o INTRODUCTION
o INTRODUCTION OF WAGE AND SALARY
ADMINISTRATION
o PROFILE OF THE ORGANISATION
o WAGES AND SALARY ADMINITRATION
o FINDING
o SUGGESTION
o QUESTIONNAIRE
o BIBLOGRAPHY
conductor system, Reservoir etc. and Under Stage II, of one unit of 80
MW. Major Works of Stage I were completed during February 1990 and
that of Stage II during 1993.
II.
HSITORY AND CONSTRUCTION FEATURES: Preliminary investigations of the Project was carried out by the
Government of Madras before April 1936. At that time Koraput district was
a part of Madras Presidency. Subsequently detailed investigations were
carried out by Govt. of Orissa after 1961. Finally, in the year 1966, Govt. of
Orissa decided to set up a dam across river Kolab near Karunga village.
The 1st Stage work of Power Project for installation of 3 nos. 80 MW
Hydro Generator Units along with associated water conductor system,
reservoir, tailrace channel etc. was approved by the Planning Commission
Govt. of India, during August 1975 and that of Irrigation Project in June
1976.
UNIT-I
FIRST SPINNING 19.12.87
SYNCHRONISED 15.03.88
UNIT-II
29.03.88
UNIT-III
24.01.90
UNIT-IV
03.07.92
14.04.88
10.02.90
22.07.92
16.04.88
10.02.90
12.01.93
TO GRID
COMMERCIAL
OPERATION
15.03.88
SALIENT FEATURES
I.
II.
HYDROLOGICAL DATAS:
1.
Catchement Area
2.
Average Rainfall
1415 mm
3.
Average Run-off
1704 M. Cumt.
Length
630.5 Mts.
2.
Maximum Height
54.5 Mts.
3.
Overflow Length
169.2 Mts.
4.
Number of Gates
11 Nos.
DYKE :
1.
2.
IV.
Landiguda Dyke :
a)
Length
257 Mts.
b)
Height
5.45 Mts.
Jatiguda Dyke :
a)
Length
466 Mts.
b)
Height
9.85 Mts.
858.0 Mts.
2.
844.0 Mts.
3.
1215 M. Cumt
4.
935 M. Cumt.
5.
Regulated Flow
45.5 Cumecs.
6.
RESERVOIR :
1.
V.
VI.
MAIN TUNNEL :
1.
Type
2.
Length
3.
Diameter
3924 Mts.
6 Mts. Finished
SURGE TANK :
1.
Type
Simple Type
2.
Diameter
15.0 Mts.
3.
Depth
145.0 Mts.
4.
Diameter
(b)
Length
8.0 Mts.
-
80.0 Mts.
02 Nos.
391.0 Mts.
2.
Length
3.
Diameter
5.0 Mts.
4.
Type
VIII. PENSTOCK :
IX.
1.
No. of Penstock
04 Nos.
2.
Length
537 Mts.
3.
Diameter
4.
3.5 Mts.
-
65 Mts.
HEAD :
1.
253.0 Mts.
2.
241.72 Mts.
3.
264.0 Mts.
4.
Head Loss
12.48 Mts.
X.
XI.
862.5 mts.
2.
765.10 Mts.
3.
581.537 Mts.
4.
576.75 Mts.
5.
585.3 Mts.
6.
585.8 Mts.
7.
Turbine Floor
587.35 Mts.
8.
M.I.V. Floor
581.56 Mts.
9.
590.45 Mts.
10.
593.7 Mts.
11.
598.5 Mts.
12.
603.5 Mts.
13.
616.4 Mts.
14.
595.2 Mts.
15.
587.68 Mts.
POWER HOUSE :
1.
51700 mm
2.
85000 mm
Length
942.5 Mts.
2.
Catchment Area
3.
595.2 Mts.
4.
593.5 Mts.
5.
Gross Pondage
1.746 M. Cumt
6.
Live Pondage
1.519 M. Cumt.
No. of B. F. Valve
2.
04 Nos.
-
56000 mm
18750 mm
XV. SWITCHYARD :
33 K. V. Switchyard:
1.
Length
2.
Width
15000 mm
Length
2.
Width
160,000 mm
78500 mm
ELECTRICAL
1.
Generator
11 KV,
2.
Turbine
4.
3500 mm
5.
P.M.G.
amps, 50 C/s, 428 rpm
6.
E.H.G.
7.
Static Excitation
Generator Transformer
K.V. / 220 K.V. 3 ,
pressure. It controls the water flow from Pressure Tunnel to Turbine through
penstock and MIV of Power House.
MAIN INLET VALVE (MIV): It is located just after the Penstock and before spiral casing of Turbine to
control the flow of water in to Turbine. It is operated by 2 nos. of servomotors at
40 Kg/Cm2 oil pressure. Its rated discharge is 40.35 m3/Sec. There is a bye pass
valve and seal valve to operate the MIV. Before opening the MIV, Bye-pass valve
is opened to equalise the before valve pressure and after valve pressure of MIV.
The seal valve is opened for MIV operation. After opening MIV, the Seal valve
and the Bye-pass valve are closed. Generally MIV is opened before running of
Machine and continues till stopping of Machine. Similarly during stopping of
Machine, Seal valve is opened and MIV is closed. Then Seal valve is closed. The
water flow to Turbine is stopped.
M.I.V. OPERATION:
Electrical operation of M.I.V. from UCP / Control Desk.
Keep control switch CSS-X in control desk in manual position.
Ensure D.C. supply in MIV control circuit through energisation of relay
27V (In panel RP2 fuse to MIV to be checked).
The operation OPU is to be checked. The oil pressure in the accumulator
would be normal (40 Kg/Cm2 approx.). The oil pressure valve to MIVHMC (558 both and 598) to be opened.
The OLU unit should be kept in auto operation. The penstock water
pressure to be checked. (Pressure 28 30 Kg approx.
TURBINE: -
Type of Turbine
Net Head
Discharge
1.
Pelton
Low
2.
Francis
30m to 600m
Medium
3.
Kaplan/Fixed Propeller
10m to 80m
High
4.
Bulb
Below 25m
High
5.
Tubular
Below 20m
--
6.
50m to 600m
--
Figure 3
Constructional Details of The Turbine:
a)
Make
b)
Type
c)
Rated Output
d)
Rated Discharge
e)
f)
g)
Rated Speed
h)
Direction of Rotation
Generator Top).
i)
:
:
40.33m3/ Sec
:
265.73 Mts.
241.72 Mts.
:
82050MW
Clock
428.6 rpm
Wise
(Viewed
from
37.15m3/
j)
Runner
k)
Turbine Shaft
l)
Guide Bearing
mm
800lits/min,
m)
Guide Apparatus :
n)
o)
p)
Spiral Casing
Casing-11.36m/Sec.
q)
Shaft Sealing
:
Dia. Of Shaft Sealing805mm,
Cooling Water
Required- 60Ltrs. /min.
