Sunteți pe pagina 1din 152

ACEH

INVESTMENT
PROFILE

DETAILED PLAN OF

ACEH INVESTMENT PROFILE

ACEH INVESTMENT COORDINATING BOARD


2014

FOREWORD

dr. Zaini Abdullah


GOVERNOR OF ACEH

Aceh is your investment destination. There are four key


strengths that make Aceh very promising: friendly investment
laws, geographical position, abundant natural resources, and
human capital.
Friendly investment laws are related to our status as a special
autonomy province in Indonesia. We have a wider authority to
govern ourselves than other regions in Indonesia. We also have
privilleges to make direct cooperation with foreign institutions.
Another important investment measure is the free port
and free trade zone in Sabang. The zone provides attractive
incentives for investors, such as import duty and tax exemption.
For simplification, all licensings for investment in the zone are
issued by the Sabang Management and Development Board
(BPKS).
Another reason that makes Aceh one of the best place to
invest is its location proximity. Located in one of the busiest
international shipping lane, on the entrance of Malacca Strait,
Aceh is geographically close to potential markets, such as
East Africa, Middle East, South Asia, Southeast Asia, East Asia,
along with Australia and New Zealand. This relative position is a
beneficial networking for long term investment activities.
Aceh also has abundant natural resources. Coffee, cocoa,
rubber, and palm oil are just a short list. Mineral resources,
located inland and offshore also await further investment
Potential investors can get the most of the commodities,
utilizing the large number of productive and hardworking labor
force in Aceh. To highlight, the Government of Aceh provides
20% of its annual budget for human capital so they can be your
partners in the business.
To accelerate investment in the region, we work on some
important issues to be resolve, such as de-regulation, licensing
acceleration, security and business comfort improvement.
Hence, the brand-new Aceh is just perfect for your future
investment.
Last but not least, we welcome you to visit Aceh and invest in
amazing Aceh.

dr. Zaini Abdullah


GOVERNOR OF ACEH

PREFACE
We thank God that Aceh regains trust from
investors and being in the top seven of
investment realization in Indonesia in 2013.
42 new businesses, domestic and overseas,
acquired investment licenses to operate
in Aceh, and are committed to invest in 10
priority sectors, with the total investment
value was up to IDR 6.1 trillions.
Meanwhile, 139 existing companies/projects
have been operating in Aceh, with the total
amount of investment, up to December
2013, was about IDR 5 (five) trillions, and
employed about 21.866 local manpower.
As our vision is to be one of the leading
investment destination in Indonesia, we
will continue to work hard and to make sure
that investor and potential investors get
the best services and full assisstance where
necessary. We will also make effective and
efficient coordination with related sectors
and institutions to simplify all procedures.
All the efforts are for one reason, to provide
business comfort to investors.
We thank you all for your continuous
support to Aceh and to trust Aceh as your
investment destination.

Ir. Iskandar, M.Sc


Chairman of Aceh Investment
Coordinating Board

Ir. Iskandar, M.Sc


Chairman of
Aceh Investment
Coordinating Board

Content
I
INTRODUCTION

1.1 VISION ~ 11
1.2 GEOGRAPHY~ 12
1.3 DEMOGRAPHY ~ 14
1.4 SPATIAL PLANNING ~ 16
1.5 ECONOMIC PERFORMANCE ~ 18
1.6 INFRASTRUCTURE SUPPORT ~ 20
1.7 DOING BUSINESS IN ACEH ~ 30
1.8 FACT AND FIGURE ~ 32

II
DETAILED PLAN OF AGRO INDUSTRIES
PROJECT

2.1 DETAILED PLAN OF FOOD CROPS AND


HORTICULTURE ~ 38
2.2 DETAILED PLAN OF PLANTATION ~ 52
2.3 DETAILED PLAN OF ACEH BEEF INDUSTRY
DEVELOPMENT PROJECT ~ 76
2.4 DETAILED PLAN OF FISHERIES ~ 88

III
DETAILED PLAN OF INFRASTRUCTURE
AND ENERGY

3.1 DETAILED PLAN OF INSFRASTRUCTURE ~ 98


3.2 DETAILED PLAN OF ENERGY ~ 102

4.1 KRUENG ACEH RIVER WALK ~ 112


IV
4.2 ULEE LHEU BEACH ~ 116
DETAILED PLAN OF TOURISM
DEVELOPMENT PROJECT IN BANDA ACEH

V
SABANG FREE PORT AND FREE
TRADE ZONE PROJECT

5.1 INTERNATIONAL SHIPPING LINE ~ 124


5.2 SABANG INTERNATIONAL WATER FRONT
RESORT AND CONVENTION CENTRE ~ 126
5.3 PASSANGER CRUISE TERMINAL ~ 128
5.4 YACHT MARINA & SUPPORTING FACILITIES ~ 130
5.6 DIVING CENTER ~ 132
5.7 SEA PORT ~ 134

VI
DETAILED PLAN OF INDUSTRIAL AND
TRADING ESTATES

6.1 ACEH INDUSTRIAL AREA ~ 144

I
Introduction

10

INTRODUCTION

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

11

VISION

Aceh becomes one of the leading


Investment Destination in 2017

ACEH INVESTMENT COORDINATING BOARD |

12

INTRODUCTION

1.2 GEOGRAPHY

ACEH,
THE WEST
GATE OF
INDONESIA

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

13

ACEH

ACEH INVESTMENT COORDINATING BOARD |

14

INTRODUCTION

1.3 DEMOGRAPHY

| WWW.ACEHINVESTMENT.COM

1
,49

8
1,97
rce

Fo
ors
Lab

5,015

,2 3 4

by
bited )
Inha le (2013
peop

48 %
of the n
tio
popula the
work inture
agricul r.
secto

cities subdistrict mukim villages


district

56,770.81
Km2

7
,
4
7
8
,
8
0
1
.95
Ha

Total area
Total are
according to
the territ a of
Basemap of
or
sea whos ial
Indonesia.
e
breadth
extends
two hun to
nautical dred
measuredmiles
the basel from
ines.

ACEH INVESTMENT COORDINATING BOARD |

Topogr
mountaaphically hilly
w
i
waterfans, valleys, rive ith
lls, an
rs,
floodpl d narrow
ain

778 6.493

289

18

15
ACEH INVESTMENT PROFILE

16

INTRODUCTION

1.4 SPATIAL PLANNING

Photo: Banda Aceh From Sky

Strategic Area:

The Center of National Stragic Activities (PKSN) : Sabang, free port and free trade
areav
National Activity Center : Lhokseumawe and greater area (PKN)
Capital City : Banda Aceh

2,934,602 Ha
Cultivated Area
Those areas for production forest,
community forest; agriculture;
fisheries; mining; industry; tourism;
housing and other functions.

| WWW.ACEHINVESTMENT.COM

2,708,550 Ha
Protected Area and Conservation Area
Those areas ruled for the protection for
following areas Local protected area; preserve
region and areas and cultural heritage; national
disaster-prone; geology protection; and other
preservation areas.

ACEH INVESTMENT PROFILE

17

Sabang

Banda Aceh

Lhokseumawe

Takengon
Langsa
Meulaboh

Cultivated Area
Protected Area
Conservation Area

ACEH INVESTMENT COORDINATING BOARD |

INTRODUCTION

111,183,310

40,783,226
5,085,052

411,428,571
102,857,143

26,133,215

13,127,198

4,407,581
| WWW.ACEHINVESTMENT.COM

165,101,527

8,565,728

382,330,821

1.5 ECONOMIC PERFORMANCE

Minimum Wage (USD)

18

Domestic Investment (USD)


Foreign Investment (USD)

ACEH INVESTMENT PROFILE

19

Photo: Illustration

Inflation

Economic Growth

Export (ton)

Import (ton)

