DETAIL ESTIMATE FOR CONSTRUCTION OF WATER TANK 5000 GALLONS
S.#
T.1

ITEM OF WORKS
Excavation

NO

Cols foundation

L
5.00

B
5.00

D
2.00

Total
T.2

P/L Pcc 1:4:8 in foundation

Cols foundation

5.00

5.00

0.25

25.00

Cft

10.00

10.00

0.33

33.00

Cft

Steps

14.50

1.00

0.50

29.00

Cft

16.50

2.00

0.50

66.00

Cft

153.00

Cft

5.00

5.00

0.50

50.00

P/L Rcc 1:2:4 i/c shuttering and finishing Cols footing

19.53

Cft

Cols up to bottom slab

x5.00+1.25/2x5.00+1.25/2x0.5
4
4

1.25

1.25

21.75

135.94

Cft

Top slab

11.33

11.33

0.41

52.63

Cft

Tie beams

10.00

1.25

1.25

62.50

Cft

Bracing beams

10.00

1.25

1.25

62.50

Cft

383.10

Cft

P/L Rcc 1:1:3 i/c shuttering and finishing


Bottom slab

16.50

16.50

0.75

204.19

Cft

Core walls

11.33

0.67

8.00

121.46

Cft

10.00

0.67

8.00

107.20

Cft

432.85

Cft

4.44

M.tons

4.44

M.tons

"
Total
Steel reinforcement bars

Rcc 1:2:4 item T.3

383.10

Rcc 1:1-1/2:3 item T.4

432.85

Total Rcc

815.94

Cft

Steel bars

815.94

x12/2204

Total
T.6

P/L moasic floor in 1:2

Inner floor

10.00

10.00

Total
T.7

Cft

Total

T.5

Cft

200.00
4

"

T.4

Unit

Under floor

Total
T.3

Qty
200.00

P/L terrazo dado or skirting in 1:2

Inner walls

10.00

8.00

Total

100.00

Sft

100.00

Sft

80.00

Sft

80.00

Sft

T.8 P/F steel ladder made of 2"x2"x1/4" angle iron @15"c/c


and 5/8" Dia bars @12" c/c i/c fixing and painting

36.00

Total
T.9

Earth filling under floor

10.00

10.00

0.67

Total
T.10

Sand filling under floor

10.00

10.00

0.33

Total
T.11

P/L B.B masonry in F&P in 1:6

10.00

1.25

Total
T.12

P/L 2" thick Pcc 1:2:4 floor toping

1
Total

T.13

16.50

Rft

36.00

Rft

67.00

Cft

67.00

Cft

33.00

Cft

33.00

Cft

75.00

Cft

75.00

Cft

272.25

Sft

272.25

Sft

P/F 2'x2' man hole cover made of 1-1/2"x1-1/2"x1/8"


and 18 gauge m.s sheet and painting

Total
T.14

16.50

1.50

36.00

P/F 4" Dia C.I bell mouth

No

No

Nos

Total
T.15

Rising,Delivery,Washing,Overflow

40.00

Total
T.16

P/F 4' Dia G.I long bend

T.17

P/F 4" Dia duck foot bend

4
Total
4
Total

T.18

Nos

P/F 4" Dia G.I pipe 9 gauge

P/F: Railing

4
Total

16.00

160.00

Rft

160.00

Rft

4.00

Nos

4.00

Nos

4.00

Nos

4.00

Nos

64.00

Rft

64.00

Rft

http://mosttutorials.blogspot.com/
Free Civil Engineering softwares,tutorials,setups,ebooks and much more
ESTIMATE FOR CONSTRUCTION OF WATER TANK 5000 GALLONS
S.#

ITEM OF WORKS

T.1

3.23b+3.16a
Excavation

T.2

06.03b
P/L Pcc 1:4:8 in foundation

T.3

T.4

T.5

Cols foundation

Cols foundation
Under floor
Steps

6.06a-03
P/L Rcc 1:2:4 i/c shuttering and finishing Cols footing
"
Cols up to bottom slab
Top slab
Tie beams
Bracing beams
6-06-b-02
P/L Rcc 1:1:3 i/c shuttering and finishing
Bottom slab
Core walls
"
6.07b
Steel reinforcement bars

NO
4

200.00 Cft
200.00 Cft

0.25
0.33
0.50
0.50
Total

25.00
33.00
29.00
66.00
153.00

4
5.00
5.00
0.50
4 x5.00+1.25/2x5.00+1.25/2x0.5
4
1.25
1.25
21.75
1
11.33
11.33
0.41
4
10.00
1.25
1.25
4
10.00
1.25
1.25
Total

1
2
2

Rcc 1:2:4 item T.3


Rcc 1:1-1/2:3 item T.4
Total Rcc
Steel bars

5.00
10.00
14.50
16.50

16.50
11.33
10.00

5.00

5.00
10.00
1.00
2.00

16.50
0.67
0.67

0.75
8.00
8.00
Total

383.10
432.85
815.94 Cft
815.94 x12/2204
Total

T.6

10.22a+(10.43a = 10x10 room = 1/61 P.Sft)


P/L moasic floor in 1:2
Inner floor

CONTENTS UNIT RATE

2.00
Total

4
1
4
4

5.00

10.00

10.00
Total

AMOUNT

4.52

904.00

Cft
Cft
Cft
Cft
Cft

75.19

11504.07

50.00
19.53
135.94
52.63
62.50
62.50
383.10

Cft
Cft
Cft
Cft
Cft
Cft

153.44

58782.67

204.19
121.46
107.20
432.85

Cft
Cft
Cft
Cft

165.36

71575.27

86060.41

382108.22

61.47

6147.00

4.44 M.tons
4.44 M.tons
100.00 Sft
100.00 Sft

10.40a-01
Page 3

S.#
T.7

ITEM OF WORKS
P/L terrazo dado or skirting in 1:2 Inner walls

NO
4

L
10.00

D
8.00
Total

CONTENTS UNIT RATE


AMOUNT
80.00 Sft
80.00 Sft
52.56
4204.80

Page 4

S.#
T.8

T.9

ITEM OF WORKS
N.S
P/F steel ladder made of 2"x2"x1/4" angle iron @15"c/c
and 5/8" Dia bars @12" c/c i/c fixing and painting
3.16-b+3.04-a+3.18-c+3.19-b+3.26-b-02
Earth filling under floor

07.30
T.10 Sand filling under floor
07.04a-05
T.11 P/L B.B masonry in F&P in 1:6
10.15-e+10.43-c
T.12 P/L 2" thick Pcc 1:2:4 floor toping

Non Schedule
T.13 P/F 2'x2' man hole cover made of 1-1/2"x1-1/2"x1/8"
and 18 gauge m.s sheet and painting
9.19a+9.20/15+9.21/15
T.14 P/F 4" Dia C.I bell mouth
24-16-c-09
T.15 P/F 4" Dia G.I pipe 9 gauge
Rising,Delivery,Washing,Overflow

NO

36.00

10.00

10.00

10.00

16.50

10.00

10.00

1.25

36.00 Rft
36.00 Rft

280

10080.00

0.67
Total

67.00 Cft
67.00 Cft

6.45

432.15

0.33
Total

33.00 Cft
33.00 Cft

12.21

402.93

1.50
Total

75.00 Cft
75.00 Cft

100.81

7560.75

Total

272.25 Sft
272.25 Sft

35.35

9624.04

Total

1 No
1 No

3500

3500.00

Total

2 Nos
2 Nos

363.71

727.42

202.21

32353.60

16.50

40.00
Total

24-30-d-07
T.16 P/F 4' Dia G.I long bend
Non Schedule
T.17 P/F 4" Dia duck foot bend
25-37+13-06b01+2x13.06d02
T.18 P/F: Railing

