Executive Director,
Engineering & Projects
Table of Contents
-
Face Sheet
Table of Contents
Scope
Definitions
Drafting Requirements
11
CADD Standard
12
13
19
22
Applicable Documents
27
SEEDS-II-01
Page No.
2 of 27
Scope
This standard establishes a uniform means of Computer Aided Design & Drafting (CADD)
standard used, in producing new and modifying existing SEC project engineering drawings
soft/hard copies and submitted by the contractor.
Definitions
2.1
Abbreviations and Letter Symbols: These shall be used where physical space prevents
complete spellings as in title blocks and in small drawings. Abbreviations shall only be
used when absolutely necessary and never used when the meaning is to be clear. SEC
standard Abbreviations and Letter Symbols shall be used to maintain consistency within
the SEC documents.
2.2
2.3
2.4
CADD Standard Tool: The tool that provides a unique method to apply the SEC
CADD ( SECS-Auto) standards tool.
2.5
2.6
2.7
2.8
DCC (Drawing Completion Certificate) A document bearing the names and signatures
of persons authorized, per this procedure, to certify that an Engineering Drawing meets
the applicable SEC Engineering, Design, Drafting and CADD Standards. The DCC
fulfills the approval/certification requirement in lieu of signing the drawing title block.
2.9
DCC Number: A unique number that identifies a specific DCC for the purpose of
cross-referencing the certified DCC and the Engineering Drawings covered by that DCC
and as a log number for the permanent archival of the DCC (Appendix B).
SEEDS-II-01
Page No.
3 of 27
2.10
Design Agency: Refers to any SEC organization or Contractor charged by SEC with
the responsibility of developing and/or modifying of SEC Engineering
Drawings/Documents.
2.11
Drawing Name: File system name of the Engineering Drawing in a standard SEC
format. The name format is used when transferring drawings to or from EDMS
(TSSD/TDMD).
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
SEEDS-II-01
Page No.
4 of 27
2.21
Standard Drawings: Specially prepared engineering drawings that have been preapproved by responsible SEC organization for mandatory application in the design of
SEC facilities when the information they contain applies and is appropriate during
design. The production of a Standard Drawing follows the normal production
requirements presented in this separate Standard Drawings.
2.22
2.23
Title Block: The reserved portion of a drawing containing information about the
drawing projects of Substation/Transmission and Facilities.
2.24
User: The SEC organization, which creates, controls and/or contracts engineering,
procurement and/or construction work to outside contractors is the User. If there is no
separate User organization, the Proponent is the User.
2.25
SEEDS-II-01
All Project Engineering drawings sheets from size A to E will be obtained from
TSSD/TDMD (electronic Files of Boarders will be provided by SEC).
3.1.2
3.1.3
Page No.
5 of 27
3.1.4
3.2
3.1.5
SEC color table & boarder shall be received from TSSD/TDMD with SEC
standard setting.
3.1.6
All Project Engineering drawings save setting shall be as per SEC standard.
SEEDS-II-01
3.3.1
The Drawing Control Sheet shall be prepared listing details of all As-Built
Engineering Drawings required for a particular project, listed by index and
drawing numbers in sequence.
3.3.2
The Drawing Control Sheet shall be prepared and submitted in Excel format.
SEC form no. 16758 (Appendix-H) without making any amendments in the
format.
3.3.3
The first drawing number from the allocated block of drawing numbers shall be
assigned to the Drawing Control Sheet (If only one location).
3.3.4
More then one locations in one project allocated block of drawing numbers can
be break-up as per locations and then assigned the first drawing number from the
break-up block.
3.3.5
The Drawing Control sheet Number shall be mentioned on all drawings sheets in
the reference drawings area.
3.3.6
3.3.7
3.3.8
6 of 27
3.4
3.4.1
CONTRACT NO.
INDEX
PLANT NO.
DRAWING NO.
SHEET NO.
REV. NO.
1234567
DA123
EA-123456
04 OF 05
00
3.4.2
3.4.3
E A - 123456
Drawing No.
Drawing Number
A six (6) digit identifying a drawing number shall be assigned from the allocated
block of numbers.
3.4.4
Drawing Revision
For Final Projects Drawings (as-built) submitted to TSSD/TDMD shall have
zero revision (Existing drawings shall be with next higher revisions).