Each vertical shaft Francis type
turbines comprises a draft tube, spiral casing, stay ring, guide apparatus,
shaft, runner, guide bearing, shaft seal & auxiliary items.
Spiral Casing:
The spiral casing is fabricated with steel plates of logarithmic form &
circular cross section for maintaining a constant velocity throughout its passage.
The stay ring of cast steel in quadrant designed to bridge the throat of the spiral
casing to act as a water channel to guide vanes and to transmit the weight of the
machinery to the foundation through the stay vanes. The stay vanes are of smooth
streamline form rigidly connected the upper and lower sections of the stay ring.
Guide Apparatus:
The guide apparatus regulates the flow of water with the change in
load and also serves as a closing device. 24 Nos. of guide vanes are provided for
this purpose. It includes top cover, pivot ring guide vanes and turning mechanism.
The mechanism for turning the guide vanes is designed to ensure simultaneous
turning of guide vanes during opening or closing of turbine and load change. Two
guide vane servomotors mounted on the spiral casing inside the turbine pit, actuate
the regulating ring which in turn operates the guide vanes through the regulating
gear. The servomotors are identified as Guide vane servomotor with stopper and
Guide vane servomotor without stopper. Stopper lock is provided on
Servomotor with stopper, to hold the guide vanes in closed position. This lock
must be applied before doing any internal maintenance on turbine or during
prolonged shut down. The stopper is designed for maximum hydraulic load which
may occur in the closed position of guide vanes. No oil pressure is allowed to be
fed to the servomotor when the stopper is engaged. A scale has been provided on
Servomotor with stopper for indicating stroke of servomotor.
Guide Bearing:
The function of guide bearing is to guide the shaft while rotating. The
guide bearing is pivoted pad type with a self-contained oil bath for lubrication and
internally mounted oil coolers. It consists of eight numbers of babbit-line pads
arranged a along the outer circumference of the shaft. Each pad is adjustable by
means of studs. In stationary condition the pads are kept immersed in oil bath
approximately up to 40mm above the centerline of the bearing. Rotation of the
shaft induces centrifugal force due to which oil rise along the journal surface thus
lubricating the pads. Temperature of guide bearing pads is monitored by RTDs
and TSDs.
GOVERNOR:-
The governor is basically speed sensing type, sensitive to speed variation from a set
of value of speed. The speed signal is produced with a turbine shaft mounted
toothed wheel and magnetic pickup(for unit 2,3 4). In case of unit 1 the speed
signal is derived from a permanent magnet generator directly coupled to the
generator shaft. This signal is compared with speed sensing signal so that at
nominal speed and speed setting the resultant signal is zero volts and varies by
+0.8 v/Hz depending upon weather the speed is above normal or below normal.
GOVERNOR SYSTEM: For each Generator, there is a Governor system of Electro Hydraulic
Governor type G 40 of BHEL make to regulate the speed of the Machine at
different output. The Governor is basically speed sensing type, sensitive to speed
deviation from a set value of speed. Temporary droop stabilizing technique has
been employed. The speed signal is derived from a Permanent Magnet Generator
(PMG) directly coupled to Generator shaft. Frequency of the PMG output is
directly proportional to the rotational speed of the Turbine Generator set. The
PMG frequency representing Machine speed is measured in a speed measuring
unit, which is so designed that, at normal speed its output is Zero and varies by
0.8 volt per Hz depending on whether the speed is above or below normal.
GENERATOR: The BHEL make 14 pole Generator is coupled with Turbine, generates 11
KV, 50 Hz frequency and 80 MW. Weight of the Generator is 360 Ton. Rotor is
rotating on Thrust bearing and having upper guide bearing and Lower guide
bearing. The Neutral point of the Generator is grounded through Neutral
Generator floor
S = 3 VI. KVA
P = 3 VI cos = power factor
Generator Structure
Generator is a machine which converts Mechanical energy into Electrical
energy by Magnetic Induction Principle. An electro magnet field is induced in a
coil whenever a coil cuts through a magnetic field. A magnetic field cuts through
a coil electro magnet field induction is due to relative motion between two parts
(coil & magnetic field). Relative motion is by Rotation.
Two mechanical parts:
TYPES
a) Horizontal
b) Vertical
i)
Suspension type
ii) Umbrella type
GENERATOR PARTS
a)
b)
c)
d)
Stator
Rotor
Brackets
Auxiliaries
pads are of such material as to produce least metal dust due to braking e.g .
Ferodo
JACKING
As the name suggest it means lifting of the rotor.
Compressed oil at about 60 kg/cm applied through brake pad for lifting of the
rotor.
Purpose of lifting
a) Allowing oil film to enter friction area of thrust bearing pads before starting.
b) Inspection of thrust bearing pads.
Normally when a machine kept idle for a longer time jacking is required. An oil
pump actuated by electric motor gives the necessary pressurized oil to the jacking
cylinders till a limit switch cuts off the supply.
Normally the rotor is allowed to go up by 6-8 mm.
TRANSFORMERS
102 MVA POWER TRANSFORMERS: There are 4 nos. of Crompton Greaves make Generator Transformer of Star
/ Delta, 11 KV / 220 KV, 3 Transformer to step up 11 KV generated voltage to
220 KV, for transmission purpose.
In UKHEP the connection of transformer is Yd11,
In a three phase transformer, the HV winding is indicated by a capital letter (e.g. Y
for star, D for Delta) & LV winding by a lower case letter (e.g. y for star, d for
delta etc) The symbol Yd represents a 3 phase transformer with HV in star &
LV in delta.
The HV line emf & the corresponding LV line emf may or may not have a phase
displacement between them. This time phase displacement can be expressed by
clock method.
According to this method the HV line phasor is considered as the minute hand
always set at 12 Oclock (zero hours) position & the corresponding LV line phasor
is represented by hour hand.
For two winding 3 transformers as per the clock method, first symbol represents
HV winding connection, second symbol represents LV winding connection & the
third symbol is for the phase displacement between hv & lv line emfs expressed as
clock hour number.
Yd11 - HV winding star, LV winding delta and the LV line phasor at 11 O
clock, i.e. 30 ahead of the zero hour position of the HV. line phasor.
4 MVA TRANSFORMERS: There are 2 nos. of GEC make 4 MVA Delta / Star, 33 KV / 11 KV, 3
Transformer for station Auxiliary Consumption. 33 KV supply from Jayanagar
Sub-Station is step down to 11KV for the purpose of Station Service and Colony
Consumption.
1250 KVA STATION AUXILIARY TRANSFORMER: There are 2 nos. of M/s Kalinga Transformers make Delta / Star, 11 KV /
415 V (0.415 KV), 1250KVA Transformer used for Station Auxiliary
Consumption. The Transformers are located at transformer deck.
1000 KVA UNIT AUXILIARY TRANSFORMER: There are 4 nos. of M/s Kirloskar Electricals make Delta / Star, 11 KV /
415 V (0.415 KV), 1000 KVA Transformer used for Unit Auxiliary Consumption.
The Transformers are located at transformer deck.