160.00 Rft
160.00 Rft

Total

4.00 Nos
4.00 Nos

428.09

1712.36

Total

4.00 Nos
4.00 Nos

640

2560.00

322.26

20624.64
624803.92

AMOUNT

Total

CONTENTS UNIT RATE

16.00
Total

64.00 Rft
64.00 Rft

Page 5

Page 6

Page 7

Page 8

Page 9

Page 10

Page 11

Page 12

Page 13

Page 14

Page 15

Page 16

Page 17

Page 18

Page 19

Page 20

Page 21

Page 22

Page 23

Page 24

Page 25

Page 26

Page 27

Page 28

Page 29

Page 30

Page 31

Page 32

Page 33

Page 34

Page 35

Page 36

Page 37

Page 38

Page 39

Page 40

Page 41

Page 42

Page 43

Page 44

Page 45

Page 46

Page 47

Page 48

Page 49

Page 50

Page 51

Page 52

Page 53

Page 54

Page 55

Page 56

Page 57

Page 58

Page 59

Page 60

Page 61

Page 62

Task No 08
HEALTH FACILTY IMPROVEMENT & RFEHABILITATION OF CIVIL DISPENSARY KOHI BAHARA FR D.I
KHAN
ESTIMATE FOR CONSTRUCTION OF LABOUR ROOM & MEDICAL LABORATORY AT KOHI BAHARA FR
D.I KHAN
ABSTRACT OF COST

Description

S No,

1-

Civil Work

2-

Internal Electrification

3-

Water Supply

Amount(Rs.)

1,565,436
85,801
144,176
G.Total

http://mosttutorials.blogspot.com/
Free Civil Engineering softwares,tutorials,setups,ebooks and much more

1,795,412

re

Task No 08
COST ESTIMATE FOR CONSTRUCTION OF WATER TANK 5000 GALLONS

S.# CSR item Coad

Description
Excavation

Cols foundation

UNIT

Qty

RATE

Cft

200

4.52

Cft

153

75.19

T.1

3.23b+3.16a

T.2

06.03b

T.3

6.06a-03

P/L Rcc 1:2:4 i/c shuttering and finishing


Cols footing

Cft

383.1

153.44

T.4

6-06-b-02

P/L Rcc 1:1:3 i/c shuttering and finishing

Cft

432.9

165.36

T.5

6.07b

Steel reinforcement bars


item T.3

MT

4.44

86060.4

Sft

100

61.47

Sft

80

52.56

P/L Pcc 1:4:8 in foundation


foundation

10.22a+(10.4
3a = 10x10
T.6
P/L moasic floor in 1:2
room = 1/61
P.Sft)

Cols

Rcc 1:2:4

Inner floor

P/L terrazo dado or skirting in 1:2


walls

Inner

T.7

10.40a-01

T.8

N.S

P/F steel ladder made of 2"x2"x1/4" angle


iron @15"c/c and 5/8" Dia bars @12" c/c
i/c fixing and painting

Rft

36

280

T.9

3.16-b+3.04a+3.18c+3.19b+3.26-b-02

Earth filling under floor

Cft

67

6.45

T.10

07.30

Sand filling under floor

Cft

33

12.21

T.11

07.04a-05

P/L B.B masonry in F&P in 1:6

Cft

75

100.81

T.1210.15-e+10.43-c

P/L 2" thick Pcc 1:2:4 floor toping

Sft

272.3

35.35

T.13 Non Schedule

P/F 2'x2' man hole cover made of 1-1/2"x11/2"x1/8" and 18 gauge m.s sheet and
painting

3500

T.14

9.19a+9.20/1
5+9.21/15

P/F 4" Dia C.I bell mouth

363.71

T.15

24-16-c-09

P/F 4" Dia G.I pipe 9 gauge


Rising,Delivery,Washing,Overflow

Rft

160

202.21

T.16

24-30-d-07

P/F 4' Dia G.I long bend

No

428.09

T.17 Non Schedule

P/F 4" Dia duck foot bend

640

25-37+13T.18 06b01+2x13.0
6d02

P/F: Railing

Rft

64

322.26

Total:

000 GALLONS

http://mosttutorials.blogspot.com/
AMOUNT
904
11504.07
58782.864
71576.076
382108.2204

6147

4204.8
10080

432.15

402.93
7560.75
9624.0375
3500
727.42
32353.6
1712.36
2560
20624.64

624804.9

Free Civil Engineering Softwares,tutorials.setups,ebooks and much


more

Task No 08

HEALTH FACILTY IMPROVEMENT & RFEHABILITATION OF CIVIL DISPENSARY KOHI


BAHARA FR D.I KHAN
GENERAL ABSTRACT OF COST
Description

S No,

Amount(Rs.)

1-

Doors & Windows of Doctor House

445,520

2-

Dining Hall Wash Basin

3-

Quarter Class-IV + Chowkidar House (Doors & Windows

4-

BHU Distempering

5-

Overhead Water Tank

624,805

6-

Transformer 25 KV etc.

304,206

7-

Boring of Tube Well & Machinary

8-

Stabilizer 10000 watt

16,500

9-

1" G.I Pipe

24,350

10-

Labour Room + Medical Lab

4,544
562,249
46,879

G.Total

2,171,617

1,795,412
5,996,082

http://mosttutorials.blogspot.com/
Free Civil Engineering Softwares,tutorials.setups,ebooks and much
more

HEALTH FACILTY IMPROVEMENT & RFEHABILITATION OF CIVIL DISPENSARY KOHI BAHARA FR D.I KHAN
TASK-8
Doors & Windows of Doctor House
S No. CSR item Coad

Description

Unit

Qty

Rate

Amount (Rs.)

1-

04-34

Removing door with chowkat (Existing)

No

16.00

164.43

2630.88

2-

04-35

Removing windows CSW

No

9.00

119.73

1077.57

3-

12.07c+12.24c+
12.27a/28+13.0
6c01+(2x13.06c02
)

P/F: of 1st class 1" thick paneled door with 2"x5" 16


gauge M.S Sheet chowkat i/c all hardware and iron
mongry such as earl drawer, handle, tower bolt, holdfast,
cleat and stopper with 1" thick panel door of 18 gauge
M.s Sheet, 2 coats of read oxide and 3 coats of synthetic
enamel paint, filling of box with PCC 1:2:4. Complete in all
respect as per specification and instruction of E/Incharge.

Sft

370.00

805.19

297920.3

25.039-b05+12.50

P/F: 1" thick glazed windows/csw with 4"x1" & 1"x1"


M.S pipe (18 gauge) chowkat and 2"x1" M.S pipe (18
gauge) for shutters, fixed wire gauze and steel grill i/c all
iron mongery & hardware such as hinges, holdfast, cleat &
stopper, handles, tower bolts, 12x24 wire mesh Islamabad
made, 5mm glass pan with rubber packing and 3 coats of
S/E paint. Complete in all respect as per specification and
instruction of Engineer incharge.

Sft

241.00

597.06

143891.46

4-

Sub Total :

445520.21

Dining Hall Wash Basin


S No. CSR item Coad

1-

Description

P/F: ICL Boch wash hand basin large size i/c water mixer,
14.05astop cocks (Fisal or equivalent), C.P inlet pipe and
03+(14.25x2)+1
pedestal. Complete in all respect as per specification and
4.27
instruction of Engineer incharge.
Sub Total :
Quarter Class-IV & Chowkidar House

Unit

Qty

Rate

Amount (Rs.)

No

2272.18

4544.36

4544.36

S No. CSR item Coad

Description

Unit

Qty

Rate

Amount (Rs.)

1-

04-34

Removing door with chowkat (Existing)

No

21

164.43

3453.03

2-

04-35

Removing windows CSW

No

12

119.73

1436.76

S/F: of Steel doors 18 SWG MS sheet with angle iron


frame 1"x1"x1/8", bolt, hinges & paint etc.

Sft

84

251.56

21131.04

P/F: of 1st class 1" thick paneled door with 2"x5" 16


12.07c+12.24c+
gauge M.S Sheet chowkat i/c all hardware and iron
12.27a/28+13.0 mongry such as earl drawer, handle, tower bolt, holdfast,
6ccleat and stopper with 1" thick panel door of 18 gauge
01+(2x13.06c02 M.s Sheet, 2 coats of read oxide and 3 coats of synthetic
)
enamel paint, filling of box with PCC 1:2:4. Complete in all
respect as per specification and instruction of E/Incharge.

