ABB provides a total life cycle safety capability aligned to the IEC 61508 Safety
Lifecycle. We are the best-placed leading international company to be able to advise
you on all phases from Concept (1) to Decommissioning (16), including the Hazard and
Risk Analysis which is necessary to determine the overall safety requirements of any
plant or process. In addition, ABB offers a comprehensive selection of instrumentation
and other equipment required to implement fully safety compliant plant, whether as
stand alone products or in fully integrated packages. These are supported by our
installation, commissioning, operation, maintenance and other services.
Overall Operation
& Maintenance
Planning
Overall
Validation
Planning
9
8
Overall Planning
6
Overview of
Lifecycle Phases
Overall Installation
& Commissioning
Planning
12
Safety Related
Systems:
E / E / PES
10
Realisation
11
(Engineering /
Equipment Supplier)
External Risk
Reduction
Facilities
Realisation
Realisation
Overall Installation
& Commissioning
13
16
15
Lifecycle repeats
Decommissioning
Typical Methodology
Safety
Integrity Level
Average Probability of
Failure on Demand (PFDavg)
% Reliability
1
2
3
4
0.1 to 0.01
0.01 to 0.001
0.001 to 0.0001
0.0001 to 0.00001
90% to 99%
99% to 99.9%
99.9% to 99.99%
99.99% to 99.999%
Risk
Graphs
CA
Starting point
for risk reduction
estimation
X1
X2
CB
FA
FB
CC
FA
FB
CD
Generalized arrangement
(in practical implementations
the arrangement is specific
to the applications to be
covered by the risk graph)
FA
FB
PA
PB
X3
PA
PB
X4
PA
PB
X5
PA
PB
X6
W3
W2
W1
---
---
---
C = Consequence parameter
F = Exposure time parameter
P = Probability of avoiding the hazardous event
W = In the absence of the SIF under consideration
Operations
On-going
Review
Identify
Potential
Hazardous
Events
Residual
risk
Assess
Risk
10
11
Design
Safety
Instrumented
Function
Initiating
cause
F.5
F.14.2
Initiation
likelihood
F.6
F.14.3
General
process
design
F.14.4
BPCS
F.14.5
Fire from
distillation
column
rupture
Loss of
cooling
water
0,1
0,1
0,1
Fire from
distillation
column
rupture
Steam
control
loop
failure
0,1
Alarms, Additional
IPL
InterSIF
etc.
mitigation, additional mediate integrity
F.14.6 restricted mitigation
event
level
access F.8 dikes,
likelihood
F.11
F.14.7
pressure
F.10
F.14.10
relief
F.14.9
F.9
F.14.8
Mitigated
event
likelihood
F.12
F.14.10
Notes
0,1
0,1
0,1
0,1
0,1
PRV 01
PRV 01
10-7
10-9
High
pressure
causes
column
rupture
10-6
10-2
10-2
10-8
Risk reduction
from SIS layer
Allocate
Risk
Reduction to
Technologies
OVERPRESSURIZATION
0.1/year
EXTERNAL EVENTS
(fire)
Risk reduction
from other
protection
layers
Assess
Required
Risk Reduction
Fault Tree
Analysis
Risk reduction
from other
non-SIS
prevention /
mitigation layers
Assess SIL
for Instrumented
Risk Reduction
Same
as
above
Process
risk
Compare
with
Criteria
Overall
Lifecycle
PROTECTION LAYERS
Impact Severity
event
level
description
F.4
F.3
F.14.1
F.14.1
Residual
risk
BPCS FUNCTION
FAILS
Legend
BPCS
FAILS
SENSOR
FAILS
VALVE
STUCK
OR
Basic event
Transfer gate
www.abb.co.uk/instrumentation
ABB Limited, Howard Road, St Neots, Cambridgeshire, PE19 8EU, UK. Tel: 0870 600 6122