250 KVA TRANSFORMER (FOR SWITCHYARD AUILIARY): There are 2 nos. of Delta / Star, 11 KV / 415 V (0.415 KV), 250 KVA
Transformer used for Switchyard Auxiliary Consumption, Workshop, Garage and
Store Area. One no. 250 KVA Transformer is also installed at Valve house for area
lighting of Valve House.
MAIN CONTROL ROOM: CONTROL DESK: The Machine Starting, Spinning, Voltage built up, Synchronising, Loading
and Stopping etc. are done at the control desk. All the parameters of Generator,
Excitation can be controlled from the control desk.
DUPLEX PANEL: In Duplex Panel all the facia indications for Machine Tripping and Nontripping alarm are provided. Ampere meter, Volt meter, Energy meter of the
Generator and Temperature indicator of the Generator Transformer are also
provided in the duplex panel. The Feeder protection facia, alarm and trip, metering
are provided in Feeder meter. At the both end the Synchronising panels are there
for synchronisation of the Machine and the Feeder.
UNIT CONTROL PANEL (UCP): Each Generator Unit is having an Unit Control Panel (UCP). The following
provisions are made in UCP for operation of the Unit: MIV operation Relays,
Start / Stop Relays,
D.C. SYSTEM: There are two sets of 220 Volt D.C. Batteries, Chargers, Distribution Board,
A.C. Panel. Batteries are of AMCO make 600 Ampere-Hour at 10 hours discharge.
The Batteries are charged through Battery Charging Unit, USHA rectifier.
There are 2 sets of D.C. distribution panels for Units, Feeders, Relay panels,
Emergency Lighting etc.
EXCITATION SYSTEM: The Static Excitation equipment regulates the Generator Voltage (the
reactive power flow with parallel operation of Generator) by direct influence on
the excitation current. The S.E.E. can be divided into 4 main sections.
1. Excitation Transformer,
2. Converter,
3. Excitation build up and de-excitation facility,
4. Regulation and Control Unit.
The required excitation power is taken form the Generator it self, supplied
to the thyrister converter via Excitation transformer and from there it is delivered
to the Generator through the Field Circuit Breaker (FCB). This so-called shunt
circuit requires a separate device for excitation build up since the remanance
Voltage of Generator is too low. Excitation build up is effected either form station
battery or from the auxiliary mains and is disconnected by the Circuit Breaker (CB)
on reaching 70% of the generator voltage.
220 K.V. & 33K.V. SWITCHYARD: After Generation, the voltage is step up to 220 KV by Generator Transformer and
are connected to 220 KV Bus via 220 KV C.T, isolator and BHEL make MOCB.
There are 2 nos. of Bus Bars Bus A & Bus B. The Generators can be connected
to either Bus A or Bus B. There is a set of Bus PTs for each Bus for measuring
bus voltage, protection and measurement.
Then power is evacuated to GRID by 2 nos. of 220 KV Feeders connected to
Jayanagar Sub-station via MOCB, Isolators, CT and LA. The distance is about 8
Kms.
For black start of Units we need auxiliary powers from Jayanagar Substation
(GRIDCO) on 33KV feeder I & II. There is a 33 KV Switchyard for the purpose.
There are 2 nos. 33 / 11 K.V. 4 MVA Transformers for Station Auxiliary
Consumption. Upper Kolab Power House is not having any alternate provision for
black start.
MAIN AUXILIARIES OF GENERATOR: 1. COOLING WATER PUMP (C.W. PUMP): Cooling Water is required for cooling of Thrust Bearing oil bath, UGB,
LGB and TB oil bath, Generator air cooler, Generator Transformer cooling and
Shaft Seal cooling. For this purpose there are 2 nos. of C.W. Pump (Main and
Stand by) of 250 H.P. for each Unit. Water is pumped from Tailrace through
Motorised Operated Valve (MOV) and Strainer to the Generator bearings,
coolers, Transformer and Shaft seal.
2. OPU PUMP: There are 2 nos. OPU pumps of 55 KW 3, 415 Volt, 1460 RPM for each
Unit. From sump, oil is pumped to accumulator at 40 Kg / cm2 at normal oil
level. High Pressure air (40 Kg / cm2 ) is charged /
motor, to transfer grease to moving parts of MIV and Turbine. The unit is run
daily for 3 minutes through each path.
MULSIFIRE SYSTEM: -
Mulsifire system is provided for all the Generator, Transformer, UAT, SST
and Cable gallery with 3 zones. For the above purpose there are 10 nos. are deluge
valves. These valves are automatically operated by Heat Detector / Smoke
Detector (cable zones only). In case of fire, high velocity water spray occurs with
alarm at emulsifier panel. For the above purpose there is a 110 KW Fire Fighting
Pump to meet the hydrant system. Besides there are two nos. of make up pumps
to store the water up to 8 Kg / cm2 in a tank near penstock slope at E.L. 675.0
mtr.
Besides there are hydrant cabinets in all the floor of the Power house. The
hydrant are charged water pressure at 8 Kg / cm2.
ii)
CO2 SYSTEM: -
There are 3 nos. of 10 H.P, Jyoti make six stage vertical turbine pump. Capacity
1200 LPM at 18 meter. and 1000 LPM at 22 meter. head with discharge size 100
mm. these pumps are used to drain the leakage water at MIV and Turbine floors.
Besides there are 2 nos. of 40 HP drainage pumps located at turbine floor for the
same purpose.
3. COMPRESSORS: i) H.P. COMPRESSOR: There are 2 nos. of BHEL make 15 HP, 3 stage high pressure air cooled
stationary splash lubricated, intermittent duty, belt driven compressor. Discharge
pressure 55 Kg/Cm2,650 RPM. There is an air receiver tank for 40 Kg / Cm2. The
compressor starts in auto mode when pressure falls to 38 Kg / Cm2 and stops at a
pressure of 42 Kg /Cm2. The compressor air is used for OPU accumulator tank
and the reduced air pressure 4 Kg / Cm2 is used for braking purpose of Generator
through reducer valve.
No. of stages
Type
-55kg/cm2
-3
- Model 15 T2 x 15 Type 30 ,
belt driven
Make
- Ingersol Rand
Speed
- 650 rpm
F.A.D
Duty
- Intermittant duty
Cooling
intercoolers
After coolers
- Air cooled
ii) L.P. COMPRESSOR: There are 2 nos. of ELGI make, 1 5 KW reciprocating type L .P.
compressor with speed 800 RPM and capacity 100 / hour at 27 0C. This
compressed air is used for general cleaning of equipments, painting, under water
works etc.
4. CENTRALISED AIR CONDITIONING SYSTEM: There are 2 nos. 30 Ton capacity M/s Batilboi & Co. Ltd., Calcutta makes
Air Condition. Each unit consists of condensing unit, compressor, condenser,
circular pump for multi PACs condenser, cooling tower, air handling unit,
insulation, controls, ducts ceiling diffusers, condenser water system and piping,
refrigerant piping, electrical motors for compressors and air handling unit. The
Air Conditioning system is fed to Main Control Room, Testing Laboratory, and
Carrier Room. In addition to the above, 2 nos. 5 Ton capacities Packaged Air
Condition system is also provide for Conference Room and 8 nos. 1.5 Ton
capacity Air Condition Machine are also provided for 4 nos. UCPs and 4 nos.
