Documente Academic
Documente Profesional
Documente Cultură
MISIONES
LIBERTAD 1 - LIBERTAD 2
Agenda
1. LIBERTAD 1
2. LIBERTAD 2
Objetivos
Arquitectura del sistema
Cronograma
Investigacin
El equipo
Libertad 1
DESPIECE LIBERTAD 1
TARJETAS DE POTENCIA,
COMUNICACIONES Y MEMORIA
CARA DE ANTENAS
SISTEMA DE DESPLIEGE DE
ANTENAS
BATERAS, MEMORIA SD
FRECUENCIAS DE RADIOAFICIONADO
PRUEBAS DE CAMPO
PRUEBAS DE CAMPO
PRUEBAS DE VIBRACIN
PRUEBAS DE VIBRACIN
EL TRABAJO EN EQUIPO
Cubo
satlites en 3
dispositivos
de despliegue
APOYO DE GOBIERNOS
EMPRESA PRIVADA
RIESGOS
RIESGOS
Asunto: Update: LIBERTAD 1 Close Approach Notification
Sir/Ma'am,
The United States Joint Space Operations Center (JSpOC) has updated a predicted conjunction
between LIBERTAD 1 (SCC# 31128) and SCC# 35615.
Primary Object: LIBERTAD 1 (SCC# 31128)
Secondary Object: SCC# 35615
Time of Closest Approach: 08 JUN 12 04:19 UTC
Overall miss distance: 510 meters
Radial (dU) miss distance: -66 meter
In-Track (dV) miss distance: -90 meters
Cross-track (dW) miss distance: 498 meters
Primary Radial Error (U): 7 meters
Primary In-Track Error (U): 271 meters
Primary Cross-track Error (U): 11 meters
Secondary Radial Error (U): 140 meters
Secondary In-Track Error (U): 6094 meters Secondary Cross-Track Error (U): 382 meters
MISIN SATELITAL
LIBERTAD 2
MISIN SATELITAL
LIBERTAD 2
Objetivos
Disear, Construir, Integrar y Lanzar un Cubesat 3U
Desarrollar Cargas tiles prcticas
Generar investigacin en el campo aeroespacial
Payload 2
Nanocircuitos
Control de
posicin - ADCS
Bus de Datos
C&DH
Telemetra
Comunicaciones
MDR
SRR
PDR
CDR
SIR
TRR
ORR
FRR
STANDBY
LANZAMIENTO
PLAR
CERR
March
February
2014
January
December
November
October
September
August
July
June
2013
May
April
March
February
January
December
November
October
September
August
July
June
2011
2012
May
April
March
February
January
December
November
October
September
August
July
June
May
April
December
Cronograma
2015
Libertad 2: Investigacin y
Desarrollo
Desarrollo de un sistema de adquisicin de imgenes para
Cubesats
Diseo de interfaces para la integracin de nanocircuitos en
Cubesats
Organigrama
Comit estratgico
Rafael Orduz, Reinaldo Nuez, Lucy Medina, Julia Rojas, Ral Joya
Estacin
Terrena
Gustavo
Puerto
Beatriz
Arbelez
Energa
Jess
Gonzlez
C&DH
Freddy
Daz
Paula
Lago
SEQUOIA SPACE
Comm
Camilo
Londoo
Payload
Freddy Daz
Alejandro
Garzn
Paula Lago
Jess
Gonzlez
Estudiantes
ADCS
Ronald
Hurtado
Estructura
Integracin
Ronald
Hurtado
Thermal
Alejandro
Garzn
GRACIAS