Documente Academic
Documente Profesional
Documente Cultură
CLASSES
CHOOSE
TANK
TESTS
CONFORMITY
TECHNICAL
specification
INSTALLATION
ACCESSORIES
ALARM
OPERATION
Oi l s e pa r a tor s
La r ge f l ows 25 > 250 l/sec
PRE-TREATMENT 2008
INTRO
CLASSES
Oil separators
Requirements
An oil separator is designed to catch the source of pollutants
carried by run-off waters.
CHOOSE
Fields of application
CONFORMITY
TESTS
TECHNICAL
specification
INSTALLATION
ACCESSORIES
ALARM
OPERATION
TANK
PRE-TREATment 2008
EN858-1
Advices
1. The rule becomes more and more strict as regards the
quantity of hydrocarbons rejected in natural environment. It is the reason why we advise to rather use devices provided with a coalescing filter which assures a
hydrocarbon discharge lower than 5 mg/l.
2. The good working of the separator imposes a sludge
trap large enough for allowing the settling of muds (see
following page).
3. The installation of the separator will largely be facilitated if the level of water has been correctly measured.
We propose, for that purpose, fixed or adjustable extension shafts which allow to position the device without
problem.
INTRO
CLASSES
Classes of separators
CONFORMITY
TESTS
ALARM
OPERATION
ACCESSORIES
TECHNICAL
specification
INSTALLATION
PRE-TREATment 2008
INTRO
CLASSES
T he choice o f an o il sep ar ato r is o f ten re l ate d to spe c i fi c con strai n ts of the c onsi dered case . We
g iv e herea ft er a sum m ar y o f the cr iter ia w h i ch c an hel p to di mensi on the se parator. As y ou c a n
ea s ily understand , these tab les d o no t con si de r th e parti c u l ar c ase s w hi c h can ari se: pl ease t a k e
CHOOSE
Parameters
CONFORMITY
peak flow
polluted load to treat
density of the hydrocarbons
compulsory output level
surface to be treated (covered and/or uncovered)
Covered surfaces
Uncovered surfaces
ACCESSORIES
ALARM
OPERATION
TANK
TESTS
Surface parking
m2
Flow
l/sec
1 to 500
1,5
501 to 1500
1501 to 3000
3001 to 5000
10
5001 to 8000
15
8001 to 15000
20
TECHNICAL
specification
INSTALLATION
Without by-pass
With by-pass
Surface
m2
Flow
l/sec
1 to 100
1,5
101 to 200
PRE-TREATment 2008
Flow
l/sec
1 to 600
201 to 400
601 to 1200
401 to 670
10
1201 to 2000
10
671 to 1000
15
2001 to 3000
15
1001 to 1400
20
3001 to 4200
20
Caution:
Surface
m2
INTRO
EN858-1
CLASSES
L/S Ref.
SKPE1,5/150
# Srie
3930
Serial #
Capacit sparateur
850 l
Capacity separator
Capacit dbourbeur
150 l
Capacit stockage
223 l
Storage hydrocarbons
Epaisseur couche
180 mm
Anne de fabrication
2008
CONFORMITY
Thickness layer
hydrocarbons
Manufacturing year
TESTS
EN858
Cl.
Type
1,5
1
CHOOSE
D b it
NS
ALARM
OPERATION
TANK
EC declaration o
f conformity
P.I. Hauts-Sarts
INSTALLATION
ACCESSORIES
We hereby gu
arantee and de
clare that the
CE marked pro
cable provision
duct, SEPARA
s of the Direct
TOR, fulfils the
ive 89/106/EEC
appliconcerning sep
well as the Eur
arator system
opean norme EN
for light liquids
858-1 Separat
as
or systems for
Principles of pro
light liquids (e.g
duct design, pe
. oil and petro
rformance and
l).
testing, marking
and quality con
This certificate
trol.
is valid for all de
vices describe
d here above and
nating from the
bearing the CE
following sites:
ma
COLLINET Assai
rking originissement s.a
undetermined
., Herstal, Belgi
period of time.
um and for an
B-4040 Hersta
l BELGIUM
+32.4.256.56.
