EE-320-2:2012 SINGLE PHASE ELECTRICAL INSTALLATION & MAINTENANCE

CU WORK ACTIVITIES DURATION


CU

C01

C02

C03

COMPETENCY UNIT

EE-320-2:2012 - C01
SINGLE PHASE DRAWING

EE-320-2:2012 - C02
SINGLE PHASE WIRING

EE-320-2:2012 - C03
SINGLE PHASE WIRING
MAINTENANCE

CU WORK ACTIVITIES

C05

C06

EE-320-2:2012 - C04
SINGLE PHASE MOTOR &
MOTOR CONTROL
INSTALLATION

EE-320-2:2012 - C05
SINGLE PHASE
ELECTRICAL APPLIANCES
MAINTENANCE

EE-320-2:2012 - C06
SINGLE PHASE WIRING
TESTING AND
COMMISSIONING

DEMONSTRATION

JUM.JAM

JUM.HARI

PENILAIAN

MENGAJAR MENGAJAR PEPERIKSAAN CO-CU

Identify single phase drawing specifications and requirement

24

32

Carry out layout drawing

12

28

40

Carry out single line / schematic diagram drawing

12

24

36

4.5

Carry out Single Phase wiring drawing

14

22

2.75

Inspect single phase drawing

12

1.5

Identify single phase wiring specifications and procedures

24

48

72

Identify single phase wiring tools, equipment and materials

20

44

64

Carry out wiring activities

32

48

80

10

Carry out single phase earthing system installation

24

50

74

9.25

Carry out single phase Distribution Board (DB)(metallic or


insulated) installation

24

50

74

9.25

Carry out fitting and accessories installation

24

52

76

9.5

Carry out wiring system visual inspection

16

36

52

6.5

Cary out dead circuit test

16

32

48

Carry out live circuit test

16

32

48

10

Prepare single phase work activities report

12

24

36

4.5

Identify single phase wiring maintenance requirement,


specifications and procedures

12

1.5

Identify single phase wiring tools, equipment and materials

12

1.5

Carry out electrical wiring inspection

12

16

Carry out electrical wiring maintenance

10

14

1.75

Inspect electrical wiring functionality

12

1.5

Record wiring system maintenance activities


Identify single phase motor installation specifications and
procedures
Prepare single phase motor and motor control installation
maintenance tools, equipment and materials

0.75

12

24

36

4.5

16

32

48

C04

LECTURE

2
3

Carry out single phase motor installation

12

24

36

4.5

Carry out single phase motor control termination

24

32

Inspect single phase motor and motor control functionality

12

24

36

4.5

Record single phase motor and motor control installation.

12

1.5

Electrical appliances maintenance requirement specifications and


manuals

12

16

Prepare single phase electrical appliances maintenance tools,


equipment and materials

12

1.5

Carry out electrical appliances inspection

18

24

Carry out electrical appliances maintenance

12

20

2.5

Identify single phase testing and commissioning specifications and


procedures

12

1.5

Prepare single phase testing and commissioning tools, equipment


and materials

10

1.25

Carry out single phase insulation resistance testing

16

24

Carry out single phase polarity testing

16

24

Carry out single phase continuity testing

12

18

2.25

Carry out single phase earthing resistance testing

16

22

2.75

Carry out testing commissioning

18

22

2.75

Prepare testing and commissioning report

12

1.5

TOTAL TRAINING HOURS


TOTAL TRAINING DAYS
TOTAL TRAINING MONTH

TOTAL CU TIME
DURATION

142

624

72

200

72

144

1254
156.75
7.8375

EE-320-3:2012 THREE PHASE ELECTRICAL INSTALLATION & MAINTENANCE


CU WORK ACTIVITIES
CU

C01

C02

C03

COMPETENCY UNIT

EE-320-3:2012 - C01
THREE PHASE DRAWING

EE-320-3:2012 - C02
THREE PHASE WIRING

EE-320-3:2012 - C03
THREE PHASE WIRING
MAINTENANCE

CU WORK ACTIVITIES
1

Identify three phase drawing specifications and requirement

Preapare three phase drawing equipment and material

16

Carry out three line / schematic diagram drawing

16

Carry out three Phase wiring drawing

16

Inspect three phase drawing

12

Identify three phase wiring specifications and procedures

12

24

Identify three phase wiring tools, equipment and materials

12

24

Carry out wiring activities

12

24

Carry out three phase earthing system installation

12

24

Carry out three phase Distribution Board (DB)(metallic or


insulated) installation

12

24

Carry out fitting and accessories installation

12

24

Carry out wiring system visual inspection

16

Cary out dead circuit test

Carry out live circuit test

10

Prepare three phase work activities report

16

Identify three phase wiring maintenance requirement

Identify three phase wiring tools, equipment and materials

Carry out electrical wiring inspection

Carry out electrical wiring maintenance

Inspect electrical wiring functionality

Record wiring system maintenance activities


Identify three phase motor installation specifications and
procedures
Prepare three phase motor and motor control installation
maintenance tools, equipment and materials

12

16

Carry out three phase motor installation

14

Carry out three phase motor control termination

12

Inspect three phase motor and motor control functionality

12

Record three phase motor and motor control installation.