Excitation Cubicles.
5. VENTILATION SYSTEM: There are 3 nos. pumps of M/s Batilboi & Co. Ltd., Calcutta make, for
supply of air fans with total exhaust air quantity 1,46,000 m3 / hour, so as to
provide adequate ventilation to all the floors. The system consists of supply air
system fans, exhaust fans, dampers, ducts, grills, filters, motors and panels.
PASSENGER LIFT: The Elevator is M/s OTIS make, with loading capacity of 884.0 Kg, speed is
1.5 meter / Sec. It travels 16.15 mtr. (5 nos. of floors). There is a Motor
Generator set to control the Lift drive unit by D.C. motor of 20 H.P. The lift is
operating on Auto / Manual mode operation. The main supply is fed from SSB to
Motor Generator set.
CRANES: There are 2 nos. of 125 / 25 Ton capacity EOT Crane at power house. Main
hook is 125 Ton and Auxiliary hook is 25 ton. Cranes are used for lifting of
Machine and other auxiliary Equipment during maintenance. There are 2 nos.
bridge travel motors, 1 no. trolly cross travel motor, 1 no. main hoist motor, 1 no.
auxiliary hoist ring for creep speed motor. 1 no. motor for main hoist and 1 no. for
auxiliary hoist. There is a master controller, 5 steps for hoist and 4 steps for C.T.
and L.T. Deadmans handle is provided. Tandem operation of two cranes is done
during lifting or lowering of Rotor.
Similarly there is a 40 / 10 Ton EOT Crane at Valve house and 10 Ton
EOT Crane at Equipment Store.
There is a Gantry Crane near Transformer deck for operation of Draft tube
gate during maintenance of Turbine of Units.
OPERATION OF GENERATING UNITS: For Power generation in U.K.P.H., the potential energy from Reservoir is
utilised at Power House by using the head. The water of the Reservoir is taken in a
closed water conductor system to Turbine. Up to Surge tank there is one Horse
Shoe Tunnel. Then from Surge Shaft there are two Pressure Tunnel up to Valve
house. Then before Valve house by Y piece, there are 4 nos. Penstock valve
(BFV) control for filling up of penstock valve is opened to fill up the penstock,
which takes 2 hours time (approx.). After filling up of Penstock, BFV is opened
either in Auto or in Manual mode. Then bye-pass valve is closed.
After filling up of Penstock MIV before valve pressure is 26 Kg / Cm2
(approx.). The Generator should be jacked before starting of the Unit. Then for
starting of Unit MIV bye-pass valve is opened. Then after equalisation of pressure
between before valve pressure and after valve pressure seal valve is opened. Then
MIV is opened. After opening of MIV, Seal and bye-pass valves are closed. The
MIV operation is done on Remote / Local panel. MIV operation is done by
servomotors with oil pressure of 40 Kg / Cm2. These pressures are maintained in
OPU system in auto mode. The Cooling Water pump is started and flows to all
bearings, Generator Transformer, Shaft seal etc. are checked.
Then for spinning of Unit, Guide Vane is opened from control desk. The
limiter is opened up to 25%. Then Governor picks up when the Machine speed is
80%. When the Machine comes to rated speed, Excitation supply given by closing
Field Circuit Breaker (FCB). Then the voltage is build up to 11KV. Then the
auxiliary supply is changed over to its own auxiliary of the Unit, from Station
auxiliary system.
Then the Synchronisation of the Unit is done with the Grid by comparing
Voltage and Frequency. The voltage and frequency of the Machine are adjusted
with the Grid from control desk by means of adjusting the Excitation current and
guide vane opening / closing. When synchronisation limit attains, MOCB
(Minimum Oil Circuit Breaker) is closed. Then load is raised as per the grid
demand as per instruction of SLDC (State Load Despatch Center). Machine
MVAR loading is also controlled as required by SLDC to control the system
voltage. Loading of Generator is done as per BHEL (Manufacturer)
recommendation, i.e. loading at 20 MW and loading in between 60 MW to 80 MW.
Load between 20 MW to 60 MW is considered as unstable zone. In this zone of
operation, the vibration of the Machine increases. So while loading the Machine,
loading in unstable zone is avoided. The Generator Units are designed to take 15%
over load continuously. But this over load is always avoided.
During fault condition of the Machine, Unit trips on relay operation for
turbine generator protection Electrical Lock out, Electrical Non-Lock out and
Non-Electrical (Machine) Lock out relays are provided in UCP / MCR. The details
are shown in Unit tripping order chart. During normal stopping of Machine, load
is gradually reduced to 6 MW and Machine is de-synchronised. Then unit auxiliary
supply is changed over to SSB. The FCB is hand tripped and stop command is
given from CD. Then Guide vane and MIV are closed in auto to stop the Unit.
Then at 14% of speed, brake is applied to stop (stand still) the Unit.
INTRODUCTION
One of the most important factors in Human Resource Management is
Compensation Management. The soundness of compensation management
depends upon the amount of wage or salary is paid to an employee for a fair days
work.
Wage
and
Salary
administration
refers
to
the
established
and
wage rates which often is not directly related to output performance of time
worked. Refer to special rates to certain period such as over time, Sundays and
holidays. The objective of wage and salary administration is numerous and
sometimes conflict with each other. Candidates decide upon their career in a
particular organization mostly on the basis of the amount of remuneration the
organization mostly on the basis of the amount of remuneration the organization
offers qualified and competent people join the best paid organization. The
organization should aim at payment of salaries at that level where they can attract
competent and qualified people. If the salary does not present compare favorable
with that of other similar organization. Employees quit the present one and join
the other organization.
The organization must keep the wage levels at the competent level, in
order to prevent quite. Internal equity does mean payment of similar wages for
similar jobs within the organization. External equity implies payment of similar
wages to similar jobs in comparable organization.
Over all salary range for all the jobs in an organization is arranged. Each
job grade will be assigned salary range. These individual salary ranges will be filled
into an overall range Overall salary grades of the organization may be adjusted on
the data information collected about the salary levels of similar organizations.
Individual salary may also be adjusted based on the performance of the individual
employees
NEED FOR THE STUDY
The present study has been conducted with the following objectives:
To study the fluctuations in wage and salary policies of OHPC management
and employee satisfaction.
To compare the wage and salary administration practices between workers
and officials of M/s OHPC.
In study the primary data collected by means of personal interview with the help of
questionnaire.
PRIMARY DATA:
The information consists of data gathered from the differnt source.
Primary data is the refresh data. This has been collected from various sources. The
sources adopted to get data is questionnaire and through observation.
Questionnaire is designed in such way that every employee can
understand. It consists of 16 questions which are sample and close and open end
question.