Sft

433.5

805.19

349049.865

P/F: 1" thick glazed windows/csw with 4"x1" & 1"x1"


M.S pipe (18 gauge) chowkat and 2"x1" M.S pipe (18
gauge) for shutters, fixed wire gauze and steel grill i/c all
iron mongery & hardware such as hinges, holdfast, cleat &
5- 25.039-b-05+12.50
stopper, handles, tower bolts, 12x24 wire mesh Islamabad
made, 5mm glass pan with rubber packing and 3 coats of
S/E paint. Complete in all respect as per specification and
instruction of Engineer incharge.

Sft

313.5

597.06

187178.31

3-

4-

Sub Total :

562249.005

BHU Distempering
S No. CSR item Coad

1-

(11.23-a-03)

Description

Unit

Qty

Rate

Amount (Rs.)

P/A: 2 coats of distemper SPD of (Berger Robbialac) or


equivalent) on walls or ceiling as per approved shade &
quality i/c scraping of old surface, putty filling, cement
repair where required & brining the surface to sparkling
finish, complete as per instruction of Engineer incharge.

Sft

4034.3

11.62

46879.0308

Sub Total :

46879.03

Transformer 25 KV
S No. CSR item Coad

1-

15.39

2-

Non Schedule

3-

4-

Description

Unit

Qty

Rate

Amount (Rs.)

S/F: of 4 legged angle iron HT pole in PCC 1:3:6 at depth


of 6' complete in all respect as per WAPDA specification
I/c HT shackles disc, insulators wooden bars etc. earthing
of each pole as per instruction of Engineer incharge.

No

16103

32206

Rft

800

60

48000

Rft

60

400

24000

No

200000

200000

S/F of HT line of aluminum conductor 7/.132 aluminum as


per WAPDA specification I/c 3% saage, cutting, jointing.
Complete in all respect as per specification and instruction
of Engineer incharge.
P/F of 4 core cable as per design 19/.083 for connection of
electric board for motor to transformer. Complete in all
Non Schedule
respect as per specification and instruction of Engineer
incharge.
Non Schedule

P/F: of transformer 25 KVA "Climax" I/c H.poles with


transformer for meter etc. as per WAPDA specification.
Sub Total :

304206

New Tube Well


S No. CSR item Coad
1-

Description

Unit

Qty

Rate

Amount (Rs.)

Job

30000

30000

Mobilization of boring plant and equipment to site

Job

20000

20000

Non Schedule Resistivity of survey for selection of site.

2-

24.01

3-

24.02a-09

Tube Well boring in all kind of soil except shangle/rock 18"


I/d from ground upto 100' below G.L

Rft

100

1124.76

112476

4-

24.02b07

From 101' to 200' below G.L 18" I/d.

Rft

100

1424.37

142437

5-

24.02c07

From 201' to 300' below G.L 18" I/d.

Rft

100

1424.37

142437

6-

24.02-d25

From 301' to 340' below G.L 18" I/d.

Rft

40

1707.59

68303.6

Job

20000

20000

Rft

340

1709.8

581332

7-

Non Schedule Subsequent shifting to next site (if required)


Providing and installation PVC blind pipe in tube well with
stranger BSS class "D" working pressure and jointing. 12"
I/d

8-

24.12c04

9-

24.06

Furnishing sample of water from bore hole and testing.

Sets

1323.55

5294.2

10-

24.08d

S/Installation of 12" dia 2' long M.S bail plug in tube well
bore hole. Complete in all respect as per specification and
instruction of Engineer incharge.

No

2181.54

2181.54

11-

24.39c

S/Installation on MS suspension clamp of heavy duty 3/8"


thick 12" I/d with PCC 1:2:4 block round it Complete.

Job

1089

1089

12-

24.36a

Furnishing/installation of MS cap over housing pipe with


locking arrangement. Complete in all respect as per
specification and instruction of Engineer incharge.

Job

884

884

13-

24.14

Shrouding with graded gravel pack 3/8" to 1/8" around


tube well in bore hole. Complete in all respect as per
specification and instruction of Engineer incharge.

Rft

340

133.66

45444.4

14-

24.13b

Development and testing of tube well with air compressor


over 1.5 cusecs discharge. Complete in all respect as per
specification and instruction of Engineer incharge.

Hrs

72

511

36792

Job

20000

20000

15-

Development and testing of tube well with "D" and "T" unit.
Non Schedule Complete in all respect as per specification and instruction
of Engineer incharge.

16-

17-

18-

19-

Supply/Installation of "KSB" submersible pumping set with


seimens A.C electric motor upto 40 H.P, 6" dia 12 stages
KSB pump, 6" dia KSB column pipes of required length, 4
core submersible electric cable for 40 HP motor to electric
starter, 14 gauge main switch board, star/delta "Seimens"
starter, Japan made, bolt meter, Ampere meter and
Non Schedule
selector switches, phase indicator lamps, earthing of main
switch board and starter, 6" dia sluice valve and non return
valve of "AERO Brand" 6" dia M.S long bend and 18
gauge M.S sheet cover for bore hole. Complete in all
respect as per specification and instruction of Engineer
incharge.

Set

750000

750000

Nos

5568

11136

P/F: of 6" dia G.I pipe or CI Tee with jointing material.


Non Schedule Complete in all respect as per specification and instruction
of Engineer incharge.

Nos

3500

7000

P/F: of 6" dia GI pipe heavy quality I/c excavation of trench


and refilling. Complete in all respect as per specification
and instruction of Engineer incharge.

Rft

250

647.84

161960

24.22c

24.16a02

P/F of 6" dia C.I sluice valve. BSS standard for G.I and
PVC pipe I/c jointing material. Complete in all respect as
per specification and instruction of Engineer incharge.

20-

P/F: of 6" dia G.I socket heavy quality. Complete in all


Non Schedule respect as per specification and instruction of Engineer
incharge.

Nos

650

5850

21-

P/F: of 6" dia G.I Long bend heavy quality with jointing
Non Schedule material. Complete in all respect as per specification and
instruction of Engineer incharge.

Nos

3500

7000

Sub Total :

2171616.74

Stabilizer (10000 Watt)


S No. CSR item Coad
1-

Description

Unit

Qty

Rate

Amount (Rs.)

S/F: 10000 watt Stablizier (Universal or Allied)

No

16500

16500

Sub Total :

16500

Water Supply
S No. CSR item Coad

24-16-c-05

Description

Unit

Qty

Rate

Amount (Rs.)

P/Fixing 1" dia G.I pipe (IIL-L) or equivalent in trench I/c


excavation and its refilling, all necessary fitting for pipe.
Complete in all respect as per specification and instruction
of Engineer incharge.

Rft

200

121.75

24350

ESTIMATE FOR CONSTRUCTION OF LABOUR ROOM & MEDICAL LABORATORY AT KOHI BAHARA FR D.I KHAN
Civil Work
S No. CSR item Coad

C-1

3.23b+3.16a

C-2

26.15

C-3

06.03b

C-4

07.04a-05

C-5

6.22a-02

C-6

6.06a-03

C-7

06.07c

C-8

07.05a-05

Description

07.30

Qty

Rate

Amount (Rs.)

