Text19
Indicators
Duration
% complete
Start
Finish
Actual
Start
Actual
Finish
Predecessors
Format
CL46
cf mise en
forme
CC05
Verdena08
CC05
Verdena08
CC05
Verdena08
CC05
Verdena08
CC12
Verdena08
CR06
Verdena08
CL06
Verdena08
CC05
Verdena08
CC08
Verdena08
CC10
Verdena08
CC06
Verdena08
CC07
Verdena06
CC02
Verdena06
CC05
Verdena08
CC08
Verdena08
CC08
Verdena08
CC08
Verdena08
CC08
Verdena08
CC08
Verdena08
CC08
Verdena08
CL10
Verdena08
Nom
WBS
Etape
Lot
Type
Groupe
Unit
App.
Appareil
Bt.
Btiment
Produit
Fournisseu
r
Resp.
Responsable
MJ
Mise Jour
Masque
Dure
% ralis
Dbut
Fin
Dbut
(ralis)
Fin
(ralis)
Lien
Numro
Code
Jalon
01
MNG
02
PRO
Process
03
ENG
Engineering
Management
04
ASS
Asset Construction
05
OSU
Operationnal Start Up
06
PSC
07
ETU
ASS
08
ACH
ASS
Achat
09
CHA
ASS
Chantier
10
CTS
ASS
11
MES
ASS
Mise en Service
12
MEC
ASS
Mcanique
13
INF
ASS
Infrastructure
14
UTI
ASS
Utilits
15
ELC
ASS
Electrique
16
FOC
ASS
Foclan
17
SEC
ASS
Scurit
18
TOR
MNG
Terms of References
19
URS
MNG
20
DIG
PRO
Diagramme simplifie
21
FLW
PRO
Flowsheet
22
BVO
PRO
BVO
23
HMB
PRO
24
PRA
PRO
25
SCH
ASS
ETU
Schma RI
26
MAQ
ASS
ETU
Maquette 3D
27
ISO
ASS
ETU
Isomtrie
28
SPE
ASS
ACH
Spcification
ASS
ACH
Appel d'Offres
ASS
ACH
Commande
ASS
ACH
Fabrication
ASS
ACH
Rception Usine
ASS
ACH
Livraison
Montage
Etude
29
AOF
30
CMD
31
FAB
32
FAT
33
LIV
34
MON
ASS
CHA
35
C11
ASS
CHA
36
CTM
ASS
CTS
MEC
37
CTE
ASS
CTS
ELC
12/18/2014 8:54 AM
COP 11
255090580.xls.ms_office Champ
Planning de Projet
Objectif : Planifier toutes les actions de faon reprsenter leur enchanement et identifier les tches significatives pour satisfaire aux exigences du
contrat quant sa ralisation, son dmarrage et son achvement.
Faire en sorte que tout soit aussi simple que possible, mais pas plus simple : Se limiter au dtail utile.