SEEDS-II-01
Page No.
7 of 27
3.4.5
3.4.6
3.4.6.2
Plant numbers are two alpha and three numeric characters in length.
Example-I
Example-II
3.4.6.4
SEEDS-II-01
Example:
Page No.
8 of 27
3.4.7
3.4.6.5
When an Engineering Drawing is typical for more than one plant, then
a separate drawing shall be produced for each plant (Substations,
Transmission lines..etc.) with other new drawing number.
3.4.6.6
Drawing Index
3.4.7.1
3.4.7.2
Example-I
Example-II
transmission
line
and
The Index implies, but does not determine, a group of associated types.
Drawing Title
Details in the Title block of the drawings should be Tag Values instead of plain text.
And in the drawing wherever there is a text, which denotes reference of another
drawing like Refer Drawing No. should be used Tag Values instead of plain text.
(Appendix-D).
SEEDS-II-01
Page No.
9 of 27
Example-I
Example-II
EQUIPMENT LAYOUT
CONTROL AND SWITCHGEAR BUILDING
AL-NUZHA 115/13.8kV SUBSTATION
AL-HASA
SAUDI ARABIA
SEEDS-II-01
3.7.1
Graphic Scale, a line scale reference shall be included on both new and existing
drawing just over the title block on scale drawings. The line scale shall be
divided into units of length as determined by the scale of the drawing. Refer to
SECS-Auto for a list of graphic scales symes.
3.7.2
The SEED files and attached borders are created at 1:1 scale. Do not change the
seed file scale.
3.7.3
3.7.4
For scaled drawings, use the auto-dimensioning command where applicable and
dont drop it.
3.7.5
Do not scale down drawings, instead, rearrange the drawing or split the drawing
into two drawings.
Page No.
10 of 27
3.7.6
The setting of all SEC border files are set at (Global Origin) GO=0,0. This GO
is defined at the left bottom corner of the border. No changes are allowed in the
GO setting for all drawing types including scaled drawings.
3.7.7
3.7.8
3.7.9
Drawings may be produced to various scales, dependent upon the nature of the
drawing concerned. An enlargement scale is where the ratio is greater than 1: 1.
Full size is indicated by 1: 1 enlargement by X: 1 and reduction by 1: X Where
it is necessary to use more than one scale on a drawing, each scale shall be
clearly identified.
3.7.10 The scale chosen for a drawing depends on the size of the drawing sheet and the
size of the object to be depicted. The scale shall be large enough to permit easy
and clear interpretation. Details that is too small for clear dimensioning in the
main view(s) shall be shown in a separate view to a larger scale.
Drafting Requirements
4.1
All existing drawings (raster files) shall be revised and redrawn in an electronic format
utilizing Microstation (V8i or latest version using SEC Cad tools) ONLY, if required
for new project with higher revision.
4.2
Existing Drawing Control Sheet shall be retyped and submitted in Excel format, SEC
form no. 16758 (Appendix-H), if required for new project with the next higher revision.
4.3
Existing drawings shall be utilized for any modification of a facility. Creation of new
drawings to indicate a change in an existing facility will not be accepted. If, however,
this is unavoidable for some reason such as being too crowded or major revision
changes, then a new sheet shall be added to the existing drawing.
4.4
New drawings that are created as a continuation of an existing design are considered as
continuation drawings of that design bearing the next sequential (numeric) sheet number
of that drawing set.
4.5
When revising an existing drawing, the incorrect information on the title block including
substation/transmission/facilities description and drawing type shall be corrected or
completed.
4.6
Revision diamonds 01 shall be placed in the drawing area in such a way as to make it
possible to locate revisions quickly.
SEEDS-II-01
Page No.
11 of 27
4.7
Old revision diamonds, clouds and related notes shall be removed from the drawing.
4.8
4.9
When revising some pages of bulk drawings that have a single electronic file of the
complete set such as scope of work, the revision block of only first sheet shall indicate
the changes and revision number change. Complete set shall be submitted.
4.10
The standard north arrow symbol shall be drawn in a prominent place in the upper left
region of the drawing for all plan view drawings. It shall be drawn pointing upward, or
if unavoidable, pointing left, but shall never point right or down.