1809

4.52

8176.68

880

1.26

1108.8

3695.6

75.19

277872.164

1009

100.81

101712.2495

141

32.34

4559.94

1104.9

153.44

169534.3216

3.68

86060.4

316702.3088

1303.9

108.55

141536.174

Cft

1218

6.45

7856.1

Cft

404

12.21

4932.84

Excavation as in foundation of building upto required depth


in all kind of soil i/c subsequent re-filling in trenches and
plinth area or where required, disposal of surplus earth as
Cft
directed, watering, ramming and consolidating the earth as
as specified complete in all respect as per specification
and instruction of E/Incharge.
P/A: termite proofing chemicals in 3 stages as per
Sft
specification and instruction of Engineer Incharge.
P/L: P.C.C 1:4:8 in any part of building such as foundation,
sub flooring etc. using 1" down graded stone aggregate
i/c framework, placing, compacting, leveling and curing etc. Cft
Complete as per specification and instruction of Engineer
incharge.
P/L: 1st class BB masonry in foundation and plinth in 1:6
cement sand mortar i/c racking out the joints where
Cft
necessary scaffolding & curing etc. Complete in all respect
as per specification and instruction if Engineer incharge.
P/L: 2" thick DPC with cement concrete, 1:2:4 using
approved quality fine/course aggregate i/c farmwork,
compacting, leveling, finishing and curing etc. 2 coats of
Sft
hot bitumen (PB/3 or PB/4) and 2 layers of approved
polythene sheet. Complete in all respect as per
specification and instruction of Engineer incharge.
P/L: RCC 1:2:4 i/c finishing as in footing, columns, beam,
lintels, slabs, sun shade & projection etc. of specified
strength using approved quality crushed stone & fine
aggregate i/c formwork & its removal, compacting,
vibrating, leveling, finishing and curing etc. but excluding
Cft
the cost of MS re-inforcement bars i/c cost of RCC design
& lab tests. RCC works be designed & submitted well in
time by the contractor from approved designer or reputed
structure designer. Complete in all respect as per
specification and instruction of Engineer icharge.
P/F: in position mild steel, reinforcement bars of minimum
40000 PSI yield strength, of any size and diameter i/c
straightening, bending, placing, binding in position and
binding wire, spacer, wastage etc. Steel required for RCC
M.T
works be designed & submitted well before by the
contractor from approved designer or reputed structure
designer. Complete in all respect as per specification and
instruction of Engineer incharge.
P/L: 1st class BB masonry in superstructure in any
thickness of wall. Set in 1:6 cement sand mortar i/c racking
out the joints where necessary, Scaffolding, making
Cft
grooves and corners where required & curing etc.
Complete as per specification and instruction of Engineer
Incharge.

Earth filing: under floors with earth brought from out side
3.16-b+3.04approved source i/c all leads & lifts, filling in layers not
C-9 a+3.18-c+3.19more than 6" thick, consolidating upto specified density
b+3.26-b-02
and to the satisfaction of Engineer incharge.
C-10

Unit

P/F: clean course sand under floors from an approved


source i/c leveling, watering, compacting etc. Complete in
all respect as per specification and instruction of Engineer
incharge

P/L: mosaic floors consisting of 1" thick PCC 1:2:4


divided into panels not morethan 3'x3' with 3/8" thick
10.22a+(10.43a
marble strip and 1/2" thick mosaic topping (1 part of grey
C-11 = 10x10 room =
cement & 3 parts of approved colour and size marble chips
1/61 P.Sft)
i/c curing, grinding, rubbing and polishing etc. Complete as
per specification and instruction of Engineer incharge.

Sft

826.63

61.47

50812.95

10.40a-01

P/L: 3/8" thick terrazzo dado or skirting over 1/2" thick


cement plaster in 1:3 ratio, (1 part of gray cement and
three parts of approved colour and size marble chips i/c
grinding, rubbing, curing and wax polishing etc. Complete
as per specification and instruction of Engineer incharge.

Sft

80

52.56

4204.8

11.09b

P/A: 1/2" thick cement plaster on walls in 1:4 c/sand mortar


i/c scaffolding, chamfering of edges, rounding the corners,
making grooves and edges where required, P/F: of
expended metal jali, 1/2"x1/2" size, 1' wide at all joints of
RCC & bricks & curing etc. Complete as per specification
and instruction of Engineer Incharge.

Sft

4812.6

11.82

56884.46

11.18a

P/A: deep struck pointing in cement/surkhi mortar in 1:1


with approved colour i/c racking out the joints not less than
1/2" deep, saturating the surface, scaffolding & curing etc.
Complete in all respect as per specification and instruction
of Engineer incharge.

Sft

1567.5

13.11

20549.93

P/F: of 1st class 1" thick paneled door with 2"x5" 16


gauge M.S Sheet chowkat i/c all hardware and iron
mongry such as earl drawer, handle, tower bolt, holdfast,
12.07c+12.24c+12.27a/28+13.06c-01+(2x13.06c02)
C-15
cleat and stopper with 1" thick panel door of 18 gauge
M.s Sheet, 2 coats of read oxide and 3 coats of synthetic
enamel paint, filling of box with PCC 1:2:4. Complete in all
respect as per specification and instruction of E/Incharge.

Sft

158.25

805.19

127421.3175

Sft

155

597.06

92544.3

Sft

4812.6

15.09

72621.53

Rft

75

363.71

27278.25

Sft

63.75

90.15

5747.06

Cft

152.96

101.41

15511.67

Sft

836

69.22

57867.92

C-12

C-13

C-14

P/F: 1" thick glazed windows/csw with 4"x1" & 1"x1"


M.S pipe (18 gauge) chowkat and 2"x1" M.S pipe (18
gauge) for shutters, fixed wire gauze and steel grill i/c all
iron mongery & hardware such as hinges, holdfast, cleat &
C-1625.039-b-05+12.50
stopper, handles, tower bolts, 12x24 wire mesh Islamabad
made, 5mm glass pan with rubber packing and 3 coats of
S/E paint. Complete in all respect as per specification and
instruction of Engineer incharge.
P/A: 3 coats of distemper SPD of (Berger Robbialac) or
equivalent) on walls or ceiling as per approved shade &
C-17 (11.23-a-03) quality i/c scraping of old surface, putty filling, cement
repair where required & brining the surface to sparkling
finish,
P/F: 4" dia CI rain water pipe i/c jointing, bends and clamps
9.19a+9.20/15+ and 3 coats of synthetic enamel paint. complete in all
C-18
9.21/15
respect as per specification and instruction of Engineer
incharge.
S/F: of 1" thick D/Wood joinery as in wire gauze door
12.13d+13.06bwithout chowkat i/c all iron mongery and hardware such as
C-19 01+(13.06bhinges, handle, holdfast, door spring and tower bolts etc.
02x2)
as approved, 12x24 wire mesh and 3 coats of S/E paint.
P/L: PCC 1:3:6 as in plinth protection, around the building
over compacted earth or where required i/c framework,
placing, curing, leveling, compacting and finishing etc.
Complete in all respect
P/L: roof treatment consisting of:a) 2 coats of hot bitumen with sand blinding.
09.05+09.12+1 b) 2 layers of approved polythene sheet.
C-21 1.17+polythene c) 4" thick compacted earth with proper slope.
sheet
d) 1" thick brick tiles in 1:6, grouting in 1:3 and flush
pointing in 1:1
Complete
Sub Total :
C-20

6.05h

1565435.76

INTERNAL ELECTRIFICATION
S No. CSR item Coad

Description

Unit

Qty

Rate

Amount (Rs.)

E-1

Wiring of light or fan point from point to switch with


2x3/.029 Pakistan cable i/c sub circuit wiring with 7/.029
Pakistan cable, with all accessories such as PVC
Non Schedule
concealed conduit PPI switches (premier) fixed on plastic
sheets & wooden box, ceiling rose and holder etc.
Complete as per instruction of Engineer Incharge.

No

20

783.5

15670

E-2

Same as item # 01, but wiring with 2x7/.044+1x3/.029 for 3


pin 15 Amp. power plug i/c P/F: of 15 Amp. switch socket
Non Schedule unit PPI (China clay base) fixed on wooden box on
separate circuit. Complete as per instruction of Engineer
Incharge.

No

950

4750

E-3

15.24b

P/F: 4' long tube light (Asia/M. Inayatullah made) with


starter, tube rod (Phillips) and choke. Complete as per
specification and instruction of Engineer Incharge.

No

12

528.17

6338.04

E-4

15.68c

P/F: of 56" sweep capacitor type ceiling fan with dimmer,


(Pak Fan Delux) i/c suspension rod and canopy etc.
Complete as per instruction of Engineer Incharge.

