Purpose
This section lists all the master data you have to create to run the heuristic successfully in Supply Network Planning.
It lists all of the required fields and other data considered by the heuristic. Use this information as a checklist before
you run the heuristic to make sure you have created all the master data for your supply chain model.
For detailed information, see the field-level help (F1 help). For more information, see the APO
master data document.
If you want to work with local time zones, you have to set the Local Time Zone indicator
in Model and Version Management. If you do not set this indicator, we recommend that you use
the UTCtime zone. When using local time zones, we also recommend that you use the same time
zone for both the location and the planning calendar or for the location and the resource.
Process Flow
1. Create Locations (that are not product-dependent)
Location type
Storage resource
Handling resource
Calendar (production, shipping)
ATD category groups (for deployment, TLB)
Time zone
2. Create products
Tab page/screen
Field
Attributes
Gross weight
Volume
Units of Meas.
Define a conversion from the volume unit into the base unit of measure (based on the unit of measure of the
planning area)
Lot size
SNP 2
Procurement
Procurement type
GR/GI
Field
Standard
Bucket definiton - if you choose From Cont.Capacity, the PP/DS available capacity is used to generate
the available bucket capacity. You can also define a loss factor here (for maintenance or setup times for
example). If you choose Maintain, you must enter the following additional data:
Period type
Number of periods
Bucket capacity
Rate of bucket-oriented capacity utilization (%)
Capacity
You can use the Bucket Capacity button to display the available bucket capacity that was defined for the individual
buckets.
You can also still define an available capacity profile and capacity variants, and change the periodicity and capacity of
individual buckets. For more information, see the APO master data document.
Bucket Resources
Tab page/screen
General Data
Field
Resource
Resource category
Location if you define a location, the system adopts the time zone from the location master data; if
not, you have to enter the time zone
Time zone
Planner group
Factory calendar
Active variant
Reference resource
Planning Parameters
Standard Capacity
Capacity variants
button
Period type
Number of periods
Bucket capacity
Rate of bucket-oriented capacity utilization (%)
You can define up to 99 capacity variants in order to define the available capacity for specific validity periods.
Capacity variant
Valid from/to
Rate of bucket-oriented capacity utilization (%)
Quantity/rate definition
The system takes into account the default available capacity for periods without a capacity variant.
Definitions button
You use the quantities/rates definition to define the available capacity for the capacity variant.
Field
Initial screen
Plan number
Use of a plan: S (for SNP)
Operations
Description of PPM
Operation
Description (of operation)
Activities
In Supply Network Planning, each activity must be at least one day long or a multiple of one
day. Each operation can contain only one activity.
Components
Activity number
Description (of activity)
Activity type
Scrap %
Product
Input/output indicator
From date
To date
Unit of measure
Material consumption (variable)
Time-dependent data, if required
Modes
Resources
Resource (can enter several, but required only if resources are connected to this
PPM)
Unit of measure (required only if resources are connected to this PPM)
Calendar resource (for the entire PPM)
Variable and fixed bucket consumption (required only if resources are connected
to this PPM)
Time-dependent data, if required
Activity relationships -
Operation name
Activity number
6. You create transportation lanes in the Supply Chain Engineer or in master data.
Means of transport (using the Aggr. Planning key figure)
Transportation calendar
Procurement priority
For more information, see Supply Chain Model Set Up.
7. You have the option of creating quota arrangements in the Supply Chain Engineer or in master data.
Quota arrangement at location, external procurement relationship, or in-house production (PPM)
Quota arrangement (percentage)
If you do not define any quota arrangements, you must determine a procurement priority on the
transportation lane, or in the PPM for automatic source determination. If both quota arrangements
and procurement priorities have been defined, the heuristic includes the quota arrangements.
Result
Once you have set up the master data, you have to set up the supply chain model in the Supply Chain Engineer
before you can perform any planning runs.
Process
1. You create locations (that are not product-dependent).
Location type
Storage resource
Handling resource
Calendar
Time zone
2. You create products.
Tab
Page/Screen
Field
Header data
Attributes
Units of
Define a conversion from the volume unit into the base unit of measure (based on the unit of measure of the planning
Measure
area)
SNP 1
For customer demand, demand forecast, and the corrected demand forecast. Location-dependent penalty costs are also
available.
No delivery penalty
Delay penalty
Maximum lateness
SNP 2
SNP optimizer profile on theIntegration tab page whether the horizons are to be taken into
Procurement
GR/GI
Handling capacity consumption - if not specified, the optimizer uses the Volume specified on
theAttributes tab page as the default value.
Storage consumption - if not specified, the optimizer uses the Volume specified on the Attributes tab
page as the default value.