SAMPLING:
In order to get data a sample size of 100 is taken and employee
selected on random base.
SECONDARY DATA:
The data is collected from published reports, unpublished reports,
annual reports, unpublished manuals and materials etc.
CORPORATE MISSION
OHPC shall be responsible for the operations and maintenance of the
existing power plants taken over from the goO and erstwhile OSES as well as
their expansion, wherever feasible and viable.
TRADE UNION
Trade union is an association of employees or workers it is organised by the
workers to get united strength to high against injustices which are inflicted on
them. The main goal of trade unions is protection and promotion of the
interest of the working class.
There are total 2 numbers of trade union functioning in UKHEP, OHPC
ltd one is the Orissa hydro power corporation employees union, upper kolab
unit, bariniput and other one is the upper kolab power plant workers union
barinigput.
Both the union are registered under trade union act 1926 the OHPC employees
union having registration no. is 197-jyp and the upper kolab power plant union
has been also registered and having registration no. is 41-jyp.
OHPC employees union barinigput is the recognised under recognition is
normally for a period of three yrs the members of both trade union is 7 for
registration.
The membership of both trade unions are verify through secret ballot system.
Only insider that means any person also employes as on employee under
OHPC bariniput unit under regular establishment (not be a member of any
other trade union) and not below 15 years of age irrespective of caste, colour,
and creed is eligible for a member of the union subject to the terms of the
constitution and upper kolab power plant union also have inside employees as
member.
The Total member of both trade union is 288 out of that the OHPC employees
union is 185 and rest is the upper kolab power plant union.
OBJECTIVES OF TRADE UNION
The main objectives of trade union is OHPC office Bariniput is as follows :
To improve the status and condition of the life of the members
To faster the co-operation among the members.
To Faster the co-operation among the members.
To obtain and maintain a fair adequate scale of wages reasonable hours of
work.
To conduct trade disputes and to provide relief to members during trade
disputes
METHOD OF CONDUCTING SECRET BALLOT :
The Government of Madras carried out preliminary investigations for the project
before April 1936. At that time Koraput district was a part of Madras Presidency
and Govt. of orissa carried out subsequently detailed investigations after 1961. The
present proposal was finalized after investigating systems. The Planning
Commission during August 1975 and irrigation project approved the power project
in June 1976.
PROJECT COST : Estimated cost of the project at different time is shown below (in Lakhs).
I)Power Development
Original
Revised
Estimate as per estimate 1979
A.A. 1976
Reviesed
estimate 1983
5790.27
8062.18
3777.65
5322.14
2283.00
5729.00
5729.00
5832.61
15296.92
19613.32
6774.85
10477.46
22071.77
30090.76
c) Power
(Electrical)
Sub Total
II)
Irrigation 1631.32
Developments
Grand Total
7643.93
Orissa
Jeypore
5 Kms. From Jeypore
4 (Four)
80 MW
320 MW
Kolab Dam
Straight Masonry Gravity
54.50 Mts.
630.5 Mts.
1630 Sq. Km.
1803 M cum.
858 Mts.
844 Mts.
1215 M cum.
280 M cum.
935 M cum.
4 (Four)
Vertical Francis
III)
IV)
Make
Net Head
a) Max. Head
b) Minimum
c) Rated
d) Design Head
V)
Normal Speed
7. Tail race
Type of Tunnel / Channel
8. Generators
I)
No. of Units
II)
Type
III) Make
IV) Voltage
V)
Current
VI) Power Factor
VII) Speed
VIII) Excitation System
BHEL, India
265.73 Mts.
241.72 Mts.
241.72 Mts.
253.0 Mts.
428.6
-
Channel
4 (Four)
Suspension
M/s BHEL, India
11 KV
4665 Amp.
0.9 lag
428.6 rpm
Stat
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
UNITII
UNITIII
UNITIV
SYNCHRONISED
TO 15.03.88 14.04.88 10.02.90 22.07.92
GRID COMMERCIAL
OPERATION
COMMISSIONING DATES
STAGE 1 (3 UNITS)
Approval by planning commission : August 1975
Commencement of work : 1976
Completion of work : 1990
GENERATION
Year
2007-08
2006-07
2005-06
2004-05
2003-04
2002-03
2001-02
2000-01
1999-2000
1998-99
1997-98
1996-97
Generation (IN Mu
1107.963
1026.468
623.693
896.017
656.509
497.392
657.378
520.024
808.198
434.321
469.290
726.667
of
For the
year 200203
163953199
83873692
248494754
17417 12318040
8752 2
3974773
3856441
19318700
27809 1995296
12
Total
EXPENDIT
URE
167927972
87730133
267813454
17695 12517569
9664 8
Repair and 11
maintenanc
e expenses
14199857
22614383
15168388
17067 12330017
070
Operational 12
Expenses
6960513
7137820
5713252
56024 3681832
53
Other
Income
10
Employee
13
&
other
relatd cost
100754266
56234102
53237013
52629 47720935
852
Administrat 14
ive
&
General
expenses
13612522
12802053
1279118
91781 8604477
83
Interest & 15
Financial
Charges
10636234
10636234
10636234
10636 10636234
234
Depreciatio 5
n
127906547
127932734
126892131
12969 12891388
4369 3
Less
: 16
Expendiutr
e
during
constructio
n
-13020946
-3868241
-5096554
-4296624
46634
82
Total
261048993
233489085
219349582
22014 20759075
4679 4
Loss on sale
of assets
Preliminary
expenses
written off
Sanctioned Strength
(S.S)
163
Reseve Strength
(R.S)
102
Reseve Strength
(R.S)
290
UNIT AVAILABILITY
Unit availability in % from 1996-97 to 2006-07
Year
Unit-I
Unit-II
Unit-III
Unit-IV
2007-08
91.43
90.36
94.63
91.59
2006-07
92.23
87.46
97.51
46.35
2005-06
90.89
94.59
90.55
29.95
2004-05
95.35
93.37
94.21
92.65
2003-04
98.37
91.35
97.99
92.09
2002-03
99.11
94.39
92.61
94.98
2001-02
94.05
93.56
93.83
95.48
2000-01
94.96
93.45
90.26
94.67
1999-2000
87.05
94.53
93.29
97.54
1998-99
82.43
90.21
90.20
95.61
1997-98
86.15
92.33
92.94
83.63
1996-97
78.63
87.54
91.40
95.16
UI
HE
P
Tot
al
Old
PS
UIHE
P
1996 3585 0
-97
358
5
38.00 -
137-79
114.26
69.86
69.86
1997 3210 0
-98
321
0
49.00 -
173.73
122.05
77.78
147.64
1998 3280 0
-99
328
0
48.11 -
160.05
99.93
55.21
202.85
437
8
49.64 59.45
219.75
100.19
50.38
253.23
444
50.02 58.63
233.76
65.92
-27.44
225.79
(Rs. Crores
-01
630
7
24.99 65.40
215.25
92.70
-3.89
221.90
302
6
24.73 63.82
171.41
59.11
-41.92
179.98
579
6
27.35 64.96
(PE)
230.34
118.50
5.70
185.68
672
6
28.67 62.86
(PE)
274.94
169.90
59.05
244.73
208.46
89.70
46.38
(SE)
2005 3177 175
-06
1
492
8
33.69 65.50
(PE)
46.38
(SE)
706
6
33.69 65.50
303.65
178.21
53.93
274.49
773
4
44.10 67.16
386.04
254.43
121.39
395.88
439
5
46.00 67.28
PS = Power Station
As on
Paid up equity capital
State Govt.
