(MBR)
Future for Water and Wastewater
Treatment
By
R V SINGH
M b
Membrane
Bi
Bioreactors
t
(MBR)
Modification of the traditional activated sludge
g p
process
Combine aeration, clarification and filtration into a
single step (reduced footprint)
Water Quality
Reuse
Biological Nutrient Removal (BNR)
Footprint Hidden
Hidden out of site
site
Retrofit/Upgrade
MBR A hi
MBR-Achievable
bl Effluent
Effl
t Quality
Q lit
-
* - prior
i to
t disinfection
di i f ti
Mixed liquor in
A
Aeration
ti
T nk
Ta
k
Membrane Cartridges
g ((flat-plate
p
MF))
Polyethylene
y y
membrane;; ultrasonically
y welded
to both sides of an ABS plate
M b
Membrane
C t id
Cartridges
C t id Anatomy
Cartridge
A t
-ABS plate
Chlorinated polyethylene
-Chlorinated
membrane
-Ultrasonically weld process
-Polyester
P l
t plenum
l
material
t i l
-0.4 mean pore size
-<0.1 effective p
pore size
Type 510
T
Type
515
-1.64ft x 3.28ft
-1.64ft x 4.92ft
-8.61ft2 Area
-13.451ft2 Area
The Submerged
S
Membrane Unit (SMU)
(S
)
Tube
Membrane case
Membrane cartridge
Diffuser case
Diffuser
MBR-SMU
MBR
SMU Types
BRACKETTGREEN CAIRD & RAYNER CLARK COPA DORR-OLIVER EIMCO PROCESS ENVIROQUIP JONES+ATTWOOD WEMCO
11
EW 400
EW-400
EK 400
EK-400
ES200
ES-200
BRACKETTGREEN CAIRD & RAYNER CLARK COPA DORR-OLIVER EIMCO PROCESS ENVIROQUIP JONES+ATTWOOD WEMCO
14
Th Biofilm
The
Bi fil (A Dynamic
D
i Membrane)
M b
)
Biofilm
MBR M b
MBR-Membrane
Cl
Cleaning
i In
I Place
Pl
Cleaning takes approximately 3-6 hours per basin, using 0.5% Sodium
Hypochlorite or Weak Acid
Cleaning of membranes is required only once every 3-6 months
No backflushing,
backflushing backwashing or maintenance cleaning required
Manual, semi-automated and fully-automated systems available
No chemical storage required
Acid neutralization and dechlorination not required for spent chemical disposal
MBR 3-stage
MBR3 t
UNRTM Process
P
Ultimate
Nutrient
Removal
TM
Process
Applications
Custom designs
g
Package plants
Portable plants
Applications
Wastewater
reuse/reclamation
Sludge thickening
MBR ttechnology
h l
combines
bi
the functions of a clarifier and
filter
No longer have to be
concerned about
Sludge bulking/filamentous
organisms (poor settling)
Solids loading on clarifiers
High
Hi h flows,
fl
I&I
Maintenance
MBR in basement
of Office Building
MBR-Blend
MBR
Blend Into Surroundings
2 MLD MBR
Easy to Operate
Easy to Operate
Membrane plants do not require the constant
fine-tuning required in many conventional
treatment systems
Strict control of MLSS concentrations, sludge
wasting rates, etc. is not required
Daily procedures generally consist of plant
checkout and regulatory sampling/testing
requirements
Fewer
F
man-hours
h
required
i d for
f operation
ti
L
Low
TMP operation
ti
P
Process
Fl ibilit
Flexibility
8,000 18,000 MLSS operations
12 30 days SRT
1.
2
2.
3.
4.
Source: EWT/KUBOTA