Documente Academic
Documente Profesional
Documente Cultură
Document Name
DT Methodology
Date Created
July 3, 2014
Version
V 002
Approved By
Document Number
Owner
NPO
Prepared By
Alan Castaneda
Designed For
NPO
Reviewed By
Xuwei
Project
1. Version History
Version
001
002
Modified By
Alan Castaneda
Alan Castaneda
Date Modified
May 23, 2014
July 3, 2014
Description of Changes
First draft of the DT Methodology
Added new methodology/sequence in the DT tool
setup
2. OBJECTVE
Main purpose of this document is to have proper guidelines in performing the DT and likewise to
have uniform set-up of the DT tools.
3. DT KPIs
2G DT KPI
DT KPIs
KPI No.
2G DT KPIs
Full Test
No MOS
Remarks
Methodology
Target
CSSR [%]
18.00%
20.00%
Mandatory
CDR [%]
18.00%
20.00%
Mandatory
7.00%
7.00%
Mandatory
PS Call
7.00%
7.00%
Mandatory
PS Call
HOSR [%]
9.00%
9.00%
Mandatory
9.00%
9.00%
Mandatory
Rx Quality (0 5) [%]
9.00%
9.00%
Mandatory
8.00%
8.00%
Mandatory
Scanner
Maintain
7.00%
7.00%
Mandatory
PS Call
10
3.00%
4.00%
Mandatory
PS Call
11
5.00%
N/A
Mandatory
12
N/A
N/A
Information
PS Call
13
N/A
N/A
Information
PS Call
14
Average BER
N/A
N/A
Information
PS Call
15
CODEC
N/A
N/A
Information
16
UE Tx Power
N/A
N/A
Information
17
TA Distribution
N/A
N/A
Information
18
N/A
N/A
Information
DT METHODOLOGY GUIDELINES
3G DT KPI
DT KPIs
KPI
No.
3G DT KPIs
Full
Test
No
MOS
No
Video
No Video/No
MOS
10.00%
10.00%
10.00%
10.00%
10.00%
10.00%
10.00%
10.00%
1.00%
1.00%
1.00%
1.00%
1.00%
1.00%
N/A
N/A
1.00%
1.00%
N/A
N/A
7.00%
7.00%
7.00%
7.00%
7.00%
7.00%
7.00%
7.00%
2.00%
2.00%
2.00%
2.00%
2.00%
2.00%
2.00%
2.00%
10
6.00%
6.00%
6.00%
6.00%
11
6.00%
6.00%
6.00%
6.00%
12
4.00%
4.00%
4.00%
4.00%
13
4.00%
4.00%
4.00%
4.00%
14
Soft/Softer HO SR [%]
4.00%
4.00%
4.00%
4.00%
15
2.00%
2.50%
2.50%
2.50%
16
IFHO SR [%]
3.00%
3.00%
3.00%
3.00%
17
2.00%
2.50%
2.50%
2.50%
18
5.00%
5.00%
5.00%
5.00%
3.00%
3.00%
3.00%
3.00%
3.00%
3.00%
3.00%
3.00%
5.00%
5.00%
5.00%
5.00%
4.00%
4.00%
4.00%
4.00%
3.00%
4.00%
4.00%
4.00%
24
Info
Only
3.00%
Info
Only
5.00%
25
5.00%
N/A
5.00%
N/A
Info
Only
Info
Only
Info
Only
Info
Only
Info
Only
Info
Only
Info
Only
Info
Only
Info
Only
Info
Only
Info
Only
Info
Only
Info
Only
Info
Only
Info
Only
Info
Only
Info
Only
Info
Only
Info
Only
Info
Only
Info
Only
Info
Only
Info
Only
Info
Only
19
20
21
22
23
26
Average BLER
26
26
26
26
UE Tx Power [%]
26
RTWP dBm
26
Compress Mode
26
Target
Baseline + 20%
Improvement
Baseline + 20%
Improvement
< 7 sec
Baseline + 20%
Improvement
Baseline + 20%
Improvement
Maintain
Baseline + 20%
Improvement
Baseline + 20%
Improvement
Baseline + 20%
Improvement
Baseline + 20%
Improvement
Baseline + 20%
Improvement
Baseline + 20%
Improvement
Baseline + 20%
Improvement
Baseline + 20%
Improvement
Baseline + 20%
Improvement
Baseline + 20%
Improvement
Baseline + 20%
Improvement
Baseline + 20%