No

2433.13

14598.78

E-5

Same as item # E-1, but wiring of 5 pin 5 Amp. light plug


away from switch board i/c P/F: of PPI (premier) light plug
Non Schedule
i/c wiring with 7/.029 etc. Complete as per instruction of
Engineer Incharge.

No

400

2400

E-6

Providing and Fixing of main board having:a. 20 AMP TPNACB 01 No.


(Hager) or Tarrasaki
Non Schedule
b. 10 AMP single phase
ACB 08 Nos.
i/c connection of earth with main switch, Complete in all
respect.

No

18000

18000

E-7

P/Fixing: of 2 core 7/0.052 aluminum cable in PVC pipe of


Non Schedule approved quality i/c connection from nearest source to
main board.

Rft

180

80

14400

15.69a

P/Fixing: 12" Sweep (Pak) Exhaust fan with louver.


Complete in all respect as per specification and instruction
of Engineer incharge.

No

1618.54

3237.08

15.53

Earthing of main switch with 8 SWG copper wire, laid in


1/2" dia GI pipe from main switch to 2'x2' copper plate
burried in 14 feet deep pit alongwith salt & charcoal
mixture. Complete in all respect as per specification and
instruction of Engineer incharge.

No

6406.6

6406.6

E-8

E-9

Sub Total :

85800.5

WATER SUPPLY & SANITARY INSTALLATION


S No. CSR item Coad

Description

Unit

Qty

Rate

Amount (Rs.)

No

3280.13

3280.13

No

2272.18

2272.18

P/F: CP adjustable shower rose i/c stop cock and CP inlet


pipe etc. Complete as per instruction of Engineer Incharge.

No

684.82

684.82

P/F: Asiatic type WC (ICI Boch) or equivalent) i/c "Master"


14.03a+14.10a Tanki, P/Trap, Stop Cock, Plastic Connection & Hockey
+14.25+14.47a Pipe etc. Complete as per specification and instruction of
Engineer Incharge.
P/F: ICL Boch wash hand basin large size i/c water mixer,
14.05astop cocks (Fisal or equivalent), C.P inlet pipe and
W-2 03+(14.25x2)+1
pedestal. Complete in all respect as per specification and
4.27
instruction of Engineer incharge.
W-1

W-3

14.26a+14.23

W-4

14.39-a

P/F: Brass bib cock " dia screw down type Faisal or
equivalent make. Complete as per instruction of Engineer
Incharge.

No

185.31

370.62

W-5

14.34b-01

P/F: of soil, water, vent pipe of CI with plain socket i/c tee,
bend, caulking the joints with cement, painting to pipe,
making holes and repair to original shape. Complete in all
respect. 4" dia CI pipe.

Rft

30

377.4

11322

14.34b-02

P/F: of soil, water, vent pipe of CI with plain socket i/c tee,
bend, caulking the joints with cement, painting to pipe,
making holes and repair to original shape. Complete in all
respect. 2" dia CI pipe.

Rft

18

257.42

4633.56

Rft

80

42.74

3419.2

No

597.03

1194.06

No

415.88

415.88

No

110.53

110.53

No

129.23

129.23

No

353.56

707.12

No

30000

30000

No

45000

45000

Rft

40

101.26

4050.4

No

3500

14000

No

22586

22586
144175.73

W-6

24.16c-01

W-7

14.31a

W-8

14.16a

W-9

14.20a

W-10

14.20b

W-11

14.24b

S/L: jointing and testing of " dia GI pipe (IIL-L) i/c tees,
bends, union, elbows, socket etc. Making hole and repair
complete.
P/F: 3" floor trap of CI i/c CP grating, caulking the joints
with cement and hole repair complete.
Providing and Fixing of best quality 24" long towel rail.
(Fiasal or equivalent of approved quality). Complete in all
respect as per specification and instruction of Engineer
incharge.
Providing and Fixing of best quality Plastic soap dish.
(Fiasal or equivalent of approved quality). Complete in all
respect as per specification and instruction of Engineer
incharge.
Providing and Fixing of best quality Plastic paper holder.
(Fiasal or equivalent of approved quality). Complete in all
respect as per specification and instruction of Engineer
incharge.
P/F: CP bib cock heavy 1/2" dia Faisal or equivalent
made. Complete as per specification and instruction of
E/Incharge.

Construction of septic tank of BB size, 8'x4'x6' with 9" thick


BB wall, 4" thick BB partition, 1/2" thick cement plaster in
W-12 Non Schedule 1:4 and 6" thick PCC 1:3:6 in foundation and bed, 4" thick
RCC 1:2:4 precast covers with 1/2" dia bars, 4" C/C both
way. Complete as per instruction of Engineer Incharge.
Construction of 6' internal dia 30' deep soakage pit i/c 9"
thick BB in 1:4 from top to 6' depth, filling of pit with stone
W-13 Non-Schedule boulder, making chemny and RCC 1:2:4 cover 4" thick with
1/2" dia bars 4" C/C both way. Complete in all respect as
per specification and instruction of Engineer incharge.
P/L: in trench, jointing and testing 6" dia RCC pipe i/c
collar, excavation of trench & re-filling after laying of pipe.
W-14
23.01b
Complete as per specification and instruction of Engineer
Incharge.
Construction of 2'x2' or 2' dia BB manhole, upto required
depth i/c 4" PCC 1:4:8 in bed, BB wall laid & plastered in
W-15 Non-Schedule
1:4 making channel inside and RCC 1:2:4 cover, 4" thick
with 3/8" dia bars 4" C/C both side.
W-16 14-69-b-03
S/F: of polythene water tank 500 gallons
Sub Total :

HEALTH FACILTY IMPROVEMENT & RFEHABILITATION OF CIVIL DISPENSARY KOHI BAHARA


FR D.I KHAN
TASK-8
Doors & Windows of Doctor House

1- Removing door with chowkat (Existing)


16 Nos.
2- Removing windows CSW
9 Nos.

3- P/F: of 1st class 1" thick paneled door with 2"x5" 16 gauge M.S Sheet chowkat i/c all hardware
and iron mongry such as earl drawer, handle, tower bolt, holdfast, cleat and stopper with 1" thick
panel door of 18 gauge M.s Sheet, 2 coats of read oxide and 3 coats of synthetic enamel paint,
filling of box with PCC 1:2:4. Complete in all respect as per specification and instruction of
E/Incharge.
1
4.00
8.50 =
34.00
10
3.50
7.00 =
245.00
1
3.00
7.00 =
21.00
4
2.50
7.00 =
70.00
370.00
Total =

Sft
Sft
Sft
Sft
Sft

4- P/F: 1" thick glazed windows/csw with 4"x1" & 1"x1" M.S pipe (18 gauge) chowkat and 2"x1"
M.S pipe (18 gauge) for shutters, fixed wire gauze and steel grill i/c all iron mongery & hardware
such as hinges, holdfast, cleat & stopper, handles, tower bolts, 12x24 wire mesh Islamabad made,
5mm glass pan with rubber packing and 3 coats of S/E paint. Complete in all respect as per
specification and instruction of Engineer incharge.
2
3
2
1
1

8.00
6.00
4.00
3.00
2.00

5.50
5.50
5.50
2.00
2.00
Total

=
=
=
=
=
=

Dining Hall Wash Basin

1- P/F: ICL Boch wash hand basin large size i/c water mixer, stop cocks (Fisal or
equivalent), C.P inlet pipe and pedestal. Complete in all respect as per specification
and instruction of Engineer incharge.
2 Nos.

