MINISTRY OF HOUSING
AL-KHARJ SITE (PACKAGE-02)
Employer:
Consultant:
Contractor:
Apply on:
Sheet1of1
MONTHLY STATEMENT NO.00
Employer:
Consultants:
Contractor:
Bill No.:
Description:
Item No.:
ELECTRICAL UTILITIES
(Compact Package Substation)
(1.0) 1.3
Sub-Bill No.
Description of Work
Unit
BOQ Estimated
(Quantity)
Upto Date
(Quantity)
Previous Month
(Quantity)
This Month
(Quantity)
7=5-6
ELECTRICAL UTILITIES
1.0
1.3
Nos
68.000
66.000
Nos
68.000
66.000
66.000
66.000
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd. (SAPL)
Sheet1of1
MONTHLY STATEMENT NO.00
Employer:
MINISTRY OF HOUSING (MOH)
Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.
DIVISION 5 - Earthwork
(Water Drainage) Backfilling including warning tape
(5/7/6)
Sub-Bill No.
Description
Unit
3
Zone - A
Zone - B
Zone - C
Zone - D
Remarks
4 = Backfill (A)
5 = Backfill (B)
6 = Backfill (C)
7 = Backfill (D)
Water Drainage
5/7/6
Nos
26.000
14.000
16.000
10.000
66.000
26.000
14.000
16.000
10.000
66.000
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Cum
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd. (SAPL)
Employer:
Consultants:
Contractor:
Bill No.:
Description:
Item No.:
Sr.
No.
Alignment Name
Zone
Grids
Road Type
(Width)
Unit
Substation
Name
Stations
A-01
Grid-02
18 meters
Nos
SS-A1-1
1+272.000
A-02
Grid-02
Nos
SS-A1-3
A-03
Grid-03
18 meteres
Nos
SS-A1-2
A-06
Grid-03
18 meteres
Nos
A-16
Grid-03
18 meteres
Nos
A-15
Grid-04
18 meteres
CR-07
Grid-01
36 meteres
A-29
Grid-01
A-33
Grid-01
10
A-34
Grid-01
11
A-08
Grid-07
12
A-11
Grid-07
13
A-32
14
A-17
15
A-18
16
17
Profile
Grade
Offset
from
CL
10
9.000
469.203
SE
Side
L/S
R/S
11
12
13
RS
-2
Cover
Level
Excavation
Level
Top of PCC
Level
14
15 = (14-0.80)
16 = (15+0.10)
468.583
468.683
469.383
17
18
19
4.50
2.50
1.20
Quantity
Remarks
20
24
1.000
HOLD
2+034.000
474.471
9.000
RS
-2
474.651
473.851
473.951
4.50
2.50
1.20
1.000
SS-A1-5
8+034.000
476.352
9.000
RS
-2
476.532
475.732
475.832
4.50
2.50
1.20
1.000
SS-A2-1
16+163.562
480.116
9.000
LS
-2
479.936
479.136
479.236
4.50
2.50
1.20
1.000
Nos
SS-A2-2
16+385.000
478.909
9.000
RS
-2
479.089
478.289
478.389
4.50
2.50
1.20
1.000
Nos
SS-A1-7
7+351.571
472.357
18.000
LS
-2
471.997
471.197
471.297
4.50
2.50
1.20
1.000
18 meteres
Nos
SS-A1-8
29+036.000
475.777
9.000
LS
-2
475.597
474.797
474.897
4.50
2.50
1.20
1.000
18 meteres
Nos
SS-A1-9
33+034.000
475.030
9.000
RS
-2
475.210
474.410
474.510
4.50
2.50
1.20
1.000
Nos
SS-A1-12
18 meteres
Nos
SS-A1-4
8+107.920
476.508
9.000
RS
-2
476.688
475.888
475.988
4.50
2.50
1.20
1.000
18 meteres
Nos
