Sunteți pe pagina 1din 12

EHV/HV Cable Sheath Earthing

EHV/HV Cable Sheath Earthing:


Introduction:

In urban areas, high voltage underground cables are commonly used for the transmission and distribution of
electricity. Such high voltage cables have metallic sheaths or screens surrounding the conductors, and/or armour
and metallic wires surrounding the cables. During earth faults applied to directly earthed systems, these metallic
paths are expected to carry a substantial proportion of the total fault current, which would otherwise flow through
the general mass of earth, while returning to system neutrals. These alternative return paths must be considered
when determining the extent of the grid potential rise at an electrical plant due to earth faults.

For safety and reliable operation, the shields and metallic sheaths of power cables must be grounded. Without
grounding, shields would operate at a potential considerably above ground. Thus, they would be hazardous to
touch and would cause rapid degradation of the jacket or other material intervening between shield and
ground. This is caused by the capacitive charging current of the cable insulation that is on the order of 1 mA/ft of
conductor length.

This current normally flows, at power frequency, between the conductor and the earth electrode of the cable,
normally the shield. In addition, the shield or metallic sheath provides a fault return path in the event of insulation
failure, permitting rapid operation of the protection devices.

In order to reduce Circulating current and electric potential difference between the sheathings of single core
three-phase cables, the sheathing is grounded and bonded at one or both ends of the cables. If the cable is long,
double bonding has to be carried out which leads to circulating currents and increased total power loss. Raising
the sheaths resistance, by decreasing its cross section and increasing its resistivity, can reduce this almost to the
level of the core losses.

However, in case of an earth fault, a considerable portion of the fault current flows through the increased sheath
resistance, creating much higher power in the sheaths than in the faulty core. A simple solution, a conductor rod
buried into the soil above or under the cable can divert this power from the sheaths.

Cable Screen:
(1) Purpose of cable screen:

Cable screen controls the electric field stress in the cable insulation.

Cable Screen Provides return path for Cable neutral and fault current.

If the screen is earthed at two ends than it provides Shielding for electromagnetic radiation.

Enclosing dangerous high voltage with earth potential for safety.

(2) Purpose of bonding cable screens at both ends:

The electric power losses in a cable circuit are dependent on the currents flowing in the metallic sheaths of the
cables so by reducing the current flows in metallic sheath by different methods of bonding we can increases the
load current carrying capacity (ampacity) of the cable.

It provides low impedance fault current return path and provides neutral point for the circuit.
It provides shielding of electromagnetic field.

(3) Induced voltage & circulating circulating current in cable screen:

Electromagnetic coupling between the core and screen Electromagnetic screen.

If the cable screen is single point bonded, no electrical continuity and mmf generates a voltage.

If the cable screen is bonded at both ends, the mmf will cause circulating current to flow if there is electrical
continuity.

The circulating current produces an opposing magnetic field.

Suitable bonding method should be employed to meet the standing voltage limit and keep Circulating current to
an acceptable level.

Laying Method of Cable:

The three Single core cables in a 3-phase circuit can be placed in different formations. Typical formations include
trefoil (triangular) and flat formations.

(1) Trefoil Formation:

To minimize the electromechanical forces between the cables under short-circuit conditions, and to avoid eddycurrent heating in nearby steelwork due to magnetic fields set up by load currents, the three single-core cables
comprising the three phases of a 3-phase circuit are always run clamped in Trefoil formation.

Advantage:

1.

This type of Formation minimizes the sheath circulating currents induced by the magnetic flux linking the cable
conductors and metallic sheath or copper wire screens.

2.

This configuration is generally used for cables of lower voltages (33 to 132kV) and of smaller conductor sizes.

Disadvantages:

1.

The trefoil formation is not appropriate for heat dissipation because there is an appreciable mutual heating effect
of the three cables.

2.

The cumulated heat in cables and cable trench has the effect of reducing the cable rating and accelerating the
cable ageing.