88.00
99.00
44.00
6.00
4.00
241.00

Sft
Sft
Sft
Sft
Sft
Sft

Quarter Class-IV & Chowkidar House

1- Removing door with chowkat (Existing)


21 Nos.
2- Removing windows CSW
12 Nos.
3- S/F: of Steel doors 18 SWG MS sheet with angle iron frame 1"x1"x1/8", bolt,
hinges & paint etc.
3

4.00
Total

7.00 =
=

84.00 Sft
84.00 Sft

4- P/F: of 1st class 1" thick paneled door with 2"x5" 16 gauge M.S Sheet chowkat i/c all hardware
and iron mongry such as earl drawer, handle, tower bolt, holdfast, cleat and stopper with 1" thick
panel door of 18 gauge M.s Sheet, 2 coats of read oxide and 3 coats of synthetic enamel paint,
filling of box with PCC 1:2:4. Complete in all respect as per specification and instruction of
E/Incharge.
6
3.50
8.50 =
178.50
3
3.50
7.00 =
73.50
3
3.00
8.50 =
76.50
6
2.50
7.00 =
105.00
433.50
Total =

Sft
Sft
Sft
Sft
Sft

5- P/F: 1" thick glazed windows/csw with 4"x1" & 1"x1" M.S pipe (18 gauge) chowkat and 2"x1"
M.S pipe (18 gauge) for shutters, fixed wire gauze and steel grill i/c all iron mongery & hardware
such as hinges, holdfast, cleat & stopper, handles, tower bolts, 12x24 wire mesh Islamabad made,
5mm glass pan with rubber packing and 3 coats of S/E paint. Complete in all respect as per
specification and instruction of Engineer incharge.
3
6
3

6.00
5.00
3.00

5.50
5.50
5.50
Total

=
=
=
=

99.00
165.00
49.50
313.50

BHU Distempering

1- P/A: 2 coats of distemper SPD of (Berger Robbialac) or equivalent) on walls or ceiling as per
approved shade & quality i/c scraping of old surface, putty filling, cement repair where required &
brining the surface to sparkling finish, complete as per instruction of Engineer incharge.
987.65 Sft
3046.69 Sft
4034.34 Sft

Sft
Sft
Sft
Sft

Transformer 25 KV

1- S/F: of 4 legged angle iron HT pole in PCC 1:3:6 at depth of 6' complete in all respect
as per WAPDA specification I/c HT shackles disc, insulators wooden bars etc. earthing
of each pole as per instruction of Engineer incharge.
2 Nos.
2- S/F of HT line of aluminum conductor 7/.132 aluminum as per WAPDA specification I/c
3% saage, cutting, jointing. Complete in all respect as per specification and instruction
of Engineer incharge.
800 Rft
3- P/F of 4 core cable as per design 19/.083 for connection of electric board for motor to
transformer. Complete in all respect as per specification and instruction of Engineer
incharge.
60.00 Rft
4- P/F: of transformer 25 KVA "Climax" I/c H.poles with transformer for meter etc. as per
WAPDA specification.
1 Nos.

ESTIMATE FOR CONSTRUCTION OF NEW TUBE WELL BORING & MACHINARY

New Tube Well


1- Resistivity of survey for selection of site.
1 Job
2- Mobilization of boring plant and equipment to site
1 Job
3- Tube Well boring in all kind of soil except shangle/rock 18" I/d from ground upto 100'
below G.L
100.00 Rft
4- From 101' to 200' below G.L 18" I/d.
100.00 Rft
5- From 201' to 300' below G.L 18" I/d.
100.00 Rft
6- From 301' to 340' below G.L 18" I/d.
40.00 Rft

7- Subsequent shifting to next site (if required)


1 Job
8- Providing and installation PVC blind pipe in tube well with stranger BSS class "D"
working pressure and jointing. 12" I/d
340.00 Rft
9- Furnishing sample of water from bore hole and testing.
4 Sets
10- S/Installation of 12" dia 2' long M.S bail plug in tube well bore hole. Complete in all
respect as per specification and instruction of Engineer incharge.
1 No.
11- S/Installation on MS suspension clamp of heavy duty 3/8" thick 12" I/d with PCC 1:2:4
block round it Complete.
1 Job
12- Furnishing/installation of MS cap over housing pipe with locking arrangement.
Complete in all respect as per specification and instruction of Engineer incharge.
1 Job
13- Shrouding with graded gravel pack 3/8" to 1/8" around tube well in bore hole.
Complete in all respect as per specification and instruction of Engineer incharge.

340.00 Rft
14- Development and testing of tube well with air compressor over 1.5 cusecs discharge.
Complete in all respect as per specification and instruction of Engineer incharge.

72.00 Hrs
15- Development and testing of tube well with "D" and "T" unit. Complete in all respect as
per specification and instruction of Engineer incharge.
1 Job
16- Supply/Installation of "KSB" submersible pumping set with seimens A.C electric motor
upto 40 H.P, 6" dia 12 stages KSB pump, 6" dia KSB column pipes of required length,
4 core submersible electric cable for 40 HP motor to electric starter, 14 gauge main
switch board, star/delta "Seimens" starter, Japan made, bolt meter, Ampere meter and
selector switches, phase indicator lamps, earthing of main switch board and starter, 6"
dia sluice valve and non return valve of "AERO Brand" 6" dia M.S long bend and 18
gauge M.S sheet cover for bore hole. Complete in all respect as per specification and
instruction of Engineer incharge.
1 Set

17- P/F of 6" dia C.I sluice valve. BSS standard for G.I and PVC pipe I/c jointing material.
Complete in all respect as per specification and instruction of Engineer incharge.

2 Nos.
18- P/F: of 6" dia G.I pipe or CI Tee with jointing material. Complete in all respect as per
specification and instruction of Engineer incharge.
2 Nos.
19- P/F: of 6" dia GI pipe heavy quality I/c excavation of trench and refilling. Complete in
all respect as per specification and instruction of Engineer incharge.
250.00 Rft
20- P/F: of 6" dia G.I socket heavy quality. Complete in all respect as per specification and
instruction of Engineer incharge.
9 Nos.
21- P/F: of 6" dia G.I Long bend heavy quality with jointing material. Complete in all
respect as per specification and instruction of Engineer incharge.
2 Nos.
Stabilizer (10000 Watt)

1- S/F: 10000 watt Stablizier (Universal or Allied)


1 No.
Water Supply
P/Fixing 1" dia G.I pipe (IIL-L) or equivalent in trench I/c excavation and its refilling, all necessary
fitting for pipe. Complete in all respect as per specification and instruction of Engineer incharge.

200.00 Rft
ESTIMATE FOR CONSTRUCTION OF LABOUR ROOM & MEDICAL LABORATORY AT KOHI BAHARA FR D.I
KHAN

Civil Work
C-1

Excavation as in foundation of building upto required depth in all kind of soil i/c subsequent re-filling
in trenches and plinth area or where required, disposal of surplus earth as directed, watering,
ramming and consolidating the earth as as specified complete in all respect as per specification and
instruction of E/Incharge.
2
5
1
1
9

56.75
13.50
3.00
3.00
4.00

3.00
3.00
3.00
1.50
4.00

3.00
3.00
3.00
2.00
1.00
Total

=
=
=
=
=
=

1021.50
607.50
27.00
9.00
144.00
1809.00

Cft
Cft
Cft
Cft
Cft
Cft

C-2

P/A: termite proofing chemicals in 3 stages as per specification and instruction of Engineer
Incharge.
As per Covered Area

C-3

880.00 Sft

P/L: P.C.C 1:4:8 in any part of building such as foundation, sub flooring etc. using 1" down graded
stone aggregate i/c framework, placing, compacting, leveling and curing etc. Complete as per
specification and instruction of Engineer incharge.
2
5
1
1
9
1
1
1
1
1
1

C-4

56.75
13.50
3.00
3.00
4.00
20.00
15.00
10.00
5.00
10.00
11.25

3.00
3.00
3.00
1.50
4.00
16.00
16.00
10.00
5.00
5.50
5.75

0.75
0.75
0.75
0.50
0.50
0.50
0.50
0.50
0.50
51.50
0.50
Total

255.38
151.88
6.75
2.25
72.00
160.00
120.00
50.00
12.50
2832.50
32.34
3695.60

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft

P/L: 1st class BB masonry in foundation and plinth in 1:6 cement sand mortar i/c racking out the
joints where necessary scaffolding & curing etc. Complete in all respect as per specification and
instruction if Engineer incharge.
2
2
2
2
5
5
5
5
1
1
1
1
1
1