ACEH INVESTMENT COORDINATING BOARD |

20

INTRODUCTION

1.6 INFRASTRUCTURE SUPPORT

ROAD

Photo: Highway Road, Lhok Seudu, Aceh Besar

Provincial Road
1.813,33 Km

| WWW.ACEHINVESTMENT.COM

National Road
1.803,36 Km

Regencial Road
13.841,07 Km

ACEH INVESTMENT PROFILE

21

Sabang
Banda Aceh

Lhokseumawe

Takengon

Langsa

Meulaboh

ACEH INVESTMENT COORDINATING BOARD |

22

INTRODUCTION

SEAPORT

Photo: Malahayati Seaport, Aceh Besar

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

23

Balohan-Sabang

Malahayati-Aceh Besar

Krueng Geukueh-Lhokseumawe

Kuala Langsa

Calang

Meulaboh

Susoh

Tapak Tuan

Sinabang

Singkil

ACEH INVESTMENT COORDINATING BOARD |

24

INTRODUCTION

AIRPORT

Photo: Iskandar Muda International Airtport, Aceh Besar

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

25

Maimun Saleh-Sabang

Sultan Iskandar Muda-Aceh Besar

Malikussaleh-Lhokseumawe

Rembele-Central Aceh

Point A-North Aceh

Blang Keujeuren-Gayo Luwes

Alas Lauser-Southeast Aceh

Cut Nyak Dhien-Nagan Raya

Kuala Batee-Southwest Aceh

T. Cut Ali-South Aceh

Lasikin-Simeulu
Hamzah Fansuri-Aceh Singkil

ACEH INVESTMENT COORDINATING BOARD |

26

INTRODUCTION

ENERGY

Capacity

Tariff/KWH
IDR

USD

450 VA

485

0.05

900 VA

600

0.06

1300 VA

930

0.09

2.200 VA

960

0.1

3.500 VA -14 KVA

1112

0.11

14 KVA-200 KVA

972

0.1

200 KVA-30.000 KVA

803

0.08

More Than 30.000 KVA

723

0.07

| WWW.ACEHINVESTMENT.COM

Photo: Steam Power Plant, Nagan Raya

Aceh-North Sumatra
Interconnection
343 MW

Nagan Raya Steam


Power Plant
2x110 MW

PLTG Arun
Lhokseumawe
200 MW

Peusangan Hydro
Power Plant
88MW

ACEH INVESTMENT PROFILE

27

Aceh North Sumatera


Interconnection
PLTG Arun Lhokseumawe
Finishing: 2014

Peusangan Hydro
Electric Power Plant
Finishing: 2016

Nagan Raya Steam


Power Plant

ACEH INVESTMENT COORDINATING BOARD |

28

INTRODUCTION

WATER
DISTRICT/CITY

WATER SUPPLY COMPANY

Banda Aceh

PDAM Tirta Daroy

Sabang

PDAM Tirta Aneuk Laot

Aceh Besar

PDAM Tirta Mon Tala

Pidie

PDAM Tirta Mon Krueng Baro

Pidie Jaya

PDAM Tirta Krueng Meureudu

Bireun

PDAM Tirta Krueng Peusangan

North Aceh

PDAM Tirta Mon Pase

East Aceh

PDAM Tirta Peusada

Lansa

PDAM Tirta Keumeuneng

Central Aceh

PDAM Tirta Tawar

Gayo Luwes

PDAM Tirta Sejuk

Bener Meriah

PDAM Tirta Beungi

Aceh Jaya

PDAM Tirta Mon Trata

West Aceh

PDAM Tirta Meulaboh

Southeast Aceh

PDAM Tirta Agara Kutacane

Singkil

PDAM Tirta Singkil

South Aceh

PDAM Tirta Naga Tapaktuan


Photo: Ilustration

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

29

ACEH INVESTMENT COORDINATING BOARD |

30

INTRODUCTION

1.7 DOING BUSINESS IN ACEH

Photo: Palm Oil Industry, PT. Megalopolis, Aceh Jaya

REGULATIONS
Law No 11 of 2006 on Aceh
Governance.
The law gives the Government
of Aceh privileges to govern the
province including in economic
development to improve health,
safety, and public welfare.

| WWW.ACEHINVESTMENT.COM

Law No. 37 of 2000 on Sabang


Free Port and Free Trade Zone.
It concludes a wide range of
facilities for doing business in
Sabang, such as import duty
and tax exemption. The Sabang
Management and Development
Agency (BPKS) operates the zone
and has an authorization to issue
all licensings for investment in
this area.

Presidential Regulation No. 11


of 2010 on Cooperation between
the Government of Aceh and
Foreign Institutions.
The regulation allows a wide
authority for the Government of
Aceh to establish cooperation
with foreign institutions,
especially in economic
development.

ACEH INVESTMENT PROFILE

31

Ease of Doing Business in Aceh


POTENTIAL
INVESTORS
INVESTMENT ACCELERATION
TASK FORCE TEAM

INFORMATION, FACILITATION AND ASSISTANCE

LICENSING

One Stop Service for Local Licenses

PRINCIPLE LICENSE: BKPM/BPKS


WORKING LICENCE: BKPM/BPKS
LOC AL LICENCE: BP2T

CONSTRUCTION

> Security, convenience and law certainty


> Land availability, labor, wages & incentive
> Licensing administration
> Policy, Regulation
> Field Visit, etc

INVESTMENT EVALUATION AND


CONTROLLING TASK FORCE TEAM
FACILITATION AND ASSISTANCE

OPERATION AND
BUSINESS EXPANSION

> Security, convenience and low certainty


> Land dispute, labor dispute, etc
> Regulation and licensing for business

NOTE:
BKPM > Indonesian Investment Coordinating Board
BPKS > Sabang Free Port and Free Trade Management Board
BP2T > One Stop Service Office

INCENTIVES
Providing incentives to investors in the form of:
a. Reduction of Sectoral levy
b. Stimulus funding, for selected
permits; Shall not exceed 50
sectors; Stimulus funds
% (fifty percent) of the levy
awarded in the form of interest
payable amount.
subsidy shall not exceed 2 %
(two percent) of the rate of
interest paid for the purchase of
machinery or equipment.

c.

Capital relief; in the form of


equity capital and assets in
accordance with the ability of
the Government of Aceh .

ACEH INVESTMENT COORDINATING BOARD |

32

INTRODUCTION

1.8 FACT AND FIGURE

The Big 5 of Foreign Direct Investment


by Country of Origin

UK
USA

3.8
| WWW.ACEHINVESTMENT.COM

1.8

ACEH INVESTMENT PROFILE

OUR PROGRESS
IN 2013

33

We got 42 new projects


(IDR 6.1 trillion) and more
than IDR 5.09 trillion
of 139 projects (21.866
workers) already have
boost our economy. Now,
its your turn !

South Korea
India
Malaysia

1 USD = 9,300 IDR


March, 2013 Kurs

0.2

8.7

4.7

Billion USD

ACEH INVESTMENT COORDINATING BOARD |

II
Detailed Plan of
Agro Industries
Project

Photo: Lineung Buleun Potato Farm

36

Detailed Plan of Agro Industries Project

2.1 FOOD CROPS AND HORTICULTURE

PADDY
The overall demand of rice in Indonesia is
currently reaches 33 million tons, while Aceh
domestic consumption is about 658,340 tonnes
(2013). There are huge potential to develop
rice farming and processing to meet domestic
market share.

Agriculture is the key


sector in Aceh,
with the area of

438,855 Ha,
and the annual production of about

1,788,783 tonnes

in 2012

Supported by about

359,478

farmers in Aceh.

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

37

Photo: Ilustration

ACEH INVESTMENT COORDINATING BOARD |

38

Detailed Plan of Agro Industries Project

AREA AND PRODUCTION OF PADDY BY REGENCY/CITY, 2012


Regency/City

Planted Area (Ha)

Production (Ton/Ha)

Simeulue

6,907

26,005

Aceh Singkil

2,220

6,611

South Aceh

19,367

64,309

Southeast Aceh

12,320

62,462

East Aceh

46,442

213,033

Central Aceh

7,092

25,816

West Aceh

15,039

44,342

Aceh Besar

47,124

203,516

Pidie

43,904

204,052

Bireuen

36,285

141,440

North Aceh

68,189

341,951

Southwest Aceh

29,019

96,426

Gayo Lues

6,654

31,776

Aceh Tamiang

27,193

102,082

Nagan Raya

33,903

75,899

Aceh Jaya

13,081

41,211

Bener Meriah

2,944

13,903

Pidie Jaya

13,606

62,014

121

285

Langsa

3,493

13,295

Lhokseumawe

2,239

11,645

Subulussalam

1,713

6,665

TOTAL

438,855

1,788,738

Banda Aceh

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

PROJECT PURPOSE
Establishing the modern rice
milling plant, capacity 8 ton/
hour.

