Sunteți pe pagina 1din 4

AYAZ HUSSAIN SOOMRO

Flat # B-103, Pioneer White Palace


Apartment near Telephone Exchange
Gulzar-e-Hijri,
Gulshan-e-Iqbal Karachi,
Cell: 0333-3272918.
ayazee80@yahoo.com

SUMMARY
To enhance my knowledge, improve my skills and pursue a dynamic career for the best well- being of
the organization, people and nation. I am able to work well on my own initiative and can demonstrate the
high levels of motivation required to meet the tightest of deadlines. Even under significant pressure, I
possess a strong ability to perform effectively. Currently seeking a challenging professional civil or
structural engineering position, and willing to consider permanent or short term contracts.

WORK EXPERIENCE (08+ years)


Banu Mukhtar Contracting (Pvt.) Limited.
Project Manager

July 2009-Todate
Karachi

Worked with the focus of responsibility on execution of construction projects

Excellent written and verbal communication skills along with the strong interpersonal skills.
Good understanding of Quality Management System and QA/QC System from Project starts to final
project dossier and familiar with various local/International codes and standards.
Ability to review document submittals and evaluate its integrity and compliance as per project
drawings and specifications.
Skilled at handling multiple tasks simultaneously in challenging environments with excellent
relationship
Organized plan, direct, advice and managed site staff, Allocate Resources to specific aspects of
project.
Coordinated tracking and control of project related resources and materials.
Exercised functional authority for control and completion of projects.
Actively initiate the schedule, plan the required resources, set the construction logistics, Quality and
safety plans and enforced of the same, perform follow up, analysis and monitoring activities.
Prepare of look ahead program, cash flow management, submittals, shop drawings, variations/ claims,
Established and maintained effective QA/QC system in place for the Projects strictly adhering to
standards and specifications.
Prepare interim/completion project progress reports. Quality control, project estimates, and Interim
payment invoice.
Set, organized and conducted site meetings, dealing with progress, coordination, and quality related
issues.
Control work force of supervisors and operators.
Liaised with sub-contractors, consultant and Clients. Checking/approving subcontractors works
within the construction phase.
Able to perform all duties to ensure timely, courteous and quality support and perform the other
duties as assigned.

Inspected construction projects while surveying different fields.

Projects Handled With Banu Mukhtar Contracting (Pvt.) Limited


Pakistan Petroleum Limited (PPL) Gas filed Kandhkot
Pakistan Petroleum Limited
Currently I am working as Project Manager for the construction of RCC/ Pre-cast Boundary
Wall 6KM Long with 4000m3 earth filling both sides along 6km boundary wall at trapiziodal
shaped and stone pitched formation work.
Security barracks for 200 persons, this is oil and gas industry and fully complied all Health and
Safety polices of PPL and also QMS and QIP Policies according to international rules.
The project cast was 250 million and the duration was 12 months.
Artistic Milliners (Textile Industries)
AA Associates
As Project Coordinator- for the construction of RCC Shell structures 72 Nos, which comprises following
structures

Construction of RCC Shell Structures 27 Nos


Construction of RCC Boundary Wall 1KM Long
Heavy earth filling and stone pitching work
Construction of Power House 1MW
Construction of spinning mill

AGRIAUTO STAMPING COMPANY AT PAKISTAN STEEL MILLS INDUSTRIAL AREA KARACHI.


Mushtaq & Bilal Consulting Engineers

Worked at Agriauto site for the construction of plant which consists of following
Buildings/Structures.

PEB Building (RCC Foundations)


Press Pit Foundation
Utility Building
Canteen Building
Underground water tank
Road works.

SUPARCO (Space & Upper Atmospheric Research Commission of Pakistan)


ASSES Consulting Engineers
Construction of office building and ground control station for first ever launched communication
satellite of Pakistan which consists of Bore site tower 240 ft height complete RCC structure with latest
slip formwork, and other building as follows.