4.11
4.12
non-essential items from design, which add nothing to the accuracy, completeness and
clarity of the drawing, shall be eliminated.
4.13
4.14
Revisions on drawings may be encircled or clouded on the prescribed layer for easy
identification of the revised portion during certification and review cycle. However, for
100% As-Built drawings, all revision encirclement or clouding shall be either removed
or the level turned off prior to submitting the drawings to TSSD/TDMD.
4.15
The letter O and I shall not be used for identification symbols on the drawings, as they
are often confused with Zero and One.
4.16
4.17
Contractor should not use their companys LOGO in the SEC Engineering drawings and
in drawing control sheet. They should use the reserve place in the title block.
(Appendix-D)
4.18
5. CADD Standards
5.1
General
SEC Cad tools to be used during the preparation of as-built drawings in MicroStation.
SEEDS-II-01
Page No.
12 of 27
5.2 Requirements
To ensure maximum productivity from the SEC CADD systems, the CADD standards
parameters shall be followed.
5.2.1
All drawing files shall be created from a SEC product seed file.
5.2.2
Do not overrides or change the product seed file setups? Do not change the
working units.
5.2.3
SEC forms (borders) shall be referenced only. Do not include forms as part of
the design file. A border shall remain with the CADD drawing.
5.2.4
5.2.5
5.2.6
File design to display the drawing such as that view 1 (maximized) showing the
title block with data fields turned OFF position.
5.2.7
SEEDS-II-01
Interactive Submittal:
refers to submitting the drawings/documents/manuals
electronically through the Enterprise Drawing management System (EDMS) by means
of a workstation connection to the SEC network, interacting directly with the EDMS.
Page No.
13 of 27
6.2
Manual Submittal:
refers to submitting the drawings/documents/manuals by
transmitting all deliverables to TSSD/TDMD manually in the form of CDs or other
storage media. (Not through EDMS).
6.3
6.4
Approval/Certification
6.4.1
6.4.2
One single project has one DCC. Engineering Discipline(s) (e.g. Electrical,
Instrumentation, Communication, Piping, Mechanical, Structural, Architectural,
Civil, etc.) Have one DCC and submittal. No more than one project shall be
covered by one DCC.
6.4.3
SEEDS-II-01
6.4.3.2
6.4.3.3
Page No.
14 of 27
The full names of all the signatories, and dates, shall appear where
applicable in the title block of each drawing, as required, as well as
on the DCC. Drawn By and Checked By shall also be completed in
each drawing title block.
6.4.3.5
For revised drawings, the initials of the signatories shall appear where
applicable in the revision block of the drawing.
6.4.4
At the signing of the DCC and after affixing the Revision Approval/Certification
information, each relevant drawing electronic file shall be managed to prevent
subsequent modification until each of these files is transferred into a CD for final
submittal.
6.4.5
6.4.6
6.4.7
The signatures in the SEC Review for Drawings block of the DCC are
indicative of the reviewers familiarity with the contents of the drawings and
agreement with the design in principle. The signatures do not relieve the Design
Agency of its full responsibility for compliance with all relevant project scope,
standards, procedures, specifications, codes, contract documents, etc.
6.4.8
After the signing of the DCC, each drawing shall indicate that it is covered by
the DCC for approval/certification requirements by completing the
Approval/Certification information. The Design Agency shall include in the
block the following:
6.4.9
6.5
6.4.3.4
6.4.8.1
6.4.8.2
Submittal
All SEC new, revised, canceled and canceled/superseded Engineering Drawings shall be
submitted to the corporate engineering drawing management system (EDMS) for
permanent retention and management.
SEEDS-II-01
Page No.
15 of 27
6.5.1
Deliverables
When submitting drawings to TSSD/TDMD, the following shall be delivered
depending on the type of submittal:
6.5.1.1
6.5.1.2
6.5.2
Manual Submittal
Completed Original Form No. 15057 (Appendix -F)
Drawing Control Sheet. Form No. 16758 (Appendix-H)
Electronic Drawing/document/manual files (On CD)
Interactive Submittal
Completed Original Form No. 15057 (Appendix -F)
Drawing Control Sheet. Form No. 16758 (Appendix-H)
Generated list of processed drawings.
