Bureau of Mines Information Circular/1976

Basic Estimated Capital Investment

and Operating Costs for Underground


Bituminous Coal Mines
Mines With Annual Production of 1.06
Million Tons From a 72-Inch Coalbed

to 4.99

Revision of Information Circular 8632

fcWTO^

UNITED STATES DEPARTMENT OF THE INTERIOR

Information Circular

8682A

Basic Estimated Capital Investment

and Operating Costs for Underground


Bituminous Coal Mines
Mines With Annual Production of 1.06 to
Million Tons From a 72-Inch Coalbed

4.99

Revision of Information Circular 8632

By Sidney

Hemingway, and L.JH. Berkshire


Process Evaluation Group MMRD, Morgantown, W. Va.
Katell, E. L.

UNITED STATES DEPARTMENT OF THE INTERIOR


Thomas

S.

Kleppe, Secretary

BUREAU OF MINES
Thomas

V. Falkie, Director

As

the Nation's principa] conservation agency, the Department of the Interior

has responsibility for most of our nationally owned public lands and natural
resources.

sources,

This includes fostering the wisest use

of our land

and water re-

protecting our fish and wildlife, preserving the environmental and

cultural values of our national parks and historical places, and providing for

the enjoyment of life through outdoor recreation.

The Department assesses

our energy and mineral resources and works to assure that their development is
in the

best interests of all our people.

The Department also has a major

sponsibility for American Indian reservation communities and for people

re-

who

live in Island Territories under U.S. administration.

l^i

Ui

This publication has been cataloged as follows:

Katell, Sidney

Basic estimated capital investment and operating costs


underground bituminous coal mines: mines with annual

for

production of 1.06 to 4.99 million tons from a 72-inch coal-,


bed,

by

Sidney

Berkshire.
41 p.
lar

Katell,

E.

L.

Hemingway,

and

L. H.

[Washington] U.S. Bureau of Mines [1976]

illus., tables.

(U.S. Bureau of Mines.

Information circu-

8682A)

Revision of information circular 8632.


Bituminous coal Costs. 2. Coal mines and mining United
1,
States Cost of operation. L U.S. Bureau of Mines. II. Hemingway,
E. L., jt. auth. IIL Berkshire, L. H^.jt. auth. IV. Title. (Series)

TN23.U71

no.

8682A

622.06173

U.S. Dept. of the Int. Library

For sale by the Superintendent of Documents, U.S. Government Printing Office

Washington, D.C. 20402


Catalog No. I28427:8682A

l*

CONTENTS

r^

Page

^
^^ti5tract
Introduction
N^ General mining plan
Summary
^Appendix A,--l .06-MM-tpy
sj Appendix B.--2.04-MM-tpy
Appendix C.
3.18-MM-tpy
Appendix D.--4.99-MM-tpy

1
i
2

mine
mine
mine
mine

15
24
33

ILLUSTRATION
1.

General mining plan

TABLES

Acreage required to provide coal resources necessary to


sustain a 20-year mining operation
2.
Summary of estimated capital investment, operating cost,
and selling price by annual output capacity
A-1
Capital investment summary, 1 .06-MM-tpy mine
A-2.
Manning table, 1. 06-MM-tpy mine
A-3.
Depreciation schedule, 1 .06-MM-tpy mine
Power and water cost, 1. 06-MM-tpy mine
A-4.
A-5.
Estimated anntial production cost, 1 .06-MM-tpy mine
A-6._ Estimated development cost, 1 .06-MM-tpy mine
A-7.- Estimated working capital and total capital investment,
1 .06-MM-tpy mine
Summary of discounted cash flow, 1. 06-MM-tpy mine
A-8.
A-9.
Discounted cash flow, 1 .06-MM-tpy mine
B-1
Capital investment summary, 2.04-MM-tpy mine
B-2.
Manning table, 2.04-MM-tpy mine
B-3.
Depreciation schedule, 2.04-MM-tpy mine
Power and water cost, 2. 04-MM-tpy mine
B-4.
B-5.
Estimated annual production cost, 2.04-MM-tpy mine
B-6.
Estimated development cost, 2.04-MM-tpy mine
B-7.
Estimated working capital and total capital investment,
2.04-MM-tpy mine
B-8.
Sunmary of discounted cash flow, 2.04-MM-tpy mine
B-9.
Discounted cash flow, 2.04-MM-tpy mine
Capital investment summary, 3.18-MM-tpy mine
C-1
Manning table, 3.18-MM-tpy mine.
C-2.
Depreciation schedule, 3.18-MM-tpy mine
C-3.
Power and water cost, 3.18-MM-tpy mine
C-4.
Estimated annual production cost, 3.18-MM-tpy mine
C-5.
Estimated development cost, 3.18-MM-tpy mine
C-6.
C-7.
Estimated working capital and total capital investment,
3 1 8-MM-tpy mi ne
1.

5
6
8
9

10
11
12
12
13
14
15
17
18
19
20
21

21
22
23
24
26
27
28

29
30
30

11

TABLES Continued
Page
C-8.
C-9.
D-1

D-2.
D-3.
D-4.
D-5.
D-6.
D-7.
D-8.
D-9.

Summary of discounted cash flow, 3.18-MM-tpy mine


Discounted cash flow, 3.18-MM-tpy mine
Capital investment summary, 4.99-MM-tpy mine
Manning table, 4.99-MM-tpy mine
Depreciation schedule, 4.99-MM-tpy mine
Power and water cost, 4.99-MM-tpy mine
Estimated annual production cost, 4.99-MM-tpy mine
Estimated development cost, 4.99-MM-tpy mine
Estimated working capital and total capital investment,
4.99-MM-tpy mine
Summary of discounted cash flow, 4.99-MM-tpy mine
Discounted cash flow, 4.99-MM-tpy mine

31
32
33
35
36
37
38
39
39
40
41

BASIC ESTIMATED CAPITAL INVESTMENT AND OPERATING COSTS


FOR UNDERGROUND BITUMINOUS COAL MINES
Mines With Annual Production of 1.06 to 4.99 Million Tons
From a 72-Inch Coalbed
Revision of Information Circular 8632
by
Sidney KatellJ E. L. |Hemingway,2 ^nd L. H. Berkshire^

ABSTRACT
This study estimates capital investment, operating costs, and selling prices for four underground bituminous mines producing coal with
It is assumed
annual production ranging from 1.06 to 4.99 million tons.
Wages and union welfare payments are
that the mines have a 20-year life.
considered as of December 6, 1974, under the Bituminous Wage Agreement
of 1974, and costs for material and equipment are based on 1975 indexes.

investment ranges from $20,799,800 for the 1.06million-ton-per-year (MM tpy) mine to $84,027,500 for the 4.99-MM-tpy
Total capital investment ranges from $32,506,800 to $122,983,500
mine.
Corresponding selling prices for the coal range
for the same mines.
from $12.87 to $11.64 per ton, assuming a 15-percent discounted cash flow
rate of return after Federal income taxes.
Initial capital

INTRODUCTION

Growing public concern about the increasing demand for energy has
brought about a renewed interest in coal production in the United States.
Because cost is an important factor in determining the extent to which
coal will be used to satisfy this energy requirement, the Bureau of Mines
is preparing a series of reports that provide estimated capital investment and operating costs for hypothetical mines that may be utilized in
the production of synthetic fuels or for electric utility plants.

2
^

Chief, Process Evaluation Group.


Mining engineer.
Economist.

Three studies that presented capital investment and operating costs


for coal mines, based on rates in effect under the Bituminous Wage Agreement of 1971, were published in 1974^. This report is the first of a new
series that updates the previous publications to reflect wage and union
welfare rates, which went into effect December 6, 1974, under the Bituminous
Wage Agreement of 1974. Costs for material and equipment are based on
January 1975 cost indexes, and selling prices are based on a 15-percent
discounted cash flow (DCF) rate of return after Federal income taxes. Mines
are assumed to have a 20-year life.
This study presents basic capital investment and production costs for
four hypothetical underground bituminous coal mines with a 72-inch working
height and with annual production ranging from 1.06 to 4.99 million tons
of coal.
Since costs are affected by many factors, any particular mine, in
reality, will have to be considered in relation to its own special situation and requirements.

This publication. Information Circular 8682A, modifies areas in which


results of various calculations were carried forward incorrectly in
Information Circular 8682.

