Sunteți pe pagina 1din 2

MEETING MINUTES

Ithaca Commons Repair & Upgrade Project


Date
08/12/2014

Start
10:00 AM

End
11:00 AM

Purpose
2014 Construction Meeting #21
Distribution/Attendance:
City of Ithaca
Downtown Ithaca Alliance
Sasaki Associates
Labella Associates
Vacri Construction / ACP /
Power & Construction Group
Verizon
NYSEG Gas
DDS
NYSEG Electric

C#3A Surface, C#3B Electric


Next Date
08/19/2014

Next Time
10:00 AM

Prepared By
Jessica Buckley

Location
Commons Project Office 215 East State St Ithaca, NY
(Present at meeting unless noted: A absent)
Michael Kuo, Jessica Buckley, Nicole Mason
Tammy Baker
Susannah Ross, Eamonn Hutton(A), Kimberly Michaels TWM
Dan Walker, James Matzat(A)
Ralph Avery(A), Andy Breznay, Matt Thomas(A), Roberto
DeVincentis(A), Bob Bellavigna ACP
Lou Zupan, Bill Planert
James Edwards(A), Dave Comer(A)
Doug Stafford(A), Jack Barker(A), Dawn Stillwell(A), John Mattiace(A)
Jeff Bubb(A), Flint Brann(A)
Jack Czapranski, Dennis Kuhn(A)

Item / Description
1. RFIs, SUBMITTALS
1.1. Vacri (Contract #3A):
1.1.1.Granite Coordination (#87) Granite
shops expected by 08/08; Need to
relocate conduit stubs for EX6s to
butt joint
1.1.2.Curb Sample (#99) Detail issued by
Sasaki 08/08 (Bulletin #17);
Resubmit shop drawing
1.1.3.Gateway (#106) Add to agenda for
steel meeting 08/13

1.2. P&CG (Contract #3B):


1.2.1.Lighting Submittal #13R4 EX1 poles
to be issued 08/11; EX4 fixtures and
mounting arm for EX8 not approved

Notes
Shop drawings do not seem to reflect joint
perpendicular to building edge on west
seat wall; SR to review granite seat wall
shop drawings; BB to put SR in contact
with Jim; SR to review manufactures
concern of light boxes cut into granite
steps, no concern of light box in seat wall;
Curb to be sawn on 6 sides and approved
by the City and Sasaki; Concrete will not
be poured around railing bolts; SR to
review gateway footings with DE; Vacri to
update city on helical pile schedule; Vacri
to coordinate with Verizon to relocate DB
Sasaki reviewing RFI 21; Locations of tabs
EX1 poles are to be taped off to be field
welded; SR to review anchor bolt pattern
for EX1 pole in regards to base plate being
in line with diagonal bands; SR to resend
example of EX4 junction boxes from
lighting designer for tomorrows meeting;

Page 1 of 2

Due

Catenary wire to be submitted on


2. DESIGN, FIELD DIRECTIVES
2.1. TTC Alley: Start today; Sasaki to issue
grading for alley

Electricity will be shut off on third floor


tomorrow; Water pit may have to be
moved, surveyor will layout Kiosk
tomorrow and determine if there is a
conflict;
2.2. Electric Panel & Kiosk Housekeeping Pads: NM to follow up with supplier on bolt
Vacri to relocate water meter pit per
detail
Bulletin 15
3. CRITICAL PATH ITEMS
3.1. Water Feature Vault: NYSEG to schedule
Vault installation pending gas main
crew to remove section of gas main
retirement; PCG to determine which light
poles are in conflicts gas main; MK to
notify BP when NYSEG gas will be
available to cut out old gas main
3.2. Aurora Street Gateway: Vacri to dig test
DW to review electric to gateway with BD;
pit this week to verify if pier is in conflict
with vault wall at 224 E State
3.3. Vacri (Bank Alley): Sasaki issued 18 curb
detail; Start pouring ribbon footers
3.4. NYSEG Gas: 4 flanged pipe is in; services
remaining to dig: (4) 2, (4) 4, (1)
medium pressure
3.5. NYSEG Electric: Reschedule wire pull to
Wire pull completed; Labella to send out
Aurora (targeted for 08/09)
revised service duct bank to LP
3.6. 202 E State Waterproofing: Vacri
Owner interested in replacing hatch with
submitted cost for waterproofing
air intakes
3.7. Pavilion Lighting: Meeting scheduled for
08/13
4. M&PTP: MAINTENANCE & PROTECTION
OF TRAFFIC & PEDESTRIANS
4.1. Site Maintenance: NYSEG to remove
NYSEG gas has denied responsibility of
surplus fill to re-establish site to subremoving excess fill on site, Vacri hauls
grade; All trash and debris must be
material on and off site, PCG hauled
removed on a weekly basis
excess fill from north side of E State St.