PIDIE
43,904 Ha
204,052 Tons

Photo: Rice Milling Unit , Pidie

INVESTMENT ESTIMATION

USD 8,000,000
BIREUEN
36,285 Ha
141,440 Tons

ACEH BESAR
47,124 Ha
203,516 Tons

39

NORTH ACEH
68,189 Ha
341,951 Tons

EAST ACEH
46,442 Ha
213,033 Tons

SOUTHEAST ACEH
12,320 Ha
62,462 Tons

ACEH INVESTMENT COORDINATING BOARD |

40

Detailed Plan of Agro Industries Project

CORN
There is a reason why corn [Zea mays] is the
most-produced grain worldwide; it is involved
in just about every aspect of our lives. Corn
provides about 21 percent of human nutrition
across the globe. Corn is usually fed to animals.
There are many other non-culinary uses for the
grain as well; it is a key ingredient in ethanol,
cosmetics, ink, glue, laundry starch, medicines
and fabrics, just to name a few. It also can be the
raw material for baskets and toys. In short, corn
is an essential ingredient in our diets and also
in our world (source: en.wikipedia.org/wiki/
Maize).
As one of the major producers of corn, we offers
opportunities for potential investors to set up a
poultry feed industry in Aceh.

... it is a key ingredient


in ethanol, cosmetics,
ink, glue, laundry
starch, medicines and
fabrics, just to name a
few.

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

41

ACEH INVESTMENT COORDINATING BOARD |

42

Detailed Plan of Agro Industries Project

AREA AND PRODUCTION OF CORN BY REGENCY/CITY, 2012


Regency/City

Planted Area (Ha)

Production (Ton/Ha)

28

Aceh Singkil

201

464

South Aceh

12,330

49,377

6,000

Southeast Aceh

26,602

89,301

6,000

East Aceh

2,480

8,214

7,800

Central Aceh

138

434

4,500

West Aceh

209

485

Aceh Besar

452

216

Pidie

751

679

4,500

Bireuen

894

1,729

3,300

North Aceh

1,619

1,406

5,750

33

22

Gayo Lues

1,333

5,174

3,000

Aceh Tamiang

2,020

4,464

1,500

Nagan Raya

318

598

Aceh Jaya

126

397

5,750

Bener Meriah

728

1,193

6,000

Pidie Jaya

239

93

7,000

Banda Aceh

Sabang

34

Langsa

12

Lhokseumawe

58

Subulussalam

1,208

3,005

TOTAL

51,788

167,286

Simeulue

Southwest Aceh

| WWW.ACEHINVESTMENT.COM

Farmer

61,100

ACEH INVESTMENT PROFILE

PROJECT PURPOSE

43

INVESTMENT ESTIMATION

Establishing poultry feed factory


(maize bran, maize germ, cattle
feed, corn grits) which has drying
machine (capacity 40 tons/hour)
and warehouse (capacity 9000
tons)

USD 12,367,320

SOUTH ACEH
12,330 Ha
49,377 Tons

SOUTHEAST ACEH
26,602Ha
89,301 Tons

ACEH INVESTMENT COORDINATING BOARD |

44

Detailed Plan of Agro Industries Project

SOYBEAN
Soybean is a main source for worlds vegetable
protein and vegetable oil
Nationwide, soybean production in 2012 was
851,647 tons with the area of the land 554,132
Ha. In Aceh, the soybean plantation in 2012 was
approximately 44,638 Ha, and its production
was 51.440 tons.
Supported by about 90,305 farmers in Aceh

90,305
farmers in Aceh

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

45

ACEH INVESTMENT COORDINATING BOARD |

46

Detailed Plan of Agro Industries Project

AREA AND PRODUCTION OF SOYBEANS BY REGENCY/CITY, 2012


Regency/City

Planted Area (Ha) Production (Ton/Ha)

Farmer

Simeulue

Aceh Singkil

43

30

South Aceh

105

140

East Aceh

1,922

2,404

Central Aceh

690

818

West Aceh

30

32

Aceh Besar

757

634

Pidie

5,333

6,138

9,000

Bireuen

21,847

27,127

12,000

North Aceh

3,532

2,744

13,500

Southwest Aceh

3,866

3,896

28

52

Aceh Tamiang

2,182

1,756

Nagan Raya

202

155

Aceh Jaya

98

15

Bener Meriah

60

381

3,899

5,078

Banda Aceh

Sabang

Langsa

Lhokseumawe

18

Subulussalam

15

29

44,638

51,439

Southeast Aceh

Gayo Lues

Pidie Jaya

TOTAL

| WWW.ACEHINVESTMENT.COM

39,305

7,500

9,000

90,305

ACEH INVESTMENT PROFILE

PROJECT PURPOSE
Establishing poultry feed factory
(maize bran, maize germ, cattle
feed, corn grits) which has drying
machine (capacity 40 tons/hour)
and warehouse (capacity 9000
tons)

INVESTMENT ESTIMATION

USD 12,367,320
PIDIE JAYA
3,899 Ha
5,078 Tons

PIDIE
5,333 Ha
6,138 Tons
WEST ACEH
30 Ha
32 Tons

47

NORTH ACEH
3,532 Ha
2,744 Tons
ACEH TAMIANG
2,182 Ha
1,756 Tons

SOUTHEAST ACEH
4 Ha
7 Tons

ACEH INVESTMENT COORDINATING BOARD |

48

Detailed Plan of Agro Industries Project

FRUITS AND
VEGETABLE
Horticulture area is a geographic area that has similarity
ecosystems and united by a common infrastructure facilities
thus forming region filled with various business activities
including the provision of facilities based horticultural
production, cultivation, post-harvest handling and
processing, marketing, and various supporting activities
(Indonesia Directorate General of Horticulture). Its main
purpose is to develop well-being of society through
the utilization of resources in a sustainable manner by
integrating communal relations, the economy, and the
environment in harmony.
Linueng Buleun in Bener Meriah is very potential for
horticultural farm, as it is close to the new hydro power
plant and has direct access to seaports in the east coast. The
local government provides 25.300 ha of land for potential
investors to set up organic horticultural farms in this area.
The target is to supply fruits and vegetables for international
markets. The very supportive and welcome local community
ensures that investment in this area is very promising.

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

49

Photo: Harvesting Potatos in Lineung Buleun, Bener Meriah

ACEH INVESTMENT COORDINATING BOARD |

50

Detailed Plan of Agro Industries Project

POTENTIALS
(tons)
AVOCADO 74,624
MANGGO 270,544
RAMBUTAN 280,994
ORANGE 85,522
JACK FRUIT 81,154
DURIAN 270,449
PAPAYA 148,298
BANANA 689,892
WATERMELON 165,397

Horticulture

STRING BEAN 170,188


CHILI 300,188
CAYENNE PEPPER 195,052
TOMATO 173,573
EGG PLANT 147,778
CUCUMBER 198,629
RED UNION 26,004
GARLIC 772
POTATO 86,154

Planted Area (Ha)

Produksi (Ton/hari)

Potato

835

18

Cabbage

654

30

Tomato

99

20

Carrot

397

8.5

String Beans

92

4.5

Red Chilies

1048

Cayenne Pepper

875

Red Onion

220

4.2

Scallion

230

4.3

Avocado

1022

Orange

418

Terong Belanda

166

0.6

Markisah

73

0.3

Kasmak

72

0.2

Vegetable:

Fruit:

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

PROJECT PURPOSE

Establishing organic farm


base on a production system
that sustains the health of
soils, ecosystems and people.
Selling the products in
international markets.

51

INVESTMENT ESTIMATION

USD 1,025,850

LINEUNG BULEUN
25.300 HA

ACEH INVESTMENT COORDINATING BOARD |

52

Detailed Plan of Agro Industries Project

2.2 DETAILED PLAN OF PLANTATION

PALM OIL
Palm oil constitutes the largest plantation crop
in Aceh in volume and economic value, and the
palm oil sector has significant growth potential
as a major source of revenue for food and bio
fuel products.
The Government of Aceh has been initiating
several strategic plans in this commodity:
1. Create operational and policy support for
sustainable palm oil among government,
private sector, NGOs, and smallholders.
2. Support palm oil public-private investment
partnerships.
3. Reduce threats to high conservation value
forests and peat swamp ecosystems.
4. Create a provincial seed certification and
distribution program.
5. Improve supply chains and pricing
transparency for palm oil production and
processing.

In 2010, it consisted of smallholders production: 185,265 Tons,


Government plantation production: 69,634 Tons, and private
plantation production: 238,927 Tons and the status is still
temporary.

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

53

493.826

482.895

326.665

769.010

765.416

Annual Production
(tons)

2006

2007

2008

2009

2010

ACEH INVESTMENT COORDINATING BOARD |

54

Detailed Plan of Agro Industries Project

Although many districts in Aceh have palm oil plantations, only Aceh
Tamiang, Aceh Singkil, and Nagan Raya have higher number of crude
palm oil (CPO) production that suitable for a big processing industry. The
following table shows total production for each district.

