Sunteți pe pagina 1din 5

Submitted to the Chairman

Respected Sir,

Proposed Date: 22.12.2014 to 31.12.2014

The following CADD training centers are interested to conduct value added course (Ansys Analysis Software)
for third year mechanical students in our campus.

B.E-MECHANICAL ENGINEERING
YEAR/SEMESTER: III/VI
SL.NO

QUOTATIONS

Rs/students

SHARPTHINK PRO-TRAN
1
NAME OF THE

New# 86, Old#22,

CENTER-I

Annamalai Nagar 3rd Street,


Rs 3000 Per
student

Mettupalayam, West Mambalam,


Chennai 600 033.
PH- 91-44-42172122/42129668
Mail: protran@sharpthink.in web: www.sharpthink.in
Contact Person : Mr. K. Sakthivel

+919940444199

CADD Centre,
NAME OF THE
CENTER-II

Chidambaram on behalf of
Rs 5500
+1500=Rs7000
Per student

CADD Centre, 91, Gee Gee Crystal,


Dr.R.k.Salai,
Mylapore, Chennai 4
Contact Person : Ms. Uma

04144239239

NAME OF THE
CENTER-III

Diagonal CADD
M.R.K. Complex, 2nd Floor,
7E-Sannathi ST, Jayankondam,
Ariyalur (Dt) -621802.
Ph; +91 04331- 250554,

Rs 1700 Per
student

web: www.diagonalcadd.com
Contact Person : Mr.P.Natarajan

HEAD OF THE DEPARTMENT

9566330554

PRINCIPAL

Dr. NAVALAR NEDUNCHEZHIYAN COLLEGE OF ENGINEERING,THOLUDUR- 606 303.


DEPARTMENT OF MECHANICAL ENGINEERING
Submitted to the Chairman
Respected Sir,
The following CADD training centers are interested to conduct value added course for third year mechanical students in our
campus.

ME-MANUFATURING ENGINEERING
SEMESTER II: MF 7211 AUTOMATION AND METAL FORMING LABORATORY
URAMSL.NO

NAME OF THE

QTY

QUOTATION-II

EQUIPMENT

JEHOVAHJIREH ENGINEERING
NO.60 A-2 4TH MAIN ROAD,L&T COLONY,
CRR PURAM MANAPAKKAM,CHENNAI-600 125
T.Bernet Johnson

7200456099,
9500197799

Determination of strain

TOTAL AMOUNT

TAX

DISCOUNT

Rs

AMOUNT

AMOUNT

WITH TAX

Rs.

Rs.

&DISCOUNT Rs.

16,266.60

3,90,398.40

hardening Exponent

3,87,300.00

Equipment
2

Determination of strain rate

Construction of formability

Determination of efficiency

(5%)

sensitivity index equipment


3

19,365.00

FINAL AMOUNT

3,15,000.00

15,750.00

13,230.00

(5%)

3,17,520.00

limit diagram equipment


1

in water hammer forming

1,85,000.00

equipment
5

Determination of interface

friction factor equipment


6

Determination of extrusion

load equipment
7

Mini rolling mill

GRAND TOTAL RUPEES

9,250.00
(5%)

--------

------

--------

------

1,23,000.00

10,10,300

6,150.00

7770.00

--------

-------5,166.00

(5%)

50,515

42,433

1,86,480.00

--------

--------

1,23,984.00

10,18,382

HEAD OF THE DEPARTMENT

PRINCIPAL

Dr. NAVALAR NEDUNCHEZHIYAN COLLEGE OF ENGINEERING,THOLUDUR- 606 303.


DEPARTMENT OF MECHANICAL ENGINEERING
ME-MANUFATURING ENGINEERING
SEMESTER II: MF 7211 AUTOMATION AND METAL FORMING LABORATORY
SL.NO

NAME OF THE

QTY

EQUIPMENT

QUOTATION-I

QUOTATION-II

PRABA ENGINEERING CORPORATION,

JEHOVAHJIREH ENGINEERING

213,SIVAJI COLONY,THADAGAM ROAD ,

NO.60 A-2 4TH MAIN ROAD,L&T COLONY,

COIMBATORE-64125

CRR PURAM MANAPAKKAM,CHENNAI-600 125

Mr.R.Augustin

Determination of strain

Determination of strain rate

7200456099, 9500197799

TAX

TOTAL

FINAL AMOUNT

TOTAL

TAX

TOTAL

FINAL AMOUNT

AMOUNT

AMOUNT

AMOUNT

WITH DISCOUNT

AMOUNT

AMOUNT

AMOUNT WITH

WITH DISCOUNT

Rs

Rs

WITH

&TAX

Rs

Rs

TAX

&TAX

TAX Rs

Rs

Rs

Rs

375375

3,56,606.25

265650

2,52,367.50

3,57,500.00

17,875.00
(5%)

Mr.T.Bernet Johnson

TOTAL

hardening Exponent Equipment


2

98422 40507

2,53,000.00

sensitivity index equipment

3,87,300.00

19,365.00

4,06,665.00
3,90,398.40

(5%)

12,650.00
(5%)

3,15,000.00

15,750.00

3,30,750.00
3,17,520.00

Construction of formability

2,75,000.00

limit diagram equipment


4

Determination of efficiency in

(5%)
1

4,40,000.00

water hammer forming

(5%)

13,750.00
288750

2,74,312.50

462000

4,38,900.00

22,000.00
(5%)

1,85,000.00

Determination of interface

2,75,000.00

friction factor equipment


6

Determination of extrusion

Mini rolling mill

3,85,000.00

(5%)
1

6,05,000.00

25,90,500

288750

2,74,312.50

404250

3,84,037.50

635100

6,03,345.00

--------

------

------

------

--------

------

------

------

19,250.00

1,29,375

1,23,984.00

6,150.00

30,100.00
(5%)

GRAND TOTAL RUPEES

1,86,480.00

13,750.00
(5%)

load equipment
7

1,94,250.00

(5%)

equipment
5

9,250.00

27,19,875

25,83,881

1,23,000.00

10,10,300

(5%

1,29,150.00

50,515

10,60,815

10,18,382

S-ar putea să vă placă și