GENERAL MINING PLAN


It is assumed that the mines operate 5 days per week, 220 days per
year, and have a 20-year life.
Continuous miner- sections produce 344 tons
of coal per unit per shift.

Acres of surface needed to produce the required tonnages are calculated


assuming 1,800 tons of coal per acre-foot with 6 feet of mining height and
57-percent recovery. The following table shows the acreage requirements.

TABLE

Acreage required to provide coal resources


necessary to sustain a 20-year mining operation
-

Production, MM tpy
1.06
2.04
3.18
4.99

Acres required, 57-percent recovery


3,442
6,639
10,326
16,228

iKatell, Sidney, and E. L. Hemingway.


Basic Estimated Capital Investment
and Operating Costs for Underground Bituminous Coal Mines:
Mines With
Annual Production of 1.06 to 4.99 Million Tons From a 72-Inch Coal bed.
BuMines IC 8632, 1974, 41 pp.
Basic Estimated Capital Investment and Operating Costs for Under.
ground Bituminous Coal Mines: Mines With Annual Production of 1.03 to
3.09 Million Tons From a 48-Inch Coal bed.
BuMines IC 8641, 1974, 31 pp.
Basic Estimated Capital Investment and Operating Costs for Coal
Strip Mines.
BuMines IC 8661, 1974, 31 pp,

The general mining plan involves driving main entries along the
center axis of the property with production headings on the right and
left.
In the 1.06- and 2.04-MM-tpy mines, all mining is concentrated
on
one side of the main heading, the plan being to mine one side of the main
entries on the advance and the other side on the retreat.
In the 3.18and 4.99-MM-tpy mines, production headings were driven both ways off the
main headings to reduce development time and to reach full production with
the number of units required.
The main headings have

11

entries, and the production headings have

8 entries, 14 feet wide on 95-foot centers.


The production panels are on
the 8-entry system, 16 feet wide on 95-foot centers.
Production panels
are 2,600 feet long plus an additional length for development of the

bleeder system.

Figure

is a

diagram of the general mining plan.


Coalbed outcrop

Bleeders

Direction of mining

s 'r

Direction of mining

Prod uction heading

Production heading
:B e e d e

B eede

Bleeders:

Production heading

FIGURE

Production headi ng-

1.

General Mining plan.

Each loading unit will consist of a continuous miner, a loading


The shuttle cars will dump
machine, two shuttle cars, and a roof bolter.
into a ratio feeder at the tailpiece of the unit belt conveyor.
Unit
manpower consists of 10 men and a foreman.
Each unit is equipped with a
power center to reduce high voltage to equipment requirements. A rectifier converts alternating current to direct current where necessary.
Coal is transported to the surface by belt conveyors.
The main heading conveyors are 42 inches wide, and the production headings and panels
are 36 inches wide.

The estimated development cost covers the period of time needed to


establish the outside facilities and the time required to place all underground mining units in operation within the basic mining plan.
Time
needed to develop the surface area depends on topography and the location
of existing roads, railroads, navigable rivers, or plant site. The
development period was estimated conservatively at 1 year for the 1 -MM-tpy
mine, 1-1/2 years for the 2- and 3-MM-tpy mines, and 2 years for the 5-MMtpy mine, but could vary with the location.
The following detailed equipment list describes the principal pieces
of equipment that will be used in the mines:

Continuous miner
Hp:

600.

Drive:

Motor.

Roof bolter
Dual
Hp:

boom.
50.

Equipped with dust collector.


Loading machine
25/30 tons
Loading rate:
per minute (tpm).
160.
Motor.
Drive:

Supply motor
To haul supplies to working
faces.

Hp:

Hp:

80.

Drive:

Motor.

Shuttle car
135.
Motor.
Drive:

Hp:

Mainl ine belt power center


kV-A.

~I00

Ratio feeder
Can accept 15+ tons of coal
discharge at desired rate.
Self-tramming.
Equipped with lumpster.

Section belt power center


150 kV-A.

Auxiliary fan
To provide more effective
ventilation at working face.

Rectifier for track haulage

Triple duty rock duster


To dust main heading, faces,
and back area.
Hp:

30.

Section rectifier
200 kW.

,000 kW.

Main ventilation fan


Dual.
Type:
Size:
8 ft.
350,000 cfm at 6-inch water'
gage.

Information supporting the cost figures in this study is included


B, C, and D for the 1.06-, 2. 04-,
3. 18-, and 4.99-MM-tpy mines, respectively.
The following tables are
included for each of the mines.
in tables that make up appendixes A,

Table No

Capital investment summary


Manning table
Depreciation schedule
Power and water cost
Estimated annual production cost
Estimated development cost
Estimated working capital and total capital
investment
Summary of discounted cash flow
Discounted cash flow

4
5
6
7

SUMMARY
This study furnishe:5 cost analyses for four hypothetical underground
bituminous mines that produce 1.06, 2.04, 3.18, and 4.99 million tons of
coal per year.
A summary of the total capital investments, operating
costs, and selling prices is given in table 2.

TABLE

Summary of estimated capital investment ,


operating cost, and selling price
by annual output capacity
1.06

MM tpy
Initial

Deferred
Total

2.

Per ton of
production,

Per year.
Per ton.

12 percent DCF
1 5
percent DCF
20 percent DCF

2.04
Capital

$20,799,800
11,707,000
32,506,800

$36,943,000
18_j_615,000

55,558,000

3.18
investment
$54,853,800
26,164,500
81,018,300

4.99

$84,027,500
38,956,000
122,983,500

25.48

24.65

9,744,200
9.19

Production cost
25,988,100
17,335,600
8.50
8.18

40,500,300
8.12

11.92
12.87
14.49

Selling price per ton


11.15
10.74
11.63
12.08
13.17
13.68

11.64
13.25

30.67

27.23

10.71

APPENDIX
TABLE A-1

Capital

A. 1.06-MM-TPY

investment summary.

Item
Continuous miner
Loading machine
Shuttle car
Roof bolter
Ratio feeder
Auxiliary fan
Mantrip Jeep^
Mechanic Jeep
Personnel Jeep
Trickle rock duster
Triple duty rock duster
Supply motor
Supply car
36-inch rope-type belt conveyor
Mainline belt power center (300 kV-A)...
Section belt power center (150 kV-A)....
Section power center (1,000 kV-A)
Section rectifier (200 kW)
Section switch house
Sectional i zing switch house
High voltage (HV) cable (300 mill "ion
circular mill aluminum {MCM AL})
PLM^ coupler
Section cable and coupler
Rectifier for track haulage
Trol

MINE

ey wi re

Track (60-1 b)
Fresh water lines
Pumps and 1 i nes
Telephone (page phones)
Conveyor fire protection
Automatic controls and alarms
Scoop tractor
Battery charger
All service mask
Breathi ng apparatus
Self rescuer
Stretcher set
Safety 1 ight
Methanometer
Fire chemical car
Lamp (including accessories)
Dust sampler
Site preparation
Ventilation fan (dual)

.06-MM-tpy mine

Quantity
6

12
8
6
7

6
3

4
8
7

25

25,740 ft
5

5
6
6

6
7

12,000 ft
15
1

24,740 ft
24,740 ft
24,740 ft
-

7
7

12
12

250
8

100

100
4

250
20
"

Total cost
$1,809,600
483,800
889,500
425,000
270,000
26,300
105,000
41,300
50,000
35,000
271,000
94,000
78,100
1,771,500
93,800
62,500
172,500
15,000
56,300
65,600

120,000
14,600
46,600
25,000
77,400
247,400
92,800
19,000
9,000
25,000
50,000
245,000
26,200
1,500
9,400
9,400
1,300
4,400
37,500
15,000
13,000
7,500

40,000
120,000

TABLE A-1.

Capital

investment summary, 1.06-rf1-tpy mine

Item
Concrete portal
Bulk rock dust facility
Substation and distribution......
Bathhouse, office, and lamp house,
Shop and warehouse
Powder and cap house
Front-end loader
Forklift
Bulldozer
Uti 1 i ty truck
Pickup truck
Oil storage
Water tank
Supply yard
Mine drainage treatment plant
Exploration
Total direct
Field indirect
Total construction

Quantity

Engi neeri ng

Overhead and administration


Contingency.
Fee

Estimated development cost.