Identify electrical appliences maintenance requirement,


specification and manuals

12

Prepare three phase electrical appliances maintenance tools,


equipment and materials

12

Carry out electrical appliances inspection

12

Carry out electrical appliances maintenance

18

Identify three phase testing and commissioning specifications


and procedures

Prepare three phase testing and commissioning tools,


equipment and materials

Carry out three phase insulation resistance testing

Carry out three phase polarity testing

Carry out three phase continuity testing

Carry out three phase earthing resistance testing

Carry out testing commissioning

Prepare testing and commissioning report

Monitor work progress

10

Conduct section briefing

10

Carry out staff training

10

Provide appraisal accommodation

10

Implement safety measures

10

Carry out customer and inter departmental liason

10

Preapare section budget

10

Preapare technical report

10

Identify electrical signage (neon) installation requirement


Plan electrical signage (neon) installation & maintenance
activities
Carry out electrical signage (neon) installation

10

12

Carry out electrical signage (neon) maintenance


Inspect electrical signage (neon) installation and maintenance
activities
Preapare electrical signage (neon) installation & maintenance
report

10

C04

C05

C06

C07

E01

EE-320-3:2012 - C04
THREE PHASE MOTOR &
MOTOR CONTROL
INSTALLATION

EE-320-3:2012 - C05
THREE PHASE
ELECTRICAL APPLIANCES
MAINTENANCE

EE-320-3:2012 - C06
THREE PHASE WIRING
TESTING AND
COMMISSIONING

EE-320-3:2012 - C07
SUPERVISORY FUNCTION

EE-320-3:2012 - E01
THREE PHASE WIRING
TESTING AND
COMMISSIONING

DURATION
DEMONTRATIO
LECTURE
N
6
12

2
3
4
5
6

TOTAL CU TIME
DURATION

108

286

36

102

72

72

TOTAL TRAINING HOURS


TOTAL TRAINING DAYS
TOTAL TRAINING MONTH

104

72

852
106.5
5.325

BULAN

JUL '14
1

BILANGAN MINGGU
MINGGU ORIENTASI
CORE ABILITY

C01

EE-320-2:2012 - C01
SINGLE PHASE
DRAWING

Identify single phase drawing


specifications and requirement

Carry out layout drawing

Carry out single line / schematic


diagram drawing

Carry out Single Phase wiring


drawing

Inspect single phase drawing

LAWATAN VERIFIKASI PPL ( C01 )


1

Identify single phase wiring


specifications and procedures

Identify single phase wiring tools,


equipment and materials

Carry out wiring activities

C02

EE-320-2:2012 - C02
SINGLE PHASE WIRING

5
6

Carry out single phase earthing


system installation
Carry out single phase Distribution
Board (DB)(metallic or insulated)
installation
Carry out fitting and accessories
installation

Carry out wiring system visual


inspection

Cary out dead circuit test

Carry out live circuit test

10

Prepare single phase work


activities report

LAWATAN VERIFIKASI PPL


1
2
3

C06

EE-320-2:2012 - C06
SINGLE PHASE WIRING
TESTING AND
COMMISSIONING

Identify single phase testing and


commissioning specifications and
procedures
Prepare single phase testing and
commissioning tools, equipment
and materials
Carry out single phase insulation
resistance testing

Carry out single phase polarity


testing

Carry out single phase continuity


testing

Carry out single phase earthing


resistance testing

Carry out testing commissioning

Prepare testing and


commissioning report

LAWATAN VERIFIKASI PPL

OGOS '14
4

SEPT '14
8

OKT '14

NOV '14

DIS'14

JAN '15

FEB '15

MAC '15

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

APR '15

1
2

C03

EE-320-2:2012 - C03
SINGLE PHASE WIRING
MAINTENANCE

Identify single phase wiring


maintenance requirement,
specifications and procedures
Identify single phase wiring tools,
equipment and materials

Carry out electrical wiring


inspection

Carry out electrical wiring


maintenance

Inspect electrical wiring


functionality

Record wiring system


maintenance activities

LAWATAN VERIFIKASI PPL ( C02, C03, C06 )


1
2

C04

EE-320-2:2012 - C04
SINGLE PHASE MOTOR
& MOTOR CONTROL
INSTALLATION

Identify single phase motor


installation specifications and
procedures
Prepare single phase motor and
motor control installation
maintenance tools, equipment
Carry out single phase motor
installation

Carry out single phase motor


control termination

Inspect single phase motor and


motor control functionality

Record single phase motor and


motor control installation.