PALM PLANTED AREA AND PRODUCTION OF SMALL HOLDER &


ESTATE ENTERPRISES BY REGENCY/CITY 2012
Regency/City

Planted Area (Ha)

Production (Ton)

Aceh Singkil

54,560

397,729

South Aceh

9,765

32,004

Southeast Aceh

7,666

19,942

East Aceh

70,565

35,0797

West Aceh

25,485

33,618

Aceh Besar

1,180

397

77

16

Bireuen

4,644

2,2161

North Aceh

24,595

115,664

Southwest Aceh

20,612

13,093

Aceh Tamiang

54,417

3,849,265

Nagan Raya

50,401

168,767

Aceh Jaya

15,953

15,357

Bener Meriah

1,300

144

Pidie Jaya

2,087

990

Banda Aceh

Sabang

Langsa

419

947

Lhokseumawe

208

243

Subulussalam

21,514

49,135

368650

5070555

Central Aceh

Pidie

Gayo Lues

TOTAL

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

PROJECT PURPOSE

55

INVESTMENT ESTIMATION

Establishing palm oil processing


industries (Biodiesel, Fatty Alcohol,
Edible Oil, Shortening, SBE, Soap
Noodles Plant, Dove Plant, Fatty
Acid Plant, NPK Fetilizer Plant,
Refinery Plant, Biomass Pellet
Production Plant).

USD 26,449,321
Net Present Value : 8,411,663.48 USD
Internal Rate of Return : 23,1%

PAYBACK PERIOD : 6 YEARS AND 8 MONTHS

Banda Aceh

Lhokseumawe

ACEH TAMIANG
50,755 Ha
121,916 Tons

Meulaboh

NAGAN RAYA
76,439 Ha
90,241 Tons
ACEH SINGKIL
47,111 Ha
110,004 Tons

Photo: Palm Oil Processing Industry,


PT. Megalopolis, Aceh Jaya

ACEH INVESTMENT COORDINATING BOARD |

56

Detailed Plan of Agro Industries Project

RUBBER
Natural rubber consists of suitable polymers
of the organic compound isoprene with minor
impurities of other organic compounds plus
water. The rubber plant can grow up to 15-25
meters, has an upright big stem and big high
branching.
Currently, rubber is harvested mainly in the
form of the latex from a rubber tree (Hevea
brasiliiensis) which was tapped from the cut
bark of the plant. It can be used to produce
another form of rubber, such as crumb rubber
and rubber timber.
Natural rubber is used extensively in many
applications and products, either alone or
in combination with other materials such
as firewood, charcoal, wood or lumber for
household apliance (furniture), door and
window profiles, hoses, belts, matting, flooring
and dampeners (antivibration mounts) for the
automotive industry, aircraft industry, textile,
gloves (medical, household and industrial) and
toys.

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

57

Photo: Rubber plant, Illustration

ACEH INVESTMENT COORDINATING BOARD |

58

Detailed Plan of Agro Industries Project

There are five districts in Aceh that have higher number of rubber
production that suitable for a big processing industry: West Aceh, East
Aceh, Aceh Tamiang. The following table shows total production for each
district.
PLANTED AREA AND PRODUCTION OF RUBBER IN ACEH
District/City

Planted Area (Ha)

Production (ton)

Simeulue

1,201

141

Aceh Singkil

3,698

2,376

South Aceh

1,099

252

Southeast Aceh

10,183

9,802

East Aceh

35,277

21,333

West Aceh

27,381

18,649

Great Aceh

16

Pidie

20

Bireuen

2,506

1,387

North Aceh

10,485

6,601

851

134

Aceh Tamiang

22,238

14,736

Nagan Raya

10,870

3,322

Aceh Jaya

12,416

5,025

Bener Meriah

Pidie Jaya

Banda Aceh

Sabang

Langsa

1,642

1,430

Lhokseumawe

20

25

Subulussalam

4,379

2,192

144,292

87,407

Central Aceh

Southwest Aceh
Gayo Lues

TOTAL

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

PROJECT PURPOSE

59

INVESTMENT ESTIMATION

Establishing rubber processing


industries.

USD 21,161,739

EXISTING COMPANY
PT. Aceh Rubber Industry
(Aceh Tamiang)

Net Present Value : 234,618,007 USD


Internal Rate of Return : 53,81 %
Benefit Cost Ratio : 1,26
Net Benefit Cost Ratio : 3,739

PAYBACK PERIOD : 6 YEARS AND 8 MONTHS

EAST ACEH
35,277 Ha
21,333 Tons

Banda Aceh

Lhokseumawe

ACEH TAMIANG
22,238 Ha
22,238 Tons

WEST ACEH
27,381 Ha
18,649 Tons

Photo: Rubber Processing Industry, PT. Aceh Rubber Industry, Aceh Tamiang

ACEH INVESTMENT COORDINATING BOARD |

60

Detailed Plan of Agro Industries Project

COCOA
Indonesia is the third largest producer of cocoa
beans in the world after the Ivory Coast and
Ghana.
In Aceh, cocoa is a leading commodities
other than coffee, palm oil, rubber, organic
horticulture, corn and patchouli.
Cocoa plantations spread almost in all districts
in Aceh, from Aceh Tamiang in the eastern part
of Aceh, to Simeulue Island in the outer edge of
Aceh Province.
Aceh cocoa has been exported to many countries
in the world. The statistics indicate that in 2010,
Aceh export volumes of cocoa beans reached
420,978.40 kgs or equals to USD 1,166,080.30
(Aceh Industry and Trade Agency, 2012).
The development strategy is to gear sustainable
cocoa industries. The upstream industries are
strengthened, however the focus is to boost
value added in the downstream sector.

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

61

Photo: Cacoa Farm in Pidie Jaya

ACEH INVESTMENT COORDINATING BOARD |

62

Detailed Plan of Agro Industries Project

There are five districts in Aceh as the major cocoa producers that are
suitable for a big processing industry: Pidie Jaya, Bireuen, Aceh Tamiang,
Southeast Aceh, and Soutwest Aceh. The following table shows total
production for each district.

CACOA PLANTED AREA AND PRODUCTION OF SMALL HOLDER &


ESTATE ENTERPRISES BY REGENCY/CITY 2012
Regency/City

Planted Area (Ha)

Production (ton)

1,806

200

Aceh Singkil

636

147

South Aceh

1,332

153

Southeast Aceh

19,454

8,843

East Aceh

12,416

6,536

Central Aceh

2,322

546

West Aceh

722

235

Aceh Besar

3,136

426

Pidie

9,609

4,499

Bireuen

6,023

3,801

North Aceh

9,503

3,163

Southwest Aceh

4,356

874

Gayo Lues

4,443

888

Aceh Tamiang

2,280

941

Nagan Raya

5,372

1,335

Aceh Jaya

1,267

206

Bener Meriah

1,190

185

Pidie Jaya

12,734

3,645

Sabang

637

172

Langsa

303

132

Lhokseumawe

135

64

Subulussalam

816

130

100492

37121

Simeulue

Banda Aceh

TOTAL

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

PROJECT PURPOSE

63

INVESTMENT ESTIMATION

Establishing cocoa processing


industries (paste, butter,
powderander).
Establishing packaging
industry.

USD 97,095,995
Net Present Value : 5,730,808.44 USD
Internal Rate of Return : 22,4%
Benefit Cost Ratio : 1,69

PAYBACK PERIOD : 6 YEARS AND 9 MONTHS

Banda Aceh

PIDIE JAYA
10,513 Ha
3,073 Tons

BIREUEN
5,436 Ha
4,039 Tons
ACEH TAMIANG
2,675 Ha
1,127 Tons

Meulaboh

SOUTHWEST ACEH
4,356 Ha
2,746 Tons

Photo: Illustration

SOUTHEAST ACEH
11,970 Ha
7,622 Tons

ACEH INVESTMENT COORDINATING BOARD |

64

Detailed Plan of Agro Industries Project

COFFEE
Gayo coffee is a typical coffee from the Gayo
highlands, an area that covers Bener Meriah,
Central Aceh and Gayo Lues Districts in Aceh
Province.
Gayo is the name of the tribe who inhabits this
region. The majority of people in this area are
coffee growers. The plantation has began as
early as 1908 which main product is arabica
coffee. In fact, arabica coffee production
resulting from the Gayo land is the largest in
Asia.
Gayo coffee has been exported to many
countries in the world. The statistics indicate
that in 2012, Aceh export volumes of coffee
beans to 18 countries were up to 9,703,260.00
kgs or equals to USD 64,358,771.31 (Aceh Industry
and Trade Agency, 2012).
Gayo coffee also has gained some international
certifications as a recognition to its excellence in
quality, such as organic and fair trade certified as
well as Geographical Indication (GI). Particularly,
black gayo arabica coffee obtained the highest
score in the Indonesian Specialty Coffee Auction
2010 in Bali, which guarantees that it is the best
coffee in the world.