Interest during development
Gross estimate
Credit for coal mined during development at $10 per ton
Land acquired at $2,500 per acre

Continued
Total cost

75,000
20,000
100,000
350,000
187,500
5,000
63,000
44,000
100,000
9,000
6,000
12,000
12,000
15,000
37,500
65,000
,175 ,800

183 ,500
9,359 ,300
187 ,200
477 ,300
10,023 ,800
1,503 ,600
11,527 ,400
230 ,500
11,757 ,900
8,593 ,700
20,351 7BM
1,017,600

':7m
11,275 ,000
10,094 ,200
8,600 ,000

Net estimate,
18,694,200
^Reference to specific trade names in this report is done to facilitate
understanding and does not imply endorsement by the Bureau of Mines.

TABLE A- 2.

Manning table, 1.06;-MM-tpy mine

Personnel

Underground:
Continuous miner operator...
Loading machine operator
Machine operator helper
Shuttle car operator
Roof bol ter
Bra tt iceman
Ut i 1 i ty man
Mechanic (section)

Total
14
14
14
28
28
14
14
14

Wagesi
per day

$55.00
51.98
51.98
49.23
55.00
47.03
49.23
55.00

140

Supply motorman
Bel tman
Trackman
Wi reman
Mason (precision)
Pumper
Utility crew
Roving mechanic
Fireboss (union)

4
9
6
6

6
3
9

6
3

47.58
47.03
47.03
47.03
49.23
47.03
49.23
55.00
55.00

52

Outside:
Lampman
Front-end loader operator...
Shop mechanic

3
2

6
11

Salary:
Superintendent
General mi ne foreman
Assistant mine foreman

45.38
47.85
49.50

Cost
per year

$172,128
162,826
162,826
308,713
344,256
147,580
154,357
172,128
1,624,800
42,398
94,968

Cost
per ton

$1.53

63,311
63,311

65,743
31,657
99,324
73,568
36,916
571,196

.54

30,568
21,318
66,572
118,458

.11

30,000
20,000
3
48,000
14
196,000
Maintenance superintendent..
1
21,800
1
15,200
Mine maintenance foreman
3
45,000
1
22,500
Draftsman
1
9,200
Survey crew
3
29,700
Safety director
1
19,800
Safety inspector
3
43,500
3
Dust sampler
31,500
Office manager
1
15,800
1
Timekeeper and bookkeeper...
11,000
Purchasing supervisor
1
15,800
Warehouseman
4
39,600
43
614,400
.58
Total labor and supervision...
2.76
246
2,928,900
1 Figures
in this column are for the day shift.
Shift differentials for
other shifts are reflected in the cost per year.
1

TABLE A-3.

Depreciation schedule,

.06-MM-tpy mine

Straight-line
Yearly charge,
depreciation, years
doll ars

Item

Exploration
Mine drainage treatment plant
Supply yard
Water tank
Oil storage
Pickup truck
Utility truck
Bulldozer
Forklift
Front-end loader
Powder and cap house
Shop and warehouse
Bathhouse, office, and lamp house.
Substation
Bulk rock dust facility.
Concrete portal s
Ventilation fan.
Site preparation.
Coal mine safety equipment.
Underground equipment
Interim equipment replacement
Subtotal

Depreciation for field indirect,


engineering, overhead and
administration, contingency,
fee, cost of development, and
interest during development,
less credit for coal mined
at $1
per ton
Total
^.'^l.O.l

per ton.

n, 090, 200

10

TABLE A-4.

Number
of
units

Power and water cost, 1.06-MM-tpy mine

Operation
Continuous miner.
Continuous miner.

10
8
5

Hr per
day, full
load
10
3,000

Hp,
total
load

KW,
total
load

Total kW-hr
revquirement

2,238
1,790

22,380
8,950

597
477

5,970
2,385

1,007
806

10,070
4,030

187
149

2,244
894

2,400

160
160

800
640

10

Shuttle car
Shuttle car

135
135

1,350
1,080

10

Roof bolter
Roof bolter

50
50

250
200

12

125
125

625
500

10
5

466
373

4,660
1,865

18

112

2,016

Loading machine.
Loading machine.

Hp per
unit
600
600

Ratio feeder
Ratio feeder

Auxiliary fan

30

150

Mantrip Jeep
Mantrip Jeep

15
15

75

60

56
45

224
90

Mechanic Jeep

15

45

15

34

510

Personnel Jeep

30

15

22

330

Rock duster

30

210

12

157

1,884

Supply motor

80

240

12

179

2,148

36-inch conveyor.

850

15

634

9,510

Ventilation fan.

500

24

373

8,952

400

10

298

2,980

10
1

Extra for pumps,


tools, lights,
etc

7.5

Total
NOTE.

Power:

Water:

$0.02 x 92,092 x 220 = $405,200 r 1,059,500


= $0.38 per ton.
3,000 gal per unit per shift at $0.10 per M gal
= 3,000 X 14 X 220 x 0.10 t 1,000 = $900.

92,092

n
TABLE A-5.

Estimated annual production cost, 1.06-MM-tpy

i.,ine

Annual cost Cost per ton

Direct cost:
Production:
Labor
Supervision.

Maintenance:
Labor
Supervision,

Operating supplies:
Mining machine parts
Lubrication and hydraulic oil
Roof bolts and timber
Rock dust
Ventilation
Bits
Cables

$2,002,200
532,400
2,534,600

$1.89

312,300
82,000
394,300

.29
.08

669,800
266,000
328,600
139,800

.63
.25

201 ,400

.50

2.39

.37

.31

.13
.19

127,200
63,600
159,000
1,955,400

1.84

Power

405,200

.38

Water

900

Miscellaneous

.12
.06
.15

Payroll overhead (40 percent of payroll)..

1,171,600

1.11

Union welfare^

1,105,900

1.05

732,600

.69

Indirect cost:
15 percent of labor, supervision,
and supplies
Fixed cost:
Taxes and insurance,
mine cost
Depreciation

Total

lEffective Dec.

6,

percent of

353,500

.33

1,0 90,200
r;443.70ff

1.03

9,744,200

9.19

1974, under the Bituminous Wage Agreement of 1974.

12

TABLE A-6.

Estimated development cost^, 1.06-MM-tpy mine

Item
labor and supervision
Operating supplies
Power
Payrol 1 overhead
Union welfare
Indirect cost
Fixed cost

Cost per ton


$3,166,600
1.15
1,296,600
.25
281,900
1.12
1,266,600
1.04
1,172,600
654,000
.58
.67
755,400
7.62
Total
8,593,700
lEstimated development cost covers the period of time required to place
all units in operation within the projected mining plan.
Total cost

Total

NOTE.

Cost per ton = $7.62.


Tonnage *= 1,127,500.
Credit for coal mined at $10 per ton

TABLE A-7.

$11,275,000.

Estimated working capital and total capital investment ,


1 .06-M'^-tpy mine

Estimated working capital:


Direct labor
3 months.
3 months.
Operating supplies
Payroll overhead
3 months.
Indirect cost
4 months.
Fixed cost
0.5 percent of insurance base.
Spare parts
Mi seel 1 aneous
Total worki ng capi tal
Total estimated capital investment:
Total mine cost (insurance, tax base)

$732,200
488,900
292,900
244,200
88,400
230,000
29,000
2,105,600

17,676,600
Interest during development
1 ,017,600
Subtotal
18,694,200
Working capital
2,105,600
20,799,800
Estimated capi tal i nvestment
Estimated deferred capital investment
11 ,707,000
Total capital investment and deferred investment... ^32,506,800
iThis is an average cost of f)3n.67 per ton of annual production.

13

TABLE A-8,

Year

Summary of discounted cash flow, 1.06-MM-tpy mine

Capital
investment

Cash flow
$20,799,800 $-20,799,800

Present
worth
factor at
15 percent
1.