Visions
Maillage diffrent
par tape
par lot technique
Codification
> langage commun
> tri et filtre pour les objets rptitifs
> visibilit du planning
> pilotage du projet
> orientation finalits (livrables / jalons)
Structuration
(Groupe ; Tche ; Etape) > Liste de livrables
PMI
Syngenta
Project Phase
Project Milestone
Initiation (Lancement)
Design (Conception)
Capital Proposal
Implementation (Ralisation)
Mechanical Completion
Beneficial Operation
Operation (Rception)
Project Close-out
12/18/2014 8:54 AM
PI
Project Initiation
CD
Conceptual design
BD
Basic Design
DD
Detailed Design
AP
Approvisionnement
CO
Commisionning
RE
Realisation
MP
Mise en Production
CL
Clture
255090580.xls.ms_office Guide
Service
Poste
Direction
Propritaire du Projet
Direction
Sponsor du Projet
Ingnierie
Chef de Projet
Production
Chimiste
Production
Exploitant
T&P
Ingnieur Procd
Ingnierie
Ingnieur Projet
Ingnierie
Chantier
Ingnierie
MSRT
Ingnierie
MSRT
Coordinateur Chantier
Ingnieur MSRT
Programmeur
Maintenance
Ingnieur Maintenance
SHE
Risk Assessor
R : Responsable
P : Participant
Livrables
Rle
Pilote le projet
Apporteur du procd
P
R
P
R
Ralise la programmation
Fonction
Fluide
Transfert
Produit / Solvant / Lavage /
Equilibre
Rcupration
Recirculation
Bypass
Quench
Neutralisation
Service
N2 / Air comprim /
Energie
Vapeur, Saumure,
De "dpart ligne" (=sortie unit-position) "arrive ligne" (=entre unit-position)
WBS Projet
2/23/2009
Level 1
#
Description
Project management
MNG
Process
PRO
Engineering
ENG
Level 2
#
Description
1.1
Project Integration
1.2
Financial Process
1.3
Project Planning
1.4
Project Costs
1.5
1.6
Project Quality
Project resource plan
1.7
1.8
1.9
Communications
Project risk management
Project procurement
1.1
Authorizations
2.1
Process package
2.2
2.3
2.4
2.4
Process control
2.5
Quality control
3.1
Project engineering
Building Services
Main Equipment
Piping
Control
Electrical
Construction
Maintenance
Asset
ASS
4.1
Enabling works
4.2
Building construction
External works
Electrical supply
Pipied services
Waste Connections
Automation infrastructure
Unit reference
Operationnal Start Up
OSU
Tests
Equipment preparation
Chemical tests
Manufacturing start
Process, equipement Hand-over
Production planning
Supply chain
12/18/2014 8:54 AM
Level 3
#
1.1.1.
1.1.2
1.1.3
1.1.4
1.1.5
1.2.1.
1.2.2
1.2.3
1.2.4
1.3.1
1.3.2
1.3.3
1.4.1
1.4.2
1.4.3
1.4.4
1.4.5
1.4.6
1.4.7
1.5.1
1.6.1
1.6.2
1.6.3
1.6.4
1.7.1
1.8.1
1.9.1
1.9.2
1.9.3
1.9.4
1.9.5
1.10.
1
1.10.
2
1.10.
3
1.10.
4
1.10.
5
2.1.1
2.1.2
2.1.3
2.1.4
2.1.5
2.1.6
2.1.7
2.1.8
2.1.9
2.1.1
0
2.1.1
1
2.1.1
2
2.1.1
3
2.2.1
2.2.2
2.2.3
2.3.1
2.3.2
2.3.3
2.3.4
2.3.5
2.3.6
2.3.7
2.4.1
2.4.2
2.4.3
2.4.4
2.5.1
2.5.2
2.5.3
2.5.4
2.6.1
2.6.2
2.6.3
3.1.1
3.1.2
3.1.3
3.1.4
3.1.5
3.1.6
Description
Terms of Reference
Strategy & Execution Plan
Global Steering
Technical Steering
Project Meetings
Charter & Planning Credit
Planning Credit II
Capital Proposal
Completion Report
Level 1 - Milestone
Level 2 - Integrated
Level 3 - Detailed
Indicative estimate
+/-30% estimate
+/-10% estimate
Expenditure profile
Cost report
Change control
Capitalisation
Project reviews
Organisation
Job profiles
Recruitment
External engineering
Stakeholder management plan
Risk register
Supply Positioning
Procurement plan
Contract plan
Pre-qualification
Administration procedures
Permis de construire
Environmental impact
Permis d'installer
Exploitation
CIMO
Process Description
Block diagram
Process Flowsheets
Main equipment list
Heat & Mass Balance
Control & Operating Philosophy
Utility Requirements
Waste streams
Materials of construction
Sampling requirements
Data sheets for non standard equipment
Pressure relief and venting
Protective systems
Chap. 1
Chap. 2
Chap. 3
Preliminary area classification
Occupational Health requirements
Fire/smoke detection, fire protection and fire fighting philosophy.
