Documente Academic
Documente Profesional
Documente Cultură
DEPARTMENT
INSPECTION DATE
REPORT DATE
:
:
:
:
SR. NO
DATE
Name of the
Inspector
AREA VISITED
24-Jul-12
Y.Srinivas
TG Fabrication#1
24-Jul-12
Y.Srinivas
AHP
24-Jul-12
Y.Srinivas
AHP
ORISSA
ACTIVITY
OBSERVATION/DEVIATION
N REPORT
VATION/DEVIATION
REMEDIAL ACTION
SUGGESTED
NAME OF THE
Contractor
Sapoorji
MBPL
Asked to incorparate
MBPL
STATUS
close
close
open
RECTIFICATION
REFERENCE WITH
DATE AND SR. NO.
NAME OF PROJECT
DEPARTMENT
INSPECTION DATE
REPORT DATE
:
:
:
:
SR. NO
DATE
Name of the
Inspector
AREA VISITED
23-Jul-12
Y.Srinivas
Boiler#1
23-Jul-12
Y.Srinivas
CHP
23-Jul-12
Y.Srinivas
ESP#1
23-Jul-12
Y.Srinivas
Boiler#1
ORISSA
ACTIVITY
OBSERVATION/DEVIATION
N REPORT
VATION/DEVIATION
REMEDIAL ACTION
SUGGESTED
NAME OF THE
Contractor
BHEL/PCP
Asked to do proper
stacking.
Techpro
Golden edge
BHEL/PCP
STATUS
close
Open
close
close
RECTIFICATION
REFERENCE WITH
DATE AND SR. NO.
NAME OF PROJECT
DEPARTMENT
INSPECTION DATE
REPORT DATE
:
:
:
:
SR. NO
DATE
Name of the
Inspector
AREA VISITED
19-Jul-12
Y.Srinivas
Boiler#1
19-Jul-12
Y.Srinivas
19-Jul-12
Y.Srinivas
ESP#1
20-Jul-12
Y.Srinivas
Boiler#1
20-Jul-12
Y.Srinivas
20-Jul-12
Y.Srinivas
ESP#1
ORISSA
ACTIVITY
OBSERVATION/DEVIATION
N REPORT
VATION/DEVIATION
REMEDIAL ACTION
SUGGESTED
Repair and re
inspection
Asked to send RT for
internal inspection of
weld
Repair and re
inspection
Repair and re
inspection
-
NAME OF THE
Contractor
BHEL/PCP
RIL
BHEL/PCP
RIL
-
STATUS
Open
Open
Open
Open
Open
Closed
RECTIFICATION
REFERENCE WITH
DATE AND SR. NO.
NAME OF PROJECT
DEPARTMENT
INSPECTION DATE
REPORT DATE
:
:
:
:
SR. NO
DATE
Name of the
Inspector
AREA VISITED
14-Jul-12
Y.Srinivas
TG#2fabrication
14-Jul-12
Y.Srinivas
TG#1fabrication
14-Jul-12
Y.Srinivas
Boiler # 2
14-Jul-12
Y.Srinivas
Boiler#1
CT,ORISSA
ACTIVITY
OBSERVATION/DEVIATION
Welder test for structure no's 03 01 no's (MIG) Visual failed due to
L.F
(MIG) 01 no's (SMAW)
Welder test for structure no's 02
(MIG)
ON REPORT
VATION/DEVIATION
REMEDIAL ACTION
SUGGESTED
NAME OF THE
Contractor
Asked for RT
Petron
Asked for RT
SPCL
ed and found ok
Asked 10% RT
BHEL/UBEL
BHEL/PCPL
STATUS
Open
Open
Open
Close
RECTIFICATION
REFERENCE WITH
DATE AND SR. NO.
NAME OF PROJECT
DEPARTMENT
INSPECTION DATE
REPORT DATE
:
:
:
:
SR. NO
DATE
Name of the
Inspector
AREA VISITED
13-Jul-12
Y.Srinivas
Boiler#1
13-Jul-12
Y.Srinivas
Boiler#1
13-Jul-12
Y.Srinivas
Cw Pipeline
13-Jul-12
Y.Srinivas
RW Pipe line
CT,ORISSA
ACTIVITY
OBSERVATION/DEVIATION
ON REPORT
NAME OF THE
Contractor
VATION/DEVIATION
REMEDIAL ACTION
SUGGESTED
BHEL/PCPL
BHEL/PCPL
Gammon
Asked to attachNDT
Documents
Raunaq
STATUS
Close
Close
Close
Open
RECTIFICATION
REFERENCE WITH
DATE AND SR. NO.
