Documente Academic
Documente Profesional
Documente Cultură
Calc no
DOC NO.
File
DOC NO.
Project title
GN INFILL PROJECT
Phase/CTR
Client
Calculation title
Calculation objective
MAJOR OIL
Pipeline Stability & Weight Coating Calculations
Deliverable
Page
3
1. To determine the on-bottom stability of various GN Ubie phase 2 pipelines in the liquefied swampy terrain and in a typical water crossing
2. If required, calculate the thickness of concrete weight coating (of density 3040 Kg/m3) to give the pipeline a negative buoyancy factor of 1.3
3. Analysis based on the worst case scenario of "decommissioned case corroded pipe empty".
Calculation method
The calculations are performed in accordance with the following general equation:
Wpipe
Wbuoy
Where
>= 1.3
Method of analysis is based on in-house spread sheet detailed in the section Method of Analysis
Basic Data & Assumptions
The following basic data and assumptions were applied:Safety Factor
= 1.3
= 1.02
= 1.442
Density of concrete
= 3040 Kg/m3
Concrete coating of less than 25mm is practically not achivable. Therefore a minimum concrete thickness of 25mm will apply where required.
Further Assumptions
g
pp
p and water swamp
p or water
1)) Effect of marine g
growth has not been considered as there is little evidence of significant
marine g
growth in the applicable
swamp
conditions.
2) Stability analysis and weight coating calculations for river crossings have been based solely on forces due to buoyancy of the river water. Forces (lift and
drag) due to river current and tidal velocities have not been considered, because the pipelines will be trenched.
3) Calculated wall thickness less corrosion allowance has been used for the weight coating analysis.
References
1
2
March 2002
Conclusions
1) On-bottom stability analysis has been carried out for the various GN Ubie phase 2A Pipelines and weight coating thicknesses have been determined
where required. Analysis and results are presented in the individual work sheets, while the recommended coating thicknesses are in the summary sheet.
2) The required Safety Factor of 1.3 - with the determined weight coating thickness - is very adequate to ensure on-bottom stability of the Pipeline under
buoyancy conditions.
3) A minimum concrete thicknessof 25mm will always be applied for all submerged pipeline river crossings as mechanical impact protection.
C01
12-Apr-11
SH
ET
KLA
A02
A01
R01
16-Feb-11
13-Jan-11
13-Dec-10
SH
SH
SH
ET
ET
ET
KLA
KLA
KLA
REV
DATE
DESCRIPTION
BY
CHECKED
APPROVED
Page 1 of 4
Calculation Checklist
Calc no
DOC NO.
File
DOC NO.
Elec file location
Project title
GN INFILL PROJECT
Phase/CTR
Client
MAJOR OIL
Deliverable
Calculation title Pipeline Stability & Weight Coating Calculations
Page
4
Please check boxes for all applicable items checked or delete if not appropriate:
Calculations:
12-Apr-11
16-Feb-11
13-Jan-11
13-Dec-10
SH
SH
SH
SH
ET
ET
ET
ET
KLA
KLA
KLA
KLA
REV
DATE
DESCRIPTION
BY
CHECK
APPROVED
Page 2 of 4
Calculation Sheet
Proj No
Phase/CTR
Calc No.
DOC NO.
Project
GN INFILL PROJECT
Deliverable
Subject
Client
MAJOR OIL
Sheet
Pipeline
REV
DATE
BY
CHK
APP
C01
4/12/2011
SH
ET
KLA
SYMBOLS
INPUT
ODpipe
in/m
DATA
WALL THICKNESS
WTpipe
mm/m
WTcorr
mm
WT FBE
mm
WT Adh
mm
WT3LPE
mm
WTconc
mm
WTmar
mm
pipe
fbe
Kg/m
rAdh
Kg/m
3 LPE
Kg/m3
conc
Kg/m
mar
Kg/m
PRODUCT DENSITY
cont
Kg/m3
mud
water
Kg/m
Case 2
Case 3
Case 4
Case 5
Case "n"
Values for Concrete Coating thickness obtained using Goal Seek with SG >= 1.3
FBE DENSITY
PIPE DENSITY
Case 1
UNIT
Kg/m3
3
3
3
Kg/m3
INTERNAL DIAMETER
IDpipe
DATA
OVERALL DIAMETER
ODtotal
m
2
Apipe
Asteel
PIPE WEIGHT
Wpipe
Kg/m
W FBE
Kg/m
N/m
N/m
ADHEHSIVE COATING WEIGHT
W Adh
Kg/m
N/m
COATING 3 LAYER PE WEIGHT
W 3 LPE
Kg/m
N/m
Wconcrete
Kg/m
Wmarine
Kg/m
PRODUCT WEIGHT
Wproduct
Kg/m
Wdry
Kg/m
Wbuoy
Kg/m
Wmud
Kg/m
N/m
N/m
N/m
TOTAL WEIGHT IN AIR
N/m
N/m
WEIGHT OF PIPE IN WATER
Wsuba
Kg/m
Wsubw
Kg/m
Wsubp
Kg/m
N/m
N/m
N/m
SPECIFIC GRAVITY OF PIPELINE IN WATER
SGwater
1.3
SGmud
1.3
YES/NO
YES/NO
WTconc
mm
Recommended Concrete Coating thickness from values in Row 21 rounded to the nearest 5mm
WTconc
mm
Recommended Concrete Coating thickness from values in Row 21 rounded to the nearest 5mm
Page 3 of 4
Calculation Sheet
Proj No
Phase/CTR
Calc No.