Philosophy on noise and smell (at boundary, in plant).
Site/plant/building security requirements.
Environmental Impact
Operational and Chemical Hazard Assessments
PRA 1
PRA 2
PRA 3
PRA 4
Cahier des charges mcaniques (FUN)
tablissement des recettes
programmation
tests et validation
Analytical methods
Equipment identification / needs
On-line analysis
Plant Equipment layout
Services routing, major supports, pipe racks
Site Clearance: dismantling, demolition
Condition of existing equipment: overhauls, repairs
Permanent lifting equipment requirements
Define Packaged equipment and PAUs
Site surveys, soil investigations, buried services
Floor Plans, sections and elevations
Foundations, structural frame and floors
Finishes schedules
Demolition
Buried Services
Loading Criteria
Compartmentation, means of escape
Effluent containment systems
Drainage philosophy
Protection of Ground and Groundwater requirements
High Containment areas
Plant Structures and Pipebridges requirements
Lifting equipment, cranes, etc
Room data sheets and room layouts for buildings
Key standards and specifications to be used
Key standards and specifications to be used
Schematic of pressure regimes and direction of air movements
Schedule of required environmental conditions
Types, numbers and sizes of air handling systems
Types, numbers and sizes of piped services systems
Line diagrams for each service
Single line ductwork and piping layouts with preliminary sizes
Location of major equipment items, including heating and cooling plant
Location of air intakes and exhausts
Schedule of main plant items, including standby plant, and their capacities
Proposals for energy conservation
Types, numbers and sizes of fume cupboards, fume extract hoods, special extract
cabinets and their extract and supply philosophies.
Size, location and internal segregation of plant areas and distribution voids
Co-ordination drawings (plans and sections)
Building management/control systems schematics and description
Detailed equipment list
Enquiry specifications
Equipment data books
Piping standards and specifications
Line list
PED analysis
Valve and special item list
Break-in or Tie-in schedule
Insulation schedule
Testing philosophy
Instrument list
Instrument data sheets
Special requirements for in-line items
Control system user requirements
Control system architecture
Trip and alarm system philosophy
Instrumented protectiv systems
On-line and off-line analysis equipment
Control cabling routing/segregation/protection/support
Communication systems - telecons, PA, data
Fire/gas/special alarm systems
Access control, CCTV, intruder alarm, syntime
Key standards and specification to be used
Electrical design philosophy
Electrical one-line diagrams (main feeder cables, distribution, switchgear)
Drives list and loads/motor control centres/motor starters/variable speed drives
Electrical trace heating specification
Earthing (grounding) and bonding (static and power requirements)
Lightning protection
Main and external lighting/special lighting control systems
Emergency/escape lighting
Emergency power supplies/generators/uninterruptible power supplies
Small power supplies
HV systems, transformers and main switchgear
Electrical cabling routing/segregation/protection/support
Lifts and Hoists
Electrical safety requirements
COP11
Access for Construction
Temporary construction services requirement
Siting and specification of Contractors compound
Criticality assessment
Spare parts
Preventive maintenance
Maintenance contracts
Dismantling
Site clearance
Service diversions
Excavations
Piling
Galleries
Foundations
Structure
Cladding
Lightning protection
Control Block
HVAC
Power & Lighting
Energy distribution
Excavations
Piling
Foundations
Concrete
Road
Rail
Landscaping
HV
Transformers
Switchgear
LV distribution
MCCs
6bar steam
12bar steam
process air
instrument air
nitrogen
natural gas
Industrial water
Towns water
Potable water
Demineralised water
fire water
chlorine
phosgene
NaOH
Proticend
WAI
WAR
WAS
PCS hardware
Interface racks
Local panels
Control room
P&ID
3D Model/Piping layout
Piping Isometrics
Piping Pre-fabrication
Equipment reference
specification
tender
bid analysis / purchase order
expediting / inspection
delivery date
installation
piping installation
instrumentation / electrical
functional tests
Initial state/Cleanings