Total Loan
31.03.2004 320.80
274.26
1801.60
2075.86
31.03.2005 320.80
252.09
1801.60
2053.69
31.03.2006 320.80
228.62
1782.60
2011.22
31.03.2007 320.80
254.63
1782.60
2037.23
31.03.2008 320.80
203.62
1743.40
1947.02
SHIFT SYSTEM
Upper kolab power plant runs in three shifts a day and it has designed three relays
to carry out the work process round the clock in the organization. For
administrative function, upper kolab plant has designed a general shift for its
employees.
Shift A : Starts from 6.00 A.M. to 2.00 P.M.
Shift B : Starts from 2.00 P.M. to 10.00 P.M.
Shift C : Starts from 10.00 P.M. to 7.00 A.M.
General Shift : Start from 8.00 A.M. to 5.30 P.M. with launch break of two & half
an hours.
STANDING ORDER OF OHPC LTD
The standing orders have applied to all the workers in the organization but Deputy
Labour Commissioner at Bhubaneswar implements these orders.
TRADE UNION OF UKHEP; OHPC LTD
A Trade Union is the result of growth of the modern industrial establishment
involving employment of large number of workers under such conditions, which
make them helpless in bargaining individually for their terms of contract. A trade
union is continuous and voluntary association of employees formed mainly for the
purpose of safeguarding the social economical interest of members.
There are 2 numbers of trade unions registered and functioning in OHPC office of
upper kolab power plant namely i.e. OHPC Employee Union (recognized union)
and other one is Upper Kolab Power Plant Workers Union.
ACHIEVEMENTS & REWARDS OF OHPC LTD
ACHIEVEMENTS IN 2007 08
OHPC achieved an all time record power generation of 8025 MU and sale
of 7909 MU, which represents 43% of the total consumption of the State.
OHPC earned a record net profit of Rs. 121.39 Crores after meeting its
liabilities and income tax.
The ministry of Coal, Govt. of india allotted Baitarini West Coal Block (602
MT) to OHPC; GPCL & KSEB vide letter dtd. 25.07.2007 a new company
namely Baitarini West Coal Company ltd. Was incorporated on 22/04/2008.
ACHIEVEMENTS IN 2006-07
OHPC achieved a record generation of power of 7541 MU. UIHEP
achieved record generation of power of 3019 MU.
Cash profit achieved during the year was Rs. 171.16 Crores.
A joint venture company namely Orissa Thermal Power Corporation Ltd.
(OPTCL) was incorporated on 29.01.2007 OHPC and OMC hold 50%
share capital of the JV company.
ACHIEVEMENTS IN 2005-06
RM & U of Unit 3 & 4 of Burla after renovation and modernization started
commercial operation on 01.01.2006 with capacity addition of 16 MW.
The rotor pole repair works of all the four units of UIHEP were completed
before the schedule.
The high interest bearing APDP loan of Rs. 19 crores plus interest accured
has been fully paid to the state govt. in January 2006.
ACHIEVEMENTS IN 2004-05
Record Power Generation of 6868 MU is highest in the history of OHPC.
Power Generation in Balimela H.E. Project (1526MU) is the 2nd highest
since its inception.
Energy sold (6726MU), Turnover (Rs 274.94 cr.) and profit before
depreciation (Rs. 169.90 cr.)
The Corporation has earned a profit (before tax) of Rs. 64.08 crores.
Realization from GRIDCO (exceeding Rs. 280 crores) is the highest since
inception of OHPC.
ACHIEVEMENTS IN 2003-04
Capacity additions of 600 MW by commissioning 4 x 150 MW Upper
Indravati Project.
Capacity addition of 24 MW during 1998 by Renovation Modernization and
up rating of Unit II of Burla Power House & I.
Establishment of VSAT communication link from corporate office to
Upper Indravati, Rengali and Balimela Project sites.
OHPC has been able to mobilize internal resources from its operation to
the extent of Rs. 280 Crores for the completed and on going projects and
towards other capital expenditures.
Out of the term loan of Rs. 495.37 Crores availed for the projects, it has
repaid Rs. 263.15 Crores to the lender PFC.
REWARDS OF UKHEP
Upper kolab power plant has achieved 2nd Award as a best performing unit
2010 where there is no industrial dispute till the date that is awarded by
CMD on the occasion of the OHPC foundation day.
Factories & Boiler Officer awards another 2nd & 3rd Prize for safety.
01.01.2008
Sl. No.
E-2JM SO/PA
PB-2
RS-9300-34800
RS-4200
E-3AM
SO(SG)/PS
PB-2
RS-9300-34800
RS-4600
E-4DM
PB-2
RS-9300-34800
RS-5400
E-5MGR.
PB-3
RS-15600-39100
RS-6600
E-6AGM
PB-3
RS-15600-39100
RS-6600
E-7DGM
PB-3
RS-15600-39100
RS-7600
E-8GM
PB-4
RS-37400-67000
RS-8700
E-9SGM
PB-4
RS-37400-67000
RS-8800
E-10CGM
PB-4
RS-37400-67000
RS-9000
01.04.2005
1
NE1
S-1
RS-444010,200/-
RS-1750/-
NE-2
PB-1
RS-520020,00/-
RS-1900/-
NE-3
PB-1
RS-520020,00/-
RS-2100/-
NE-4
PB-1
RS-520020,00/-
RS-2400/-
NE-5
PB-1
RS-520020,00/-
RS-2500/-
NE-6
PB-1
RS-520020,00/-
RS-2800/-
NE-7
PB-1
RS-520020,00/-
RS-3300/-
NE-8
PB-2 NE
RS-930034,800/-
RS-4200/-
NE-9
PB-2 NE
RS-930034,800/-
RS-4200/-
10
NE-10
PB-2 NE
RS-930034,800/-
RS-4200/-
ADMINISTRATIVE
OFFICE (SGM)
TECHNICAL WING
GENERATION
DIVISON
MAINTANCE
DIVISION
PRPTECTION &
CONTROLLING
DIVISION
HRD WING
FINANCIAL WING
UTILITY DIVISION
1. TECHNICAL WING
On Introduction of Availability Based Tariff with effect from April 2003
and application of Electricity Act 2003 it has become important on the part
of generators to maintain high level of machine availability and plant load
factor. Hydropower generation has special place in the load management
under the ABT regime.
Activities
For efficient running of their Hydro Power stations, the technical wing of
OHPC has been reorganized to carry out the following activities.