Procurement type
Planned delivery time (with external procurement)
Cost function (with external procurement)
Procurement costs
Production storage costs
Penalty costs for shortfall of safety stock
Field
Page/Screen
Standard
Capacity
Buckets If you choose Buckets from Conti., the PP/DS available capacity is used to generate the
available bucket. You can also define a loss factor (for maintenance or setup times, for example,)
here.If you choose Maintain Buckets, you must enter the following additional data:
Period type
Number of periods
Bucket capacity
Utilization rate for bucket-oriented capacity (%)
You can use the Available Bucket Capacity button to display the defined available bucket capacity for the individual
buckets.
You can also still define an available capacity profile and capacity variants, and change the periodicity and capacity of
individual buckets. For more information about this, see the SAP APO master data documentation.
You can define costs for the SNP optimizer in the capacity profile or in the quantity/rate definition for the individual
capacity variants (for details, see the Capacity variants button section below).
Planning
Parameters
Cross-period lot sizes (only valid for single-mixed resources!) - set this indicator if you want to run SNP optimizer
cross-period lot size planning on this resource.
Bucket Resources
Tab Page/Screen
Field
General Data
Resource
Resource category
Location when you define a location, the system refers to the time zone from the location
master data, otherwise you have to enter the time zone.
Time zone
Planner
Factory calendar
Active variant information about the active variant of a resource is required for liveCache
purposes only. If you have defined multiple capacity variants, you should specify the maximum
capacity variant as the active variant or, if this has not been defined, the normal capacity
variant. During the capacity check in interactive planning, the system considers the active
variant. For more information, see the explanation of the Capacity Variants button.
Planning Parameters
Standard Capacity
Period type
Number of periods
Bucket capacity
Utilization rate for bucket-oriented capacity (%)
Capacity Variants
Capacity variant
Valid from/to
Capacity utilization
Qty/rate definition
Button
You can define multiple capacity variants and use a status indicator to label the available capacity of this variant
as normal capacity, maximum capacity, or minimum capacity.You can define costs for using the normal or
maximum capacity and for falling below the minimum capacity in the quantity/rate definition or the capacity
profile of the resource.The SNP optimizer then takes these costs into account during planning. However, the
SNP optimizer only takes into account the minimum available capacity and the costs you defined for a capacity
variant with the status Normal Capacity for production resources.
You define the status indicator globally for all resources that have been assigned with the capacity variant. From
the resource initial screen, choose Current Settings Capacity Variants. The default value is a maximum
capacity (blank field). If you have defined multiple capacity variants with the same status, the system uses the
smallest numbered variant.
We recommend that on the General Data tab page you always define the maximum capacity variant as the
active variant or, if this has not been defined, the normal capacity variant.
The system includes the default available capacity for periods for which you have not created a capacity
variant. If the normal capacity is below the minimum capacity, the system uses the normal capacity as the
minimum capacity.If the normal capacity exceeds the maximum capacity, the system uses the normal capacity
as the maximum capacity.
The SNP optimizer does not consider the Workdays field for planning. The optimizer considers the entries
within this field when calculating the available capacity of the capacity variant but always uses the factory
calendar for planning.
Definitions Button - the You use the Qty/Rate Definition to define the available capacity for the capacity variant.
Quantities/Rates Tab
Page
Field
Initial screen
Plan number
Use of a plan: S (for SNP)
Operations
Activities
In Supply Network Planning, each activity must be at least one day long or a multiple of one
day. Each operation can also contain only one activity.
Components
Description of PPM
Single level costs
Cost function (cost profile)
Operation
Description (of operation)
Activity number
Description (of activity)
Activity category
Scrap %
Product
Input/output indicator
From date
To date
Unit of measurement
Material consumption (variable)
Time-dependent data
Modes
Resources
Resource (can enter several, but required only if resources are connected to this
PPM)
Unit of measure (required only if resources are connected to this PPM)
Calendar resource (for the entire PPM)
Variable and fixed bucket consumption (required only if resources are
connected to this PPM)
Time-dependent data
Operation name
Activity number
Results
After you have configured the master data, you must set up the supply chain model in the Supply Chain Engineer,
including the creation and maintenance of transportation lanes, before you can perform any planning runs.
Process Flow
You must enter the products and locations and assign the location products to a model.
You can enter the data, which should be taken into account during Supply & Demand Propagation, in
the fields listed below:
Product Master
Tab
Field
Attributes
Field
GR/GI
Optional Fields:
Goods rcpt time
Goods issue time
HandlCap consump. GR and unit
HandlCap consump. GI and unit
You must define all the master data at sub product level as well as at header product level. That
means that the system cannot automatically generate the master data from sub product level.