6.5.2.2
6.5.2.3
EE123456X.0001.0000
EE123456W.0001.0000
EE123456P.0001.0000
SEEDS-II-01
Page No.
16 of 27
6.5.3
6.5.4
Media
6.5.4.1
6.5.4.2
6.5.4.3
6.5.5
6.5.6
6.5.7
Submit the
complete
package
to
TSSD/TDMD, Room
1-200 West, Saudi Electricity Company, Eastern Area Administration
Office, Dammam & respective Area Operating Offices in Riyadh,
Jeddah & Abha.
SEEDS-II-01
6.5.7.3
6.5.7.4
6.5.7.5
17 of 27
6.6
SEEDS-II-01
6.5.7.6
6.5.7.7
6.5.7.8
When the drawings are accepted for inclusion into the EDMS,
TSSD/TDMD shall confirm such by forwarding a signed copy of the
DCC to the SEC person responsible for signing the initial submittal.
Until such confirmation is received, the TSSD/TDMD responsible for
the development of the drawings shall maintain a temporary backup
of all the submitted drawings. When confirmed as accepted, the
backups shall be deleted unless deemed justified to maintain longer.
6.5.7.9
6.5.7.10
TSSD/TDMD Approval/Verification
6.6.1
6.6.2
When an existing drawing is requested for revision, then the requester shall
allow for the Approval/Certification of the new revision by removing the
previous Approval/Certification information When possible, this task may be
carried out by TSSD/TDMD prior to releasing the drawing to the requester.
Page No.
18 of 27
6.7
DCC Number
The TSSD/TDMD certifying a Drawing Completion Certificate shall assign the
DCC number (Appendix-E).
Example
E 123456
DCC No.
6.9
Contractors Responsibilities
7.1.1
All
specified
requirements
for
Turnkey
Project
final
drawings/documents/manuals (As-built) shall be prepared as per chapter-3.
Engineering Drawings Specifications, which is submitted to CTAP or DTAP.
7.1.2
7.1.3
7.1.4 Make sure that only the latest SEC Engineering Drawing borders used for new as
well as for revised drawings.
SEEDS-II-01
7.1.5
Five (5) sets of As-Built engineering drawings, manuals and other documents
related with project shall be submitted to CTAP or DTAP for SEC record.
7.1.6
19 of 27
7.2
SEC Project Manager/Engineer is the authority to certify for filing final project
drawings and submits to TSSD/TDMD
7.2.2
7.2.3
7.2.4
Upon the project construction completion, the Project Manager/ Engineer shall
assure that good quality set of originals of as-built Engineering drawings are sent
to TSSD/TDMD before signing the Technical Completion Certificate (TCC). All
Vendors operations/maintenance manuals, performance curves, etc. and other
related documents of the project, shall be distributed by CTAP or DTAP per distribution list of
contract.
7.3
7.2.5
Verify that the submittal package is complete and that it has been prepared in
accordance with the submittal requirements as per item 6.5
7.2.6
TSSD/TDMD Responsibilities
7.3.1
7.3.2
7.3.3
7.3.4
7.3.5
SEEDS-II-01
Page No.
future
20 of 27
SEEDS-II-01
7.4.2
Prepare the engineering drawings using the latest version of SEC CADD
Standards Tools or other as provided by the Transmission Document
Management Division (TDMD).
7.4.3
Prepare and submit all engineering drawings in accordance with SEC CADD
Standards Manual and chapter-3.
7.4.4
Ensure to fill the box beneath the title block to indicate the file format type i.e.
VECTOR, EXCEL or WORD or PDF.
7.4.5
Ensure that every new drawing is prepared using the latest version of the border
from the CADD Standards Manual.
7.4.6
7.4.7
7.4.8
Request existing As-built drawings and revise these per requirement of the
project.
7.4.9
Return all unused data and drawing numbers to SEC at the completion of the
project.
Page No.
21 of 27
8.1 Instructions
8.1.1
SEEDS-II-01
8.1.1.2
The User shall ensure that only the needed amount of original and
duplicate original Engineering Drawing Data, to efficiently perform the
specified work, shall be transferred out of SEC to the Contractor.
Page No.