(2) Flat Formation:

This is a most common method for Laying LT Cable.

This formation is appropriate for heat dissipation and to increase cable rating.

The Formation choice is totally deepened on several factors like screen bonding method, conductor area and
available space for installation.

Type of Core and Induced Voltage:


(1) Three Core Cable:

For LT application, typically for below 11 kV.

Well balanced magnetic field from Three Phase.

Induced voltages from three phases sum to zero along the entire length of the cable.

Cable screen should be earthed at both ends

Virtually zero induced voltage or circulating current under steady state operation.

(2) Single Core Cable:

For HV application, typically for 11 kV and above.

Singlecore cables neglects the use of ferromagnetic material for screen, sheath and armoring.

Induced voltage is mainly contributed by the core currents in its own phase and other two phases.If cables are
laid in a compact and symmetrical formation, induced in the screen can be minimized.

A suitable screen bonding method should be used for singlecore cables to prevent Excessive circulating current,
high induced standing voltage.igh voltage.

Accessories for HT Cable Sheath Bonding:


(1) Function of Link Box?

Link Box is electrically and mechanically one of the integral accessories of HV underground above ground cable
bonding system, associated with HV XLPE power cable systems.

Link boxes are used with cable joints and terminations to provide easy access to shield breaks for test purposes

and to limit voltage build-up on the sheath

Lightning, fault currents and switching operations can cause over voltages on the cable sheath. The link box
optimizes loss management in the cable shield on cables grounded both sides.

In HT Cable the bonding system is so designed that the cable sheaths are bonded and earthed or with SVL in
such way as to eliminate or reduce the circulating sheath currents.

Link Boxes are used with cable joints and terminations to provide easy access to shield breaks for test purposes
and to limit voltage build-up on the sheath. The link box is part of bonding system, which is essential of improving
current carrying capacity and human protection.

(2) Sheath Voltage Limiters (SVL) (Surge Arrestors):

SVL is protective device to limit induce voltages appearing on the bonded cable system due to short circuit.

It is necessary to fit SVLs between the metallic screen and ground inside the link box. The screen separation of
power cable joint (insulated joint) will be protected against possible damages as a result of induced voltages
caused by short circuit/break down.

Type of Sheath Bonding for HT Cable:


There is normally Three Type of Bonding for LT/HT Cable Screen.
(1) Single Point Bonded.
1.

One Side Single Point Bonded System.

2.

Split Single Point Bonded System.

(2) Both End Bonded System


(3) Cross Bonded System

(1) Single point bonded system:


(A) One Side Single Bonded System:

A system is single point bonded if the arrangements are such that the cable sheaths provide no path for the flow
of circulating currents or external fault currents.

This is the simplest form of special bonding. The sheaths of the three cable sections are connected and grounded
at one point only along their length. At all other points there will be a voltage between sheath and ground and
between screens of adjacent phases of the cable circuit that will be at its maximum at the farthest point from the
ground bond.

This induced voltage is proportional to the cable length and current. Single-point bonding can only be used for
limited route lengths, but in general the accepted screen voltage potential limits the length

The sheaths must therefore be adequately insulated from ground. Since there is no closed sheath circuit, except
through the sheath voltage limiter, current does not normally flow longitudinally along the sheaths and no sheath
circulation current loss occurs.

Open circuit in cable screen, no circulating current.

Zero volt at the earthed end, standing voltage at the unearthed end.

Optional PVC insulated earth continuity conductor required to provide path for fault current, if returning from earth
is undesirable, such as in a coal mine.

SVL installed at the unearthed end to protect the cable insulation during fault conditions.

Induced voltage proportional to the length of the cable and the current carried in the cable .

Zero volt with respect to the earth grid voltage at the earthed end, standing voltage at the unearthed end.

Circulating current in the earthcontinuity conductor is not significant, as magnetic fields from phases are partially
balanced.

The magnitude of the standing voltage is depended on the magnitude of the current flows in the core, much
higher if there is an earth fault.