In the following setting recommendations, the use of the word should means that planning can
otherwise lead to incorrect or unexpected results.
Settings
Create Products and Locations
The following distinct features apply to aggregated planning:
You execute aggregated planning at header location product level. A header location product is the header
product of a location product hierarchy that you have generated from a location hierarchy and a product
hierarchy (see Create Hierarchies section). You create all the levels of these two-level hierarchies as standalone
products and locations in the product and location master data.
If you want to plan multiple levels (locations) of your network, the same header products should be defined in all
locations. There should not be any cycles in your network.
SNP disaggregation takes into account the rounding values and lot size parameters defined for the individual
header and sub products. If you want to ensure that during SNP disaggregation there are no remainders at
header product level, the rounding values defined at sub product level must be the same within a location
product hierarchy. The rounding value of the header product must be a multiple of the value at sub product
level. In addition, the minimum lot size at header level should be larger than or equal to the minimum lot size
defined at sublevel.
The procurement type defined at header product level should also be supported at sub product level.
The same SNP production horizon, extended SNP production horizon, and SNP stock transfer horizon should be
defined for all products of the location product hierarchy (including the header product).
Create Hierarchies
Standard hierarchy structures are already assigned to the standard planning area 9ASNP02. You can create
hierarchies for location products, resources, and PPMs based on these structures. In SNP Customizing, you can also
create your own hierarchy structures and assign them to your planning area. A standard hierarchy structure is also
predefined for a PDS hierarchy. However, it is not assigned to the standard planning area 9ASNP02, so you have to
assign it to your own planning area.
For more information, see the Implementation Guide (IMG) under Advanced Planning and Optimization Master
Data Hierarchy Define Hierarchy Structure.
The figure shows the different possible combinations when you create a location product
hierarchy. In this example, the product hierarchy consists of header product A with sub products B
and C. The location hierarchy consists of header location 1 with sub location 2. In addition, there
are location products A/1, A/2, C/2, and B/3, and location 3.
The generated location product hierarchy consists of the following levels: Header product/sub
location level (level 1) and sub product/ sub location level (level 2). A/2 is located on level 1 and
C/2 on level 2. C/2 is subordinate to A/2. A/1 is not a component of the generated location product
hierarchy since the header product/header location level was not defined in the generated
hierarchy. B/3 is not a component of the hierarchy since location 3 is not a component of the
location hierarchy and nor are there any header product/sub location nodes for B/3 (which would
then have to be called A/3).
Resource Hierarchy
If you want to display the resource consumption at header level and you are not using the same resources at header
and sub level in the PPMs or PDS, you should create a resource hierarchy so that the resource consumption is
displayed correctly. This hierarchy should be consistent with the PPM/PDS hierarchy used.
Process
1. Determine whether you want to use standard or extended safety stock planning.
2. If you use standard safety stock planning, enter the relevant data in the following fields on the Lot Size tab
page in the location product master:
Safety Stock Method Methods SB, SZ, SM for time-independent determination and methods MB, MZ,
MM for time-dependent determination.
Safety Stock - is considered by the system during safety stock methods SB and SM.
Safety Days Supply - Considered by the system during safety stock methods SZ and SM.
3. If you use extended safety stock planning, enter the relevant data in the following fields on the Lot Size tab
page in the location product master:
Safety Stock Method Methods AT, AS, BT and BS.
Service Level (%)
Demand Fcast Err. (%) Can also be calculated by the system using historical data.
RLT Fcast Error (%) Can also be calculated by the system using historical data.
Target Days Supply During safety stock methods AT and BT the system interprets this value as an order
cycle. During safety stock method BS the system uses this value to calculate the purchase order quantity.
Replen. Lead Time Can also be calculated by the system using historical data.
Min. SFT
Max. SFT
Process Flow
1. Create locations (choose the SNP tab page in the location master)
ATD receipt
ATD issue
You can define these fields in the location master as well as the location product master. During the
deployment run, the system first checks whether the category group is specified for the location product. If
not, the system checks the entry at location level. If no category group is defined for the location either,
the system uses the standard category groups ATR or ATI.
You define category groups in the Customizing for SNP under Basic Settings Maintain Category
Groups.
Push not allowed
You set this indicator to restrict the locations to which the system distributes the supply available during
deployment. For example, you may not wish to push supply to a location that has low demand.
2. Create products
Deployment profile
If you choose fair share rule C or push rule Q, the system uses the quota arrangements defined in the
Supply Chain Engineer (SCE); therefore, you must also define the quota arrangements when you set up
the supply chain model.
SNP supply profile
SNP demand profile
SNP 2 tab page
ATD receipt
ATD issue
(see above)
Lot Size tab page
Maximum lot size
Rounding value
If you have assigned an SNP lot size profile for transportation lanes to the relevant transportation lane, the
system first takes into account the rounding data that you have defined in this profile.