22 of 27
8.1.2
8.1.3
8.1.1.3
The User and the Contractor shall restrict the number of copies,
duplicate reproducible, and reference prints made of Engineering
Drawing Data on the basis of need-to-know only. Shredding beyond
recognition immediately when no longer required shall destroy all such
documents.
8.1.1.4
Transmittals
8.1.2.1
8.1.2.2
8.1.2.3
SEEDS-II-01
Page No.
23 of 27
during the time such Engineering Data is outside the secured area, it
shall be kept in locked cabinets during non-working hours. All visitors
shall be escorted.
8.1.4
SEEDS-II-01
8.1.3.2
8.1.3.3
8.1.3.4
8.1.3.5
8.1.3.6
The Contractor shall return all originals, and duplicate originals of,
Engineering Drawings/Documents Data to the User immediately, upon
completion of work or when they are no longer needed.
8.1.4.2
The
unauthorized
electronic
access
of
Engineering
Drawings/Documents Data by Contractor personnel is strictly
prohibited under any circumstances and shall be reported to the User.
Page No.
24 of 27
8.1.4.3
8.1.5
8.2
Daily and weekly back-ups are required for all electronic Engineering
Drawings/Documents Data files. Weekly back-up files shall be stored
in off-site fireproof safe(s) approved by the User and shall be kept for
the duration of the job until three (3) months after the submittal of all
the Engineering Drawings/Documents Data to the User after which all
back-ups shall be destroyed by means of mechanical shredding
equipment when approved by the User.
Responsibilities
8.2.1
8.2.2
SEEDS-II-01
Proponents
8.2.1.1
8.2.1.2
Users
8.2.2.1
8.2.2.2
8.2.2.3
25 of 27
8.2.3
8.2.2.4
8.2.2.5
8.2.2.6
8.2.3.2
8.3
8.2.3.4
8.2.3.4
Non-Compliance
In the event of Mishandling by the Contractor, or his personnel, of any SEC Engineering
Drawings/Documents Data, in the custody of the Contractor, the User, jointly with the
Proponent, shall investigate the matter and bring their findings to the attention of the
SEC contract proponent who may take appropriate action.
SEEDS-II-01
Page No.
26 of 27
Applicable Documents
Appendix A
Appendix B
Appendix C
Appendix D
Appendix E
Appendix F
Appendix G
Appendix H
Appendix J
Appendix K
Appendix L
Appendix M
Appendix N
Appendix P
Appendix Q
SEEDS-II-01
Page No.
27 of 27
APPENDIX-A
Flow Chart of Submittal & Approval/Certification
of As Built drawings of the Turnkey Project
As Built Drawings Development
By Contractor/Design Agency
Manual Submittal
Interactive Submittal
TSSD/TDMD Acknowledgement
Acknowledge Receipt Appendix-E
Assign Control Number Appendix-E
TSSD/TDMD Approval/Verification
Review for Compliance
Rejection
Return for Correction to
Contractor/Design Agency
Acceptation
Assign DCC Number Appendix-B
Acceptation letter to the Contractor
Approval/Certification
Fill Approval/Certification Information in all Drawings
Signature on Appendix-E
Prepare the Electronic Drawing File Appendix-G
Signnature on DCC Appendix-B
APPENDIX-B
Project Title
Location(s)
Contractor Name
Address
P. O. Box No.
Zip Code
City
Tel. No.
Fax No.
CERTIFICATION
Contractor's Certification
Discipline Engineer
Name
Signature
Date
Name
Signature
Date
Name
Signature
Date
Project Engineer
Certified by (SEC)
(Project Manager/Engineer)
NOTES:
1
TDMD shall attach a hardcopy print of the Electronic Drawing official count generated per 6.5.7.5
Verified By
Name
Signature
Date
APPENDIX-C
Drawing/Document Type
Drawing
Size
File Format
Requirements
List of Materials
Calculations Sheets
D or E
A, B, C, D
&E
Notes:1.
2.