.6575
.5718
.4972

3,096,000
2,691,900
2,340,900
2,035,800
1,688,600

67,900
59,000
51,300
44,600
2,075,500

1,539,100
1,338,300
1,163,900
1,012.200
-1,156,600

33,700
25,500
22,200
39,500

765,100
665,400
578,500
503,100
417,400

16,800
14,600
12,700
11,000
-644,500

380,600
330,800
287,700
250,300
871,600

23,266,700

800

4
5

321 ,000

3,560,300
3,560,300
3,560,300
3,560,300
3,396,300

157,000
157,000
157,000
157,000
8,396,000

3,560,300
3,560,300
3,560,300
3,560,300
-4,678,700

.4323
.3759
.3269
.2843
.2472

157,000
157,000
157,000
157,000
321,000

3,560,300
3,560,300
3,560,300
3,560,300
3,396,300

.2149
.1869
.1625
.1413
.1229

157,000
157,000
157,000
157,000
-10.548,60a

3,560,300
3,560,300
3,560,300
3,560,300
14,265,900

.1069
.0929
.0808
.0703

8
9

10
11

12
13
14
15
16
17
18

19
20

Present worth
cash flow value
at 15 percent
$-20,799,800

136,500
118,700
103,200
89,800
159,600

.8696

157,000
157,000
157,000
157,000

Present worth
capital
investment
at 15 percent
^20,799,800

.7561

.0611

-29,300

14

TABLE A-9.
15 percent

Discounted cash flow, 1.06-MM-tpy mine

20 years

$23,266,700 - 6.259i
less depreciation
Depletion + net profit

R =

=
=

$3,717,300
1,090,200
2,627,100

Depletion = 10 percent of sales


Federal income tax = net profit
Depletion + net profit = cash flow
Sales

=
=

depreciation

1/0.55 (1/2 operating cost + cash flow


1/0.55 (4,872,100 + 2,627,100)

Sal es
Operating cost
Gross profit
Depletion
Taxable income
Federal income tax
Net profit

$1

depreciation)

3,634,900
9,744,200
3,890,700
1,363,500
2,527,200
1 ,263,600
1,263,600

Annual cash flow = net profit + depreciation + depletion


= $1,263,600 + $1,090,200
+ $1,363,500
=

$3,717,300

Selling price per ton = $13,634,900 f 1.059,500


lUniform series present worth factor.

$12.87

15

APPENDIX
TABLE B-1

C apital

B. 2.04-MM-TPY

MINE

investment summary, 2.04-MM-tpy mine

Item
Continuous miner
Loading machine
Shuttle car
Roof bolter
Ratio feeder
Auxiliary fan
Mantrip Jeep
Mechanic Jeep
Personnel Jeep
Trickle rock duster
Triple duty rock duster
Supply motor
Supply car
42-inch rope-type mainline belt conveyor
36-inch rope-type belt conveyor
Mainline belt power center (300 kV-A)
Section belt power center (150 kV-A)
Section power center (1,000 kV-A)
Section rectifier (200 kW)
Section switch house
Sectional izing switch house
HV cable (300 MCM AL)
PLM coupler
Section cable and coupler
Rectifier for track haulage
Trolley wire
Track (60-1 b)
Fresh water line
Pumps and lines
Telephone (page phones)
Conveyor fire protection
Automatic controls and alarms
Scoop tractor
Battery charger
All service mask
Breathing apparatus
Self rescuer
Stretcher set
Safety light
Methanometer
Fire chemical car
Lamp (including accessories)
Dust sampler
Site preparation
Ventilation fan (dual)

Quantity
T\
11

22
13
11

13
9

4
6

14
12
5

50
9,000 ft
26,561 ft
5

7
11

11
11

10
13,100 ft
17
2

31,300 ft
31,300 ft
31,300 ft
-

12
12
36
24

450
12

200
200
8

450
35
-

Total cost~
$3,317,600
886,600
1,630,200
692,900
495,000
49,400
157,500
55,200
75,000
61,600
466,800
156,500
155,000
720,000
1,832,700
95,000
87,500
316,300
27,500
103,100
93,800
131,000
16,600
85,300
50,000
98,600
313,000
117,400
25,000
10,000
27,500
75,000
375,000
30 ,000

4,500
18,800
16,900
1,900
8,800
75,000
30,000
23,600
13,100
37,500
115,000

16

TABLE B-1

Capital

investment summary, 2.04-MM-tpy mine

Item

Concrete portal
Bulk rock dust facility
Substation and distribution
Bathhouse, office, and lamp house
Shop and warehouse
Powder and cap house
Front-end loader
Forklift
Bulldozer
Utility truck
Pickup truck
Oil storage
Water tank
Supply yard
Mine drainage treatment plant
Exploration
Total direct
Field indirect
Total construction
Engineering
Overhead and administration

Quantity
5
1
1
1
1
1
1
1
1
1
1
1
1

Conti ngency

Fee

Estimated development cost


Interest during development
Gross estimate
Credit for coal mined during development at $10 per ton.
Land acquired at $2,500 per acre
Net estimate

Continued
Total cost
87 , 500

25,000
87,500
390,000
250,000
7, 500
62,500
25,000
100,000
5,000
3,800
18,800
18,800
18,800
37,500
125,000
14,437,400
288,700
14,726,100
294,500

751 ,000

15,771,600
2,365,700
18,137,300
362,700
18,500,000
11 ,795,900
30,295,900
1 ,514,800
31,810,700
15,251 ,000

16,559,700
16,597,500
33,157,200

17

TABLE B-2.

Manning table, 2.04-MM-tpy mine

Personnel
Underground:
Continuous miner operator..
Loading machine operator...
Machine operator helper
Shuttle car operator
Roof bolter
Bratt iceman
Utility man
Mechanic (section)

Total
27
27
27
54
54
27
27
27

Wages 1
per day

Cost
per year

$55.00
51.98
51.98
49.23
55.00
47.03
49.23
55.00

$332,244
314,304
314,304

270

Supply motorman
Beltman
Trackman
Wi reman
Mason (precision)
Pumper
Utility crew
Roving mechanic
Fireboss (union)
o

18
9

12
3

18
9
3

47.58
47.03
47.03
47.03
49.23
47.03
49.23
55.00
55.00

87

Outside:
Lampman
Front-end loader operator..
Shop mechanic

3
3

15

Salary:
Superintendent
General mi ne foreman
Assistant mine foreman
Section foreman
Maintenance superintendent.
General shop foreman
Mine maintenance foreman...
Chief mine engineer
Draftsman
Survey crew
Safety director
Safety inspector
Dust sampler
Office manager
Timekeeper and bookkeeper..
Purchasing supervisor
Warehouseman

45.38
47.85
49.50

Cost
per ton

595,941

664,488
284,901
297,971
332,244
3,136,397
64,037
189,936
94,968
94,968
132,430
31,657
198,648
110,748
36,916
954,308
30,568
32,197
99,858
162,623

$1.54

.47

,08

30,000
20,000
48,000
3
378,000
27
21,800
1
15,200
1
45,000
3
22,500
1
9,200
1
29,700
3
19,800
1
43,500
3
31,500
3
15,800
1
11,000
1
15,800
1
39,600
4
39
796,400
56
5,049,700
2.48
428
supervision
and
labor
Total
Shift differentials for
1 Figures
in this column are for the day shift.
per
year.
cost
in
the
reflected
are
shifts
other
1

18

TABLE B-3.

Depreciation schedule, 2.04-MM-tpy mine

Straight-line
Yearly charge,
depreciation, years
dol lars

Item

Exploration
Mine drainage treatment plant
Supply yard
Water tank
Oil storage
Pickup tfuck
Utility truck
Bulldozer
Forklift
Front-end loader
Powder and cap house
Shop and warehouse
Bathhouse, office, and lamp house,
Substation
Bulk rock dust facility
Concrete portal s
Venti 1 ati on fan
Site preparation
Coal mine safety equipment
Underground equipment
Interim equipment replacement....,
Subtotal
,

3 ,800
1
1

800

Depreciation for field indirect,


engineering, overhead and
administration, contingency,
fee, cost of development, and
interest during development,
less credit for coal mined
at $1
per ton
Total

i$0.86 per ton.

,900
,900
,900

,000
10 ,000
2 ,500
6 ,30C
800
12 ,500
19 ,500
4 ,400
2 ,500
4 ,400
5 ,800
1 ,900
59 ,000
,272 ,700
233 ,000
1

1,652,900

106.100
1,759,000

19

TABLE B-4.