TECHNICAL
specification
Signature of an
authorised pers
on
Mr Pierre AND
RE
Administrateur
Dlgu
10 +32.4.2
56.56.19l TVA
BE 0432.172.909
export@collinet
.eu www.colli
net.eu
PRE-TREATment 2008
TECHNICAL
specification
INSTALLATION
ACCESSORIES
ALARM
OPERATION
TANK
TESTS
CONFORMITY
CHOOSE
CLASSES
INTRO
Tests reports
PRE-TREATment 2008
INTRO
CLASSES
The tank
CHOOSE
15
15
8
12
9
13
6
5
11
TESTS
CONFORMITY
14
TANK
Simulation
ALARM
ACCESSORIES
TECHNICAL
specification
OPERATION
INSTALLATION
Advantages
PRE-TREATment 2008
INTRO
ALARM
OPERATION
TANK
TESTS
CONFORMITY
CHOOSE
CLASSES
The tank
ACCESSORIES
INSTALLATION
Options
Optical and audible alarm N8 VARS
Anchoring belts
Anchorings in stainless steel
Ladder in the sludge trap
TECHNICAL
specification
Sludge trap
PRE-TREATment 2008
INTRO
OPERATION
TANK
TESTS
CONFORMITY
CHOOSE
CLASSES
TECHNICAL
specification
INSTALLATION
ACCESSORIES
ALARM
PRE-TREATment 2008
INTRO
CLASSES
4
CHOOSE
CONFORMITY
ALARM
OPERATION
TANK
TESTS
Coalescing cel
Ventilation
Automatic obturator
ACCESSORIES
INSTALLATION
TECHNICAL
specification
Maintenance instructions
Empty sludge and hydrocarbons.
The frequency of emptying depends on the
quantity of polluted matters in the separators.
The sludge trap will be emptied once a year.
10
PRE-TREATment 2008
INTRO
CLASSES
Level alarm
CHOOSE
Control unit
Hydrocarbons
Water
Approved:
ATEX 031X.
CONFORMITY
TESTS
Control unit
TANK
Hydrocarbons
OPERATION
Water
INSTALLATION
Approved:
ATEX 031X
Water
ACCESSORIES
Hydrocarbons
Mud
ALARM
Control unit
TECHNICAL
specification
Control unit
Hydrocarbons
Mud
Water
PRE-TREATment 2008
11
INTRO
CLASSES
Level alarm
CHOOSE
The SANDSET-1000 is a complete system which makes it possible to detect a decanted sand or mud level at the bottom of a
tank. The ultrasound probe generates an alarm when the sand or mud level arises between the two sensitive elements of the
probe.
CONFORMITY
The probe does not require any calibration, nor particular maintenance. It only needs to be installed at the right level and to be
set under tension. It is in conformity with directive ATEX 94/9/EC for a use in a potentially explosive atmosphere.
Control unit
TANK
TESTS
Water
OPERATION
Control unit
Water
ALARM
Mud
ACCESSORIES
TECHNICAL
specification
INSTALLATION
Communication and warning system supplied with solar energy allowing to detect the hydrocarbon level and to send a SMS
alert message.
12
PRE-TREATment 2008
INTRO
Accessories
CLASSES
F o r l i ght fl ows
CHOOSE
90
Extension shafts
Ref: RRR630
: 630 mm
CONFORMITY
Weight: 14 kg
Height 1 extension shaft: 360 mm
Height 2 extension shafts: 720 mm
PE Cover
TESTS
Ref. E630
Load: classe A-15 kN
Weight: 10 kg
: 630 mm
Screwed on the separator: 3 x M10
TANK
OPERATION
Circular extension
shaft 630 mm
ALARM
+ 30 mm
Load
class
Weight
kg
Opening
mm
Base
mm
F600
D-400
62
610
850 x 850
INSTALLATION
Ref.
ACCESSORIES
TECHNICAL
specification
100
610
PRE-TREATment 2008
13
INTRO
CLASSES
Installation
Off-the-road
Ventilation
PE Cover
Out
TESTS
CONFORMITY
CHOOSE
TANK
In carriage zone
ACCESSORIES
ALARM
OPERATION
Ventilation
Out
INSTALLATION
TECHNICAL
specification
Ventilation
Filling material
In
Out
Anchoring belts
Stabilized sand
Ballast
pave concrete
Anchoring in the pave
concrete
14
PRE-TREATment 2008
INTRO
CONFORMITY
TESTS
TANK
OPERATION
ALARM
HSKBPPE
ACCESSORIES
HSKPE
CHOOSE
CLASSES
TECHNICAL
specification
INSTALLATION
Options
Anchoring belts
Cast iron cover class D-400 kN
Anchorings
PRE-TREATment 2008
15