Improvement
Baseline + 20%
Improvement
Baseline + 20%
Improvement
Baseline + 20%
Improvement
Baseline + 20%
Improvement
Baseline + 20%
Improvement
Baseline + 20%
Improvement
Baseline + 20%
Improvement
Remark
Methodology
Mandatory
Mandatory
Mandatory
Mandatory
Mandatory
Mandatory
Scanner
Mandatory
Scanner
Mandatory
R99 PS Sequence
Mandatory
R99 PS Sequence
Mandatory
HSDPA PS Sequence
Mandatory
HSDPA PS Sequence
Mandatory
HSUPA PS Sequence
Mandatory
HSUPA PS Sequence
Mandatory
Mandatory
Mandatory
Mandatory
PS Call Sequence
Mandatory
Mandatory
R99 PS Sequence
Mandatory
R99 PS Sequence
Mandatory
HSDPA PS Sequence
Mandatory
HSUPA PS Sequence
Mandatory
Mandatory
Mandatory
Info Only
Information
PS Sequence
Info Only
Information
Info Only
Information
Info Only
Information
PS Sequence
Info Only
Information
Info Only
Information
Info Only
Information
PS Sequence
Info Only
Information
PS Call
DT METHODOLOGY GUIDELINES
4. DT TOOL SETUP
Top View:
Inside View:
GPS ANT
MS ANT
VAN
Attenuator Settings:
Clutter
Dense urban
Urban
Sub Urban
Rural
Outdoor
DT METHODOLOGY GUIDELINES
5. DT METHODOLOGY
DT Route
Drive-test Route shall be proposed to Indosat for approval. No DT shall be conducted not unless
there is an approval from customer. DT route should be detailed as possible to capture the full coverage and
quality of the network. Identify the route per clutter type: DU, U, SU, R
Procedure
a)
Input entire network sites list, digital map and cluster border into MapInfo.
b)
c)
In the new layer, indicate the test start and draw the folded line with an arrow to
indicate the test route, indicate the test end.
d)
A test route KPIs shall be selected as much as possible based on covered all the scenarios in this
test area, all the cells as much as possible, considered the actual conditions, one day working
load.
If the customer has a predefined DT route, the DT route of KPIs shall cover the predefined DT
route. If the predefined DT route is not covered due to some objective factors, you need to
describe this case in time.
.
DT METHODOLOGY GUIDELINES
KPI Measurements
3G
KPI
No.
3G DT KPIs
Measurement
DT METHODOLOGY GUIDELINES
3
6
7
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
IFHO SR [%]
PS Inter RAT HO Success Rate (3G to
2G) [%]
Good CQI (% CQI >= 17)
Average R99 DL throughput (% Tput >
128 kbps)
Average R99 UL throughput (% Tput >
64 kbps)
Average HSDPA throughput (% Tput
>1.2 Mbps)
Average HSUPA throughput (% Tput >
300 kbps)
Soft Handover Overhead
SQI Mean > 20 [%]
MOS > 3 [%]
DT METHODOLOGY GUIDELINES
2G
KPI
No.
1
2
3G DT KPIs
CSSR [%]
CDR [%]
4
5
Measurement
Rx Quality (0 5) [%]
8
9
10
11
DT Tool Set-Up
DT METHODOLOGY GUIDELINES
DT METHODOLOGY GUIDELINES
Legend (Signal/Quality/Throughput)
Signal (RSCP/RxLevel)
0 to -65dBm
-65 to -75 dBm
-75 to -85 dBm
-85 to -95 dBm
-95 to -110 dBm
No measurement