Monitoring the functioning of Power Plants.
Preparation of database.
Monitoring of Renovation and Modernization Programs.
Planning for future R&M Programs and new projects.
Inventory & Procurement Monitoring.
Generation and maintenance Planning and monitoring.
Traiff and PPA including coordination with GRIDCO and OERC
Computerization and online communication.
Coordination with Govt. and SemiGovt. Bodies.
Corporation Organization (Head Quarters)
DIRECTOR OPERATION
SGM (ELECTRICAL PROJECT)
OPERATION & MAINTENACE
IVERTORY & PROCUREMENT
DESIGN, PLANNING : DATABASE
PPA, TARIFF & COORDINATION
ONGOING S & M ENTENTION
PROJECT
FUTURE R & M NEW PROJECTS
COMPUTER & COMMUNICATION
2. FINANCIAL WING
After formation of OHPC under the Reform Act a separate Finance wing with
experienced and qualified executives has been created to manage the Corporate
finance.
Activities
Resource Management
Budget & Allocation
Banking
Loan and Investment
Accounts & Audit
Taxation
Personnel Entitlement
Provident Fund, Pension and Gratuity Fund
DIRECTOR (Finance)
DGM (Res)
Sr GM-Cum-Company
DGM (F & A)
DGM (Funds)
AGM (Fin.)
DM (Fin.)
Grade
GET/MT/DET
E-1
Jr. Manager
E-2
Asst. Manager
E-3
Dy. Manager
E-4
Manager
E-5
E-6
E-7
General Manager
E-8
E-9
E-10
ii)
Administrative Non-Executive
Post
Grade
Peon/Helper/Watchman/Choukidar/Sweeper/Office
Attendant/Watchman-cum-Sweeper/ Night Watchman
ANE-1
Zamadar/Daftary
ANE-2
ANE-3
Storekeeper-C/Receptionist
ANE-4
ANE-9
Technical Non-Executive
Grade
TNE-9
Non Executive
CATEGORY
ANE/TNE (Un-skilled)
ANE-TNE (Skilled)
Executive
DET
Rs.12,000/- (consolidated)
GET & MT
Jr. Manager
Asst. Manager
18 Years
21 Years
Number of
forwarded
applications
to
be
Consolidated
Nil
Nil
Nil
E-2
Rs. 9300-34800/-
4200
PB-2
3% (Basic Pay+GP)
E-3
Rs. 9300-34800/-
4600
PB-2
3% (Basic Pay+GP)
E-4
Rs. 9300-34800/-
5400
PB-2
3% (Basic Pay+GP)
E-5
Rs. 15600-39100/-
6600
PB-3
3% (Basic Pay+GP)
E-6
Rs. 15600-39100/-
6600
PB-3
3% (Basic Pay+GP)
E-7
Rs. 15600-39100/-
7600
PB-3
3% (Basic Pay+GP)
E-8
Rs. 37400-67000/-
8700
PB-4
3% (Basic Pay+GP)
E-9
Rs. 37400-67000/-
8800
PB-4
3% (Basic Pay+GP)
E-10
Rs. 37400-67000/-
9000
PB-4
3% (Basic Pay+GP)
ii)
Grade
Annual increment
ANE-1
Rs. 4400-10200/-
1750
S-1
3% (Basic Pay+GP)
ANE-2
Rs. 5200-20200/-
1900
PB-1
3% (Basic Pay+GP)
ANE-3
Rs. 5200-20200/-
2100
PB-1
3% (Basic Pay+GP)
ANE-4
Rs. 5200-20200/-
2400
PB-1
3% (Basic Pay+GP)
ANE-5
Rs. 5200-20200/-
2500
PB-1
3% (Basic Pay+GP)
ANE-6
Rs. 5200-20200/-
2800
PB-1
3% (Basic Pay+GP)
ANE-7
Rs. 9300-34800/-
3300
PB-1
3% (Basic Pay+GP)
ANE-8
Rs. 9300-34800/-
4200
PB-2
3% (Basic Pay+GP)
ANE-9
Rs. 9300-34800/-
4200
PB-2
3% (Basic Pay+GP)
Pay
Band
Annual increment
iii)
Grade
TNE-1
Rs. 4400-10200/-
1750
S-1
3% (Basic Pay+GP)
TNE-2
Rs. 5200-20200/-
1900
PB-1
3% (Basic Pay+GP)
TNE-3
Rs. 5200-20200/-
2100
PB-1
3% (Basic Pay+GP)
TNE-4
Rs. 5200-20200/-
2400
PB-1
3% (Basic Pay+GP)
TNE-5
Rs. 5200-20200/-
2500
PB-1
3% (Basic Pay+GP)
TNE-6
Rs. 5200-20200/-
2800
PB-1
3% (Basic Pay+GP)
TNE-7
Rs. 9300-34800/-
3300
PB-1
3% (Basic Pay+GP)
TNE-8
Rs. 9300-34800/-
4200
PB-2
3% (Basic Pay+GP)
TNE-9
Rs. 9300-34800/-
4200
PB-2
3% (Basic Pay+GP)
2.2
INCREMENT
The annual increment @ 3% of (Basic Pay+GP) which is rounded off to the
next multiple of 10/- (ten rupees) specified in the various scale of pay as amended
from time to time shall be payable to any employee & shall be effective on the first
day of the month in which it falls due.
2.3
F-2RA-
390 sqft.
Upto NE-5
E-2RB-
580 sqft
NE-6 to E-2
D-3R-
900 sqft
C-4R-
1600 sqft
E-5
B-5R-
2300 sqft
E-6 to E-8
A-6R-
3700 sqft
LICENSE FEE
License fee as per OHPC Residential Accommodation Rules shall be paid
the concerned employees who were provided with accommodation.
2.8 REIMBURSEMENT
EXPENDITURE
Sl.
Types of Conveyance
No.
OF
MONTHLY
CONVEYANCE
Eligibility
Four Wheelers
Rs. 1,800/-
Two Wheelers
Rs. 600/-
For all
Rs. 300/-
-do-
Rail/Air
Road
Local
Use of own car / Two
Journey (By wheeler with prior
approval of competent
Road)
authority
E-7
E-6
Actual Taxi
Fare limited
to Rs. 500/per day
E-5
Actual Taxi
Fare limited
to Rs. 400/per day
E-4
E-3
Actual
Scooter Motor Cycle @
charges by Rs. 3.00 per K.M.
(3)
three
wheelers or
fare of a
single seat in
Taxi limited
to Rs. 300/per day
E-2
E-1
Actual
Scooter Motor Cycle @
charges by Rs. 3.00 per K.M.
(3)
three
wheelers or
fare of a
single seat in
Taxi limited
to Rs. 200/per day
Rail/Air
NE-8
Road
Local
Use of own car / Two
Journey (By wheeler with prior
approval of competent
Road)
authority
Actual
and
above
tire
AC Bus Fare
Sleeper
Rail/Air
Road
Local
Use of own car / Two
Journey (By wheeler with prior
approval of competent
Road)
authority
Actual
Charges by 3
(three)
wheelers
limited to Rs.