All Project Documents shall be submitted for archival into SEC corporate drawing system. The Project
Documents include, but not necessarily limited to, the following: Material take-off sheets, Construction
Specifications, Operating Specifications/Instructions, Painting Specifications, Inspection Records, Equipment
Lists, Construction Schedules, Construction Bar Charts, Calculations Sheets, Meter Reading Tables,
Reports, Studies, Charts, Operation & Maintenance Manuals, Equipment Manuals, Design Criteria, Sketches,
Requisitions, Quotations, Spare Part Lists, Performance/Calibration Curves, Purchase Orders, Installation
Witness Reports, Name Plates, etc.
APPENDIX-F
Saudi Electricity Company
SUBMITTAL TYPE
Project Title
Contract No.
PTS No.
Project Type
T/L
S/S
Misc.
SUBMITTAL CONTENTS
NUMBER OF DRAWINGS
DCC Number
New
Revised
Number of CDs.
Un-Revised
Others
Cancelled
CONSULTANT/CONTRACTOR
SUBMITTED BY
Project Manager/Engineer
Name
Badge No.
Project Engineer
Department/Division
Telephone No.
Location
Fax No.
Telephone No.
P. O. Box No.
City
E-mail
Date
Signature
Date
RECEIVED BY
NOTES
Signature
Date
Zip Code
APPENDIX-G
DRAWING INDEX FILE
DETAIL-1
DETAIL-2
APPENDIX-H
Saudi Electricity Company
DRAWING NO.
AS BUILT
BY
SHEET NO.
INITIAL
REV. NO.
CONTRACT NO.
DRAFTING OFFICE
FURTHER REV.
DRAWING TITLE
NO.
PLANT NO.
INDEX
REMARKS
DATE
DRAWING NO.
COMPANY NAME
SHEET NO.
REV. NO.
OF
00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DMS
EXCEL
APPENDIX-J
Saudi Electricity Company
BADGE NO.
TELEPHONE NO.
E-MAIL ADDRESS
LOCATION
DATE
SIGNATURE
PROJECT
DESCRIPTION
DEPT./DIVISION
PROJECT TITLE
CONTRACT NO.
CONSULTANT / CONTRACTOR
PROJECT MANAGER / ENGINEER
FAX NO.
TELEPHONE NO.
ZIP CODE
CITY
P. O. BOX NO.
PLANT
NO.
INDEX
..
DRAWING NO.
SHEET
NO.
REV.
NO.
PLANT
NO.
INDEX
DRAWING NO.
RECEIVED BY
SIGNATURE
DATE
BADGE
DATE
NOTE
SHEET
NO.
REV.
NO.
APPENDIX-K
DIVISION MANAGER
TO:
FROM:
NAME
DEPT. / DIV.
DAMMAM
TEL. NO.
PROJECT DESCRIPTION
CONSULTANT / CONTRACTOR
PROJECT TITLE
NAME
LOCATION
P. O. BOX NO.
PLANT NO.
CITY
FAX NO.
PHONE NO.
CONTRACT NO.
PROJTECT
ZIP CODE
SUBSTATION
NEW
REINF/MOD.
O/H T/L
NEW
REINF/MOD.
U/G Cables
NEW
REINF/MOD.
______________
IMPORTANT
TO:
_______________
DATE
EE- ..