Number
of
units

Power and water cost, 2.04-MM-tpy-mine

Hp per

Operation
Continuous miner.
Loading machine..
Shuttle car
Roof bolter
Ratio feeder
Auxiliary fan
Mantrip Jeep
Mechanic Jeep
Personnel Jeep
Rock duster
Supply motor
42-inch conveyor.
36-inch conveyor.
36-inch conveyor.
Ventilation fan.
Extra for pumps,
tools, lights,

5
9

18
9
9

9
9

4
6
9
5

3
2
7
1

unit
600
160
135
50
125
30
15
15

7.5
30
80
125
100
50

Hp,
Total

load
5,400
1,440
2,430
450
1,125
270
135
60
45
270
400
375
200
350
500

500

etc

Hr per
day, full
load

KW,
total
load

15
15
15
18
15
18

4,028
1,074
1,813
336
839

15
15
12
12
15
15
15
24

10

201
101

45
34
201

298
280
149
261

373

kW-hr
requirement
60,420
16,110
27,195
6,048
12,585
3,618
606
675
510
2,412
3,576
4,200
2,235
3,915
8,952

Total

373

Total
NOTE.

Power:

$0.02 X 156,787 x 220 = $689,900 - 2,043,400


$0.34 per ton.
3,000 gal per unit per shift at $0.10 per M gal
= 3,000 X 27 X 220 x 0.10 t 1,000 = $1,800.

Water:

3,730
156,787

20

TABLE B-5.

Estimated annual production cost, 2.04-MN-tpy mine


Annual cost

Direct cost:
Production:
Labor
Supervision,

Cost per ton

$3,710,500
714,400
4,424,900

$1.82

542,800
82,000
624,800

.27
.04

1,287,300
510,800
633,500
265,600
388,200
245,200
122,600
306,500
3,759,700

.63
.25

1.84

Power

689,900

.34

Water

1,800

Maintenance:
Labor
Supervision,

Operating supplies:
Mining machine parts
Lubrication and hydraulic oil
Roof bolts and timber
Rock dust
Ventilation
Bits
Cables
Mi seel 1 aneous

.35

2.17

.31

.31

.13
.19
.12
.06
.15

Payroll overhead (40 percent of payroll)..

2,019,900

.99

Union welfare^

2,101,400

1.03

1,321,400

.65

632,800
1,759,000
2,391,800

.31

Indirect cost:
15 percent of labor, supervision, and
suppl

es

Fixed cost:
Taxes and insurance,
mine cost
Depreciation

percent of
.86

1.17

17,335,600
8.50
Total
^Effective Dec. 6, 1974, under the Bituminous Wage Agreement of 1974

21

TABLE B-6.

Estimated development cost^, 2.04-MM-tpy mine

Item
Total labor and supervision.
Operating suppl ies

Power

Payrol 1 overhead
Union welfare

Total cost
$475015,800
1,75 3,900

Cost per ton


$2.95
1.15

38il,300

.25

1,708,100
1,570,900

1.12
1.03

.58
Indirect cost
884, 600
.65
Fixed cost
991 , 300
7.73
Total
11,795,900
^Estimated development cost covers the period of time rt squired to place
all units in operation within the projected mining p'lari'.
,

NOTE.

Cost per ton = $7.73.


Tonnage = 1,525,100.
Credit for coal mined at $10 per ton = $15,251,00

TABLE B-7.

0.

Estimated working capital and total capita l


2.04-MM-tpy mine

Estimated working capital


3 months.
Direct labor
3 months...
Operating supplies
3 months
Payrol I overhead
4 months...
Indirect cost
0.5 percent of insurance base...
Fixed cost
Spare parts
Mi seel 1 aneous
Total working capital
.

estimated capital investment:


Total mine cost (insurance, tax base)

linvestment.

$1,262,400
939,900
505,000
440,500
158,200
424,800
55,000
3,785,800

Total

31,642,400
1,1 514,800
Interest during development
33,1 57 ,200
Subtotal
3,7^35,800
Working capital
36,943,000
Estimated capital investment
18^1^5^000
Estimated deferred capital investment
^55,55 '^000
Total capital investment and deferred investment...
iThis is an average cost of $27.23 per ton of annual producti on

22

TABLE B-8.

Year
-1/2

Sunrnary of discounted cash flow, 2.04-MM-tpy mine

Capital
investment
$14,777,200
22,165,800

233,000
233,000
233,000

233, OOC)

537,000

233,000
233,000
233, OOO

8
9

10
11

12
13
14
15

16
17
18
19
20

233,0 00
13,580,fJ00
233, 000
233 ,000
233 ,000
23-J,O00

537,000
2?;3,000

233,000
2

33,000

?.'33,000

-20, 150,300

Cash flow
$-14,777,200
-22,165,800

Present
worth
factor at
15 percent
1.07238
1.

Present worth Present worth


cash flow
capital
vaiue at
investment
at 15 percent 15 percent
$-15,846,800'
$15,846,800
-22,165,800
22,165,800

.6575
.5718
.4972

202,600
176,200
153,200
133,200
267,000

5,593,500
4,863,500
4,229,200
3,678,000
3,047,000

6,432,300
6,432,300
6,432,300
6,432,300
-6,914,700

.4323
.3759
3269
,2843
.2472

105,400
87,600
76,200
66,200
3,357,000

2,780,700
2,417,900
2,102,700
1,828,700
-1,709,300

6,432,300
6,432,300
6,432,300
6,432,300
6,128,300

.2149
.1869
.1625
.1413
.1229

50,100
43,500
37,900
32,900
66,000

1,382,300
1,202,200
1,045,200
908,900
753,200

6,432,300
6,432,300
6,432,300
6,432,300
26,815,600

.1069
.0929
.0808
.0703

24,900
21,600
18,800
16,400
-1,231,200

687,600
597,600
519,700
452,200
,638,400

6,432,300
6,432,300
6,432,300
6,432,300
6,128,300

.8696
.7561

.0611

41,718,100

6,600

23

TABLE B-9.

Discounted cash flow, 2.04-MM-tpy mine

15 percent - 20 years

$41,718,100 T 6.259I = $6,665,300


less depreciation
1 ,759,000
Depletion + net profit = 4,906,300

R =

Depletion = 10 percent of sales


Federal income tax = net profit
Depletion + net profit = cash flow
Sales

=
=

depreciation

1.0/0.55 (1/2 operating cost + cash flow


1/0.55 (8,667,800 + 4,906,300)

Sales
Operating cost
Gross profit
Depletion
Taxable income
Federal income tax
Net profit

depreciation)

$24,680,200
17,335,600
7,344,600
2,468,000
4,876,600
2,438,300
2,438,300

Annual cash flow = net profit + depreciation + depletion


=

$2,438,300 +
$6,665,300

$1,759,000

+ $2,468,000

Selling price per ton = $24,680,000 t 2,043,400 = $12.08


lUniform series present worth factor.

24

APPENDIX C.~3.18-MM-TPY MINE


TABLE C-1

Capital

investment summary, 3'.18-MM-tpy mine

Item
Continuous miner
Loading machine
Shuttle car
Roof bol ter
Ratio feeder
Auxiliary fan
Mantri p Jeep
Mechani c Jeep
Personnel Jeep
Trickle rock duster
Tripl e duty rock duster
Supply motor
Supply car
42-inch rope-type mainline conveyor belt
36-inch rope-type secondary and panel belt...
Mainline belt power center (300 kV-A)
Section belt power center (150 kV-A)
Section power center (1,000 kV-A)
Section rectifier (200 kW)
Section switch house
Sectional izing switch house
HV cable (300 MCM AL)
PLM coupler
Section cable and coupler
Rectifier for track haulage
Trolley wire
Track (60-1 b)
Fresh water 1 ine
Pumps and lines
Telephone (page phones)
Conveyor fire protection
Automatic controls and alarms
Scoop tractor
Battery charger
All service mask
Breathing apparatus
Sel f rescuer
Stretcher set
Safety light
Methanometer
Fire chemical car
Lamp (including accessories)
Dust sampl er
Site preparation
Ventilation fan (dual)

Quantity
TT~
17
34

17
17
17
17
6

8
17
13
6

70

9,000 ft
36,000 ft
6

14

17
17
17
10

16,000 ft
18
3

51,000 ft
51
51

,000 ft
,000 ft

Total cost

WT

$b,127
1,370 200
2,519 400
906 100
765
64
297
82
100

74 800

503
187
217
720
2,412
112
175
489
42
159
94
160
18
89
75

159
510
191
31
11

17
17
36
36

650
20
300
300
10
650
50

000
600
500
800
000

30
93
595
62
3

28
24
4

13

120
38
33
20
50
120

100
800
000
000
000
800
000
600
500
800
000
000
000
300
000
600
000
300
300
300
000
800
000
900
600
800
400
000
200
000
000
800
000
000
000

25

TABLE C-1.