LAWATAN VERIFIKASI PPL ( C04 )


1

C05

EE-320-2:2012 - C05
SINGLE PHASE
ELECTRICAL
APPLIANCES
MAINTENANCE

2
3
4

Electrical appliances maintenance


requirement specifications and
manuals
Prepare single phase electrical
appliances maintenance tools,
equipment and materials
Carry out electrical appliances
inspection
Carry out electrical appliances
maintenance

LAWATAN VERIFIKASI PPL ( C05 )


CUTI SEMESTER

BULAN

JUL '14
1

BILANGAN MINGGU
MINGGU ORIENTASI

CORE ABILITY

C01

EE-320-2:2012 - C01

SINGLE PHASE DRAWING

LAWATAN VERIFIKASI PPL

C02

C06

C03

EE-320-2:2012 - C02
EE-320-2:2012 - C06

EE-320-2:2012 - C03

SINGLE PHASE WIRING

SINGLE PHASE WIRING TESTING AND


COMMISSIONING
SINGLE PHASE WIRING MAINTENANCE

LAWATAN VERIFIKASI PPL

C04

EE-320-2:2012 - C04

SINGLE PHASE MOTOR & MOTOR CONTROL


INSTALLATION

LAWATAN VERIFIKASI PPL

C05

EE-320-2:2012 - C05

SINGLE PHASE ELECTRICAL APPLIANCES


MAINTENANCE

LAWATAN VERIFIKASI PPL

LAWATAN VERIFIKASI PPL

CUTI SEMESTER

OGOS '14
4

SEPT '14
8

OKT '14

NOV '14

DIS'14

JAN '15

FEB '15

MAC '15

APR '15

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

MEI '15

BULAN

JUL '14
1

BILANGAN MINGGU
MINGGU ORIENTASI

CORE ABILITY

C01

EE-320-2:2012 - C01

SINGLE PHASE DRAWING

LAWATAN VERIFIKASI PPL

C02

EE-320-2:2012 - C02

SINGLE PHASE WIRING

LAWATAN VERIFIKASI PPL

C03

EE-320-2:2012 - C03

SINGLE PHASE WIRING MAINTENANCE

LAWATAN VERIFIKASI PPL

C04

EE-320-2:2012 - C04

SINGLE PHASE MOTOR & MOTOR CONTROL


INSTALLATION

LAWATAN VERIFIKASI PPL

C05

EE-320-2:2012 - C05

SINGLE PHASE ELECTRICAL APPLIANCES


MAINTENANCE

LAWATAN VERIFIKASI PPL

C06

EE-320-2:2012 - C06

SINGLE PHASE WIRING TESTING AND


COMMISSIONING

LAWATAN VERIFIKASI PPL

CUTI SEMESTER

OGOS '14
4

SEPT '14
8

OKT '14

NOV '14

DIS'14

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

BULAN

JUL '14
1

BILANGAN MINGGU
MINGGU ORIENTASI

CORE ABILITY

C01

EE-320-3:2012 - C01
THREE PHASE
DRAWING

Identify three phase drawing


specifications and requirement

Preapare three phase drawing


equipment and material

Carry out three line / schematic


diagram drawing

Carry out three Phase wiring


drawing

Inspect three phase drawing

LAWATAN VERIFIKASI PPL ( C01 )

C02

Identify three phase wiring


specifications and procedures

Identify three phase wiring tools,


equipment and materials

Carry out wiring activities

Carry out three phase earthing


system installation

Carry out three phase Distribution


Board (DB)(metallic or insulated)
installation

Carry out fitting and accessories


installation

Carry out wiring system visual


inspection

Cary out dead circuit test

Carry out live circuit test

10

Prepare three phase work


activities report

EE-320-3:2012 - C02
THREE PHASE WIRING

LAWATAN VERIFIKASI PPL

OGOS '14
4

SEPT '14
8

OKT '14

NOV '14

DIS'14

JAN '15

FEB '15

MAC '15

APR '15

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

C06

EE-320-3:2012 - C06
THREE PHASE WIRING
TESTING AND
COMMISSIONING

Identify three phase testing and


commissioning specifications and
procedures
Prepare three phase testing and
commissioning tools, equipment
and materials