DATE
UPON COMPLETION OF PROJECT ALL CERTIFIED ORIGINAL DRAWINGS MUST BE TRANSMITTED WITH ENG'G.DRAWING SUBMITTAL
FORM [APPENDIX-F] TO TRANSMISSION DOCUMENT MANAGEMENT DIVISION
APPENDIX-L
LEVEL COLOR WEIGHT
DISCIPLINE
33
33
PLUMBING LINES
34
34
PLUMBING SYMBOLS
35
35
PLUMBING TEXT
CENTER LINES
36
36
SURVEY LINES
37
37
SURVEY SYMBOLS
ARCHITECTURAL LINES
38
38
SURVEY TEXT
ARCHITECTURAL SYMBOLS
39
39
TELECOMMUNICATION LINES
ARCHITECTURAL TEXT
40
40
TELECOMMUNICATION SYMBOLS
CIVIL LINES
41
41
TELECOMMUNICATION TEXT
10
10
CIVIL SYMBOLS
42
42
11
11
43
43
12
12
44
44
13
13
45
45
14
14
46
46
15
15
47
47
16
16
48
TITLE
17
17
49
DRAWING NUMBER
18
18
50
19
19
51
51
20
20
52
NOTES
21
21
HVAC LINES
53
LEGEND
22
22
HVAC SYMBOLS
54
14
23
23
HVAC TEXT
55
55
CLOUDS
24
24
IRRIGATION LINES
56
56
25
25
IRRIGATION SYMBOLS
57
57
26
26
IRRIGATION TEXT
58
27
27
MISCELLANEOUS LINES
59
28
28
MISCELLANEOUS SYMBOLS
60
29
29
MISCELLANEOUS TEXT
61
30
30
PIPING LINES
62
31
31
PIPING SYMBOLS
63
63
32
32
PIPING TEXT
APPENDIX-M
LEVEL COLOR WEIGHT
DISCIPLINE
33
142
127V BUS
TRANSFORMERS
34
142
125V BUS
MACHINES
35
142
120V BUS
FIRE EQUIPMENT
36
142
110V BUS
37
142
48V BUS
OPERATING DEVICES
38
142
24V BUS
39
142
12V BUS
MISCELLANEOUS SYMBOLS
40
40
41
135
10
10
WINDINGS INSTRUMENTS
42
136
11
11
43
137
230kV LINES
12
12
SWITCHGEARS
44
138
380kV LINES
13
13
MOTOR STARTERS
45
139
14
14
CONTROL GEAR
46
140
15
15
FUSES
47
142
16
16
48
TITLE
17
17
METERING DEVICES
49
DRAWING NUMBER
18
18
COMMUNICATIONS SYSTEMS
50
19
19
51
51
20
134
52
NOTES
21
134
53
LEGEND
22
135
54
14
23
136
55
55
CLOUDS
24
137
10
230kV BUS
56
56
25
138
12
380kV BUS
57
57
26
139
58
27
140
4.16kV BUS
59
28
141
2.4kV BUS
60
29
142
480V BUS
61
30
142
380V BUS
62
63
63
31
142
220V BUS
32
142
208kV BUS
APPR'D
NO.
DATE
2002-10-06
BY
MQR
DESCRIPTION
CHK'D
INDEX
REVISIONS
DRAWN
RIZWAN
BY:-
DATE:- 2004-10-06
CHECKED
BY:-
AMJ
DATE:- 2004-03-31
OPRG. DEPT
BY
DATE:-
ENG'G. DEPT.
DESCRIPTION
PLOT PLANS, AREA MAPS, PLAN & PROFILE, FLOW, PIPING & INSTRUMENTS DIAGRAMS,
SAFETY INSTRUCTION SHEETS, LIST OF MATERIAL AND SCOPE OF WORK.
DRUMS & VESSELS, KNOCK OUT AND APPURTENANCES, TANKS AND APPURTENANCES.
PAINT, HARDWARE
COMPRESSORS, INCLUDING GEARS, & HYDRAULIC COUPLINGS, BLOWERS, FANS VACUUM PUMP
AIR CONDITIONING, REFRIGERATION. TURBINES (PUMP TURBINE DRIVES) AIR DRYERS. *
STEEL FRAMING FOR BUILDINGS, BRIDGES, WALKS, STAIRS, PLATFORM, PIPE SUPPORTS
AND ANCHORS, PERIMETER FENCING.
ALL SPECIAL EQUIPMENT PERTAINING TO BUILDINGS, INSULATOR JET WASHING SYSTEM, STRUCTURE, OR FACILITIES
WHICH APPLY TO THAT BUILDING ALONE (SUCH AS LABORATORY AND MESS HALLS)
BY:DATE:-
APPROVAL/CERTF.
INFORMATION
NOTE:-
DDC NO.
REV. NO.
THIS DRAWING IS NOT
TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND
DATED
AS BUILT BY
DATE
DRAWING TITLE
INDEX
PLANT
INDEX KEY
DRAWING NO.
SHEET NO.
REV NO.
INDEX KEY
DMS
EXCEL
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CERT'D
APPENDIX-N
APPENDIX-Q
TECHNICAL CHECKLIST
CADD OPERATOR / DESIGNER / REPRESENTATIVE
Contract No.
Project Title:
Index No.
S. NO.
DESCRIPTION
Contractor
YES
STATUS
NO N/A
Phone No.
Signature
Date
REMARKS