NAME OF PROJECT
DEPARTMENT
INSPECTION DATE
REPORT DATE
:
:
:
:
SR. NO
DATE
Name of the
Inspector
AREA VISITED
12-Jul-12
Y.Srinivas
Boiler # 1
12-Jul-12
Y.Srinivas
12-Jul-12
Y.Srinivas
RW Pipe line
12-Jul-12
Y.Srinivas
Cw Pipeline
12-Jul-12
Y.Srinivas
CHP
CT,ORISSA
ACTIVITY
OBSERVATION/DEVIATION
ON REPORT
VATION/DEVIATION
REMEDIAL ACTION
SUGGESTED
NAME OF THE
Contractor
BHEL/UBEL
on done found ok
FDPS
on done found ok
Raunaq
Gammon
nd rectified on site
Raunaq
STATUS
Open
Close
Close
Close
Close
RECTIFICATION
REFERENCE WITH
DATE AND SR. NO.
NAME OF PROJECT
DEPARTMENT
INSPECTION DATE
REPORT DATE
:
:
:
:
SR. NO
DATE
Name of the
Inspector
AREA VISITED
11-Jul-12
Y.Srinivas
Boiler # 2
11-Jul-12
Y.Srinivas
11-Jul-12
Y.Srinivas
RW Pipe line
11-Jul-12
Y.Srinivas
Cw Pipeline
CT,ORISSA
ACTIVITY
OBSERVATION/DEVIATION
R.T Interpretation
Material inspection
MDCC,T.C,Phsical&visual
Inspection done found ok
ON REPORT
VATION/DEVIATION
REMEDIAL ACTION
SUGGESTED
NAME OF THE
Contractor
Asked to
grind&reshoot
BHEL/UBEL
T.C,Phsical&visual
on done found ok
FDPS
Raunaq
Gammon
STATUS
Open
Close
Open
Close
RECTIFICATION
REFERENCE WITH
DATE AND SR. NO.
NAME OF PROJECT
DEPARTMENT
INSPECTION DATE
REPORT DATE
:
:
:
:
SR. NO
DATE
Name of the
Inspector
AREA VISITED
10-Jul-12
Ratna
TG#2fabrication
10-Jul-12
Ratna
TG#1fabrication
10-Jul-12
Ratna
Boiler # 2
10-Jul-12
Y.Srinivas
Boiler#1
10-Jul-12
Y.Srinivas
Boiler#1
10-Jul-12
Y.Srinivas
Cw Pipeline
10-Jul-12
Y.Srinivas
RW Pipe line
CT,ORISSA
ACTIVITY
OBSERVATION/DEVIATION
Welder test for structure no's 03 01 no's (MIG) Visual failed due to
L.F
(MIG) 01 no's (SMAW)
Welder test for structure no's 02
(MIG)
ON REPORT
VATION/DEVIATION
REMEDIAL ACTION
SUGGESTED
NAME OF THE
Contractor
Asked for RT
Petron
Asked for RT
SPCL
ed and found ok
Asked 10% RT
BHEL/UBEL
BHEL/PCPL
BHEL/PCPL
Gammon
Asked to attachNDT
Documents
Raunaq
STATUS
Open
Open
Open
Close
Close
Close
Open
RECTIFICATION
REFERENCE WITH
DATE AND SR. NO.
NAME OF PROJECT
DEPARTMENT
INSPECTION DATE
REPORT DATE
:
:
:
:
SR. NO
DATE
Name of the
Inspector
9-Jul-12
Ratna
9-Jul-12
Ratna
9-Jul-12
Ratna
9-Jul-12
Y.Srinivas
9-Jul-12
Y.Srinivas
9-Jul-12
Y.Srinivas
9-Jul-12
Y.Srinivas
DAILY INSPECTION R
ACTIVITY
TG#2fabrication
TG#1fabrication
Boiler # 2
Boiler#1
Boiler#1
Cw Pipeline
RW Pipe line
OBSERVATION/DEVIATION
REMEDIAL ACTION
SUGGESTED
Asked for RT
Asked for RT
Asked 10% RT
Asked to attachNDT
Documents
NAME OF THE
Contractor
STATUS
Petron
Open
SPCL
Open
BHEL/UBEL
Open
BHEL/PCPL
Close
BHEL/PCPL
Close
Gammon
Close
RECTIFICATION
REFERENCE WITH
DATE AND SR. NO.
