Documente Academic
Documente Profesional
Documente Cultură
FECHA
Oct-14
SOLICITANTE: XXXXXXXXXXXXXXXXXXXXX
LOCALIDAD:
XXXXXXXXXXXXXXXXXXXXX
UNIDAD
CANTIDAD
P.U
CEMENTO GRIS
ton
13.42
2,163.00
29,027.46
CAL
ton
1.53
1,312.00
2,007.36
VARILLA DE 3/8''
kg
647.67
12.00
7,772.04
ALAMBRE RECOCIDO
kg
53.00
13.00
689.00
CLAVO DE 2''
kg
25.00
21.00
525.00
pzas
60.00
425.00
25,500.00
pzas
25.00
384.00
9,600.00
pzas
44.00
286.00
12,584.00
pzas
4,484.22
4.83
21,658.78
10
pzas
240.00
4.00
960.00
11
ALAMBRON
kg
358.47
15.00
5,377.05
12
m3
34.65
236.00
8,177.40
13
m3
27.86
205.00
5,711.30
14
m3
18.07
24.00
DESCRIPCION
SUB-TOTAL=
IMPORTE
433.68
130,023.07
I.V.A=
20,803.69
TOTAL=
150,826.76
GENERADORES DE OBRA
NOMBRE DE LA OBRA:
LOCALIDAD:
MUNICIPIO:
CONSTRUCCION Y EDIFICACION
CHIGNAHUPAN S.A. DE C.V.
CLAVE
PROPIETARIO
ELABORO
LOCALIZACION
CONCEPTO
EJE
LIMPIA, TRAZO Y
CONSTRUCCION)
NIVELACION
DEL
TERRENO
(AREA
TRAMO
LARGO
ANCHO
ALTO
TIPO
Oct-14
UNIDAD
PARCIAL
TOTAL
PZAS
DE
35.00
26.00
1.50
1.50
1.00
M2
910.00
16.00
910.00
M3
43.20
1.20
-
M3
0.00
M3
0.00
M3
0.00
EXCAVACION
M3
43.20
MENOS ZAPATAS
M3
1.58
43.20
41.62
T.M.A. 3/4",
desplante
1.50
1.50
0.20
16.00
M3
7.20
dado
0.45
0.45
1.00
16.00
M3
3.24
10.44
1.50
4.00
8.00
M2
48.00
dado
0.45
4.00
8.00
M4
14.40
62.40
CIM.INT.CER.
60.00 / 0.20 = 300 * 0.90 = 270 * 1.15 (desperdicio)= 310.5 ml * 0.25 = 77.63 kg
3.00
KG
77.63
232.89
CIM.INT.CER.
3.00
KG
153.73
461.19
Pgina 2 de 6
GENERADORES DE OBRA
NOMBRE DE LA OBRA:
LOCALIDAD:
MUNICIPIO:
CONSTRUCCION Y EDIFICACION
CHIGNAHUPAN S.A. DE C.V.
CLAVE
PROPIETARIO
ELABORO
LOCALIZACION
CONCEPTO
EJE
TRAMO
LARGO
ANCHO
ALTO
TIPO
Oct-14
UNIDAD
PARCIAL
TOTAL
PZAS
10.00
0.55
0.70
1.00
M3
3.85
20.00
0.55
0.70
1.00
M3
7.70
10.00
0.55
0.70
1.00
M3
3.85
20.00
0.55
0.70
1.00
M3
7.70
23.10
LATERALES
3.82X1.95
8.00
7.45
8.00
M2
59.59
LATERALES
3.72X1.95
12.00
7.25
12.00
M3
87.05
FRENTE
4.70X1.95
2.00
9.17
2.00
M2
36.66
POSTERIOR
4.70X1.95
4.00
9.17
4.00
M2
146.64
2.00
M2
15.00
344.94
4.50
14.00
M3
2.52
2.52
4.50
28.00
M2
25.20
25.20
5.2 / 0.15 = 34.67 * 0.90 = 31.20 * 1.15 (desperdicio)= 35.88 ml * 0.25 = 8.97 kg
14.00
KG
8.97
125.58
14.00
KG
13.32
186.48
1.00
M3
19.11
19.11
1.00
PZA
25.00
25.00
PION
7.50
CAST. K1
0.20
CAST. K1
0.20
0.20
CAST. K1
ACERO DE REFUERZO DIAMETRO #3 F'y=4200 KG/CM2 INCLUYE
SUMINISTRO, HABILITADO, ARMADO, TRASLAPES, GANCHOS Y
DESPERDICIO
CAST. K1
PISO
19.70
9.70
0.10
25.00
Pgina 3 de 6
GENERADORES DE OBRA
NOMBRE DE LA OBRA:
LOCALIDAD:
MUNICIPIO:
CONSTRUCCION Y EDIFICACION
CHIGNAHUPAN S.A. DE C.V.