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

65

Aceh export volumes of coffee


beans to 18 countries were up to

9,703,260 kgs

Photo: Coffee plant in Bener Meriah

ACEH INVESTMENT COORDINATING BOARD |

66

Detailed Plan of Agro Industries Project

Three major producers of coffee in Aceh are, Bener Meriah, Central Aceh, and Gayo Lues. These areas
are suitable for a big coffee processing industry. The following table shows total production for each
district.

COFFEE PLANTED AREA AND PRODUCTION OF SMALL HOLDER BY REGENCY/CITY 2012


Robusta
Regency

Total Robusta & Arabika


(Ton)

Arabika

Planted Production Planted


Area (Ha)
(Ton)
Area (Ha)

Production
(Ton)

Planted
Area (Ha)

Production
(Ton)

Farmer

Central Aceh

2,315

793

48,300

25,370

50,615

26,163

33,000

Bener Meriah

1,360

660

48,101

22,414

49,461

23,074

29,000

4,652

1,118

4,652

1,118

40,000

9,540

1,569

11,846

114,268

51,924

113,846

Gayo Lues
Pidie
TOTAL

9,540
13,215

1,569
3,022

| WWW.ACEHINVESTMENT.COM

101,053

48,902

ACEH INVESTMENT PROFILE

PROJECT PURPOSE

67

INVESTMENT ESTIMATION

Establishing coffee processing


industries.
Establishing packaging
industry.

USD 30,864,300

PAYBACK PERIOD : 6 YEARS AND 9 MONTHS


Banda Aceh

BENER MERIAH
Robusta: 1,250 Ha / 660 Tons
Arabica: 48,101 Ha /22,414 Tons

CENTRAL ACEH
Robusta: 2,315 Ha / 874 Tons
Arabica: 48,000 Ha/ 24,328 Tons

GAYO LUES
4,588 Ha
1,036 Tons

Photo: Coffee bean sorting, Central Aceh

ACEH INVESTMENT COORDINATING BOARD |

68

Detailed Plan of Agro Industries Project

COCONUT
Coconut industry can be developed by either farmer
group level or larger scaled industry, for domestic and
internaional market, such as young coconut products,
coconut coctail, coconut jam, baby food supplements,
soft drinks, nata de coco, coconut water sauce, coconut
flour, virgin coconut oil, coconut shell charcoal, briquet
charcoal, liquid smoke of coconut shell, coconut wood,
and organic fertilizer. While the exporting goods are
such as copra, white copra, raw coconut oil, coconut
cake, desiccated coconut, and active charcoal.

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

69

ACEH INVESTMENT COORDINATING BOARD |

70

Detailed Plan of Agro Industries Project

COCONUT PLANTED AREA AND PRODUCTION OF SMALL HOLDER BY


REGENCY/CITY 2012
Regency/City

Planted Area (Ha)

Production (ton)

Simeulue

7,472

2,611

Aceh Singkil

5,224

2,235

South Aceh

7,023

2,948

851

488

6,797

6,015

103

11

West Aceh

2,832

1,202

Aceh Besar

14,351

7,971

Pidie

8,633

5,967

Bireuen

14,341

11,760

North Aceh

19,389

10,310

Southwest Aceh

2,155

1,244

Gayo Lues

440

85

Aceh Tamiang

575

185

Nagan Raya

1,350

659

Aceh Jaya

6,333

1,643

43

12

3,336

1,091

Sabang

4,045

2,386

Langsa

473

283

Lhokseumawe

774

391

Subulussalam

855

269

107,395

59,766

Southeast Aceh
East Aceh
Central Aceh

Bener Meriah
Pidie Jaya
Banda Aceh

TOTAL

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

PROJECT PURPOSE

71

INVESTMENT ESTIMATION

Establish Virgin Coconut Oil


Processing Industry

USD 87,286
Net Present Value : 15.5%
Internal Rate of Return : 57.39%
Benefit Cost Ratio : 2.19

Banda Aceh

BIREUEN
14,341 Ha
11,760Tons

NORTH ACEH
19,389 Ha
10,310Tons
Lhokseumawe

ACEH BESAR
14,351 Ha
9,971Tons

Meulaboh

Photo: Illustration

ACEH INVESTMENT COORDINATING BOARD |

72

Detailed Plan of Agro Industries Project

PATCHOULI
Contains the Patchouli Alcohol of 2.5% to 3.3% (the
average PA of patchouli in the world is 2.5%).
Patchouli is a species of plant from the genus
Pogostemon. It is a bushy herb of the mint family,
with erect stems, reaching two or three feet (about
0.75 metre) in height and bearing small, pale pinkwhite flowers. The plant is native to tropical regions of
Asia, and is extensively cultivated in Aceh, Indonesia
(wikipedia.org, 05/29/2013).
Patchouli oils is used as raw material for a number
of finished products, such as parfume and modern
scented industrial products such as paper towels,
laundry detergents, and air fresheners. Patcholi also
can be used in antiseptic, pesticide, and as a fixative to
bind other essential oils.
The Geographical Indication Expert of the Indonesian
Ministry of Agriculture, Dr. Riyaldi, affirmed that
Aceh is very potential for the development of largescale patchouli businesses, because of its supporting
condition of land and its quality. According to a
research, Aceh patchouli oil contains patchouli alcohol
(yield) 2.5% to 3.3% which makes it the best patchouli
in the world (patchouli-aceh.com, 03/18/2012).
As one of the major producers of patchouli, Aceh
offers opportunities for potential investors to set up
patchouli processing industries in the region.

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

73

According to a research, Aceh patchouli oil contains


patchouli alcohol (yield) 2.5% to 3.3%
which makes it the best patchouli in the world.

Photo: Patchouli Plant, Illustration

ACEH INVESTMENT COORDINATING BOARD |

74

Detailed Plan of Agro Industries Project

Aceh produces the best patchouli in the world. The main production areas
are Aceh Jaya, South Aceh, Southwest Aceh and Gayo Lues Districts, which
are suitable for large-scale processing industries. The following table shows
the total production for each district.

PATCHOULI AREA AND PRODUCTION OF SMALL HOLDER BY


REGENCY/CITY, 2012
Regency/City

Planted Area (Ha)

Production (Ton/Ha)

Aceh Singkil

40

21

South Aceh

408

212

Southeast Aceh

1,418

612

East Aceh

Central Aceh

23

20

West Aceh

Aceh Besar

118

53

Pidie

Bireuen

43

33

North Aceh

132

124

Southwest Aceh

78

61

Gayo Lues

853

774

Aceh Tamiang

40

35

Nagan Raya

15

13

650

308

Bener Meriah

Pidie Jaya

Banda Aceh

Sabang

Langsa

Lhokseumawe

Subulussalam

19

3,848

2,283

Simeulue

Aceh Jaya

TOTAL

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

PROJECT PURPOSE

75

INVESTMENT ESTIMATION

Establishing patchouli
processing industries.
Increasing production volume
and quality of patchouli.

USD 1,025,960
Banda Aceh

Lhokseumawe

GAYO LUES
149 Ha
33 Tons

ACEH JAYA
107 Ha
20 Tons
WEST ACEH
114 Ha
6 Tons

SOUTH ACEH
334 Ha
21 Tons

Photo: Patchouli Processing Industry, Illustration

ACEH INVESTMENT COORDINATING BOARD |

76

Detailed Plan of Agro Industries Project

2.3 DETAILED PLAN OF ACEH BEEF INDUSTRY


DEVELOPMENT PROJECT

Livestock farm area in Aceh is 1.525.578 Ha. The


huge area is significantly feasible for foragelivestock system, integrated with crop plantation.
The project involves rearing of both breeding and
fattening. The main activities of the project would
be procurement of irrigation and hay making
equipment, construction of back-up livestock farm
infrastructure, construction of animal feeds plant,
breeding and fattening.
Strategy for Aceh beef Development project
includes : develop a neucleus-plasma structure
for the developing a beef herd in Aceh, establish
system for ; management of mature breeding
cows (grazing systems or feedlot), establish a
beef finishing unit (feedlot) plan for each regency
and halal beef processing and meet distribution.
Targeted for initial development; Aceh Besar,
Pidie, Bener Meriah, Central Aceh and Nagan Raya
Regency.