Carry out three phase insulation


resistance testing

Carry out three phase polarity


testing

Carry out three phase continuity


testing

Carry out three phase earthing


resistance testing

Carry out testing commissioning

Prepare testing and


commissioning report

LAWATAN VERIFIKASI PPL

C03

EE-320-3:2012 - C03
THREE PHASE WIRING
MAINTENANCE

Identify three phase wiring


maintenance requirement

Identify three phase wiring tools,


equipment and materials

Carry out electrical wiring


inspection

Carry out electrical wiring


maintenance

Inspect electrical wiring


functionality

Record wiring system


maintenance activities

LAWATAN VERIFIKASI PPL ( C02, C03,C06 )

C04

EE-320-3:2012 - C04
THREE PHASE MOTOR
& MOTOR CONTROL
INSTALLATION

Identify three phase motor


installation specifications and
procedures
Prepare three phase motor and
motor control installation
maintenance tools, equipment
and materials
Carry out three phase motor
installation

Carry out three phase motor


control termination

Inspect three phase motor and


motor control functionality

Record three phase motor and


motor control installation.

LAWATAN VERIFIKASI PPL ( C04 )

C05

EE-320-3:2012 - C05
THREE PHASE
ELECTRICAL
APPLIANCES
MAINTENANCE

Identify electrical appliences


maintenance requirement,
specification and manuals
Prepare three phase electrical
appliances maintenance tools,
equipment and materials

Carry out electrical appliances


inspection

Carry out electrical appliances


maintenance

LAWATAN VERIFIKASI PPL ( C05 )

C07

EE-320-3:2012 - C07
SUPERVISORY
FUNCTION

Monitor work progress

Conduct section briefing

Carry out staff training

Provide appraisal accommodation

Implement safety measures

Carry out customer and inter


departmental liason

Preapare section budget

Preapare technical report

LAWATAN VERIFIKASI PPL ( C07 )

E01

EE-320-3:2012 - E01
THREE PHASE WIRING
TESTING AND
COMMISSIONING

Identify electrical signage (neon)


installation requirement

Plan electrical signage (neon)


installation & maintenance
activities

Carry out electrical signage (neon)


installation

Carry out electrical signage (neon)


maintenance

Inspect electrical signage (neon)


installation and maintenance
activities
Preapare electrical signage
(neon) installation & maintenance
report

LAWATAN VERIFIKASI PPL ( C07, E01 )


CUTI SEMESTER

SENARAI SEMAK WIM EE-320-2/3 ELECTRICAL INSTALLATION AND MAINTENANCE

EE-320-2: 2012 SINGLE PHASE ELECTRICAL INSTALLATION AND MAINTENANCE


1

EE-320-2:2012 - C01

SINGLE PHASE DRAWING

EE-320-2:2012 - C01

SINGLE PHASE WIRING

EE-320-2:2012 - C01

SINGLE PHASE WIRING MAINTENANCE

EE-320-2:2012 - C01

SINGLE PHASE MOTOR & MOTOR CONTROL INSTALLATION

EE-320-2:2012 - C01

SINGLE PHASE ELECTRICAL APPLIANCES MAINTENANCE

EE-320-2:2012 - C01

SINGLE PHASE WIRING TESTING AND COMMISSIONING

EE-320-3: 2012 THREE PHASE ELECTRICAL INSTALLATION AND MAINTENANCE


1

EE-320-3:2012 - C01

THREE PHASE DRAWING

EE-320-3:2012 - C02

THREE PHASE WIRING

EE-320-3:2012 - C03

THREE PHASE WIRING MAINTENANCE

EE-320-3:2012 - C04

THREE PHASE MOTOR & MOTOR CONTROL INSTALLATION

EE-320-3:2012 - C05

THREE PHASE ELECTRICAL APPLIANCES MAINTENANCE

EE-320-3:2012 - C06

THREE PHASE WIRING TESTING AND COMMISSIONING

EE-320-3:2012 - C07

SUPERVISORY FUNCTION

EE-320-3:2012 - E01

ELECTRICAL SIGNAGE (NEON) INSTALLATION AND


MAINTENANCE

RIZAL

FADHIL

KERTAS PENILAIAN AMALI

PENGUBAL
KERTAS PENILAIAN TEORI

KERTAS TUGASAN AMALI

PELAN PENGAJARAN AMALI

KERTAS TUGASAN

KERTAS PENERANGAN

PELAN PENGAJARAN TEORI

WIM TELAH SIAP


KERTAS PENILAIAN AMALI

KERTAS PENILAIAN TEORI

KERTAS TUGASAN AMALI

PELAN PENGAJARAN AMALI

NAMA CU

KERTAS TUGASAN

KOD CU

KERTAS PENERANGAN

BIL

PELAN PENGAJARAN TEORI

JUMLAH BILANGAN KERTAS WIN