54.87
54.50
54.12
53.75
14.87
15.25
15.62
16.00
4.25
4.62
5.00
4.25
4.62
5.00

1.87
1.50
1.13
0.75
1.87
1.50
1.13
0.75
1.50
1.13
0.75
1.50
1.13
0.38

0.75
0.75
0.75
2.50
0.75
0.75
0.75
2.50
0.75
0.75
2.50
0.75
0.75
3.25
Total

C-5

=
=
=
=
=
=
=
=
=
=
=
=

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

153.91
122.63
91.73
201.56
104.28
85.78
66.19
150.00
4.78
3.92
9.38
4.78
3.92
6.09
1008.95

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft

P/L: 2" thick DPC with cement concrete, 1:2:4 using approved quality fine/course aggregate i/c
farmwork, compacting, leveling, finishing and curing etc. 2 coats of hot bitumen (PB/3 or PB/4) and
2 layers of approved polythene sheet. Complete in all respect as per specification and instruction of
Engineer incharge.
1

188.00

0.75 =
Total =

141.00 Sft
141.00 Sft

C-6

P/L: RCC 1:2:4 i/c finishing as in footing, columns, beam, lintels, slabs, sun shade & projection etc.
of specified strength using approved quality crushed stone & fine aggregate i/c formwork & its
removal, compacting, vibrating, leveling, finishing and curing etc. but excluding the cost of MS reinforcement bars i/c cost of RCC design & lab tests. RCC works be designed & submitted well in
time by the contractor from approved designer or reputed structure designer. Complete in all
respect as per specification and instruction of Engineer icharge.
2
5
2
1
8
8
8
1
3
2
1
4
2
1
2
2
1
8
8

C-7

0.75
0.75
0.75
0.38
4.00
4.00
0.75
0.75
0.75
0.75
0.75
0.75
0.75
54.75
0.33
0.33
2.00
0.75
1.00

0.75
0.75
0.75
0.75
1.00
0.33
15.00
0.75
0.75
0.75
0.75
0.75
0.75
0.50
2.25
2.25
0.25
15.00
1.00
Total

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

60.47
45.00
5.63
1.41
128.00
42.24
67.50
3.09
8.44
4.50
4.22
14.63
5.06
506.44
81.30
27.47
12.00
67.50
20.00
1104.89

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft

P/F: in position mild steel, reinforcement bars of minimum 40000 PSI yield strength, of any size and
diameter i/c straightening, bending, placing, binding in position and binding wire, spacer, wastage
etc. Steel required for RCC works be designed & submitted well before by the contractor from
approved designer or reputed structure designer. Complete in all respect as per specification and
instruction of Engineer incharge.
R.C.C 1:2:4 (item No.C-5)

C-8

53.75
16.00
5.00
5.00
4.00
4.00
0.75
5.50
5.00
4.00
7.50
6.50
4.50
18.50
54.75
18.50
24.00
0.75
2.50

1104.89

7.35/2204 =
Total
=

3.68 M.T
3.68 M.T

P/L: 1st class BB masonry in superstructure in any thickness of wall. Set in 1:6 cement sand mortar
i/c racking out the joints where necessary, Scaffolding, making grooves and corners where required
& curing etc. Complete as per specification and instruction of Engineer Incharge.

2
4
2
1

53.75
16.00
5.00
5.00

0.75
0.75
0.75
0.38

11.00
11.00
11.00
11.00
Total-A

=
=
=
=

886.88
528.00
82.50
20.63
1518.01

Cft
Cft
Cft
Cft
Cft

1
4
1
3
2

6.00
5.00
4.00
3.50
2.50

0.75
0.75
0.75
0.75
0.75

5.50
5.50
8.50
7.00
7.00
Total D/d

=
=
=
=
=
=

24.75
82.50
25.50
55.13
26.25
214.13

Cft
Cft
Cft
Cft
Cft
Cft

Deduction

Net B.B

1518.01

( - )

214.13 =

1303.88 Cft

C-9

Earth filing: under floors with earth brought from out side approved source i/c all leads & lifts, filling
in layers not more than 6" thick, consolidating upto specified density and to the satisfaction of
Engineer incharge.
1
1
1

C-10

20.00
15.00
15.50

1.50
1.50
1.50
Total

=
=
=
=

480.00
360.00
378.00
1218.00

Cft
Cft
Cft
Cft

16.00
16.00
16.00

0.50
0.50
0.50
Total

=
=
=
=

160.00
120.00
124.00
404.00

Cft
Cft
Cft
Cft

P/L: mosaic floors consisting of 1" thick PCC 1:2:4 divided into panels not morethan 3'x3' with 3/8"
thick marble strip and 1/2" thick mosaic topping (1 part of grey cement & 3 parts of approved colour
and size marble chips i/c curing, grinding, rubbing and polishing etc. Complete as per specification
and instruction of Engineer incharge.
1
1
1
3
2
1

C-12

16.00
16.00
16.00

P/F: clean course sand under floors from an approved source i/c leveling, watering, compacting etc.
Complete in all respect as per specification and instruction of Engineer incharge

1
1
1

C-11

20.00
15.00
15.75

20.00
15.00
15.75
3.50
2.50
4.00

16.00
16.00
16.00
0.75
0.75
0.75
Total

=
=
=
=
=
=
=

320.00
240.00
252.00
7.88
3.75
3.00
826.63

Sft
Sft
Sft
Sft
Sft
Sft
Sft

P/L: 3/8" thick terrazzo dado or skirting over 1/2" thick cement plaster in 1:3 ratio, (1 part of gray
cement and three parts of approved colour and size marble chips i/c grinding, rubbing, curing and
wax polishing etc. Complete as per specification and instruction of Engineer incharge.
1

20.00
Total

4.00 =
=

80.00 Sft
80.00 Sft

C-13

P/A: 1/2" thick cement plaster on walls in 1:4 c/sand mortar i/c scaffolding, chamfering of edges,
rounding the corners, making grooves and edges where required, P/F: of expended metal jali,
1/2"x1/2" size, 1' wide at all joints of RCC & bricks & curing etc. Complete as per specification and
instruction of Engineer Incharge.
2
20.00
11.00 =
440.00
2
16.00
11.00 =
352.00
1
20.00
16.00 =
320.00
2
15.00
11.00 =
330.00
2
16.00
11.00 =
352.00
1
16.00
15.00 =
240.00
2
10.00
11.00 =
220.00
4
10.00
11.00 =
440.00
1
10.00
10.00 =
100.00
2
10.00
11.00 =
220.00
1
10.00
5.50 =
55.00
1
20.00
7.00 =
140.00
1
16.75
11.00 =
184.25
1
16.75
5.75 =
96.31
2
53.75
11.00 =
1182.50
2
17.50
11.00 =
385.00
Total-A
5057.06
Deduction
3.50
7.00 =
73.50
3
4.00
7.00 =
28.00
1
5.00
5.50 =
110.00
4
6.00
5.50 =
33.00
1
Total-B =
244.50
Net Plaster (A - B)

C-14

5057.06

244.50 =

Sft
Sft
Sft
Sft
Sft

4812.56 Sft

P/A: deep struck pointing in cement/surkhi mortar in 1:1 with approved colour i/c racking out the
joints not less than 1/2" deep, saturating the surface, scaffolding & curing etc. Complete in all
respect as per specification and instruction of Engineer incharge.
2
2

C-15

( - )

Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft

53.75
17.50

11.00 =
11.00 =
Total
=

1182.50 Sft
385.00 Sft
1567.50 Sft

P/F: of 1st class 1" thick paneled door with 2"x5" 16 gauge M.S Sheet chowkat i/c all hardware
and iron mongry such as earl drawer, handle, tower bolt, holdfast, cleat and stopper with 1" thick
panel door of 18 gauge M.s Sheet, 2 coats of read oxide and 3 coats of synthetic enamel paint,
filling of box with PCC 1:2:4. Complete in all respect as per specification and instruction of
E/Incharge.
1
4.00
8.50 =
34.00
3
3.50
8.50 =
89.25
2
2.50
7.00 =
35.00
158.25
Total =