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

77

Photo: Governor of Aceh visiting Livestock Improvement Company farm in Victoria, Australia (11/2013)

ACEH INVESTMENT COORDINATING BOARD |

78

Detailed Plan of Agro Industries Project

Aceh Besar Beef


Industry
Development
Project

Photo: Tradisional Fattening in Krueng Aceh, Aceh Besar

| WWW.ACEHINVESTMENT.COM

Land Area
Location

: 6,434 Ha
: Krueng Aceh
Kuta Malaka
Blang Ubo-ubo

Land Status

: Goverment Ownership

ACEH INVESTMENT PROFILE

79

INVESTMENT ESTIMATION

Breeding
Fattening

: 5,500 cows
: 15,000 cows

ROI : 29.64 %
B/C : 1.23

USD 33,147,500

PAYBACK PERIOD : 3 YEARS AND 5 MONTHS

SCHEME
Nucleus : 605 Ha
Plasma : 5,829 Ha
INFRASTRUCTURE SUPPORT
Airport : Sultan Iskandar Muda
Seaport : Malahayati
Road by Condition : Moderate
Road by Surface : Gravel and Land
Water : River, Spring
Electicity : Supported

Krueng Aceh
Kuta Malaka
Blang Ubo-ubo

ACEH BESAR

Cot Sirebee

SUITABLE FOR:
Kuta Malaka - Major Feedlot for Nucleus Herd
Krueng Aceh- Traditional Fattening
Cot Sirebee, Jantho- Bull Depot
Blang Ubo-Ubo- Large Scale Breeding for
Nucleus Herd

ACEH INVESTMENT COORDINATING BOARD |

80

Detailed Plan of Agro Industries Project

Pidie Beef
Industry
Development
Project

Photo: Breeding Farm, Pidie

| WWW.ACEHINVESTMENT.COM

Land Area
Location

: 500 Ha
: Biheu Village,
Muara Tiga District

Land Status

: Private Ownership

ACEH INVESTMENT PROFILE

81

INVESTMENT ESTIMATION

Breeding
Fattening

ROI : 32 %
B/C : 1.23

: 3,080 cows
: 10,000 cows

USD 21,325,600

PAYBACK PERIOD : 3 YEARS AND 2 MONTHS

SCHEME
Plasma System
INFRASTRUCTURE SUPPORT
Airport : Sultan Iskandar Muda
Seaport : Malahayati
Road by Condition : Moderate
Road by Surface : Gravel and Land
Water : River, Spring
Electricity : Supported

Biheu Village

PIDIE

SUITABLE FOR:
Breeding

ACEH INVESTMENT COORDINATING BOARD |

82

Detailed Plan of Agro Industries Project

Bener Meriah
Beef Industry
Development
Project

Photo: Breeding Farm, Bener Meriah

| WWW.ACEHINVESTMENT.COM

Land Area
Location

: 4,155 Ha
: Perumpakan Benjadi

Land Status

: Goverment Ownership

ACEH INVESTMENT PROFILE

83

INVESTMENT ESTIMATION

Breeding
Fattening

ROI : 32 %
B/C : 1.23

: 3,080 cows
: 10,000 cows

USD 21,628,500

PAYBACK PERIOD : 3 YEARS AND 2 MONTHS

SCHEME
Nucleus dan Plasma System
INFRASTRUCTURE SUPPORT
Airport : Rembele & Malikussaleh
Seaport : Krueng Geukueh
Road by Condition : Moderate
Road by Surface : Gravel and Land
Water : River, Spring
Electicity: Supported

SUITABLE FOR:
Breeding
Central Feedlot

Perumpakan Benjadi

BENER MERIAH

ACEH INVESTMENT COORDINATING BOARD |

84

Detailed Plan of Agro Industries Project

Central Aceh
Beef Industry
Development
Project

Photo: Fattening Farm, Central Aceh

| WWW.ACEHINVESTMENT.COM

Land Area
Location


Land Status

: 2,280 Ha
: Jagong Jeget
Karang Ampar
: Private and Goverment
Ownership

ACEH INVESTMENT PROFILE

85

INVESTMENT ESTIMATION

Breeding
Fattening

ROI : 32 %
B/C : 1.23

: 3,080 cows
: 10,000 cows

USD 21,628,500

PAYBACK PERIOD : 3 YEARS AND 2 MONTHS

Karang Ampar

SCHEME
Nucleus : 780 Ha
Plasma : 1,500 Ha
INFRASTRUCTURE SUPPORT
Airport : Rembele & Malikussaleh
Seaport : Krueng Geukueh
Road by Condition : Moderate
Road by Surface : Gravel and Land
Water : River, Spring
Electicity: Supported

Jagong Jeget

CENTRAL ACEH

SUITABLE FOR:
Fattening

ACEH INVESTMENT COORDINATING BOARD |

86

Detailed Plan of Agro Industries Project

Nagan Raya
Beef Industry
Development
Project

Photo: Research Station and Feedlot, Nagan Raya

| WWW.ACEHINVESTMENT.COM

Land Area
Location

: 5,000 Ha
: Blang Baroe Rambong

Land Status

: Aneuk Nanggroe
Cooperatives

ACEH INVESTMENT PROFILE

87

INVESTMENT ESTIMATION

Breeding
Fattening

ROI : 32 %
B/C : 1.23

: 3,080 cows
: 10,000 cows

USD 21,325,600

PAYBACK PERIOD : 3 YEARS AND 2 MONTHS

SCHEME
Nucleus dan Plasma System

NAGAN RAYA
Blang Baroe Rambong

INFRASTRUCTURE SUPPORT
Airport : Cut Nyak Dhien
Seaport : PT. MDB Suak Patong
and Kuala Tripa
Road by Condition : Moderate
Road by Surface : Gravel and Land
Water : River
Electicity : Supported
SUITABLE FOR:
Research Station
Feedlot
Breeding

ACEH INVESTMENT COORDINATING BOARD |

88

Detailed Plan of Agro Industries Project

2.4 DETAILED PLAN OF FISHERIES

ACEH
INTERNATIONAL
FISHING PORT
AT LAMPULO

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

89

696,117

Tons of Fish is Aceh Potencial


from Fisheries

Photo: Lampulo Fishing Port

ACEH INVESTMENT COORDINATING BOARD |

90

Detailed Plan of Agro Industries Project

LAMPULO FISHING PORT PRODUCTION 2006 - 2012 (Kg)

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

PROJECT PURPOSE
Establishing fishery industries
(taking, culturing, processing,
preserving, storing, transporting,
marketing or selling fish or fish
products).

91

INVESTMENT ESTIMATION

USD 200,000,000

BANDA ACEH
Lampulo Fishing Port
51,8 Ha

Photo: Lampulo Fishing Port

ACEH INVESTMENT COORDINATING BOARD |

Meul

92

Detailed Plan of Agro Industries Project

IDI
FISHING
PORT

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

93

Photo: Idi Fishing Port

ACEH INVESTMENT COORDINATING BOARD |

94

Detailed Plan of Agro Industries Project

Photo: Idi Fishing Port

THE POTENTIALS IN IDI


Total catch of fishermen reached 48.67 tons daily
The number of fishermen as much as 8246 people (Year 2012)
Total fleet of 447 fishing fleets units (Year 2012)
Various Fishing gear reaching 571 pieces (Year 2012).

NO

INVESTMENT OPPORTUNITY

CAPACITY

Block Ice Factory

Modern fishery processing industry

50 ton

Pelagic

Shipyard (Wood & fiber)

4 unit

Repairs & Shipyard

Fish transportation service (domestic and foreign)

2 unit

| WWW.ACEHINVESTMENT.COM

80 tons/day

EXPLAIN

ACEH INVESTMENT PROFILE

PROJECT PURPOSE
Establishing fishery industries
(taking, culturing, processing,
preserving, storing, transporting,
marketing or selling fish or fish
products).