150/- per day
Actual
Charges by 3
(three)
wheelers
limited to Rs.
125/- per day
B. Daily Allowance
Table I (Executive)
Grade
Rate in Rs.
Rs. 400.00
Rs. 600.00
Rs. 500.00
E-5
Rs. 300.00
Rs. 500.00
Rs. 450.00
Rs. 250.00
Rs. 400.00
Rs. 350.00
E-1
Rs. 200.00
Rs. 300.00
Rs. 250.00
Rate in Rs.
Rs. 200.00
Rs. 300.00
Rs. 250.00
NE-3 to NE-7
Rs. 150.00
Rs. 250.00
Rs. 175.00
Rs. 100.00
Rs. 200.00
Rs. 150.00
E-5
Table I (Non-Executive)
Grade
NE-3 to NE-7
Entitlement
Entitlement
4.3.4
4.3.5
4.3.6
4.3.7
4.3.8
4.4
ADVANCE
5.1 PUJA / FESTIVAL ADVANCE
Normal & Special interest free Puja advance are paid to the employees as
per OHPC & State Govt. Rules.
INCENTIVE
FAMILY PLANNING INCENTIVE
Employee who are in possession of Green Card having one child are
entitled to incentive amount equal to twice the amount of last drawn increment in
their existing scale of pay and with two children will be entitled to incentive
amount equal to the amount of one increment.
6.1
Provided that the employees in NE-1 & NE-2 grades who are in possession of
Green Card having one or two children will be entitled to incentive amount
equal to twice the amount of increment.
Such incentive once sanctioned a particular rate shall not be enhanced or reduced
under any circumstances. The Eligible employees will be granted one-time cash
incentives at the following rates:
For sterilisation of a male employee / his spouse with one child Rs. 300/For sterilisation of a female employee / her spouse with one child Rs. 300/6.2 ANNUAL / PERFORMANCE INCENTIVE
Annual incentive is given to employees based on financial performance of the
corporation.
TERMINAL / INSURANCE BENEFITS
7.1
7.4 RATUITY
Gratuity is payble under payment of Gratuity Act 1972 to the employees not
covered under OHPC Pension Scheme. The employees under OHPC pension
Rules are paid gratuity as applicable to State Govt employees.
7.5 FUNERAL EXPENSES
Where an employee dies in service, his family members are given the following
amount as funeral expenses.
Rs. 5,000/- for performance of obsequies
Reimbursement up to Rs. 1000/- for transportation of the body subject to
change from time to time.
Benefits under Rehabilitation assistance Scheme (RAS) & any other Scheme
as applicable from time to time.
7.6
LEAVE ENCASHMENT
The leave encashment permissible to an employee is equal to the (Basic Pay
+ Grade Pay + DA) of the employee for the month preceding the date of
encashment and available on retirement / superannuation or resignation or death.
The maximum Leave encashment is 300 days Earned Leave.
GENERAL RULES
8.1 PERFORMANCE APPRAISAL (KPA)
Prevailing Executive Performance Appraisal System (EPAS) introduced in
1998 have been modified in line with the power sector appraisal system of the
Central PSUs. Modified appraisal form is objective based and provides scope for
measuring competencies, values & potential of executives through indicators of
Key Performance Area (KPA). Similarly the performance appraisal system for the
non-executive employees is in operation since the inception of OHPC and is based
on the 5 point scale on the relevant attributes for the different type of jobs.
8.2 CONDUCT, DISCIPLINE & APPEAL RULES
Every employee of the Corporation shall at all times.
i)
To Maintain absolute Integrity, Transparency,
ii)
To Maintain devotion to duty and the Organisaon,
iii)
Should avoid which is unbecoming of an employee of the Corporation
and conduct himself at all times in a way which will enhance the
reputation of the Corporation.
8.3 GRIEVANCE PROCEDURE
There is a Grievance Committee in this Corporation. The Corporation has laid
down a detailed grievance procedure for all categories of employees with the
who had completed 40 years of age with an ex-gratia of Rs. 1,25,000/alongwith other benefits. Under the above Scheme 962 nos. Of NMRs & CKs
were separated. No such scheme is in force at present.
The VRS was first introduced in the year 2003-04 to the Non-Executive
Employees only borne in pensionable establishment having 10 years of
qualifying service with a view to reduce surplus and un-productive labour with
an ex-gratia equipment to 21 (twenty one) days emoluments for each completed
years of qualifying service or monthly emoluments at the time of voluntary
retirement multiplied by the balance months of service left up to the date of
superannuation whichever is less alongwith all other terminal benefits. Under
the Scheme 22 nos. Of Non-Executives were separated.
The said scheme is not in force at present.
Voluntary Retirement Scheme 2009 was extended to all regular executive
and Non-Executive employees whose minimum age for applying the Scheme
should be 50 years with the compensation equivalent 2 (two) months
emoluments for each completed year of qualifying service or monthly
emoluments at the time of voluntary retirement multiplied by the balance
months of the service left up to the date of superannuation, whichever is less
alongwith all other terminal benefits. The Voluntary Retirement Scheme
2009 is still in force.
N.B : - For further reference / details to the above may be referred to the
relevant clauses of Regluations / Rules / Circulars / Orders of the
Corporation.
FINDINGS
Most of the employees satisfied with their job.
Many of the employees agreed that their salary is providing good feeling and
accomplishment.
Most of the respondents agreed that rewards should be given on the basis of
performance.
Maximum number of respondents agreed with the compensation.
Most of the employees agreed with the organization policies.
Mostly all the employees agreed that company is much concern about
employees.
Many of the respondents agreed recognition of employees contribution.
Most of the agreed that wages, Salaries and increments are followed every
year.
Maximum number of the respondents agreed about the Wages and Salary
system in OHPC is Satisfactory.
Many of the employees agreed that Wage and Salary structure implemented
according to qualification and experience.
Many of the respondents agreed that Bonus and Incentives are relative to
the employees contribution.
Mostly all the employees responded positively that they are getting their pay
as per the laws
All the employees reacted positively that they are paid for overtime.
Maximum of the respondents agreed that they are getting benefits on time
and when needed.
Above of the employees agreed that they are getting gratuity according to
laws while leaving the job.
SUGGESTIONS
NAME:
DESIGNATION:
8) The Wages and salary system for all Employees in OHPC is satisfactory.
a) Strongly agree b) Agree c) disagree d) Strongly disagree
10) Bonus & Incentives are they relative to the employees contribution.
a) Strongly agree b) Agree c) disagree d) Strongly disagree
b) No
12) Are Employees paid for overtime if their work overtime above their
contracted hours?
a) Yes
b) No
a) Yearly
b) Half yearly
14) Dose the company change DA as per the changes taking place in the
environment
a) Yes
b) No
b) Good
c) Bad
16) Suggestions
a) You want better salary
b) More monitory benefits are expected
BIBLIOGRAPHY
- K.
Aswathappa