Sft
Sft
Sft
Sft

C-16

P/F: 1" thick glazed windows/csw with 4"x1" & 1"x1" M.S pipe (18 gauge) chowkat and 2"x1"
M.S pipe (18 gauge) for shutters, fixed wire gauze and steel grill i/c all iron mongery & hardware
such as hinges, holdfast, cleat & stopper, handles, tower bolts, 12x24 wire mesh Islamabad made,
5mm glass pan with rubber packing and 3 coats of S/E paint. Complete in all respect as per
specification and instruction of Engineer incharge.
1
4
2

C-17

6.00
5.00
3.00

5.50
5.50
2.00
Total

=
=
=
=

33.00
110.00
12.00
155.00

Sft
Sft
Sft
Sft

P/A: 3 coats of distemper SPD of (Berger Robbialac) or equivalent) on walls or ceiling as per
approved shade & quality i/c scraping of old surface, putty filling, cement repair where required &
brining the surface to sparkling finish, complete as per instruction of Engineer incharge.
As per item No.C-12
Total

=
=

4812.56 Sft
4812.56 Sft

C-18
P/F: 4" dia CI rain water pipe i/c jointing, bends and clamps and 3 coats of synthetic enamel paint.
complete in all respect as per specification and instruction of Engineer incharge.
5

15.00 =

75.00 Rft

C-19

S/F: of 1" thick D/Wood joinery as in wire gauze door without chowkat i/c all iron mongery and
hardware such as hinges, handle, holdfast, door spring and tower bolts etc. as approved, 12x24
wire mesh and 3 coats of S/E paint. Complete in all respect as per specification and instruction of
E/Incharge.
1
4.00
8.50 =
34.00 Sft
1
3.50
8.50 =
29.75 Sft
Total
=
63.75 Sft

C-20

P/L: PCC 1:3:6 as in plinth protection, around the building over compacted earth or where required
i/c framework, placing, curing, leveling, compacting and finishing etc. Complete in all respect as per
specification and instruction of Engineer Incharge.
2
2

C-21

59.75
17.50

3.00
3.00

0.33 =
0.33 =
Total
=

118.31 Cft
34.65 Cft
152.96 Cft

16.00 =
=

836.00 Sft
836.00 Sft

P/L: roof treatment consisting of:a) 2 coats of hot bitumen with sand blinding.
b) 2 layers of approved polythene sheet.
c) 4" thick compacted earth with proper slope.
d) 1" thick brick tiles in 1:6, grouting in 1:3 and flush pointing in 1:1
Complete as per specification and instruction of Engineer Incharge.

52.25
Total

INTERNAL ELECTRIFICATION

E-1 Wiring of light or fan point from point to switch with 2x3/.029 Pakistan cable i/c sub circuit wiring with
7/.029 Pakistan cable, with all accessories such as PVC concealed conduit PPI switches (premier)
fixed on plastic sheets & wooden box, ceiling rose and holder etc. Complete as per instruction of
Engineer Incharge.
20 Nos
E-2 Same as item # 01, but wiring with 2x7/.044+1x3/.029 for 3 pin 15 Amp. power plug i/c P/F: of 15
Amp. switch socket unit PPI (China clay base) fixed on wooden box on separate circuit. Complete
as per instruction of Engineer Incharge.
5 Nos
E-3 P/F: 4' long tube light (Asia/M. Inayatullah made) with starter, tube rod (Phillips) and choke.
Complete as per specification and instruction of Engineer Incharge.
12 Nos
E-4 P/F: of 56" sweep capacitor type ceiling fan with dimmer, (Pak Fan Delux) i/c suspension rod and
canopy etc. Complete as per instruction of Engineer Incharge.
6 Nos
E-5 Same as item # E-1, but wiring of 5 pin 5 Amp. light plug away from switch board i/c P/F: of PPI
(premier) light plug i/c wiring with 7/.029 etc. Complete as per instruction of Engineer Incharge.
6 Nos
E-6 Providing and Fixing of main board having:1
No
E-7 P/Fixing: of 2 core 7/0.052 aluminum cable in PVC pipe of approved quality i/c connection from
nearest source to main board.

E-8 P/Fixing: 12" Sweep (Pak) Exhaust fan with louver. Complete in all respect as per specification and
instruction of Engineer incharge.
2 Nos.
E-9 Earthing of main switch with 8 SWG copper wire, laid in 1/2" dia GI pipe from main switch to 2'x2'
copper plate burried in 14 feet deep pit alongwith salt & charcoal mixture. Complete in all respect as
per specification and instruction of Engineer incharge.
1 No.

WATER SUPPLY & SANITARY INSTALLATION

W-1

P/F: Asiatic type WC (ICI Boch) or equivalent) i/c "Master" Tanki,


P/Trap, Stop Cock, Plastic Connection & Hockey Pipe etc. Complete as
per specification and instruction of Engineer Incharge.
1 No.

W-2

P/F: ICL Boch wash hand basin large size i/c water mixer, stop cocks (Fisal or
equivalent), C.P inlet pipe and pedestal. Complete in all respect as per specification
and instruction of Engineer incharge.
1 No.

W-3

P/F: CP adjustable shower rose i/c stop cock and CP inlet pipe etc.
Complete as per instruction of Engineer Incharge.
1 No.

W-4

P/F: Brass bib cock " dia screw down type Faisal or equivalent make.
Complete as per instruction of Engineer Incharge.
2 Nos.

W-5

W-6

P/F: of soil, water, vent pipe of CI with plain socket i/c tee, bend,
caulking the joints with cement, painting to pipe, making holes and
repair to original shape. Complete in all respect.
4" dia CI pipe.

30.00 =

30.00 Rft

2" dia CI pipe.

18.00 =

18.00 Rft

S/L: jointing and testing of " dia GI pipe (IIL-L) i/c tees, bends, union,
elbows, socket etc. Making hole and repair complete.
80.00 Rft

W-7

P/F: 3" floor trap of CI i/c CP grating, caulking the joints with cement
and hole repair complete.
2 Nos.

W-8

Providing and Fixing of best quality 24" long towel rail. (Fiasal or equivalent of
approved quality). Complete in all respect as per specification and instruction of
Engineer incharge.
1 No.

W-9

Providing and Fixing of best quality Plastic soap dish. (Fiasal or equivalent of
approved quality). Complete in all respect as per specification and instruction of
Engineer incharge.
1 No.

W-10

Providing and Fixing of best quality Plastic paper holder. (Fiasal or equivalent of
approved quality). Complete in all respect as per specification and instruction of
Engineer incharge.
1 No.

W-11

P/F: CP bib cock heavy 1/2" dia Faisal or equivalent made. Complete as per
specification and instruction of E/Incharge.
2 Nos.

W-12

Construction of septic tank of BB size, 8'x4'x6' with 9" thick BB wall, 4" thick BB
partition, 1/2" thick cement plaster in 1:4 and 6" thick PCC 1:3:6 in foundation and
bed, 4" thick RCC 1:2:4 precast covers with 1/2" dia bars, 4" C/C both way. Complete
as per instruction of Engineer Incharge.
1 No.

W-13

Construction of 6' internal dia 30' deep soakage pit i/c 9" thick BB in 1:4 from top to 6'
depth, filling of pit with stone boulder, making chemny and RCC 1:2:4 cover 4" thick
with 1/2" dia bars 4" C/C both way. Complete in all respect as per specification and
instruction of Engineer incharge.
1 No.

W-14

P/L: in trench, jointing and testing 6" dia RCC pipe i/c collar, excavation
of trench & re-filling after laying of pipe. Complete as per specification
and instruction of Engineer Incharge.
40.00 Rft

W-15

Construction of 2'x2' or 2' dia BB manhole, upto required depth i/c 4"
PCC 1:4:8 in bed, BB wall laid & plastered in 1:4 making channel inside
and RCC 1:2:4 cover, 4" thick with 3/8" dia bars 4" C/C both side.
Complete as per instruction of Engineer Incharge.
4 Nos.

W-16

S/F: of polythene water tank 500 gallons


1 No.