High voltage appears on the unearthed end can cause arcing and damage outer PVC sheath.

The voltage on the screen during a fault also depends on the earthing condition.

Standing voltage at the unearthed end during earth fault condition.

During a ground fault on the power system the zero sequence current carried by the cable conductors could
return by whatever external paths are available. A ground fault in the immediate vicinity of the cable can cause a
large difference in ground potential rise between the two ends of the cable system, posing hazards to personnel
and equipment.

For this reason, single-point bonded cable installations need a parallel ground conductor, grounded at both
ends of the cable route and installed very close to the cable conductors, to carry the fault current during ground
faults and to limit the voltage rise of the sheath during ground faults to an acceptable level.

The parallel ground continuity conductor is usually insulated to avoid corrosion and transposed, if the cables are
not transposed, to avoid circulating currents and losses during normal operating conditions.

Voltage at the unearthed end during an earth fault consists of two voltage components. Induced voltage due
to fault current in the core.

Advantage:

No circulating current.

No heating in the cable screen.

Economical.

Disadvantage:

Standing voltage at the unearthed end.

Requires SVL if standing voltage during fault is excessive.


Requires additional earth continuity conductor for fault current if earth returned current is undesirable. Higher
magnetic fields around the cable compared to solidly bonded system.

Standing voltage on the cable screen is proportional to the length of the cable and the magnitude of current in the
core.

Typically suitable for cable sections less than 500 m, or one drum length.

(B) Split Single Point-bonded System:

It is also known as double length single point bonding System.

Cable screen continuity is interrupted at the midpoint and SVLs need to be fitted at each side of the isolation joint.

Other requirements are identical to singlepointbonding system like SVL, Earth continuity Conductor,
Transposition of earth continuity conductor.

Effectively two sections of singlepointbonding.

No circulating current and Zero volt at the earthed ends, standing voltage at the sectionalizing joint.

Advantages:

No circulating current in the screen.

No heating effect in the cable screen.

Suitable for longer cable section compared to singlepointbonding system and solidly bonded single-core
system.

Economical.

Disadvantages:

Standing voltage exists at the screen and sectionalizing insulation joint.

Requires SVL to protect the unearthed end.

Requires separate earth continuity conductor for zero sequence current.

Not suitable for cable sections over 1000 m.

Suitable for 300~1000 m long cable sections, double the length of singlepointbonding system.

(2) Both End Solidly Bonded (Single-core cable) systems.

Most Simple and Common method.

To eliminate the induced voltages in Cable Screen is to bond (Earth) the sheath at both ends of the cable circuit.

This eliminates the need for the parallel continuity conductor used in single bonding systems. It also eliminates

Cable screen is bonded to earth grids at both ends (via link box).

the need to provide SVL, such as that used at the free end of single-point bonding cable circuits

Significant circulating current in the screen Proportional to the core current and cable length and de rates cable.

Could lay cable in compact trefoil formation if permissible.

Very small standing voltage in the order of several volts.

Suitable for route length of more than 500 Meter.

Advantages:

Minimum material required.

Most economical if heating is not a main issue.

Provides path for fault current, minimizing earth return current and EGVR at cable destination.

Does not require screen voltage limiter (SVL).

Less electromagnetic radiation.

Disadvantages:

Provides path for circulating current.

Heating effects in cable screen, greater losses .Cable therefore might need to be derated or larger cable
required.

Transfers voltages between sites when there is an EGVR at one site.

Can lay cables in trefoil formation to reduce screen losses .

Normally applies to short cable section of tens of meters long. Circulating current is proportional to the length of
the cable and the magnitude of the load current.

(3) Cross-bonded cable system.

A system is cross-bonded if the arrangements are such that the circuit provides electrically continuous sheath
runs from earthed termination to earthed termination but with the sheaths so sectionalized and cross-connected in
order to reduce the sheath circulating currents.

In This Type voltage will be induced between screen and earth, but no significant current will flow.