Capital

investment summary, 3.18-MM-tpy mine

I tem
Concrete portal
Bulk rock dust facility
Substation and distribution
Bathhouse, office, and lamp house
Shop and warehouse
Powder and cap house
Front-end 1 oader

Forkl ift
Bull dozer

Utility truck
Pickup truck
Oil storage
Water tank
Supply yard
Mine drainage treatment plant
Exploration
Total direct
Field indirect
Total construction

Quantity
5
1
1
1
1

1
1
1

2
2
1

1
1

Engi neeri ng

Conti ngency
Fee

Estimated development cost


Interest during development
Gross estimate
Credit for coal mined during development at $10 per ton

Net estimate

Continued
Total cost

~7F
37 500
93 800

500 000
312 500
8 800

Overhead and administration

Lane acquired at $2,500 per acre

63
44
100
18
12
25
25
18
37

187
20,462
409
20,872
41

1,064
22,354
3,353
25,707
514
26,221
15,940
42,161
2,108
44,269
2 0,946
23,323
25,815

000
000
000
000
000
000
000
800
500
500
900
300
200
400
500
100
100
200
100
300
100
400
100
500
000
500
000

49,138,500

26

TABLE C-2.

Manning table, 3.18-MM-tpy mine

Personnel
Underground:
Continuous miner operator...
Loading machine operator
Machine operator helper.
Shuttle car operator
Roof bolter
Bratticeman
Util ity man
Mechanic (section)
,

Total

42
42
42
84
84
42
42
42

Wages^
per day

$55.00
51.98
51.98
49.23
55.00
47.03
49.23
55.00

420
Suppl y motorman
Bel tman.

Trackman
Wi reman
Mason (precision)
Pumper
Util ity crew
Roving mechanic
Fireboss (union)

12
27
12
12

18
3

24
12
4

JW

Outside:
Lampman
Front-end loader operator...
Shop mechanic
,

3
3

12
18

47.58
47.03
47.03
47.03
49.23
47.03
49.23
55.00
55.00

45.38
47.85
49.50

Cost
per year

$516,824
488,918
488,918
927,019
1,033,648
443,180
463,510
516,824
4,878,841
128,074

Cost
per ton

$1.53

284,901
126,904
126,904

198,648
31,657
264,863
147,136
73,832
1,382,919

.44

30,568
32,197
133,144
195,909

.06

30,000
20,000
48,000
588,000
21,800
15,200
45,000
22,500
9,200
29,700
19,800
43,500
31,500
15,800
11,000
15,800
39,600
1.006.400
7,464,100

2.35

Salary:

Superintendent
General mine foreman
Assistant mine foreman
Section foreman
Maintenance superintendent.,
General shop foreman
Mine maintenance foreman
Chief mine engineer
Draftsman
Survey crew
Safety director
Safety inspector
Dust sampl er
Office manager
Timekeeper and bookkeeper..,
Purchasing supervisor
Warehouseman
,

42
1

3
1

3
3
1

1
1

4
71

Total
1

labor and supervision.

633

32

Figures in this column are for the day shift.


Shift differentials for
other shifts are reflected in the cost per year.

27

TABLE C-3.

Depreciation schedule, 3.18-MM-tpy mine

Item

Exploration
Mine drainage treatment plant
Supply yard
Water tank
Oil storage
Pickup truck
Util ity truck
Bulldozer
Forklift
Front-end loader
Powder and cap house
Shop and warehouse
Bathhouse, office, and lamp house
Substation
Bulk rock dust facility
Concrete portal
Venti 1 ati on fan
Site preparation
Coal mine safety equipment
Underground equipment
Interim equipment replacement
Subtotal

Depreciation for field indirect,


engineering, overhead and
administration, contingency,
fee, cost of development, and
interest during development,
less credit for coal mined
at $10 per ton
Total

i$0.78 per ton.

Straight-line
Yearly charge,
depreciation, years
dol lars
20
9
10
10
10
10
5
5

10
10
10
10
20
20
20
10
20
20
20
5

10
20

3 ,800
1

,900

2 ,500
2 ,500
2 ,400
3 ,600
10 ,000
4 ,400
6 ,300

900
15 ,600

25 ,000
4 ,700
3 ,800
3 ,800
6 ,000
2 ,500
81 ,900
1,832 ,500
308 ,000

2,331,500

20

143,000
12,474,500

28

TABLE C-4.

Power and water cost, 3.18-MM-tpy mine

Number
of
units

Operation
Continuous miner
Loading machine
Shuttle car
Roof bol ter
Ratio feeder
Auxiliary fan
l^antrip Jeep
P^echanic Jeep
Personnel Jeep
Rock duster
Supply motor
42-inch conveyor
36- inch conveyor
Ventilation fan
Extra for pumps,
tools, lights,

14
14
28
14
14
14
14
6

8
14
6
3

12
1

etc

Hp
per
unit
600
160
135
50

125
30
15
15
7.5
30

80
200
150

Hp,
total
load

8,400
2,240
3,780
700
1,750
420
210

Hr per
day, full
load
15

KW,
total
load

15
15
18
15

1,671

18

6,266
2,820
522
1,305
313
156

kW-hr
requirement
93,990
25,065
42,300
9,396
19,575
5,634

Total

24

45
313
358
447
560
373

936
1,005
675
3,756
4,296
6,705
8,400
8,952

10

373

3,730

90
60
420
480
600
750
500

15
15
12
12
15
15

500

67

Total

NOTE.

Power
Water:

234,415
$0.02 x 234,415 x 220 = $1,031,400 r 3,178,600
= $0.32 per ton.
3,000 gal per unit per shift at $0.10 per M gal
= 3,000 x 14 x 3 X 220 X 0.10 f 1,000 = $2,800.

29

TABLE C-5.

Estimated annual production cost, 3.18-MM-tp.y mine

Annual cost Cost per ton

Direct cost
Production:
Labor
Supervision,

Maintenance:
Labor
Supervision,

Operating supplies:
Mining machine parts
Lubrication and hydraulic oil
Rock bolts and timber
Rock dust
Ventilation
Bits
Cables
Mi seel

$5,660,600
924,400
6,585,000

$1.78

797,100
82,000
879,100

.25
.03
.28

2,002,500
794,700
985,400
413,200
604,900

.63
.25

381 ,400
1

aneous

Power
Water.

.29

2.07

.31

.13
.19
.12
.06
.15

190,700
476,800
5,849,600

1.84

1,031,400

.32

2,800

Payroll overhead (40 percent of payroll)

2,985,600

.94

Union welfare^

3,242,400

1.02

1,997,100

.63

940,600
2,474,500
3,415,100

.30
.78

Indirect cost:
15 percent of labor, supervision,
and suppl i es
Fixed cost:
Taxes and insurance, 2 percent of
mine cost
Depreciation

Total
^Effective Dec.

1.08

8.18
25,988,100
1974.
Agreement
of
Wage
6, 1974, under the Bituminous

30

TABLE C-6.

Estimated development cost^, 3.18-MM-tpy mine

Item
Total cost
Cost per ton
labor and supervision
$5,906,800
$2.82
Operating supplies
2,408,800
1.15
Power
523,700
.25
Payrol 1 overhead
2,346,000
1.12
Union welfare
1.04
2,178,400
.58
Indirect cost
1,214,900
Fixed cost
1,361,500
.65
Total
7.61
15,940,100
1 Estimated development cost covers the period of time required to place
all units in operation within the projected mining plan.
Total

NOTE.

Cost per ton = $7.61.


Tonnage ^ 2,094,600.
Credit for coal mined at

TABLE C-7.

per ton

$20,946,000.

Estimated working capital and total capital investment


3.18-MM-tpy mine

Estimated working capital


Direct labor
3 months.
Operating supplies
3 months.
Payrol 1 overhead
3 months
Indirect cost
4 months.
Fixed cost
0.5 percent of insurance base.
Spare parts
Miscellaneous
Total working capital
Total estimated capital investment:
Total mine cost (insurance, tax base)

$1,866,000
1,462,400
746,400
665,800
235,200
653,200
86,300
5,715,300

47,030,400
Interest during development
2,108,100
Subtotal
49,138,500
Worki ng capi tal
5,715,300
Estimated capital investment
54,853,800
Estimated deferred capital investment,
26,164,500
181,018,300
Total capital investment and deferred investment..
iThis is an average cost of $25.48 per ton of annual production.

31

TABLE C-8.

