Sunteți pe pagina 1din 4

www.hilti.

in
Company:
Specifier:
Address:
Phone | Fax:
E-Mail:

Hilti PROFIS Rebar 2.3.4


Amec Foster Wheeler

Page:
Project:
Fastening point:
Date:

1
Lyondell Basell
06/01/2015

Specifiers comments:

Design standard:

ACI Chapter 12

Application type:

Standard applications/Compression

1. Loads for yielding of the bar

2. Drilling & Temperature

3. Material & Safety

Loads

Drilling

Structure

Top

0 kN/bar

Hole condition

Dry

Concrete strength f'c

20 N/mm

Bottom

0 kN/bar

Drilling method

Hammer drilling

Char. yield strength (existing)

500 N/mm

Drilling aid

Drilling aid is used

Char. yield strength (new)

500 N/mm

Fire design
Fire rating

None

Temperature (ACI Chapter 12)

Fatigue design

During installation

from 5 C to 40 C

None

During service

20 C / 20 C

Seismic
Seismic loads

No

Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Rebar ( c ) 2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan

www.hilti.in
Company:
Specifier:
Address:
Phone | Fax:
E-Mail:

Hilti PROFIS Rebar 2.3.4


Amec Foster Wheeler

Page:
Project:
Fastening point:
Date:

4. Parameters

2
Lyondell Basell
06/01/2015

5. Post-installed reinforcement

cc

1.00

Number of layers

ct

1.00

Number of top layers

Number of bottom layers

ct,bond

1.00

Top reinforcements parameters

ud

0.020

Top diameter

20 mm

k2

0.85

Top spacing

150 mm

'

0.92

Top layer 1: c

50 mm

max

0.04

Top layer 1: cd (EC2, 8.4.4.1)

65 mm

c2

0.002

Top min. reinforcement

100 mm/m

c2u

0.0035

Position Factor

1.0

Bottom reinforcements parameters


Bottom diameter

20 mm

Bottom spacing

150 mm

Bottom layer 1: c

50 mm

Bottom layer 1: cd (EC2, 8.4.4.1)

65 mm

Bottom min. reinforcement

100 mm/m

Position Factor

1.0

Other
Cover of tension force line b

Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Rebar ( c ) 2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan

0 mm

www.hilti.in

Hilti PROFIS Rebar 2.3.4

Company:
Specifier:
Address:
Phone | Fax:
E-Mail:

Amec Foster Wheeler

Page:
Project:
Fastening point:
Date:

3
Lyondell Basell
06/01/2015

Selected solution
Layer of bars

Bar size

Drill bit size

Bar spacing
centre/centre

Distance
centre/surface

Drilled hole
required

Anchorage for
yield of bar

db [mm]

D [mm]

s [mm]

cs [mm]

vreq [mm]

vy [mm]

Top / left

20

25

150

2,060

537

537

Bottom / right

20

25

150

2,060

537

537

Required accessories
Please find the required accessories in your approval or the instructions for use.

Upper layer (compression side)


Design Input
Design force in bar

FE = As,rqrd * fyd/s 0

Provided reinforcement

db = 20 mm, s = 150 mm As,prov

Stress in bars

sd = FE/As,prov = fyd

Reduction for excess reinforcement

exc = As,rqd/As,prov

Adhesive used

Hilti HIT-HY 200

-911.06 kN/m
2,094 mm/m
0 N/mm

Design for yield

1.00

Anchorage Post-Installed Reinforcement


Mortar-Concrete factor

1.0

0.02 for selected units

u1 = 0.02 sqrt(1 N/mm / 1psi)

0.0

0.0003 for selected units

u2 = 0.0003 / 1 N/mm / 1psi

Development length

0.5

ld = max( u1*fy/fc

; u2*fy )mdbexc

0.0
537 mm

Definition of the installation length


Minimum anchorage length

ld,min

203 mm

Controlling anchorage length

lbd = max(lbd; ld,min)

537 mm

Installation length

linst = lbd

537 mm

Lower layer (compression side)


Design Input
Design force in bar

FE = As,rqrd * fyd/s 0

Provided reinforcement

db = 20 mm, s = 150 mm As,prov

Stress in bars

sd = FE/As,prov = fyd

Reduction for excess reinforcement

exc = As,rqd/As,prov

Adhesive used

Hilti HIT-HY 200

Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Rebar ( c ) 2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan

-911.06 kN/m
2,094 mm/m
0 N/mm
1.00

Design for yield

www.hilti.in
Company:
Specifier:
Address:
Phone | Fax:
E-Mail:

Hilti PROFIS Rebar 2.3.4


Amec Foster Wheeler

Page:
Project:
Fastening point:
Date:

4
Lyondell Basell
06/01/2015

Anchorage Post-Installed Reinforcement


Mortar-Concrete factor

1.0

0.02 for selected units

u1 = 0.02 sqrt(1 N/mm / 1psi)

0.0

0.0003 for selected units

u2 = 0.0003 / 1 N/mm / 1psi

Development length

0.5

ld = max( u1*fy/fc

; u2*fy )mdbexc

0.0
537 mm

Definition of the installation length


Minimum anchorage length

ld,min

203 mm

Controlling anchorage length

lbd = max(lbd; ld,min)

537 mm

Installation length

linst = lbd

537 mm

Remarks
This design exclusively considers the local load transfer from the post-installed tensile reinforcement at the intersection between new and
existing concrete. The joint surfaces for concreting must be roughened to at least such an extent that aggregates protrude. It assumes that
adequate transverse reinforcement is provided in the anchorage area if required.
The shear load carrying capacity of the cross section has to be designed separately.
The Installation (drilling, cleaning, setting) must be according to the approval!
Fixed diameter and spacing selected. Please be aware that over-reinforcement of the section may lead to brittle failure of the fastening.
The accessory list in this report is for the information of the user only. In any case, the instructions for use provided with the product have to be
followed to ensure a proper installation.

Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Rebar ( c ) 2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan