Purpose
2014 Construction Meeting #8
Distribution/Attendance:
City of Ithaca
Downtown Ithaca Alliance
Sasaki Associates
Labella Associates
Vacri Construction / ACP
Power & Construction Group
Verizon
NYSEG Gas
DDS
NYSEG Electric
End
11:00 AM
Next Time
10:00 AM
Prepared By
Jessica Buckley
Location
Commons Project Office 215 East State St Ithaca, NY
(Present at meeting unless noted: A absent)
Michael Kuo, Jessica Buckley, Nicole Mason
Tammy Baker
Susannah Ross (A), Eamonn Hutton (A)
Dan Walker, James Matzat (A)
Ralph Avery, Andy Breznay, Matt Thomas (A), Roberto DeVincentis (A),
Bob Belavigna - ACP
Lou Zupan, Bill Planert (A), Brian Planert (A)
James Edwards (A), Dave Comer (A)
Doug Stafford (A), Jack Barker (A), Dawn Stillwell
Jeff Bubb (A), Flint Brann
Jack Czapranski, Dennis Kuhn (A)
Item / Description
1. SITE MANAGEMENT
1.1. Thank you for being aware of site
sensitivities: Pedestrian access,
emergency access, business owner
requests, fence / safety maintenance,
coordinating with each other, etc.
1.2. Meeting of the Minds: Optional
superintendant daily meeting at 3:00 PM
at project office to map out work
footprint & coordinate with others on site
1.3. Lockout Tagout procedures to be put in
place by Vacri for temp lighting electric
panel
1.4. Notify JB of any storm pipe removal
1.5. Vacri is to schedule temp paving of
trenches prior to the end of the week for
Cornell graduation
1.6. Lights out on N Tioga Vacri to
investigate
2. CRICTIAL PATH ITEMS
Notes
Page 1 of 3
Due
Page 2 of 3
5/20
5/27
Sidewalk demo sequence in N Tioga is
priority
City request Granite submittal from
Vacri/ACP
All contractors to keep track of valve
boxes; DDS to continue use jumping jack;
Crusher run used to backfill; DDS to
submit all backfill material proctor
DATES TO REMEMBER
ADDITIONAL NOTES
3.1