
6905.00
SE SCHEDULE 2013
Inspection Chambers
SE-8-5
SE-8-5-a
SE-8-6
SE-8-6-a
SE-8-7
SE-8-7-a
SE-8-8
SE-8-8-a
No
13511.00
Extra over above for every additional metre depth upto 2.5M m.depth
do- -do- etc. complete as specified and directed.
6914.00
15419.00
No
Extra over above for every additional metre depth upto 2.5M m.depth
do- -do-.
8705.00
23576.00
No
Extra over above for every additional metre depth upto 2.M do- -do-with necessary centering etc. all complete as per m.depth
direction.
7823.00
20608.00
No
Extra over above for every additional metre depth upto 2.M - m.depth
do- -do-with necessary centering etc. all complete as per
23
6805.00
Chapter -9
VENT SHAFTS
SE SCHEDULE 2013
Vent Shafts
ITEM CODE
SE-9-1
SE-9-2
SE-9-3
SE-9-4
SE-9-5
SE-9-5-a
SE-9-6
SE-9-7
SE-9-8
ITEM DESCRIPTION
Providing R.C.C. Spun vent shaft 7.3M in height embedded in
M15 cement concrete Including flue chamber etc. complete
without excavation.The height of the vent shaft to be
measured from its bottom upto the top as per the drawing and
as specified and directed
C.I. Shoe bend 150 mm dia fixed complete including cutting
through masonary, cornices etc. and making good the same
including painting as directed.
Collar for C.I.pipes 150mm.dia.fixed complete including
painting.
Removing zinc galvanised sheet /cast iron vent shafts
including all fittings and appliances and making good the
masonary work including cornices painting and stacking the
material wherever directed etc.complete.
Removing and refixing -do-do-on the same site (for galvanised
sheet/cast iron vent shaft).
-do- -do- on different site in the same locality -do- -doBrick masonary flue chamber for vent shaft 0.375M x 0.375M x
0.6M deep of 230 mm brick wall in C.M.1:3 and 20 mm
cement and sand plaster on both sides in C.M. 1:2 finished
smooth including 150 mm M15 cement concrete bedding and
150 mm thick reinforcement concrete dhapas built complete
including excavation etc. as specified and directed
Removing & refixing of C.I. Vent shaft complete as directed
including transporting to municipal stores anywhere in
City/suburbs.
Removing & refixing of R.C.C Vent shaft complete as directed
including transporting to municipal stores anywhere in
City/suburbs.
UNIT
RATE
Each
30187.00
Each
1399.00
Each
874.00
Rmt
209.00
Rmt
419.00
Rmt
554.00
Each
4300.00
Each
3468.00
Each
12411.00
SE-9-9
Each
2081.00
SE-9-10
Each
2746.00
24
Chapter -10
IRON WORKS
SE SCHEDULE 2013
Iron Works
ITEM CODE
ITEM DESCRIPTION
UNIT
RATE
Each
382.00
Each
308.00
Each
20016.00
Each
75354.00
Each
20239.00
Each
23620.00
Each
21585.00
Each
19168.00
Each
3607.00
Each
8995.00
Each
5015.00
NOTE
Wastage in cutting will not be paid for. Only steel actually fixed
in position will be paid by linear measurement including hooks
and bends. No payment will be made for binding wire, pins,
chairs and laps and/or welding. The contractors should note
this while quoting the rates. All iron work shall be free from
rust, scale and the rate shall be inclusive of painting with 3
coats of approved make over one coat of primer to iron work.
SE-10-1
SE-10-2
SE-10-3
SE-10-4
SE-10-5
SE-10-6
SE-10-7
SE-10-8
SE-10-9
SE-10-10
SE-10-11
SE-10-12
-do- -do- 0.9M x 0.6M rectangular frame and cover. -do- -do-
Each
5926.00
SE-10-13
Mild steel in flat, round and square bar, angle tee including all
bolts washers nuts and screws, fastenings, fittings etc.
Including forming, brackets corners, treading etc. complete.
MT
65549.00
SE-10-14
MT
65411.00
25
Chapter -11
DESILTING
SE SCHEDULE 2013
Desilting
ITEM CODE
SE-11-1
SE-11-2
SE-11-3
SE-11-4
SE-11-5
SE-11-6
ITEM DESCRIPTION
Desilting functioning/non-functioning of sewers of any size
and shape upto any depth by any means including pumping
out liquid waste or sewage,plugging, diverting the flow in the
drain if necessary and stacking the removed silt in the depots
as directed within radius of 300 meters including taking
precautionary and safety measures such as test for gases
spreading bleaching powder on the depot of the removed silt
etc. complete or as directed(For payment purpose 30% voids
for silt would be deducted and for stone or boulders 40%
would be deducted on the depot measurement).
