Sunteți pe pagina 1din 2

PROJECT:

KORBA SUPER THERMAL POWER PROJECT


WAGON TIPPLER CONVEYING PLANT PACKAGE
OWNER:
NATIONAL THERMAL POWER CORPORATION LTD.
(A GOVERNMENT OF INDIA ENTERPRISE)
NEW DELHI
EPC CONTRACTOR:

ENERGO ENGINEERING PROJECTS LTD.


E-42/2, OKHLA INDUSTRIAL AREA, PHASE-II
NEW DELHI

FLAP GATE AND ACTUATOR SIZING CALCULATION

NTPC DOC.NO:

2100-155-PVM-U-011

EEPL DOC. NO:

EEPL/135/M/CAL/012

APPROVAL STATUS :

00
REV

21/04/14
DATE

RAJAT
INITIALS

SUDHEER
SIGN

PREPARED

INITIALS

ARSHAD
SIGN

CHECKED

INITIALS

SIGN

APPROVED

DETAILS OF REVISION

FLAP GATE CALCULATION (TP-33)

INPUT DATA FOR THRUST & POWER CALCULATION :


Flap Width
Flap Inclination with Hrz
Flap Length
Material W idth
Height of Material
Flap plateThickness
Horizontal Distance of CG of Material + Flap weight from Pivot
Lever arm for actuator
Lever arm for actuator (VERTICAL)
Shaft Bearing Centers
Material Used
Density of Material (for load Calculation)
ACTUATOR THRUST
Wt of flap (Considering 10% extra for Stiffners & arm etc.)
Wt of Material
Considering frictional & other resistances 100%
Maximum Torque on Shaft of Gate
Speed
Required Force in Running Condition
Minimum reqd Actuactor Force as per Actuator specification
Actuator force taken
Actuator Force Selected
ACTUATOR POWER
Drive efficiency
Required motor power
Taking 10% margin
Motor power selected
SHAFT DIAMETER AT BEARING & COUPLING
Shaft Material
Young's Modulus of Elasticity
Factor of Safety
Surface Factor
Size Factor
Reliability Factor
Temperature Factor
Duty Cycle Factor
Fatigue Stress Concentration Factor
Miscellaneous Factor
Ultimate Tensile Strength for Shaft material
Yield Strength for Shaft Material
Shaft Fatigue Limit
Corrected Shaft Fatigue Limit
Coeffeciant of friction for bearing
Coefficiant of rolling friction
Weight of Shaft
UDL on the Shaft
Maximum Torque on Shaft of Gate
Maximum Bending Moment on Shaft
Side of square Shaft at critical position (minimum)
Side of square Shaft selected
Diameter at coupling required for actuatar thrust (minimum)
Shaft diameter at coupling selected

E
F.S
ka
kb
kc
kd
ke
kf
kg
UTS
Sy
Sf*
Sf
m
k
Ws
wpm
T
M
a
a
dc
dc

Shaft Specifications for the considered flap gate


Shaft diameter at bearing
Shaft diameter at coupling
Side of square bar

dn
dc
a

b
q
l
bm
pm
tp
Xm
L
Y
Ls

=l*cos
=l*sin
=bm/3 (Distance of Centroid of the triangle)
=L*sin

Wf
Wm
F
T
v
Fth1
Fth2
Fth
Fa
h
Pr*
Pr
Ps

(2*b*l*(tp)*7.85/10^6*9.81)*1.1
(1/2)*bm*pm*b)*(/10^9)*9.81
2*(Wf+Wm)
F*Xm
=((T/(Y*9.81))
min 3500 kg for lever arm 1m
max of Fth1 and Fth2

1380
60.0
1155
577.50
1000.26
20
193
800
692.82
1,860
COAL
1,100
5400.73
4301.06
19403.58
3735188.46
30
549.57
4375.00
4375.00
4400
30.00
4.29
4.72
5.50

=(thrust*v)/(1000*h)
1.1*Pr*

dn^(-0.19)

=0.5*UTS
=ka.kb.kc.kd.ke.kf.kg.Sf*

=(a^2*Ls)*7.85/10^6*9.81
(Wf+Wm+Ws)/b
F*Xm (From above)
wpm*b^2/8
(32*FS/pi()*((M/Sf)^2+(9T/16Sy)^2)^0.5)^(1/3))
((Fth*9.81*Y)*16/(PI()*Sf))^(1/3)

150
145
160

En8
200000.00
1.50
0.80
0.39
0.90
1.00
1.00
0.77
1.00
560
280
280
60
0.015
0.500
3666.8
9.69
3735188.46
2306087.80
84.39
160.00
136.37
145.00

mm
deg
mm
mm
mm
mm
mm
mm
mm
mm
kg/m3
N
N
N
Nmm
mm/s
Kgf
Kgf
Kgf
Kgf
%
kw
kw
kw

#
#
#
#

N/mm2

N/mm2
N/mm2
N/mm2
N/mm2
mm
N
N/mm
Nmm
Nmm
mm
mm
mm
mm

mm
mm
mm

#- Drive Efficiency & motor power will be finalized as per final Vendor Recommendation for rated thrust.

OK
OK