The deployment heuristic does not consider the minimum lot size or the rounding profile, which
you can define on the Lot Size tab page in the location product master data, as well as in the SNP
lot size profile for transportation lanes.
Note in addition that deployment heuristic values generally round down.
Result
After you have set up the master data, you must set up the supply chain model in the Supply Chain Engineer before
you can execute a planning run. This includes creating and maintaining transportation lanes.
For more information, see the SAP APO master data documentation.
If you want to work with local time zones, you have to set the Local Time Zone indicator
in Model and Version Management. If you do not set this indicator, we recommend that you use
the UTCtime zone. When using local time zones, we also recommend that you use the same time
zone for both the location and the planning calendar or for the location and the resource.
Process Flow
1. Create Locations (that are not product-dependent)
Location type
Storage resource
Handling resource
Calendar
ATD category groups (for deployment and the TLB); if you do not make any entries, the optimizer uses
default values
Time zone
2. Create products
Tab
Field
Page/Screen
Header data
Base unit
Properties
Shelf life
Units of Meas. Define a conversion from the volume unit into the base unit of measure (based on the unit of measure of the planning
area)
SNP 1
Penalty costs for customer demand, the demand forecast, and the corrected demand forecast (required only for products
that fulfill demand; not required for components):
No delivery penalty
Delay penalty
Maximum delay
SNP stock transfer horizon
SNP 2
This horizon is relevant if you are using Production Planning and Detailed Scheduling (PP/DS).
The deployment optimizer does not consider the forecast horizon. It calculates total demand as a total of the forecast
plus sales orders. If you want the deployment optimizer to consider the forecast horizon, you can set it up by making
changes in Customizing. To do this, see SAP note 412551.
Lot Size
Procurement
GR/GI
Handling capacity consumption. If not specified, the deployment optimizer uses the Volume specified
on the Attributes tab page as the default value
Storage consumption. If not specified, the deployment optimizer uses the Volume specified on
the Attributes tab page as the default value
Procurement type
Planned delivery time (with external procurement)
Cost function (with external procurement)
Procurement costs
Product-dependent storage costs
Safety stock penalty
3. Create Resources
You have the option of creating the following resource types for the deployment optimizer:
Single-mixed resource
Multimixed resource
Bucket resource
Transportation resource
For general information about creating resources, see the
resource section in the APO master
data document. Below is a list of the data that you must specify for deployment optimizer planning
in SNP.
To create transportation resources, use the same procedure as for creating bucket resources.
Bucket resources
Tab Page/Screen
Field
General Data
Resource
Resource category
Location if you specify a location, the system refers to the time zone from the location master
data; if not, you have to enter the time zone.
Time zone
Planner group
Factory calendar
Active variant information about the active variant of a resource is required for liveCache
purposes only. If you have defined multiple capacity variants, you should specify the
maximum capacity variant as the active variant or, if this has not been defined, the normal
capacity variant. The system considers the active variant during the capacity check in
interactive planning. For more information, see theCapacity variants button section below.
Planning Parameters
Standard Capacity
Period type
Number of periods
Bucket capacity
Rate of bucket-oriented capacity utilization (%)
Capacity variants
button
Capacity variant
Valid from/to
Rate of bucket-oriented capacity utilization (%)
Quantity/rate definition
You can define multiple capacity variants and use a status indicator to label the available capacity of this
variant as normal capacity, maximum capacity, or minimum capacity. You can define costs for using the
normal or maximum capacity and for falling below the minimum capacity in the quantity/rate definition or the
capacity profile of the resource.The deployment optimizer then takes these costs into account during planning.
However, the optimizer only takes into account the minimum available capacity and the costs you defined for a
capacity variant with the status Normal Capacity for production resources.
You define the status indicator globally for all resources that have been assigned with the capacity variant.
From the resource initial screen, choose: Current Settings Capacity Variants. The default value is a
maximum capacity (blank field). If you have defined multiple capacity variants with the same status, the
system uses the smallest numbered variant.
We recommend that on the General Data tab page you always define the maximum capacity variant as the
active variant or, if this has not been defined, the normal capacity variant.
The system includes the default available capacity for periods that you have not created a capacity variant for.
If the normal capacity is below the minimum capacity, the system uses the normal capacity as the minimum
capacity. If the normal capacity exceeds the maximum capacity, the system uses the normal capacity as the
maximum capacity.
The deployment optimizer does not consider the Workdaysfield for planning. The optimizer does consider the
entries within this field when calculating the available capacity of the capacity variant but always uses the
factory calendar for planning.