SS-A1-6
11+102.320
476.862
9.000
RS
-2
477.042
476.242
476.342
4.50
2.50
1.20
1.000
Grid-07
18 meteres
Nos
SS-A2-11
32+100.000
475.632
9.000
RS
-2
475.812
475.012
475.112
4.50
2.50
1.20
1.000
Grid-07
18 meteres
Nos
SS-A2-4
17+158.896
473.357
9.000
RS
-2
473.537
472.737
472.837
4.50
2.50
1.20
1.000
Grid-07
18 meteres
Nos
SS-A2-5
18+225.000
474.096
7.500
LS
-2
473.946
473.146
473.246
4.50
2.50
1.20
1.000
A-22
Grid-07
18 meteres
Nos
SS-A2-6
22+100.000
471.291
9.000
LS
-2
471.111
470.311
470.411
4.50
2.50
1.20
1.000
A-42
Grid-07
18 meteres
Nos
SS-A2-8
42+036.000
472.293
9.000
RS
-2
472.473
471.673
471.773
4.50
2.50
1.20
1.000
18
A-40
Grid-07
18 meteres
Nos
SS-A2-9
40+759.572
474.156
9.000
RS
-2
474.336
473.536
473.636
4.50
2.50
1.20
1.000
19
A-40
Grid-07
18 meteres
Nos
SS-A2-10
40+111.000
475.718
9.000
LS
-2
475.538
474.738
474.838
4.50
2.50
1.20
1.000
20
A-43
Grid-07
18 meteres
Nos
SS-A2-11
43+036.000
472.208
9.000
LS
-2
472.028
471.228
471.328
4.50
2.50
1.20
1.000
21
A-21
Grid-08
18 meteres
Nos
SS-A2-3
21+111.744
474.013
9.000
RS
-2
474.193
473.393
473.493
4.50
2.50
1.20
1.000
22
A-16
Grid-08
18 meteres
Nos
SS-A2-7
RS
-2
23
A-34
Grid-10
18 meteres
Nos
SS-A1-10
34+448.180
473.416
9.000
LS
-2
473.236
472.436
472.536
4.50
2.50
1.20
1.000
24
A-31
Grid-11
22 meteres
Nos
SS-A1-13
31+362.705
471.711
11.000
LS
-2
471.491
470.691
470.791
4.50
2.50
1.20
1.000
25
A-40
Grid-11
18 meteres
Nos
SS-A2-12
9.000
RS
HOLD
HOLD
HOLD
Employer:
Consultants:
Contractor:
Bill No.:
Description:
Item No.:
Sr.
No.
Alignment Name
Zone
Grids
Road Type
(Width)
Unit
Substation
Name
Stations
Profile
Grade
Offset
from
CL
SE
Side
L/S
R/S
Cover
Level
Excavation
Level
Top of PCC
Level
14
Quantity
Remarks
20
24
10
11
12
13
15 = (14-0.80)
16 = (15+0.10)
17
18
19
26
A-45
Grid-11
15 meteres
Nos
SS-A2-13
45+034.047
470.597
7.500
LS
-2
470.447
469.647
469.747
4.50
2.50
1.20
1.000
27
A-44
Grid-11
18 meteres
Nos
SS-A2-14
44+113.000
468.125
9.000
LS
-2
467.945
467.145
467.245
4.50
2.50
1.20
1.000
28
A-42
Grid-12
18 meteres
Nos
SS-A2-15
42+379.977
467.009
9.000
RS
-2
467.189
466.389
466.489
4.50
2.50
1.20
1.000
29
A-46
Grid-12
18 meteres
Nos
SS-A2-16
46+104.078
465.717
9.000
RS
-2
465.897
465.097
465.197
4.50
2.50
1.20
1.000
30
A-48
Grid-12
18 meteres
Nos
SS-A2-17
48+182.374
465.230
9.000
RS
-2
465.410
464.610
464.710
4.50
2.50
1.20
1.000
26.000
26.000
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Approved By:
Consultant Representative
Saudi Arabian Parsons Ltd. (SAPL).
Employer:
Consultants:
Contractor:
Bill No.:
Description:
Item No.:
Sr.
No.