The maximum induced voltage will appear at the link boxes for cross-bonding. This method permits a cable
current-carrying capacity as high as with single-point bonding but longer route lengths than the latter. It requires
screen separation and additional link boxes.

For cross bonding, the cable length is divided into three approximately equal sections. Each of the three
alternating magnetic fields induces a voltage with a phase shift of 120 in the cable shields.

The cross bonding takes place in the link boxes. Ideally, the vectorial addition of the induced voltages results in U
(Rise) = 0. In practice, the cable length and the laying conditions will vary, resulting in a small residual voltage and
a negligible current. Since there is no current flow, there are practically no losses in the screen.

The total of the three voltages is zero, thus the ends of the three sections can be grounded.

Summing up induced voltage in sectionalized screen from each phase resulting in neutralization of induced
voltages in three consecutive minor sections.

Normally one drum length (500 m approx) per minor section.

Sectionalizing position and cable jointing position should be coincident.

Solidly earthed at major section joints.

Transpose cable core to balance the magnitude of induced voltages to be summed up.

Link box should be used at every sectionalizing joint and balanced impedance in all phases.

Induced voltage magnitude profile along the screen of a major section in the crossbonding cable system.

Virtually zero circulating current and Voltage to the remote earth at the solidly earthed ends.

In order to obtain optimal result, two crosses exist. One is Transposition of cable core crossing cable core at
each section and second is Cross bond the cable screens effectively no transposition of screen.

Cross bonding of cable screen: It is cancelled induced voltage in the screen at every major Section joint.

Transposition of cables: It is ensure voltages to be summed up have similar magnitude .Greater standing
voltage at the screen of the outer cable.

Standing voltages exist at screen and majority of section joints cable and joints must be installed as an insulated
screen system.

Requirement of transpose for cables core.

If core not transposed, not well neutralized resulting in some circulating currents.

Cable should be transposed and the screen needs to be cross bonded at each sectionalizing joint position for
optimal neutralization

Advantage:

Not required any earth continuity conductor.

Virtually zero circulating current in the screen.

Standing voltage in the screen is controlled.

Technically superior than other methods.

Suitable for long distance cable network.

Disadvantage:

Technically complicated.

More expensive.

Bonding Method Comparison:

Earthing Method

Standing
Voltage
at Cable
End

Sheath
Voltage
Limiter
Required

Single End Bonding

Yes

Yes

Up to 500 Meter

Double End
Bonding

No

No

Up to 1 Km and
Substations short connections,
hardly applied for HV cables,
rather for MV and LV cables

Only at
cross
bonding
points

Yes

Long distance connectionswhere


joints are required

Cross Bonding

Application

Sheath Losses according to type of Bonding:

Sheath losses are current-dependent losses and are generated by the induced currents when load current flows
in cable conductors.

The sheath currents in single-core cables are induced by transformer effect; i.e.by the magnetic field of
alternating current flowing in cable conductor which induces voltages in cable sheath or other parallel conductors.

The sheath induced electromotive forces (EMF) generate two types of losses: circulating current losses (Y1) and
eddy current losses (Y2), so the total losses in cable metallic sheath are: Y= Y1+Y2

The eddy currents circulating radially and longitudinally of cable sheaths are generated on similar principles of
skin and proximity effects i.e. they are induced by the conductor currents, sheath circulating currents and by
currents circulating in close proximity current carrying conductors.

They are generated in cable sheath irrespective of bonding system of single core cables or of three-core cables

The eddy currents are generally of smaller magnitude when comparing with circuit (circulating) currents of solidly
bonded cable sheaths and may be neglects except in the case of large segmental conductors and are calculated
in accordance with formulae given in the IEC60287.

Circulating currents are generated in cable sheath if the sheaths form a closed loop when bonded together at the
remote ends or intermediate points along the cable route.

These losses are named sheath circulating current losses and they are determined by the magnitude of current in
cable conductor, frequency, mean diameter, the resistance of cable sheath and the distance between single-core
cables.