Raunaq
Open
NAME OF PROJECT
DEPARTMENT
INSPECTION DATE
REPORT DATE
:
:
:
:
SR. NO
DATE
Name of the
Inspector
6-Jul-12
Ratna
6-Jul-12
Ratna
6-Jul-12
Ratna
6-Jul-12
Y.Srinivas
6-Jul-12
Y.Srinivas
6-Jul-12
Y.Srinivas
6-Jul-12
Y.Srinivas
6-Jul-12
B.Babu
DAILY INSPECTION R
ACTIVITY
TG#2fabrication
Boiler # 2
TG#2fabrication
Boiler#1
Boiler#1
Cw Pipeline
Material inspection
Cooling Tower
OBSERVATION/DEVIATION
REMEDIAL ACTION
SUGGESTED
Asked for RT
Asked to Complete
NDT
NAME OF THE
Contractor
STATUS
Petron
Open
BHEL/UBEL
Open
Petron
Open
BHEL/PCPL
Close
BHEL/PCPL
Close
Gammon
Open
RECTIFICATION
REFERENCE WITH
DATE AND SR. NO.
New Fire
Open
Paharpur
Close
NAME OF PROJECT
DEPARTMENT
INSPECTION DATE
REPORT DATE
:
:
:
:
SR. NO
DATE
Name of the
Inspector
5-Jul-12
Ratna
5-Jul-12
Ratna
5-Jul-12
Ratna
DAILY INSPECTION R
ACTIVITY
Boiler#2
Boiler#2
TG#2fabrication
OBSERVATION/DEVIATION
REMEDIAL ACTION
SUGGESTED
Visually passed
Asked for RT
Repair and re
inspection
NAME OF THE
Contractor
STATUS
BHEL/UBEL
Open
BHEL/UBEL
Close
Petron
Open
RECTIFICATION
REFERENCE WITH
DATE AND SR. NO.
NAME OF PROJECT
DEPARTMENT
INSPECTION DATE
REPORT DATE
:
:
:
:
SR. NO
DATE
Name of the
Inspector
4-Jul-12
Ratna
4-Jul-12
Ratna
4-Jul-12
Ratna
4-Jul-12
Y.Srinivas
4-Jul-12
Y.Srinivas
4-Jul-12
B.Babu
4-Jul-12
B.Babu
4-Jul-12
B.Babu
DAILY INSPECTION R
ACTIVITY
Boiler#2
ESP # 2
TG#2fabrication
Boiler#1
Boiler#1
D.M. Tank-B
TG#1 fabrication
CHP
Reviewed RA bill -8
OBSERVATION/DEVIATION
REMEDIAL ACTION
SUGGESTED
Retest
Retest
NAME OF THE
Contractor
STATUS
BHEL/UBEL
Open
BHEL/UBEL
Close
Petron
Close
BHEL/PCPL
Open
BHEL/PCPL
Open
Ion exchange
Close
RECTIFICATION
REFERENCE WITH
DATE AND SR. NO.
SPCL
Close
Tecpro
Close
NAME OF PROJECT
DEPARTMENT
INSPECTION DATE
REPORT DATE
:
:
:
:
SR. NO
DATE
Name of the
Inspector
3-Jul-12
Ratna
3-Jul-12
Ratna
3-Jul-12
Ratna
3-Jul-12
Y.Srinivas
3-Jul-12
Y.Srinivas
3-Jul-12
B.Babu
DAILY INSPECTION R
ACTIVITY
Boiler#2
Boiler#2
TG#1fabrication
Boiler#1
TG#1fabrication
OBSERVATION/DEVIATION
REMEDIAL ACTION
SUGGESTED
Retest
reshoot and re
inspection
NAME OF THE
Contractor
STATUS
BHEL/UBEL
Open
BHEL/UBEL
Close
Petron
Close
BHEL
Close
RIL
Open
SPCL
Close
RECTIFICATION
REFERENCE WITH
DATE AND SR. NO.
NAME OF PROJECT
DEPARTMENT
INSPECTION DATE
REPORT DATE
:
:
:
:
SR. NO
DATE
Name of the
Inspector
2-Jul-12
Ratna
2-Jul-12
Ratna
2-Jul-12
Ratna
2-Jul-12
Ratna
2-Jul-12
Ratna
2-Jul-12
Y.Srinivas
2-Jul-12
B.Babu
2-Jul-12
B.Babu
2-Jul-12
B.Babu
10
2-Jul-12
B.Babu
11
2-Jul-12
B.Babu
DAILY INSPECTION R
ACTIVITY
Boiler#2
Boiler#2
Boiler#2
TG#1fabrication
TG#1fabrication
TG#1fabrication
D.M. Tank- A
DGAW Tank
Material inspection
D.M. Plant
Material inspection
OBSERVATION/DEVIATION
REMEDIAL ACTION
SUGGESTED
Retest
Asked for RT
Repair and
reinspection
NAME OF THE
Contractor
STATUS
BHEL/UBEL
Open
BHEL/UBEL
Close
BHEL/RIPPL
Close
Petron
Open
Petron
Open
Sapoorji
Open
RECTIFICATION
REFERENCE WITH
DATE AND SR. NO.
ion exchange
Open
RIL
Close
ion exchange
Close
RIL
Close
ion exchange
Close