Alignment Name
Zone
Grids
Road
Type
(Width)
Unit
Substation
Name
Stations
Profile
Grade
Offset
from
CL
SE
Side
L/S
R/S
Cover
Level
Excavation
Level
Top of PCC
Level
14
H
19
Quantity
Remarks
11
12
13
15 = (14-0.80)
16 = (15+0.10)
17
18
B-01
Grid-01 22 meters
Nos
SS-B 2
1+153.875
472.395
11.000
LS
-2
472.175
471.375
471.475
4.50
2.50
1.20
1.000
B-02
Grid-01 22 meters
Nos
SS-B 3
2+078.696
476.108
11.000
RS
-2
476.328
475.528
475.628
4.50
2.50
1.20
1.000
B-04
Grid-02 15 meters
Nos
SS-B1
4+390.400
469.509
7.500
LS
-2
469.359
468.559
468.659
4.50
2.50
1.20
1.000
B-09
Grid-05 22 meters
Nos
SS-B7
9+081.600
478.625
11.000
RS
-2
478.845
478.045
478.145
4.50
2.50
1.20
1.000
B-14
Grid-05 18 meters
Nos
SS-B8
14+223.100
479.203
9.000
LS
-2
479.023
478.223
478.323
4.50
2.50
1.20
1.000
B-14
Grid-05 18 meters
Nos
SS-B9
14+157.632
479.438
9.000
LS
-2
479.258
478.458
478.558
4.50
2.50
1.20
1.000
B-20
Grid-06 18 meters
Nos
SS-B10
20+035.287
478.410
9.000
LS
-2
478.230
477.430
477.530
4.50
2.50
1.20
1.000
CR-07
Grid-06 36 meters
Nos
SS-B11
7+466.400
473.850
18.000
LS
-2
473.490
472.690
472.790
4.50
2.50
1.20
1.000
B-10
Grid-06 18 meters
Nos
SS-B4
10+031.000
471.515
9.000
LS
-2
471.335
470.535
470.635
4.50
2.50
1.20
1.000
10
B-12
Grid-06 18 meters
Nos
SS-B5
12+098.273
472.334
9.000
LS
-2
472.154
471.354
471.454
4.50
2.50
1.20
1.000
11
B-06
Grid-06
Nos
12
B-22
Grid-10 18 meters
Nos
SS-B12
22+036.000
483.372
9.000
RS
-2
483.552
482.752
482.852
4.50
2.50
1.20
1.000
13
B-15
Grid-10 18 meters
Nos
SS-B14
15+293.300
477.924
9.000
RS
-2
478.104
477.304
477.404
4.50
2.50
1.20
1.000
14
B-15
Grid-10 18 meters
Nos
SS-B15
15+354.300
478.210
9.000
LS
-2
478.030
477.230
477.330
4.50
2.50
1.20
1.000
15
B-23
Grid-10 18 meters
Nos
SS-B13
23+429.817
479.487
9.000
LS
-2
479.307
478.507
478.607
4.50
2.50
1.20
1.000
16
B-23
Grid-10 18 meters
Nos
SS-B16
9.000
RS
(0.800)
(0.700)
4.50
2.50
1.20
10
20
24
HOLD
HOLD
14.000
14.000
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Approved By:
Consultant Representative
Saudi Arabian Parsons Ltd. (SAPL).
Page 11 of 11
Employer:
Consultants:
Contractor:
Bill No.:
Description:
Item No.:
Sr.
No.