Project
File
GN INFILL PROJECT
DOC NO.
Subject
Client
MAJOR OIL
Pipeline
Sheet
REV
DATE
BY
CHK
APP
C01
4/12/2011
SH
ET
KLA
SYMBOLS
UNIT
m
Case 1
Case 2
Case3
Case4
Case3
Installed '12" Corroded 12"+ Installed '12" Corroded '12" Installed '12"
+3LPE df 0.72 3LPE DF 0.72 +3LPE DF 0.6 +3LPE DF 0.6 +3LPE DF 0.5
SWAMP
SWAMP
RIVER X
RIVER X
RIVER X
0.3239
0.3239
0.3239
0.3239
0.3239
Case4
Corroded '12"
+3LPE DF 0.5
RIVER X
0.3239
INPUT
ODsteel
DATA
WALL THICKNESS
WTsteel
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
WTcorr
mm
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
WT FBE
mm
0.5000
0.5000
0.5000
0.5000
0.5000
WT FBE
mm
0.5000
0.5000
0.5000
0.5000
0.5000
0.5000
WT 3 Layer PE
mm
3.0000
3.0000
3.0000
3.0000
3.0000
3.0000
WTconc
mm
0.0000
WTmar
mm
4.8393
20.9921
0.5000
0.0000
3.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
7850.0000
7850.0000
7850.0000
7850.0000
7850.0000
7850.0000
Kg/m
FBE DENSITY
pipe
fbe
1950.0000
1950.0000
1950.0000
1950.0000
1950.0000
1950.0000
fbe
Kg/m
1400.0000
1400.0000
1400.0000
1400.0000
1400.0000
1400.0000
coat 3 LPE
conc
mar
cont
mud
water
Kg/m3
940.0000
940.0000
940.0000
940.0000
940.0000
940.0000
Kg/m
3040.0000
3040.0000
3040.0000
3040.0000
3040.0000
3040.0000
Kg/m3
0.0000
Kg/m3
1.2000
Kg/m3
1442.0000
1442.0000
1442.0000
1442.0000
1442.0000
1442.0000
1020.0000
1020.0000
1020.0000
1020.0000
1020.0000
1020.0000
STEEL DENSITY
3
3
Kg/m
Kg/m
0.0000
1.2000
0.0000
1.2000
0.0000
1.2000
0.0000
1.2000
0.0000
1.2000
IDsteel
OVERALL DIAMETER
ODtotal
Apipe
2
2
#REF!
#REF!
0.3405
0.3728
#REF!
0.3309
#REF!
0.3369
#REF!
0.3309
#REF!
0.3309
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Asteel
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
PIPE WEIGHT
Wsteel
Kg/m
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
N/m
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
W FBE
Kg/m
0.99
0.99
0.99
0.99
0.99
N/m
9.74
9.74
9.74
9.74
9.74
0.99
9.74
0.72
0.72
0.72
0.72
0.72
0.72
W FBE
Kg/m
N/m
7.02
7.02
7.02
7.02
7.02
7.02
W 3 LPE
Kg/m
2.91
2.91
2.91
2.91
2.91
2.91
N/m
28.57
28.57
28.57
28.57
28.57
28.57
Wconc
Kg/m
15.56
70.74
0.00
9.59
0.00
0.00
N/m
152.61
693.74
0.00
94.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Wmar
Kg/m
PRODUCT WEIGHT
Wcont
Kg/m
N/m
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Wdry
Kg/m
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
N/m
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
N/m
Wmud
Wsuba
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
0.00
#REF!
Kg/m
92.90
111.36
87.69
90.90
87.69
87.69
N/m
911.31
1092.42
860.24
891.73
860.24
860.24
Kg/m
131.33
157.43
123.97
128.51
123.97
123.97
N/m
1288.34
1544.39
1216.15
1260.66
1216.15
1216.15
Kg/m
#REF!
#REF!
#REF!
#REF!
#REF!
N/m
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Wsubw
Kg/m
N/m
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Wsubp
Kg/m
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
N/m
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
SG Mud
Page 4 of 4