CLAVE
PROPIETARIO
ELABORO
LOCALIZACION
CONCEPTO
EJE
TRAMO
LARGO
ANCHO
ALTO
TIPO
Oct-14
UNIDAD
PARCIAL
TOTAL
PZAS
44.00
1.00
PZA
44.00
44.00
60.00
PZA
60.00
60.00
4.00
PZAS
240.00
240.00
60.00
10.44
2.52
CEMENTO
32.07
0.37
11.80
ARENA
32.07
0.531
17.03
TON
M3
GRAVA
32.07
0.643
20.62
M3
19.11
32.07
23.10
0.33
7.62
CEMENTO
11.52
0.267
3.08
TON
CALHIDRA
11.52
0.1329
1.53
TON
ARENA
11.52
1.12
12.94
M3
BLOCK
344.94
13
4,484.22
PIEDRA BRAZA
23.10
1.5
34.65
PZAS
M3
Pgina 4 de 6
GENERADORES DE OBRA
NOMBRE DE LA OBRA:
LOCALIDAD:
MUNICIPIO:
CONSTRUCCION Y EDIFICACION
CHIGNAHUPAN S.A. DE C.V.
CLAVE
PROPIETARIO
ELABORO
LOCALIZACION
CONCEPTO
EJE
TRAMO
LARGO
TIPO
ANCHO
ALTO
Oct-14
UNIDAD
PARCIAL
TOTAL
PZAS
RESUMEN
CEMENTO
14.88
TON
CALHIDRA
1.53
TON
ARENA
29.97
M3
GRAVA
20.62
M3
BLOCK
4,484
PZA
PIEDRA BRAZA
34.65
M3
ALAMBRON
358.47
KG
VARILLA # 3
647.67
KG
PZA
PZA
60.00
PZA
HERRAJES
240.00
PZA
CIMBRA
87.60
Pgina 5 de 6
Presupuesto
Nombre del Proyecto:
Propietario:
Municipio:
Localidad:
Fecha
Clave
Conceptos de Trabajo
No.
CONSTRUCCION Y EDIFICACION
CHIGNAHUPAN S.A. DE C.V.
Unidad
Cantidad
Precios Costos
de
Directos
Medida
Volumen
Importe
$
MATERIALES INDUSTRIALIZADOS.
1
CEMENTO GRIS
ton
13.42
2,163.00
29,027.46
CAL
ton
1.53
1,312.00
2,007.36
VARILLA DE 3/8''
kg
647.67
12.00
7,772.04
ALAMBRE RECOCIDO
kg
53.00
13.00
689.00
CLAVO DE 2''
kg
25.00
21.00
525.00
pzas
60.00
425.00
25,500.00
pzas
25.00
384.00
9,600.00
pzas
44.00
286.00
12,584.00
RENTA DE CIMBRA
m2
97.20
20.00
1,944.00
10
pzas
4,484.22
4.83
21,658.78
11
pzas
240.00
4.00
12
SAGUAN 4.7X4.10
pzas
1.00
18,500.00
18,500.00
13
ALAMBRON
kg
358.47
SUBTOTAL
15.00
5,377.05
136,144.69
14
MATERIALES PETREOS
PIEDRA BRAZA (INCLUYE ACARREO)
m3
34.65
236.00
8,177.40
15
m3
27.86
205.00
5,711.30
16
m3
18.07
24.00
433.68
17
AGUA
m3
0.00
SUBTOTAL
0.00
0.00
14,322.38
18
m2
200.00
2.70
540.00
19
m3
33.60
55.00
1,848.00
20
m3
10.50
35.00
367.50
21
ml
180.00
60.00
10,800.00
22
m3
23.10
400.00
9,240.00
23
ml
65.80
65.00
4,277.00
24
MURO DE BLOCKS
m2
344.94
55.00
18,971.70
25
lote
1.00
9,000.00
9,000.00
26
m2
200.00
11.00
2,200.00
27
m2
191.10
80.00
960.00
MANO DE OBRA
SUBTOTAL
15,288.00
72,532.20
MATERIALES INDUSTRIALIZADOS.
136,144.69
MATERIALES PETREOS
14,322.38
MANO DE OBRA
72,532.20
FORMULO
COSTO DIRECTO =
222,999.27
SUB-TOTAL:
I.V.A. 16 %
222,999.27
35,679.88
TOTAL:
258,679.16