BIBIYANA SOUTH 40010% mw Gas Based Combined Cycle power Plant Projects

Site Condition:

Temperature-350C
Pressure-1.013 mbar
Relative Humidity-98%
Site elevation : less than 100 ft(msl)
Power factor : 0.8 lagging
Frequency : 50 Hz

Land:

Approx. 10 acres of land is allocated for implementation of this project.


Necessary space for Fuel Gas RMS shall be kept vacant within this 10 Acres of land, which will be constructed by
BPDB (Bangladesh Power Development Board).

Fuel:

Natural Gas

Operation Mode:

Gas turbine unit-Base load as well as peak load.


Combined cycle unit- Base load

Arrangement:

The Combined Cycle unit shall be of single shaft arrangement with Synchronous Self Shifting (SSS) clutch (to
allow continuous and reliable simple cycle operation) or multi shaft arrangement having 1:1:1 (One GT + One
HRSG + One ST) configuration.

Plant Design Parameters:

Sub-Tropical Monsoon
Temperature: 50C to 450C
Relative Humidity: 36% to 100%
Annual Rain Fall: 120 cm to 345 cm
Wind Velocity: 200 km/hr
Seismic Horizontal ground Acceleration: 0.2 g

SCOPE OF WORK:

The equipment provided shall be of proven type and design, having total net output at site condition (350C,
1.013 bar, 98% relative humidity) of 40010% MW consists of One (1) heavy duty industrial indoor packaged
type gas turbine generator (without any ancillary equipment, such as water/steam injection, evaporator, chillier
etc. for increasing power output)

One (1) heat recovery steam generator and one (1) steam turbine Generating unit.
For both single-shaft and multi-shaft arrangement, Gas turbine Unit shall be equipped with a bypass stack and
diverter damper to allow continuous and reliable simple cycle operation.
Simple Cycle Net Power output at site conditions (350C, 1.013 bar, 98% relative humidity): 65% (5% Variation is
allowed) of CC net Power Output .

Natural Gas Booster Compressors

The plant shall require centrifugal type gas booster compressors (GBC manufacturer will be Man Turbo / Atlas
copco/ Cameron, Country of origin will be Germany/ USA) as the supply pressure of natural gas is in the range of
80 - 150 psig.
The capacity of the compressors have to be 3 x 50% for maximum gas requirement of the plant including auto
changeover system without interrupting operation of the plant with rated pressure & flow and at all modes of
operation & at any temperature prevailing in the site of the GTG unit.
The gas booster compressors have to be centrifugal type, 6.6 KV motor driven. Appropriate control, sealing,
cooling & anti-surge system with all necessary ancillaries and auxiliaries shall have to be provided including
compressor house.

Cooling System:

Circulating water (Condenser cooling water and cooling water for closed loop heat exchangers) will be cooled by
Cooling Tower. Additional 25% of cooling tower cell to be kept as standby.
Condenser cooling water and cooling water for closed loop heat exchangers is supplied by 2 x 100% or 3 x 50%
capacity horizontal/ vertical, circulating water pumps located in the pump house adjacent to cooling tower
basin. Auto Changeover system among the pumps shall be provided.
The circulating water pumps shall take suction from Cooling Tower basin and feed the cooling water to the
condenser and cooling water to closed loop heat exchangers.
The pumps shall be installed in the pit below minimum water level of cooling tower. A circulating water pump
house shall be provided.
A manual operated butterfly valve shall be provided at each circulating water pump discharge and suction.
Motor operated vent valves shall be provided at the top of condenser water box to vent and shut the air
automatically.
A motor operated reversing valve shall be provided for condenser backwash purpose. A EOT crane shall be
provided in circulating water pump house.
2 x 100% or 3 x 50% capacity intake pumps shall be provided in the river water pump house to supply water to
the chemical plant, a portion of which will be used to produce demi water. Make up water to cooling tower
basin and to closed loop cooling water systems will be supplied from chemical plant after required chemical
treatment.