Sunteți pe pagina 1din 6

Subject:

STRUCTURAL INTEGRITY- DEEP FOUNDATIONS _TIMBER PILES


Design Code/Reference:
Designed By:
Date:
01-Dec-14
engr_wbl
Foundation Design 2nd Edt'n by:
Output
CALCULATIONS & SCKETCHES

FOUNDATION DESIGN
Code Ref.

Input Data:

Timber Piles:
n=

16

no. of piles

P=

40 k

load per piles

L=

30 ft

length of piles

V=

3.9 k

shear

B1 =

12 in

head pile diameter

M=

7 k-ft

B2 =

7 in

toe pile diameter

fa = 800 lb/in ave. normal stress

L2 =

8 ft

moment depth from top of pile

Step 1: Check the axial and flexural stresses at depth of maximum moment.

B=

10.67 in

A=

89.36 in

P
V
L2

Assume P at 8 ft = P at head (conservative).


Eq. 12.1

fa = 447.62 lb/in

Eq. 12.3

S=

120 in

Eq. 12.2

fb =

700 lb/in

M
L

Fb = 1600 lb/in (Fb =2fa) at allowable exteme fiber

Eq. 12.5

0.99

< 1, Ok!

Step 2: Check shear stress at the head of the pile (point of maximum shear).
Eq. 12.6

Fv =

72 lb/in

A=

113.10 in

fv = 34.48 lb/in < Fv, Ok! design acceptable!

Subject:
STRUCTURAL INTEGRITY- DEEP FOUNDATIONS _PIPE PILE
Design Code/Reference:
Designed By:
Date:
01-Dec-14
engr_wbl
Foundation Design 2nd Edt'n by:

FOUNDATION DESIGN

CALCULATIONS & SCKETCHES

Code Ref.

Output

Input Data:
Pipe Pile:
t=

L=

0m

no. of piles

P=

20 kN-m

load per piles

length of piles

V=

12 kN-m

shear

B = 400 mm head pile diameter


t = 10 mm wall thickness

M = 95 kN-m
Fy = 250 N/mm ave. normal stress
for A36 steel pipe

Step 1: Check the axial and flexural stresses at depth of maximum moment.
P

A=

0.0123 m

Assume P at 0 ft = P at head (conservative).


Eq. 12.1

fa =

1.63 MPa
L

I = 2.33E-04 m4
Eq. 12.3

S=

1.17E-03 m

Eq. 12.2

fb =

81.5 N/mm

Eq. 12.10

Fa = Fb =

Eq. 12.5

87.5 MPa

0.96

< 1, Ok!

Step 2: Check thear stress using half of the cross-sectional area.


Eq. 12.6

fv =

1.96 MPa

Fv =

100.00 MPa

fv < Fv design satisfactory!

Subject:

FOUNDATION DESIGN

STRUCTURAL INTEGRITY- DEEP FOUNDATIONS _BORED PILE


Design Code/Reference:
Designed By:
engr_wbl
Foundation Design 2nd Edt'n

CALCULATIONS & SCKETCHES

Code Ref.

Input Data:
Compression Load:

Moment:

PD =

300 k

MD =

240 k-ft

PL =

260 k

ML =

80 k-ft

fy =

60000 psi

f'c = 4000 psi

Determine the required diameter and reinforcement.

Unfactored Load:

Eq. 2.13

=#NAME?
PD + PL

P=

560 k

B=

24 in

g=

0.69

Pu =

862 k

=#NAME?
1.4PD + 1.7PL

Mu =

472 k-ft

=#NAME?
1.4MD + 1.7ML

= round([B - 7.5] / B , 2)
#NAME?

Longitudinal Reinforcement:

A = 452.39 in
Pu/A = 1.91 k/in
Mu/AB =

0.52 k/in

Per Figure 12.7, g =

0.60

r=

0.055

Per Figure 12.8, g =

0.75

r=

0.038

r=

0.045

As =

20.4 in

#NAME?
= pB2 / 4
= round(Pu / A , 2)
#NAME?
= Mu / (AB / 12)
#NAME?

By interpolation:

use: steel bar:


n=

= (r) + (g - g)(r - r) / (g - g)
#NAME?
= rpB2 / 4
#NAME?

# 10
16 nos.

# 10 steel bars

Subject:
STRUCTURAL INTEGRITY- DEEP FOUNDATIONS _BORED PILE
Design Code/Reference:
Designed By:
engr_wbl
Foundation Design 2nd Edt'n

FOUNDATION DESIGN

CALCULATIONS & SCKETCHES

Code Ref.
Spiral Reinforcement:
Ac =

254 in

= p[B - 2c]2 / 4
#NAME?

rs =

0.023

= 0.45[A / Ac - 1]f'c / fy
#NAME?

conc. core cover, c =

let p = pitch
try steel bar:

#6

As =

0.44 in

Volume of steel per turn, Vs/t =

56.5 As

Volume of steel per turn, Vc/t =

254 p

= p 182 / 4
#NAME?

p=

4.2 in

= Vs / t* As /(Vc/ t*rs)
#NAME?

Use : 24 in dia.

#NAME?
=18p As
#NAME?

shaft with 16

# 6 spiral bars spaced

long. # 10 bars
@ 4 in o.c.

3 in

ORED PILE
Date:
01-Dec-14

Output

ORED PILE
Date:
01-Dec-14

Output

S-ar putea să vă placă și