95

INVESTMENT ESTIMATION

USD 10,000,000

Banda Aceh

Lhokseumawe

EAST ACEH
Idi Fishing Port
62.5 HA

Meulaboh

ACEH INVESTMENT COORDINATING BOARD |

96

Detailed Plan of Infrastructure and Energy

III

Detailed Plan of
Infrastructure
and Energy

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

97

ACEH INVESTMENT COORDINATING BOARD |

98

Detailed Plan of Infrastructure and Energy

3.1 DETAILED PLAN OF INFRASTRUCTURE

ROLL-ON/
ROLL-OFF
CARGO FERRY
SERVICE

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

99

Photo: Illustration

ACEH INVESTMENT COORDINATING BOARD |

100

Detailed Plan of Infrastructure and Energy

Photo: Krueng Gekuh Seaport

Frequent Route of PT. Pelayaran Alkan Abadi


Loading Port

Destination Port

Ship Name

Tg. Priok, Jakarta

Malahayati, Aceh

Hirondex V.9

Malahayati, Aceh

Tg. Priok, Jakarta

Hirondex V.10

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

PROJECT PURPOSE

101

INVESTMENT ESTIMATION

Establishing Ro-Ro Freight Ferry Shipping

EXISTING COMPANY
Langsa: Kenangan Passanger Ferry
PT. Pelayaran Alkan Abadi

USD 1,025,960

NORTH ACEH
Krueng Geukuh
Sea Port

LANGSA
Kuala Langsa
Sea Port

ACEH INVESTMENT COORDINATING BOARD |

102

Detailed Plan of Infrastructure and Energy

3.2 DETAILED PLAN OF ENERGY

GEOTHERMAL
POWER PLANT

Photo: Illustration

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

INVESTMENT FEASIBILITY
The power for the district of Bener
Meriah is supplied from the 150kV
transmission Aceh - Sumatra
interconnection system from North
Sumatra.
The power supply is only able to
serve 207 villages (89.22%) of the
total 232 villages. A total of 25
village have not been served yet.

103

INVESTMENT ESTIMATION

USD 288,080,000

BENER MERIAH

ACEH INVESTMENT COORDINATING BOARD |

104

Detailed Plan of Infrastructure and Energy

GEOTHERMAL POWER PLANT PROJECT 2013-2026


Energy Potential (Mwe)
N
o

Objects

Regency/City

Coordinate

Resource
(Mwe)
Spec

Reserve
(Mwe)

Hipo

Note

Expec

Iboih

Sabang

LU 0437' ; BT 9645'

25

Lho Pria Laot

Sabang

LU 0347' ; BT 9741'

50

Jaboi Keuneukai

Sabang

LU 0553' ; BT 9514

50

Ie Seum-Krueng Raya

Aceh Besar

LU 0529' ; BT 9539'

63

Seulawah Agam

Aceh Besar

LU 0550' ; BT 9518

Alur Canang

Pidie

LU 0501' ; BT 9555

25

Alue Long-Bangga

Pidie

LU 0448' ; BT 9648'

100

Tangse

Pidie

LU 0456' ; BT 9644'

25

- Hitay Energi Holding

Rimba Raya

Bener Meriah

LU 0328' ; BT 9751'

100

10

Simpang Balik

Bener Meriah

LU 0419' ; BT 9753

100

11

G. Geureudong

Central Aceh

LU 0548' ; BT 9519'

120

12

Silih Nara

Central Aceh

LU 0437' ; BT 9742'

100

13

Meranti

East Aceh

LU 0505' ; BT 9554'

25

14

Brawang Buaya

Aceh Tamiang

LU 0508' ; BT 9618'

25

15

Kafi

Gayo Luwes

25

16

Gunung Kembar

Gayo Luwes

LU 0533' ; BT 9533'

92

17

Dolok Perkirapan

Gayo Luwes

LU 0442' BT 9649'

25

625

275

215

TOTAL POTENTIALS = 1.115 Mwe

| WWW.ACEHINVESTMENT.COM

Bukaka Group/
PT. Sabang Energi

165 Pertamina

- Chevron/PT.Jasa Ayah

- Hitay Energi Holding

ACEH INVESTMENT PROFILE

105

SABANG
ACEH BESAR
PIDIE
BENER MERIAH
EAST ACEH
ACEH TAMIANG

CENTRAL ACEH

GAYO LUES

ACEH INVESTMENT COORDINATING BOARD |

106

Detailed Plan of Infrastructure and Energy

HYDRO
POWER PLANT

Photo: Illustration

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

INVESTMENT FEASIBILITY
Establishing Irrigation 19.50
HA and Hydropower Plant 160
MW/580 MWH

107

INVESTMENT ESTIMATION

USD 539,280,000

NORTH ACEH

ACEH INVESTMENT COORDINATING BOARD |

108

Detailed Plan of Infrastructure and Energy

HYDRO POWER PLANT PROJECT 2013-2026

No.

District/City

North Aceh

Project Name

Location

Capacity
(MW)

Invesment
Estimation
(Million USD)

Jambuaye-3

Wh Jambu Air

37.2

111.6

Jambuaye-5

Kr. Jambuaye

181.8

545.4

Bidin/Jambuaye

Kr. Jambuaye

246

738

Gayo Lues

Ramasan-1

Kr. Ramasan

171.6

514.8

East Aceh

Peureulak

Kr. Peureulak

34.8

104.4

Aceh Tamiang

Tampur

W. Tampur

428

1284

Jambo Papeun-2

Kr. Jambo Papeun

95.2

285.6

Kluet

Kr. Kluet

141

423

Sibubung-2

Kr. Sibubung

121.1

363.3

Teripa-3

Kr. Teripa

172.6

517.8

Teripa-4

Kr. Teripa

306.4

919.2

Meureubo-1

Kr. Meulaboh

82.1

246.3

Woyla-2

Kr. Woyla

274

822

Pameu

Kr. Pameu

160.6

481.8

Peusangan

Kr. Peusangan

90

270

South Aceh

Nagan Raya

West Aceh

Central Aceh

Southeast Aceh Dolok-1

Kr. Dolok

32.2

96.6

10

Aceh Jaya

Kr. Teunom

288.2

864.6

2862.8

8,588.40

Teunom-2
Total

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

109

NORTH ACEH
CENTRAL ACEH
EAST ACEH

ACEH JAYA

ACEH TAMIANG

WEST ACEH

GAYO LUES

NAGAN RAYA

SOUTHEAST ACEH

SOUTH ACEH

ACEH INVESTMENT COORDINATING BOARD |

110

Detailed Plan of Tourism Development Project in Banda Aceh

IV
Detailed Plan
of Tourism
Development
Project in
Banda Aceh

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

111

ACEH INVESTMENT COORDINATING BOARD |

112

Detailed Plan of Tourism Development Project in Banda Aceh

KRUENG ACEH
RIVER WALK

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

113

ACEH INVESTMENT COORDINATING BOARD |

114

Detailed Plan of Tourism Development Project in Banda Aceh

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

FASILITIES

115

INVESTMENT ESTIMATION

Food Court
Restaurant
Playground
Jogging Track
Mini Port
Amphitheater
Park

USD 10,000,000

BANDA ACEH

ACEH INVESTMENT COORDINATING BOARD |

116

Detailed Plan of Tourism Development Project in Banda Aceh

ULE LHEU
BEACH

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

117

ACEH INVESTMENT COORDINATING BOARD |

118

Detailed Plan of Tourism Development Project in Banda Aceh

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

FASILITIES

119

INVESTMENT ESTIMATION

Food Court
Restaurant
Playground
Jogging Track
Mini Port
Amphitheater
Park
Fishing Spot

USD 10,000,000

BANDA ACEH

ACEH INVESTMENT COORDINATING BOARD |

120

Sabang Management and Development Agency (BPKS) Project

Sabang Free Port


and Free Trade
Zone Project

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

121

ACEH INVESTMENT COORDINATING BOARD |

122

Sabang Management and Development Agency (BPKS) Project

VIEW OF THE SABANG BAY

FRESH WATER LAKE BUILT BY THE DUTCH

Sabang has been designated as one of national and international tourism destinations, especially with
the enactment of Sabang port as a cruise ship destination in 2011. The Govermant of Aceh has targeted 1
million visitor in 2007.
Sabang is located at the Malaca Strait gate, directly adjacent to Malaysia and Thailand, and is part of
Andaman Cluster, a very advanced and developed tourism destination. Its next to Phuket and Langkawi.

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

123

ENTRANCE TO THE PORT OF SABANG

THE POTENTIALS

Ecotourism, Adventure, Beach and Sport


Heritage and Education

ACEH INVESTMENT COORDINATING BOARD |

124

Sabang Management and Development Agency (BPKS) Project

INTERNATIONAL
SHIPPING LINE
FRIENDLY TO INVESTMENT REGULATION
The Law No.37 year 2000 about Free Trade
and Free Port Zone of Sabang
Descision of Governor of Aceh Province as
Chief Council of Sabang, Number: 193/034,
year 2001 about Forming of Management
Board of Sabang Free Port and Free Trade
Zone (BPKS)
The Law No.11 year 2006 regarding Aceh
Goverment; article 167 to 170
Goverment Regulation No.83/2011 concering
Delegation of Authority from Central
Goverment to Sabang Zone Council or DKS.