Definitions button
You use the Qty/Rate Definition to define the available capacity for the capacity variant.
the Quantities/Rates
tab page
Result
After you have set up the master data, you must set up the supply chain model in the Supply Chain Engineer before
you can execute a planning run. This includes creating and maintaining transportation lanes.
See also:
APO master data documentation
Supply Chain Model Setup
For more information about master data settings that you can make for the additional functions of
TLB in SAP SNC, see the SAP SNC documentation under Replenishment Transport Load
Builder Additional TLB Functions in SAP SNC.
Settings
Product Master Data
You make the following settings in the product or location product master data:
Tab Page
Attributes
Field
Stacking Factor
This field is relevant if you want to use the Pallet Positions TLB parameter in the TLB profile
The stacking factor indicates how many pallets of a product can be stacked on top of each other. For mixed
pallets, the system uses the smallest stacking factor of all products.
Units of measure
For the Weight, Volume, and Pallet Positions parameters (only SNP TLB) that you use in the TLB profile, you
must define the conversion of the parameter unit of measure to the base unit of measure for the product.
SNP 2
Rounding Value
The TLB uses the rounding value for building transport loads. However, the TLB first uses the value that
you have defined in the transportation lane, that is, in the lot size profile (SNP) or transportation guideline
set (SAP SNC). If no value is assigned, the TLB uses the value specified here or 1.
So that the SNP TLB can use this rounding value, you must set the relevant indicator in the SNP
Customizing under Basic Settings Maintain Global SNP Settings. Otherwise, the SNP TLB uses the
rounding value from the transportation lane.
Goods receipt/goods
issue
Handling unit G
The TLB can only pack products with the same handling unit group together in the same handling unit (HU).
In the SNP TLB, which does not use handling units, this field applies to pallets.
Max. Coverage
The TLB considers the maximum coverage time duringshipment upsizing. The system only brings forward
as many deployment stock transfers as are necessary to cover demand within this time period.
Shipment Upsizing
For the location product, you specify whether shipment upsizing is allowed and whether it is permitted
beyond the maximum coverage time period.
Loading grp.
The TLB considers the loading group for the straight loading loading method.
Not Palletable
You specify whether the location product may be stacked on pallets. If you set this indicator, the TLB does
not consider any pallet positions for this product.
Field
Initial screen
Loc. Type
This field is relevant if you want to use transportation zones. For more information, see Use of Transportation
Zones.
SNP
Field
TLB profile
You must assign a TLB profile that you created previously.
Loading Method
You specify whether you want the TLB to consider thestraight loading or load balancing loading method.
Pull-In Horizon
If the TLB carries out a shipment upsizing, it considers the pull-in horizon.
T. Lot Prfl
This field is only considered by the SNP TLB. You can enter a profile here that you created in the SNP
Customizing under Basic Settings Profiles SNP Lot Size Profiles (Transportation Lanes). The TLB
considers the value defined in this profile (see above).
Application:
o Demand Planning (DP)
o Supply Network Planning (SNP)
o Capable-to-Match Planning (CTM)
o Production Planning and Detailed Scheduling (PP/DS)
In SAP APO, the production data structure is used as a source of supply.
Constraints
Engineering Change Management (ECM) is not supported for operations, activities, modes and capacity
requirements.
Only data that is valid at the provided routing explosion date is considered for the PDS.
Only bucket or mixed resources are supported (or else an error is generated during transfer).
No product variants supported; configuration is ignored.
Fixed duration (multiple of days) is required.
Breaks between activities are ignored.
Only linear chains of activities are modeled.
Relations in recipes are checked and error is generated if not linear.
Only the standard sequence of the routing is considered.
Time-dependent process parameters (TDPP) only use BAdI SNP-PPM Generation: It is not possible to generate
SNP-PPMs from a PP/DS-PDS. Instead, the generation of the SNP-PDS from SAP ERP should be used.
In Supply Network Planning, you can use the production data structure as an alternative to the production process
model (PPM) Similar to the PPM, the PDS is a combination of the work plan and the bill of materials. Compared to
the PPM, the PDS offers more flexible ways of combining and reusing data from individual work plans and bills of
materials.
The SNP PDS is supported by all SNP planning processes, except for demand and stock propagation. There is a
further restriction for the Delete Transaction Datafunction. With this function, you cannot select or delete according
to specific PDSs.
The following options are available for creating an SNP production data structure:
Generation of an SNP Production Data Structure from iPPE Data
You can either create the iPPE data in a connected DIMP system, and then transfer it to an SAP SCM system
using the APO Core Interface (CIF), or you can create the data directly in the SAP SCM system. Note that, for
SNP, you must use an SNP work plan in the iPPE data. You then create a product version for the iPPE data, and
generate an SNP production data structure from there.