Conclusion:

There is much disagreement as to whether the cable shield should be grounded at both ends or at only one end.
If grounded at only one end, any possible fault current must traverse the length from the fault to the grounded
end, imposing high current on the usually very light shield conductor. Such a current could readily damage or
destroy the shield and require replacement of the entire cable rather than only the faulted section.

With both ends grounded, the fault current would divide and flow to both ends, reducing the duty on the shield,
with consequently less chance of damage.

Multiple grounding, rather than just grounding at both ends, is simply the grounding of the cable shield or sheath
at all access points, such as manholes or pull boxes. This also limits possible shield damage to only the faulted
section.

References:
1.

Mitton Consulting.

2.

EMElectricals

Email

Twitter1

Like this:
Like
Be the first to like this post.

FILED UNDER UNCATEGORIZED

About Jignesh.Parmar
Electrical engineer having more than 10 years experience in Power Transmission, Power Distribution, Electrical
Maintenance,Electrical Projects.Freelancer Programmer of Advance Excel.Design useful Excel Sheets of Electrical
Engineering as per IS,NEC and IEEE codes. Technical writer for "Electrical Mirror" Magazine.Technical
Blogger.familiar with English,Hindi,Gujarati,French languages.I want to share my experience and knowledge and also
help technical enthusiasts to find suitable solutions and updating themselves about various Engineering Topics.

5 Responses to EHV/HV Cable Sheath Earthing

1.

Anand Rao says:

December 21, 2011 at 4:43 pm

Dear Jigneshji,
I am working in a 3 x 300MW Thermal Power plant. The 300MW, 20KV Generator is connected to the 400KV
switchyard thru 400/20KV trafo and we have a 315MVA, 400/220KV Inter-connecting transformer between the 400to-220KV yards.
(a) We have a 220/6.6KV 50MVA station transformer (For Start-up power) in 220KV switchyard which energises 2
Nos. 6.6KV STATION switchboards.
(b) There is also 2 Nos. of 20/6.6KV, 20MVA Unit-Aux Transformers connected to Generator terminals. These
energise 2 Nos. of 6.6KV Unit switchboards.
(c) There is a TIE-BREAKER between 6.6KV Station and 6.6KV unit switchboards.
(d) Before synchronising, 6.6KV Unit-board is charged from 6.6KV Station-board (Unit-board incomer OFF) by
closing Station-to-Unit Tie breaker and all Auxiliaries on Unit-board get power from 6.6KV Station Board.
(e) After we synchronise to 400KV grid and are generating some 30 to 40MWs, we Synch-Check across Unitincomer breaker and change-over supply from 6.6KV Station trafo to Unit-Aux Trafo and switch OFF tie-betweenUnit-and-Station. So, all Auxiliaries are now fed from Unit Aux Trafo. This is called MANUAL-CHANGE OVER.
(f) If plant trips, the unit-incomer breaker trips, the tie-between-Station-Unit recloses and all Auxiliaries are
Switched back to the Station board (FAST-CHANGEOVER).
(g) The Synch-check relay (To allow FAST-changeover) is set at 10 degrees (Phase-angle diff), 7.5% (Voltage diff)
and 0.2Hz (Freq diff).
The Synch-check relay is normally giving Synch-OK signal during normal operation (ie. with 300MW synchronised
to 400KV grid, 400/2220KV ICT is ON and Aux. on 6.6KV unit-board). Recently, synch-check relay started giving
Not-OK signal. On checking, we find minimal voltage difference (< 1%) but a Phase-angle difference of 7.3 degrees
between station and Unit trafo 6.6KV voltages even though both 400KV and 220KV grids are connected,

Unit-trafo to 6.6KV unit-board is thru Bus-duct (60 metres) and Station-Trafo to 6.6KV Station board is 800 metres
XLPE cable. Can the cable give this phase-shift we are seeing between Unit and Station boards?
Anand Rao

S-ar putea să vă placă și