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

SUEZ - SABANG - KRA - TOKYO


SUEZ - SABANG - SINGAPURE - TOKYO
SUEZ - SUNDA STRAIT - TOKYO
SUEZ - LOMBOK - TOKYO

:
:
:
:

125

8,353 MILES
8,793 MILES
9,427 MILES
10,216 MILES

ACEH INVESTMENT COORDINATING BOARD |

126

Sabang Management and Development Agency (BPKS) Project

SABANG
INTERNATIONAL
WATER FRONT
RESORT AND
CONVENTION
CENTRE
Land Area
Location
Land Status
Supporting Land

:
:
:
:

0.5 Ha
Paradiso Beach
Goverment Ownership
1 Ha Sabang Fair Areal

Road by Condition
Road by Surface
Water

Electicity

:
:
:
:

Good
Asphalted
Like and Spring
Supported

INFRASTRUCTURE SUPPORT
Airport
: Maimun Saleh
Seaport
: Balohan (passanger port) and


Sabang International Hubport

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

127

Photo: Illustration

INVESTMENT ESTIMATION

USD 35,000,000
Payback : 8 Years
B/C Ratio : 1.21

ACEH INVESTMENT COORDINATING BOARD |

128

Sabang Management and Development Agency (BPKS) Project

PASSANGER
CRUISE
TERMINAL

Land Area
Location
Land Status
Depth
CT 1 Length
CT 3 Length

:
:
:
:
:
:

117 Ha
Sabang Bay
Goverment Ownership
22 m
180 m2 x 25 m2
423 m2 x 50 m2

Road by Condition
Road by Surface
Water
Electicity

:
:
:
:

Good
Asphalted
Like and Spring
Supported

INFRASTRUCTURE SUPPORT
Airport
: Maimun Saleh
Seaport
: Balohan (passanger port) and

Sabang International Hubport

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

129

Photo: Sabang bay

INVESTMENT ESTIMATION

USD 120,000,000
Payback : 8 Years
B/C Ratio : 1.23

ACEH INVESTMENT COORDINATING BOARD |

130

Sabang Management and Development Agency (BPKS) Project

YACHT
MARINA &
SUPPORTING
FACILITIES

Batchmetri Area
Land Area
Location
Land Status

:
:
:
:

26.5 Ha
13 Ha
Lhok Wieng Land
Goverment Ownership

Road by Condition
Road by Surface
Water
Electicity

:
:
:
:

Good
Asphalted
Like and Spring
Supported

INFRASTRUCTURE SUPPORT
Airport
: Maimun Saleh
Seaport
: Balohan (passanger port) and

Sabang International Hubport

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

131

Photo: Sabang

INVESTMENT ESTIMATION

USD 6,000,000
Payback : 5 Years
B/C Ratio : 1.3

ACEH INVESTMENT COORDINATING BOARD |

132

Sabang Management and Development Agency (BPKS) Project

DIVING
CENTER

Location
Land Status

: Gapang and Iboih Beach


: Goverment Ownership

Road by Condition
Road by Surface
Water
Electicity

:
:
:
:

Good
Asphalted
Like and Spring
Supported

INFRASTRUCTURE SUPPORT
Airport
: Maimun Saleh
Seaport
: Balohan (passanger port) and

Sabang International Hubport

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

133

Photo: Sabang Sea Garden

INVESTMENT ESTIMATION

USD 1,100,000
Payback : 4 Years
B/C Ratio : 1.3

ACEH INVESTMENT COORDINATING BOARD |

134

Sabang Management and Development Agency (BPKS) Project

SEA PORT

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

135

Photo: Sabang Port

INVESTMENT OPPORTUNITIES

Commerce, Export-Import
Transshipment port
Cruise line
Docking yard

Fuel Bunkering Service


Storage
Water Supply
Other
ACEH INVESTMENT COORDINATING BOARD |

136

Sabang Management and Development Agency (BPKS) Project

PLAN OF SABANG PORT

Banda Aceh

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

137

CT1 : Multi Purpose Terminal


CT2 : Cargo Terminal
CT3 : Transhipment Terminal

ACEH INVESTMENT COORDINATING BOARD |

138

Sabang Management and Development Agency (BPKS) Project

INDUSTRY AND TRADING SECTOR

BUSINEESS OPPORTUNITIES

Service of export or import trade


Fuel Bunker, Transit & Supply
Down Stream for Agro Industry (CPO, Cacao, Rubber, etc)
Shipping Industry/ Ship Docking
Fishery Industry

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

139

INDUSTRIAL PARK AT BALOHAN

We will offer the greatest advantages in todays challenging manufacturing


environtment. We will offer the most advanced Industrial Free Zone in Indonesiaminutes from the Container Seaport. We will offer competitive labor rates, onsite property management and 24-hour security. We will layout the Parks to best
utilize the land area and provide for only High Tech Industries that create jobs
beneficial to the people of Pulau Weh and Indonesia.

ACEH INVESTMENT COORDINATING BOARD |

140

Sabang Management and Development Agency (BPKS) Project

FISHERY SECTOR
It is surrounded by Hindia
Ocean, Benggala Bay and
Malacca Strait.
Sabang Zone has a big
potential for marine fish
related industies
Part of Sub Regional
Indonesia-Malaysia-Thailand
Growth Triangle (IMT-GT)/
Cluster Andaman
Some location along the
coast of Weh Island and Pulo
Aceh Island are potentials for
marine culture

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

141

INCENTIVES
BPKS has an authority to provide incentives for the
business in Sabang Zone:

Sabang Zone has free:


Custom Clearance
Custom (Export-Import) duties
Luxury good tax
Value Added Tax (VAT)
Free Trade and Free Port determined for 70 years.
Management Board of Free Trade and Free
Port Sabang (BPKS) has an authority to publish
business license and others licensings, hence,
the procedures are faster and easier

BUSINEESS OPPORTUNITIES

Export Processing Zone (EPZ)


Fresh Fish Export Terminal (sea and air cargo)
Marine Culture, such as sea weed, lobsters.
Cold Storage
Docking Yard

ACEH INVESTMENT COORDINATING BOARD |

142

VI

Detailed Plan of Infrastructure and Energy

Detailed Plan of
Industrial and
Trading Estates

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

143

ACEH INVESTMENT COORDINATING BOARD |

144

Detailed Plan of Infrastructure and Energy

6.1 ACEH INDUSTRIAL AREA PLAN AT LADONG

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

145

ACEH INVESTMENT COORDINATING BOARD |

146

Detailed Plan of Infrastructure and Energy

LOCATION:
Ladong, Great Aceh (about 18 Km to Banda Aceh and 9 Km to Port of Malahayati).

CONSISTED OF:
19 lots for small scale industries (0.10 Ha 0.30 Ha).
23 lots for medium scale industries (0.30 Ha 0,50 Ha).
10 lots for large scale industries (0.50 Ha 1 Ha).

Reserved Land
Area : 552.663 sqm

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

LADONG
556.663 sqm (55 Ha)

BEEF PROCESSING
FOCUSED
INVESTMENT AREA

147

MALAHAYATI SEAPORT

COCONUT FOCUSED
INVESTMENT AREA

ACEH BESAR

PIDIE

ACEH INVESTMENT COORDINATING BOARD |

148

Detailed Plan of Infrastructure and Energy

Chief of Editor
Iskandar
Netty Muharni
Editor
Arif Arham
Cut Eliza Mutia
Design and Layout
Eka Saputra
Zulfahmi

| WWW.ACEHINVESTMENT.COM

ACEH INVESTMENT PROFILE

149

ACEH INVESTMENT COORDINATING BOARD |

150

Detailed Plan of Infrastructure and Energy

| WWW.ACEHINVESTMENT.COM

152

INTRODUCTION

Aceh Investment
Coordinating Board

Jl. Ahmad Yani No. 39, Banda Aceh, Indonesia


P : +62 651 23170 | F : +62 651 23171
E : investasi@acehprov.go.id | bip.aceh@gmail.com
W : investasi.acehprov.go.id | acehinvestment.com
| WWW.ACEHINVESTMENT.COM

S-ar putea să vă placă și