Gujarat Solar Park

Worlds first Multi developer, Multi facility, Multi


Technology and Multi beneficiary solar park
At Charanka Village, Dist Patan - Gujarat

GUJARAT SOLAR PARK: Redefining the concept


First of its kind in the world
Fastest Implementation
Multi Developer, Multi Facility, Multi Technology and Multi

Beneficiary Solar Park


Integrated hub of Solar power generation
Unique Integration of Environment benefit , Infrastructure
development and Social upgradation
Benchmark project for other states.
Hybridization of Wind and Solar
Upgradation in the standard of living in the rural area

Project Location
Charanka Village, Santalpur Taluka,
Patan District, Gujarat

Little Runn of
Kutch

Kutch Branch Canal

The
Site
Charanka
Village
Radhanpur
Santalpur

Nearest Urban
Area: Palanpur

Total Identified Land by


GPCL: ~ 2,500 Ha

Nearest NH: NH
15 @ 20 km

Land Selected for the


Proposed Park: ~ 2000 Ha

Nearest Rly
Station: Santalpur

Ownership: ~ 60% Govt.


Land (mostly wasteland)

Details of infrastructure facilities provided in solar park


Roads

Entrance

Raw Water Pipeline

Security Towers

Rehabilitation of existing nala

Training Institute

Rehabilitation of existing reservoir

Common facilities

Water Treatment Plant

Helipad

Water Distribution Network

Water Tank (GLSR/OHT)

Green belt / buffer

Sewage Treatment Plant

Water to meet the irrigation demand

Landscaping

Surya Teertha

Internal (plot)fencing

Land levelling / Grading

Fire Station

400/220/66 KV & 66 KV Auxiliary SS


Auxiliary Power Distribution Network
Telecom Network

Fencing (Boundary)
Compound wall
4

Master Plan
Patrolling road
Internal roads
Nala
Reservoir
Water Pipe Line
Power generation capacity : 500MW
Present Installed Capacity: 214 MW

No. of Developers : 21
Well defined Plot Allotment Policy
and timely allocation of plots to
developers

Benefits over Conventionally defined


Solar Park
Tangible Benefits:

Intangible Benefits:

Basic infrastructure development benefits

Increase in Water conservation

shared with local villages


Communication network

Increase in Vegetation cover

Provision of Irrigation water

Reduction in desertification process

Developer investment of Rs. 3600 Cr

Carbon Emission reduction

(Till date)
Employment generation of about 1500

labours
Economic upliftment of rural area

Increase in aesthetic value of area


Social upliftment

Fastest Commissioning

Foundation Laying Ceremony 30 Dec, 2010

Dedication Ceremony to the nation 19 Apr, 2012


214 MW Solar Project s Commissioned

Gujarat Solar Park at a glance

Aerial View of Solar Project


Development

Aerial View of Observatory Deck


constructed within Gujarat Solar
Park for 360 Degree View of
overall Solar Park

Ocean of Solar PV Panels spread across the Solar Park

Panoramic View of Gujarat Solar Park