PGCS Building (Paksat Ground Control Station)


Under Ground water tank (100,000 Glns)
Overhead Water Tank (25000Glns)
Canteen Building
Admin Building
Engineering Facility Building

Principal Builders Engineers & Contractors

Site Engineer/QA.QC Engineer.


Halcrow Pakistan (Pvt.) Limited & Techno International

July 2007 to July 2009


Karachi

Projects Handled With Principal Builders Engineers & Contractors


TUWAIRQI STEEL MILLS LIMITED
INVOLVED IN THE CONSTRUCTION OF
DRI PLANT PROJECT
35 MW COMBINED CYCLE POWER PLANT FOR TSML DRI PROJECT
Worked on the DRI Plant Project (first ever DRI Plant built in Pakistan) by the Pak Saudi coalition and
the project was designed (mechanical) by MIDREX (America). The project is located at
PORT MUHAMMAD BIN QASIM near KESC Power House Karachi, which were includes the
construction of following Rcc structures

Reduction Furnace
Bunkers
Pipe Racks
Cooling Tower
Diesel Generator Foundation
Heat Recovery
Reformer
Settling Ponds
Material handling system
Transfer Tower foundations
Stacker & Declaimer Foundation
Gas Turbine Generator Foundation
Power House Building
Transformer Yard
Sub Station Building
Analyzer Building
Clarifier Water Treatment Building
8.5 Mg Potable Water Reservoir
GRP pipe line
RCC Pilings
Raft foundations and Infra structure works.

ENGRO ASAHI CHEMICALS AND POLIMERS Ltd. (EAPCL)


Port Qasim Karachi.
PRINCIPAL BUILDERS
Worked as J.Site Engineer for the construction of following building structures at engro Asahi
chemicals and polymers.

Residential Building Camp Office.


Technical and Training building.
Workshop.
Canteen building.
Site Development work

EDUCATIONAL QUALIFICATION
B.E (Civil):
(Feb-2007) Quaid-e-Awam University of Engineering Science and Technology Nawabshah
Thesis Project:
The Failure of Sukkur Barrage during 2004.
5 Days Workshop:
2006 on (Seismic Analysis & Design) from Centre for Continuing Engineering Education (CCEE)
N.E.D University Karachi during Studies.
COMPUTER SKILLS
M.S Project
M.S Windows Xp & 7.
M.S Office and Internet.
AutoCAD,
PERSONAL INFORMATIONS
Fathers name
Date of Birth
Nationality
C.N.I.C #
Marital Status

Muhammad Moryal Soomro


February 01, 1980
Pakistani
42201-2621240-1
Maried

REFERENCES:
1.
2.
3.
4.
5.
6.
7.
8.

Mr. Khalid Ahmed Shaikh


Cell: 0300-2033978
Mr. Abdul Qadir Soomro
Cell: 03322418740
Mr. Shakeel Ahmed
Cell: 0307-2561230
Mr. Akhtar Bashir
Cell: 0300-2030972, 0300-2234920
Mr. Nadir Hussain
Cell: 0322-8187041
Mr. Khalid Jamil
Cell: 0334-3512324
Mr. Rashid Ghaffar
Cell: 0312-3900815
Mr. AlI Qasim
Cell: 0300-9217453

(Project Manager @ PRINCIPAL BUILDERS Karachi)


(QA/QC Engineer @ All-Tuwairqi Steel Mills Port Qasim Karachi)
(Manager Works, @ SUPARCO)
(Project Manager @ Banu Mukhtar Contracting (Pvt.) Limited Karachi)
(Manager Projects @ Agriauto Stamping company Karachi)
(Manager Civil @ Artistic Milliners Karachi)
(AE Civill @ Pakistan Petroleum Limited Kandhkot Gas filed)
(AE Civill @ Pakistan Petroleum Limited Kandhkot Gas filed)

S-ar putea să vă placă și