You determine the validity of a product and a location in the production version, as in a PPM or an SAP ERP
production version. You can also define costs and enter co-products. If necessary, you can also specify a PP/DS
production version in the production version, which is considered by PP/DS when converting SNP orders into
PP/DS orders.
Generation of an SNP Production Data Structure from SAP ERP Data
You can generate the SNP PDS directly from work plan, bill of materials, and production version data in SAP
ERP. To do this, you must select SNP or SNP Subcontracting as the PDS type in the CIF integration model. The
relevant SAP ERP data is then transferred to the SAP SCM system automatically, and an SNP PDS is then
generated from it in the SAP SCM system.
If you select SNP Subcontracting, the master data (also for components) is automatically created at the
subcontractor location. The transportation lane between plant and subcontractor is also generated automatically
(this is not possible when using SNP PPM).
You can also influence the generation of a SNP PDS from SAP ERP data with the following Business Add-Ins
(BAdIs).
o /SAPAPO/CURTO_SNP: You can calculate bucket consumption of resources with the
CALC_BUCKET_CONSUMPTION method of this BAdI. This method, which executes standard
calculation of bucket consumption, is active automatically. However, you can change the calculation.
o /SAPAPO/CULLRTOSNP: If you want to carry out optimization-based SNP planning, you can use the
FILL_COST_FIELDS method of this BAdI to fill the SNP PDS cost fields.
You can use both BAdIs to change the SNP PDS data to be generated.
Once an SNP PDS has been generated, you can only display that source of supply. You can make changes in the
iPPE or SAP ERP. You must then, however, regenerate the PDS.
The SNP PDS is used in SNP like the SNP PPM. The source determination considers all existing sources of supply,
irrespective of whether it concerns an SNP PPM or an SNP PDS.
NOTE:
Note that most SNP PPM procedures also apply for the SNP PDS. This is not always explicitly mentioned in SNP
documentation
You cannot generate an SNP PDS from Production Planning and Detailed Schedulingstructures (PP/DS PDS).
The SNP PDS can also be used in CTM planning.
You use this generation function to generate SNP PPMs from PP/DS PPMs for one individual lot size and
exactly one PP/DS PPM mode combination. Each generation report run can generate exactly one SNP PPM
corresponding to one specific PP/DS PPM mode combination. For more information, see
SNP PPM generation without lot size margin.
For example, you can use this function when SNP PPM generation with lot size margins is not possible.
Prerequisites
You have initialized at least one planning version for at least one SNP planning area.
Note
The term SNP planning area refers to a planning area using one of the SNP standard master planning object
structures 9ASNPBAS or 9ASNPSA.
To use time series you need an SNP planning area that contains time series key figures. For more information,
seePlanning Area Administration.
Process
SNP Master Data Update
1.
/SAPAPO/TSQUEUE). The system automatically performs change notification and registration and immediately
after the master data change.
2. SNP Queue Update
The system updates SNP queue during planning area initialization, at the start of SNP interactive planning or any
other SNP planning application.
The SNP queue update deletes the entries in the level one queue and by processing them creates entries in the
level two queues (in table /SAPAPO/TSQMLO). Entries in level two queues are more detailed than entries in
level one queue, and they also describe the required changes in SNP master data.
By default the queue update is executed in a background process to speed up the startup of interactive planning.
You can change the runtime behavior of queue update in Customizing for Advanced Planning and
Optimization under Supply Chain Planning Supply Network Planning (SNP) Basic Settings Maintain
Global SNP Settings Change the runtime behavior in the TS: Que. Proc. field.
You can also run the queue update process manually with the /SAPAPO/TS_LCM_QUEUE_UPDATE report
3. SNP Master Data Update
At the start of an SNP application (for example, SNP heuristic), the system updates SNP master data based on
the entries of the level two queue. SNP master data update is also performed as a part of planning area
initialization or at the start of SNP planning applications. SNP interactive planning performs the master data
update when you load a selection to the shuffler.
4. Delta Initialization of Planning Areas
The system updates the time series whenever planning area initialization is carried out. For more information,
see Delta Initialization of Planning Areas.
The following error messages may occur during planning:
E207(/SAPAPO/TSM) No liveCache anchor found
E020(/SAPAPO/OM_TS) Time series does not exist
E219(/SAPAPO/TSM) Invalid data status
E230(/SAPAPO/TSM) No plannable characteristic combinations available
E001(/SAPAPO/SDP_MD) Planning object could not be determined
E085(/SAPAPO/SDP) Error reading data - planning book cannot be processed
In most cases, errors occur because the time series objects are not updated before planning with planning area
initialization. If you run planning area initialization and it does not solve the error, run the following consistency
checks:
Consistency check for the time series network
On the SAP Easy Access screen, choose Advanced Planning and Optimization Supply Network Planning
Environment Current Settings Time Series Administration Consistency Check of Time Series
Network (transaction /SAPAPO/TSCONS).