Year
-1/2

Summary of discounted cash flow, 3.18-MM-tpy

Capital
investment Cash flow
$21,941,500 $-21,941,500
32,912,300 -32,912,300

308,000
308,000
308,000
308,000
747,500

9,508,900
9,508,900
9,508,900
9,508,900
9,069,400

308,000
308,000
308,000
308,000
19,433,500

12
13
14
15

16
17
18
19
20

4
5

6
7

8
9

10
11

Present
worth
factor at
15 percent
1.07238
1.

.8696

Present worth
capital
investment
at 15 percent
$23,529,600
32,912,300

iiiine

Present worth
cash flow
value
at 15 percent
$-23,529,600
-32,912,300

.6575
.5718
.4972

267,800
232,900
202,500
176,100
371,700

8,268,900
7,189,700
6,252,100
5,437,200
4,509,300

9,508,900
9,508,900
9,508,900
9,508,900
-9,616,600

.4323
.3759
.3269
.2843
.2472

133,100
115,800
100,700
87,600
4,804,000

4,110,700
3,574,400
3,108,500
2,703,400
-2,377,200

308,000
308,000
308,000
308,000
747,500

9,508,900
9,508,900
9,508,900
9,508,900
9,069,400

.2149
.1869
.1625
.1413
.1229

66,200
57,600
50,100
43,500
91,900

2,043,500
1,777,200
1,545,200
1 ,343,600
1,114,600

308,000
308,000
308,000
308,000
-31,222,300

9,508,900
9,508,900
9,508,900
9,508,900
41,039,200

.1069
.0929
.0808
.0703

32,900
28,600
24,900
21,700
-1,907,700

1,016,500
883,400
768,300
668,500
2,507,500

61,443,800

3,400

.7561

.0611

32

TABLE C-9.
15 percent

- Discountfed

cash flow, 3.18-MM-tpy mine

20 years

$61,443,800 - 6.2591
less depreciation
Depletion + net profit

R =

=
=

$9,816,900
2,474,500
7,342,400

Depletion = 10 percent of sales


Federal income tax = net profit
Depletion + net profit = cash flow
Sales

=
=

depreciation

1/0.55 (1/2 operating cost + cash flow


1/0.55 (12,994,100 + 7,342,400

Sal es

depreciation)

$36 975, 500


25,988,100
10,987,400
3,697,600
7,289,800
3,644,900
3,644,900
,

Operating cost
Gross profit
Depletion
Taxable income
Federal income tax
Net profit.

Annual cash flow = net profit + depreciation + depletion


= $3,644,900 + $2,474,500
+ $3,697,600
=

$9,817,000

Selling price per ton = $36,975,500 t 3,178,600


lUmform series present worth factor.

$11.63

33

APPENDIX
TABLE D-1

Capital

D. 4.99-MM-TPY

MINE

investment summary, 4.99-MM-tpy mine

Item
Continuous miner
Loading machine
Shuttle car
Roof bolter
Ratio feeder
Auxiliary fan
Mantrip Jeep
Mechanic Jeep
Personnel Jeep
Trickle rock duster
Triple duty rock duster
Supply motor
Supply car
42-inch rope-type mainline belt conveyor
36-inch rope-type secondary and panel belts..
Mainline belt power center (300 kV-A)
Section belt power center (150 kV-A)
Section power center (1,000 kV-A)
Section rectifier (200 kW)
Section switch house
^
Sectional izing switch house
HV cable (300 MCM AL)
PLM coupler
Section cable and coupler
Rectifier for track haulage
Trolley wire
Track (60-1 b)
Fresh water 1 ine
Pumps and lines
Telephone (page phones)
Conveyor fire protection
Automatic controls and alarms
Scoop tractor
Battery charger
All service mask
Breathing apparatus
Self rescuer
Stretcher set
Safety light
Methanometer
Fire chemical car
Lamp (including accessories)
Dust sampler
Site preparation
Ventilation fan (dual)

Quantity
26
26
52
26
26
26
26
10

10
26
15
8

100
9,000 ft
60,000 ft
6

16
26
26
26
12

21,000 ft
22
5

69,000 ft
69,000 ft
69,000 ft
-

26
26
36
50
950
40
600
600
16

950
75
~

Total cost~

$7,841,600
2,095,600
3,853,200
1,385,800
1,170,000
98,800
455,000
138,000
125,000
114,400
580,500
250,400
310,000
720,000
4,020,000
112,800
200,000
748,800
65,000
244,400
112,800
210,000
22,000
136,500
125,000
216,000
690,000
258,800
44,000
18,000
38,000
125,000
91 0,000
96,200
3,600
40,000
35,700
8 ,000

26,400
240,000
57,000
49,400
"^^'^nn
75,000
120,000

34

TABLE D-1

Capital

investment summary, 4.99-MM-tpy mine

Item
Concrete portal
Bulk rock dust facility
Substation and distribution
Bathhouse, office, and lamp house,
Shop and warehouse
Powder and cap house
Front-end loader
Forklift
Bulldozer
Utility truck
Pickup truck
Oil storage
Water tank
Supply yard
Mine drainage treatment plant
Exploration
Total direct
Field indirect
Total construction
Engineering
Overhead and administration

Quantity

Total cost
56 ,300

110 ,000
687 ,500

Contingency.
Fee

Estimated development cost.


Interest during development..
Gross estimate
Credit for coal mined during development at $10 per ton,
,

Net estimate,

Continued

75.,000

Land acquired at $2,500 per acre

437.,500
11 ,300
63.,000
44 ,000
100 ,000
18 ,000
18 ,000
38 ,000
25 ,000
25 ,000
37 ,500
312 ,500
30 ,275 ,300
605 ,500
30 ,880 ,800
617 ,600
1 ,574 ,900
33 ,073 ,300
4 ,961 ,000
38 ,034 ,300
760 ,700
38 ,795 ,000
23 ,177 ,000
61 ,972 ,000
3 ,098.,600
65 ,070 ,600
30 ,528. 000
34 ,542 ,600

40 ,570 ,000

75,112,600

35

TABLE D-2.

Manning table. 4.99-MM-tpy mine

Personnel
Underground:
Continuous miner operator....
Loading machine operator
Machine operator helper
ShuttJe car operator
Roof bol ter
Bratti ceman
Utility man
Mechanic (section)
,

Total
66
66
66
132
132
66
66
66

660
24
45

Supply motorman^
Beltman
Trackman
Wi reman
Mason (precision)
Pumper
Util ity crew
Roving mechanic
Fireboss (union)

18
18
30
6

36
18
6

Wages 1
per day

$55.00
51.98
51.98
49.23
55.00
47.03
49.23
55.00

47.58
47.03
47.03
47.03
49.23
47.03
49.23
55.00
55.00

201

Outside:
Lampman..
Front-end loader operator,...
Shop mechanic

6
3

45.38
47.85
49.50

27

Cost
per year
$812 144
768 750
768 750
760
1 ,456
288
1 ,624
696 427
7 28 380
812 144
77367 643
256 150
474 837
189 936
189 936
331 078
63
397
220
73

$1.53

311

293
704
832
2,197 077
61

Cost
per ton

.44

136

32 197

199 716
293 049

06

Salary:

Superintendent
Assistant superintendent
General mine foreman
Assistant mine foreman
Section foreman
Maintenance superintendent...
General shop foreman
Mine maintenance foreman
Chief mine engineer
Draftsman
Survey crew
Safety di rector
Safety inspector
Dust sampl er
Of f i ce manager
Timekeeper and bookkeeper....
Purchasing supervisor
Warehouseman
-.

2
2

66
1

2
3
1

6
1

6
1

2
1

109
997
Total labor and supervision
1 Figures
in this column are for the diay shift.
column.
oth<,r shifts are reflected in the fina

30 000
48 400
40 000
48 000
924 000
21 800
30 400
45 000
22
18
59
19
43
63
15
22
15
59

500
400
400
800
500
000
800
000
800
400
.31
1,527 200
2.34
11,685 000
Shift differenti als for

36

TABLE D-3.

Depr'eciation schedule, 4.99-MM-tpy mine

Item

Exploration
Mine drainage treatment plant
Supply yard
Water tank
Oi 1 storage
Pickup truck
Utility truck
Bulldozer
Forklift
Front-end 1 oader
Powder and cap house
Shop and warehouse
Bathhouse, office, and lamp house,
Substation
Bulk rock dust facility
Concrete portal s
Ventilation fan
Site preparation.
Coal mine safety equipment
Underground equipment
Interim equipment replacement
Subtotal
,

,.