Systematically cleaning /functioning/ non-functioning sewer of
150mm dia to 230 mm dia sewer by passing ropes knots,
bamboo kamti and disc. of required size as directed and
specified including safety measures such as tests for gases,
use of safety belts, dry cell, torches, or lighting in manholes &
drains as directed and specified -do- -do- as per item No. SE11-1
Systematically cleaning /functioning/ non-functioning sewer
of300 mm dia to 600 mm dia sewer by passing ropes knots,
bamboo kamti and disc. of required size as directed and
specified including safety measures such as tests for gases,
use of safety belts, dry cell, torches, or lighting in manholes &
drains as directed and specified -do- -do- as per item No. SE11-1
Systematically cleaning / functioning / non-functioning sewer
of 700 mm dia to 1200 mm dia sewer by passing ropes
knots, bamboo kamti and disc. of required size as directed
and specified including taking necessary precautionary safety
measures such as tests for gases, use of safety belts, dry cell,
torches, for lighting in manholes & drains etc. complete
including sprinkling bleaching powder on the silt removed to
avoid bad smell -do- -do- as per item No.SE-11-1
-do- -do- 1400 mm dia to 1800 mm dia -do- -do- as per item
no SE-11-2
-do- -do- 2000 mm dia to 2400 mm dia -do- -do- as per item
no SE-11-2
26
UNIT
RATE
cum
598.00
Rmt
49.00
Rmt
70.00
Rmt
202.00
Rmt
291.00
Rmt
457.00
Chapter -12
MISCELLANEOUS
SE SCHEDULE 2013
Miscellaneous
ITEM CODE
ITEM DESCRIPTION
UNIT
RATE
SE-12-1
Sqm
46.00
SE-12-2
Sqm
1823.00
Pair
897.00
Each
999.00
Each
1531.00
Each
186.00
Each
315.00
SE-12-3
SE-12-4
SE-12-5
SE-12-6
SE-12-7
SE-12-8
SE-12-9
SE-12-10
SE-12-11
SE-12-12
SE-12-13
SE-12-14
508.00
642.00
276.00
690.00
563.00
1265.00
1668.00
SE-12-15
Nos
805.00
SE-12-16
Rmt
295.00
27
MUNICIPAL CORPORATION OF GREATER MUMBAI
SE SCHEDULE 2013
Miscellaneous
SE-12-17
Bag.
65.00
SE-12-18
Cum
1834.00
SE-12-19
Cum
714.00
28
MUNICIPAL CORPORATION OF GREATER MUMBAI
Chapter -13
MICROTUNNELING AND PIPE
JACKING
SE SCHEDULE 2013
Microtunneling Pipe Jacking
ITEM CODE
ITEM DESCRIPTION
UNIT
RATE
SE-13-1
Rmt
89362.00
800 mm dia -do- -do1000mm dia -do- -do1200 mm dia -do- -do1400 mm dia -do- -do1600 mm dia -do- -do1800 mm dia -do- -do2000 mm dia -do- -do2200 mm dia -do- -do2400 mm dia -do- -do-
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
96300.00
103033.00
117779.00
124745.00
137557.00
139753.00
144265.00
155601.00
174358.00
Rmt
15013.00
800 mm dia -do- -do1000mm dia -do- -do1200 mm dia -do- -do1400 mm dia -do- -do1600 mm dia -do- -do1800 mm dia -do- -do2000 mm dia -do- -do2200 mm dia -do- -do2400 mm dia -do- -do-
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
18165.00
22986.00
27830.00
34351.00
40530.00
57241.00
62320.00
69539.00
72373.00
SE-13-1-a
SE-13-1-b
SE-13-1-c
SE-13-1-d
SE-13-1-e
SE-13-1-f
SE-13-1-g
SE-13-1-h
SE-13-1-i
SE-13-2
SE-13-2-a
SE-13-2-b
SE-13-2-c
SE-13-2-d
SE-13-2-e
SE-13-2-f
SE-13-2-g
SE-13-2-h
SE-13-2-i
29
SE SCHEDULE 2013
Microtunneling Pipe Jacking
ITEM CODE
ITEM DESCRIPTION
UNIT
RATE
SE-13-3
Rmt
76673.00
SE-13-3-a
Rmt
86206.00
30
SE SCHEDULE 2013
Microtunneling Pipe Jacking
ITEM CODE
ITEM DESCRIPTION
UNIT
RATE
SE-13-3-b
Rmt
94874.00
SE-13-3-c
Rmt
106753.00
Rmt
0.00
Rmt
39988.00
1400 mm dia -do- -do1600 mm dia -do- -do1800 mm dia -do- -do-
Rmt
Rmt
Rmt
47691.00
56773.00
66845.00
SE-13-4
SE-13-4-a
SE-13-4-b
SE-13-4-c
31
Chapter -14
HORIZONTAL DIRECTIONAL
DRILLING AND PIPE
INSTALLATION
SE SCHEDULE 2013
Horizontal Direction Drilling and Pipe Installation
ITEM CODE
ITEM DESCRIPTION
UNIT
RATE
SE-14-1
Installation of 280mm dia (OD) HDPE pipe line (PN 6 ClassPE 80 grade: IS 14333) to correct grade and alignment using
Horizontal Directional Drilling method in any type of ground
including soft soil, mixed ground and soft/hard rock.
Rmt
32252.00
315 mm dia -do- -do355mm dia -do- -do400 mm dia -do- -do450 mm dia -do- -do500 mm dia -do- -do560 mm dia -do- -do630 mm dia -do- -do-
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
32883.00
39594.00
40720.00
42111.00
52447.00
54382.00
56973.00
Installation of 710 mm dia (OD) HDPE pipe line (PN 6 ClassPE 100 grade : IS 14333) to correct grade and alignment using
Horizontal Directional Drilling method in any type of ground
including soft soil, mixed ground and soft/hard rock.
Rmt
60521.00
800mm dia -do- -do900mm dia -do- -do1000mm dia -do- -do-
Rmt
Rmt
Rmt
64778.00
84879.00
90871.00
SE-14-1-a
SE-14-1-b
SE-14-1-c
SE-14-1-d
SE-14-1-e
SE-14-1-f
SE-14-1-g
SE-14-2
SE-14-2-a
SE-14-2-b
SE-14-2-c
32