For more information, see SAP Help Portal at http://help.sap.com SAP Business Suite SAP Supply Chain
Management SAP SCM 7.0 Application Help SAP Supply Chain Management (SCM) SAP Advanced
Planning and Optimization (SAP APO) Demand Planning Demand Planning Process Planning Area
Administration Planning Area Editing Planning Areas and Additional Functions Consistency Checks for
Planning Areas and SAP Note 577038.
Performance Optimization
The performance of SNP master data management processes affects the performance of all SNP planning
applications. You can optimize SNP master data management in the following ways:
Master data changes
Changing master data too frequently affects the performance of SNP master data update processes negatively.
Therefore, we recommend that you release master data changes periodically, for example, on a daily basis, and
followed by delta initialization of planning areas.
Regular planning area initialization
If you use SNP planning areas with time series key figures, initialize the planning areas regularly to keep the
liveCache time series up-to-date and to reduce the number of entries in level two master data queues. Initialize
planning areas for all previously initialized planning versions.
De-initialization of unused planning versions
If there are planning versions that you do not use anymore, you should de-initialize them to decrease the data
load on SNP master data update processes, especially the number of entries in level two master data queues.
Monitoring SNP Master Data Queue Update in the Computing Center Management System
(CCMS)
As of SCM 7.0 there are monitoring entries available in CCMS to monitor the status of SNP master data queues.
You can monitor the runtime of queue update process, the number of entries in each queue, the number of entries
belonging to a specific planning area and planning version combination, and the time spent since the last
initialization of a planning area.
To monitor SNP master data queue update, complete the steps below:
1. To call the CCMS, on the SAP Easy Access screen, choose Advanced Planning and Optimization APO
Administration Integration Monitor CCMS Monitor Sets .
2. To call the APO monitor set, choose SAP SCM Monitor Templates APO Monitor SNP Monitor in the
CCMS hierarchy tree.
3. Choose SNP Monitor in the CCMS hierarchy tree.
You can navigate to individual monitors grouped by system and client by opening the corresponding nodes of
the hierarchy tree. Choose node SNP Monitor clnt. x SNP Master Data and Timeseries .
4. The monitoring entries are grouped to 3 monitoring objects:
1. SNP MD queue lev. 1
Contains the number of entries in the level one queue and the runtime of the last queue update
2. SNP MD queue lev. 2
Contains the number of entries in each level two queue
3. SNP Time Series
Contains the number of corresponding entries in the level two queues for each initialized SNP planning area
and planning version combination, as well as the time spent since the last initialization
5. The colors of the entries help you to recognize problems at the highest level. For more information about the
color legend, see Display Types and Views of the Alert Monitor.
6. You analyze the problems and can go directly to the relevant transaction to receive more details or to rectify a
problem.
For more information about the CCMS, see SAP APO Monitoring with CCMS.
Purpose
In this process, you create a model name and assign the model to a planning version so that you can you can model
the supply chain in the Supply Chain Engineer in the next step. You must define the model name before you can set
up the supply chain model.
Creating multiple versions of the model allows you to perform simulative planning and what-if scenarios without
corrupting the supply chain model.
Only the active version receives data from R/3 via CIF.
Process Flow
Create a model name and give it a description.
Assign the model to at least one planning version
Planning version name and description
SNP: Change planning active (set flag to active)
PP/DS: Change planning active (set flag to active)
If you use PP/DS, you must set the PP/DS: Change planning active and SNP: Change planning
active indicators to enable automatic planning to be triggered or planning file entries to be created
when changes relevant to planning occur. These indicators are important when converting Supply
Network Planning orders into PP/DS orders and vice-versa. You must set these indicators for the
target planning version; otherwise you will have to plan all orders manually.
See also:
APO Master Data documentation
APO Supply Chain Engineer docume
The SNP planners then revise these copies within their individual planning environments. Each SNP planner has his
or her own planning section (product and location):
The SNP planners then copy the revised planning versions back into the active version:
You have to ensure that the plans of the various SNP planners do not overlap since, when the individual planning
versions are copied back into the active version, the version that is copied back last overwrites the data from all the
previously copied versions.
Prerequisites
You have created one or more copies of the active version (000) as planning versions.
An SNP planner has been assigned to all the location products in master data.
You have authorization for the relevant locations and products to copy the data from the planning version back
into the active version (authorization object C_APO_PLNR). The SNP planner controls authorization.