Depreciation for field indir^ect,


engineering, overhead and
administration, contingency,
fee, cost of development, and
interest during development,
less credit for coal mined
at $1
per ton
Total

i$0.74 per ton.

Straight-line
Yearly charge,
depreciation, years
doll ars
157 600
3, 800
2, 500
2, 500
3, 800

3, 600
3, 600

10, 000
4, 400
6, 300
1, 100

21, 900
34, 400
5, 500
5, 600
3, 800
6, 000
3, 800
130, 600
2,736, 900
456, 000

3,461,700

213,400

13,675,100

37

TABLE D-4.

Number
of
units
22
22
44
22
22
22
22

10
10
22
8
3

20
1

Power and water cost, 4.99-MM-tpy mine

OjDeration

Continuous miner.
Loading machine..
Shuttle car
Roof bolter
Ratio feeder
Auxiliary fan
Mantrip Jeep
Mechanic Jeep
Personnel Jeep
Rock duster
Supply motor
42-inch conveyor.
36-inch conveyor.
Ventilation fan...
Extra for pumps,
tools, lights.
etc

Hp per
unit
600
160
135
50
125
30
15
15

7.5
30

80
300
150

Hp,
total

load
13,200
3,520
5,940
1,100
2,750
660
330
150

Hp per
day, full
load
15
15
15
18
15
18
6

660
640
900
1,200
500

15
15
12
12
15
15
24

700

10

75

KW,
total

load
9,847
2,626
4,431
821

2,052
492
246
112
56

492
477
671

895
373

Total

kW-hr
requirement
147,705
39,390
66,465
14,778
30,780
8,856
1,476
1,680
840
5,904
5,724
10,065
13,425
8,952

522

Total
NOTE. - Power:

Water:

$0.02 x 361,260 x 220 = $1,589,500 f 4,994,900


= $0.32 per ton.
3,000 gal per unit per shift at $0.10 per M gal
= 3,000 X 22 X 3 x 220 X 0.10 t 1,000 = $4,400.

5,220

361,260

38

TABLE D-5.

Estimated annual production cost, 4.99-MM-tpy mine


Annual cost

Cost per ton

$8,925,200
1,430,000

$1.79

10,3,55,200

2.08

1,232,600
97,200
1,329,800

.25
.02
.27

3,150,000
1,250,000
1,550,000
650,000
950,000
600,000
300,000
750,000
9,200,000

.63
.25

1.84

Power

1,589,500

.32

Water

4,400

Direct cost:
Production:
Labor
Supervision,
,

Maintenance:
Labor
Supervision,

Operating supplies:
Mining machine parts
Lubrication and hydraulic oil
Roof bolts and timber
Rock dust
Ventilation
Bits
Cables
Mi seel 1 aneous

.29

.31

.13
.19
.12
.06
.15

Payroll overhead (40 percent of payroll)

4,674,000

.93

Union welfare^

5,099,200

1.02

3,132,800

.63

1,440,300
3,675,100
5,115,400

.29
.74

Indirect cost:
15 percent of labor, supervision,
and suppl i es
Fixed cost:
Taxes and insurance, 2 percent of
mine cost
Depreciation

1.03

8.12
40,500,300
Total
^Effective Dec. 6, 1974, under the Bituminous Wage Agreement of 1974.

39

TABLE D-6.

Estimated development cost^, 4.99-MM-tpy mine

Item
and
supervision,
labor
Total
Operating supplies
Power
Payrol 1 overhead
Union wel fare
Indirect cost
Fixed cost

cost
Cost per ton
$2.82
$8,615,200
1.15
3,510,700
.25
763,200
1.12
3,419,100
1.02
3,113,900
.58
1,770,600
.65
1 , 984,300
7.59
23,177,000
Total
1 Estimated development cost covers the period of time required to place
all units in operation within the projected mining plan.
Total

NOTE.

Cost per ton = $7.59.


Tonnage = 3,052,800.
Credit for coal mined at $10 per ton

TABLE D-7.

$30,528,000.

Estimated working capital and total capital investment ,


4.99-MM-tpy mine

Estimated working capital:


3 months...
Direct labor
3 months...
Operating supplies
3 months...
Payroll overhead
4 months...
Indirect cost
0.5 percent of insurance base...
Fixed cost
Spare parts
Mi seel 1 aneous
..
Total working capital
=

fl;2,921,300

2,300,000
1,168,500
1,044,300
360,100
1 ,005,700
115,000
8,914,900

estimated capital investment.


72,014,000
Total mine cost (insurance, tax base)
3,098,600
Interest during development
75,1 1 2, 600
Subtotal
8914,900
Working capital
84,027,500
Estimated capital investment
38,956,000
Estimated deferred capital investment
^122,983,500
Total capital investment and deferred investment
iThis is an average cost of $24.65 per ton of annual production.

lotal

40

TABLE D-8.

Summary of discounted cash flow, 4.99-MM-tpy mine

Present
worth
factor at
Capital
Year investment
Cash flow
15 percent
-1
1.15
$33,611,000 $-33,611,000
50,416,500
50,416,500
1.

Present worth
capital
investment
at 15 percent
$38,652,700
50,416,500

Present worth
cash flow
value
at 15 percent
$-38,652,700
-50,416,500

.6575
.5718
.4972

396,500
344,800
299,800
260,700
569,300

12,991,600
11,295,900
9,822,900
8,542,500
7,085,400

14,939,700
14,939,700
14,939,700
14,939,700
-13,518,300

.4323
.3759
.3269
.2843
.2472

197,100
171,400
149,100
129,600
7,147,500

6,458,400
5,615,800
4,883,800
4,247,400
-3,341,700

13
14
15

456,000
456,000
456,000
456,000
1,145,000

14,939,700
14,939,700
14,939,700
14,939,700
14,250,700

.2149
.1869
.1625
.1413
.1229

98,000
85,200
74,100
64,400
140,700

3,210,500
2,792,200
2,427,700
2,111,000
1,751,400

16
17
18
19
20

456,000
456,000
456,000
456,000
-49,028,900

14,939,700
14,939,700
14,939,700
14,939,700
64,424,600

.1069
.0929
.0808
.0703

48,700
42,400
36,800
32,100
-2,995,700

1,597,100
1,387,900
1,207,100
1,050,300
3,936,300

96,361,700

4,300

3
4
5

6
7

8
9

10

n
12

456,000
456,000
456,000
456,000
1,145,000

14,939,700
14,939,700
14,939,700
14,939,700
14,250,700

.8696

456,000
456,000
456,000
456,000
28,914,000

3477-27d

Xot0

.7561

.0611

41

TABLE D-9.
15 percent

Discounted cash flow, 4.99-MM-tpy mine

20 years

$96,361,700 i 6.2591
less depreciation
Depletion + net profit

R =

$15,395,700
3,675,100
11,720,600

Depletion = 10 percent of sales


Federal income tax = net profit
Depletion + net profit = cash flow
Sales

depreciation

1/0.55 (1/2 operating cost + cash flow

1/0.55(20,250,150+11,720,600)

Sales
Operating cost
Gross profit
Depletion
Taxable income
Federal income tax
Net profit

depreciation)

$58,128,600
40,500,300
17,628,300
5,812,900
11,815,400
5,907,700
5,907,700

Annual cash flow = net profit + depletion + depreciation


= $5,907,700 + $5,812,900 +$3,675,100
=

$15,395,700

Selling price per ton = $58,128,600 r 4,994,900


-^Uniform series present worth factor.

$11.64

U.S. Government Office: d^j7^^6 22-192/21 6 R3-I

^-*-

.^^

-^
'^j-

'^0^

oV

oV

"oV"

%-^^^

'bK

^-O
5*.
o_

-^**'^-'/

'^o^ .<^
vP'

'U-o^

V'^^^-\/

"^*^-'\'

V^^rf^\/

"-^

'

,0'

5-"^

A^"^.

j{/yi^w:

V
^^'

-i-

'

^C'

.^

v^.

.^

c, vr>

^/

-^^

A
0'

V^ *^^f"''

>

0'

<i>

-?>'

,f

Q>

>f'

^>

c, J-'

' o o

.^

%>

oO.

* o

'

\^

..

-^

^-n^.

S-ar putea să vă placă și