General
a. Name of the Exchange
b. Type of Exchange Equipment
c. No. of RSUs parented
d. Equipped capacity
e. Working connections
f. Waiting list
g. Other pending Advice Notes
h. Plans for expansion to wipe out the waiting list and providing telephones
on demand.
M.D.F:
i. Termination capacity
Exchange side
Line side
ii. Total primary pairs
iii. Conditions / quality of jumpering
iv. Provision of protective devices
v. Whether jumper removed from disconnected numbers
vi. Value of exchange earth. When it was last measured
vii. Whether records properly maintained for
b. Nos. disconnected under safe custody
c. Spare nos.
d. DNPs
e. Pillarwise & DP wise cable records
viii. Status of leased circuits
III.
F.R.S.
a. Whether FRS computerized. If not, what are the plans
b. Are daily test registers & fault cards being maintained
c. % of faults cleared
i.
Less than 24 hours
ii.
Less than 48 hours
iii.
Less than 72 hors
iv.
Less than one week
v.
Average duration of the fault
d. Fault rate
i. Actual this month
j. Same month of the previous year
k. Target
e. Whether register of VIP & High calling subscribers maintained and lines
tested daily
IV.
Power plant :
i. Type and date of installation
ii. Peak load and capacity
iii. Whether capacity sufficient to meet requirement of next five year