Features
You can use this function to copy four SNP key figures from a planning version back into the active version. PP/DS
order data cannot be copied. The following is a list of the SNP key figures:
Planning area: Indicates the SNP planning area that key figures are to be copied from into the active version.
Key figures: Indicates the SNP key figures that are to be copied back.
Planning version (source): Name of the planning version to be copied back.
Planning version (target): Name of the active version. You cannot modify this entry.
Product: Name of one or more location products whose previously chosen key figures are to be copied back.
This entry is optional. If you do not make an entry here, the key figures of all the location products that you are
authorized to use and that belong to the underlying model are copied back.
Location: Limits you to specific locations whose location products the key figures are to be copied back from.
This entry is optional. If you do not make an entry here, the key figures of the location products you are
authorized to use are copied back from all locations belonging to the underlying model.
Planner: Limits you to specific SNP planners whose assigned location products the key figures are to be copied
back from. This entry is optional. If you do not make an entry here, the key figures of the assigned location
products you are authorized to use are copied back for all SNP planners belonging to the underlying model.
The copying of planning versions back to the active version is not a copy process in the strict sense of the word. In
fact, the SNP key figures concerned are first deleted from the active version and then recreated in it from the
planning versions.
Test Run
The system runs the entire copy process as a simulation without actually copying the data into the active version. It
runs through all stages of the copy process (authorization checks, log file creation, and so on) apart from the final
copy into the active version. To then start the actual copy process, remove the Test Run indicator.
During the copy process, stop Core Interface (CIF) using either this function, the monitor, or a
background job in order to prevent lock problems from occurring.
To stop CIF queues, you need authorization object S_ADMI_FCD.
Constraints
SNP orders are not permitted to be published directly into the SAP R/3 system. Communication with the SAP R/3
system is only permitted to take place using the Production Planning and Detailed Scheduling (PP/DS) component.
The system performs a technical check of the corresponding Customizing for this.
It is not permitted for any releases to be made into or out of SNP until all the planning versions that came from an
active version have been copied back into this active version. In particular, no order is permitted to be converted for
PP/DS and no data can be transferred into the active version from Demand Planning.
An authorization check is made during the copy process. You can only copy key figures for location products whose
SNP planner is assigned to your user.
The copy process ignores scheduling agreement schedule lines.
Activities
1. Start transaction: Supply Network Planning Environment Planning Version Merge(/SAPAPO/VERMER).
2. Enter the necessary SNP key figures, planning version, and required restrictions (product, location, SNP
planner).
3. If required, set the following options:
Do Not Permit Errors
Test Run
Stop CIF Queues
Choose Execute
to start the function.
4. Choose Supply Network Planning Environment Planning Version Merge: Message Log to display the log
file.
You can also call up the log file directly from transaction /SAPAPO/VERMRM.
Purpose
The supply chain model consists of individual nodes (locations) and links (transportation lanes). You can assign
several different planning versions to a model. It is also possible to create multiple models for simulation purposes.
Only the active version receives data from the R/3 system through the Core Interface (CIF).
Prerequisites
You have to set up the master data for planning in accordance with how you are using this model:
Locations
Resources
Products
PPMs
For more information, see the corresponding SNP documentation sections on setting up master data for the
individual planning methods (the heuristic, the optimizer, and so on).
Process Flow
You create a model and assign objects to it that you want in your model:
Locations
Resources
Products
PPMs
For more information, see
APO Model Maintenance.
2. Add transportation lanes to the model. For general information about creating transportation lanes, see
Transportation Lane Maintenance. The SNP-relevant fields are listed below:
Header data:
Transportation planner
The product procurement area:
Procurement priority (heuristic and deployment only)
Distribution priority (deployment only)
From and to lot sizes (heuristic only)
External procurement relationship data (transferred using CIF this is relevant when working with scheduling
agreements)
The means of transport area:
Aggregated planning (indicator must be set)
Transportation calendar
Transportation duration
Additional retention period
Transportation distance
Transportation costs (optimizer only)
Cost function (optimizer only)
TLB profile (for the Transport Load Builder)
Bucket offset (optimizer only)
Period factor (heuristic only)
Discrete means of transport (optimizer only)
The product-specific means of transport section:
Transportation costs (optimizer only)
Consumption (of transportation resource)
SNP lot size profile for transportation lanes
Stacking factor (for the Transport Load Builder)
3. You maintain quota arrangements, if required. For more information about the role of quota arrangements in
supply source determination within the SNP heuristic, see
Source Determination (Heuristic). The optimizer creates quota arrangements automatically during the
planning run. For more information about creating quota arrangements, see
Quota Arrangement
Maintenance.
See also:
APO master data documentation
APO Supply Chain Engineer documentation