Alignment Name
Zone
Grids
Road
Type
(Width)
Unit
Substation
Name
Stations
Profile
Grade
Offset
from
CL
10
9.000
7.500
RS
18.000
RS
SE
Side
Cover
Level
Excavation
Level
Top of PCC
Level
14
L/S
R/S
11
12
13
15 = (14-0.80)
16 = (15+0.10)
RS
-2
475.758
474.958
475.058
-2
476.255
475.455
475.555
4.50
Quantity
Remarks
20
24
17
18
19
4.50
2.50
1.20
1.000
2.50
1.20
1.000
C-02
Grid-10 18 meters
Nos
SS-C1
2+464.943
475.578
C-04
Grid-10 15 meters
Nos
SS-C2
4+034.000
476.105
CR-04
Grid-10 36 meters
Nos
SS-C5
4+472.889
C-03
Grid-10 18 meters
Nos
SS-C3
8+100.000
479.561
9.000
LS
-2
479.381
478.581
478.681
4.50
2.50
1.20
1.000
C-02
Grid-10 18 meters
Nos
SS-C4
2+093.989
481.081
9.000
RS
-2
481.261
480.461
480.561
4.50
2.50
1.20
1.000
C-18
Grid-10 18 meters
Nos
SS-C15
18+277.563
476.960
9.000
LS
-2
476.780
475.980
476.080
4.50
2.50
1.20
1.000
C-23
Grid-10 18 meters
Nos
SS-C14
23+034.000
480.446
9.000
LS
-2
480.266
479.466
479.566
4.50
2.50
1.20
1.000
CR-04
Grid-13 36 meters
Nos
SS-C6
4+364.775
18.000
RS
C-16
Grid-13 18 meters
Nos
SS-C7
16+406.066
482.476
9.000
LS
-2
482.296
481.496
481.596
4.50
2.50
1.20
1.000
10
C-11
Grid-13 18 meters
Nos
SS-C8
11+334.000
478.894
9.000
LS
-2
478.714
477.914
478.014
4.50
2.50
1.20
1.000
11
C-15
Grid-13 18 meters
Nos
SS-C17
15+034.000
478.187
9.000
LS
-2
478.007
477.207
477.307
4.50
2.50
1.20
1.000
12
C-14
Grid-14 18 meters
Nos
SS-C9
13+110.721
476.758
9.000
LS
-2
476.578
475.778
475.878
4.50
2.50
1.20
1.000
13
C-16
Grid-14 18 meters
Nos
SS-C10
16+094.062
476.593
9.000
LS
-2
476.413
475.613
475.713
4.50
2.50
1.20
1.000
14
C-26
Grid-14 18 meters
Nos
SS-C11
26+169.000
473.911
9.000
LS
-2
473.731
472.931
473.031
4.50
2.50
1.20
1.000
15
C-25
Grid-14 22 meters
Nos
SS-C12
25+309.000
474.884
11.000
LS
-2
474.664
473.864
473.964
4.50
2.50
1.20
1.000
16
C-23
Grid-14 18 meters
Nos
SS-C13
23+102.244
477.977
9.000
LS
-2
477.797
476.997
477.097
4.50
2.50
1.20
1.000
17
C-26
Grid-14 18 meters
Nos
SS-C16
26+496.610
470.789
9.000
RS
-2
470.969
470.169
470.269
4.50
2.50
1.20
1.000
18
C-27
Grid-14 15 meters
Nos
SS-C18
27+036.000
475.670
7.500
RS
-2
475.820
475.020
475.120
4.50
2.50
1.20
1.000
HOLD
HOLD
16.000
16.000
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Approved By:
Consultant Representative
Saudi Arabian Parsons Ltd. (SAPL).
Consultant Representative
Saudi Arabian Parsons Ltd. (SAPL).
Employer:
Consultants:
Contractor:
Bill No.:
Description:
Item No.:
Sr.
No.
Alignment Name
Zone
Grids
Road
Type
(Width)
Unit
Substation
Name
Stations
Profile
Grade
Offset
from
CL
SE
Side
L/S
R/S
Cover
Level
Excavation
Level
Top of PCC
Level
14
Quantity
Remarks
10
11
12
13
15 = (14-0.80)
16 = (15+0.10)
17
18
19
D-06
Grid-11
18 meters
Nos
SS-D1
6+066.404
471.529
9.000
LS
-2
471.349
470.549
470.649
4.50
2.50
1.20
1.000
D-06
Grid-11
18 meters
Nos
SS-D2
6+312.000
467.801
9.000
LS
-2
467.621
466.821
466.921
4.50
2.50
1.20
1.000
D-17
Grid-12
18 meters
Nos
SS-D10
17+150.000
463.123
9.000
LS
-2
462.943
462.143
462.243
4.50
2.50
1.20
1.000
D-02
Grid-15
18 meters
Nos
SS-D4
2+227.343
467.331
9.000
LS
-2
467.151
466.351
466.451
4.50
2.50
1.20
1.000
D-02
Grid-15
18 meters
Nos
SS-D5
2+622.146
468.753
9.000
LS
-2
468.573
467.773
467.873
4.50
2.50
1.20
1.000
D-16
Grid-15
18 meters
Nos
SS-D7
15+036.000
467.300
9.000
RS
-2
467.480
466.680
466.780
4.50
2.50
1.20
1.000
D-06
Grid-15
18 meters
Nos
SS-D3
6+448.300
467.715
9.000
LS
-2
467.535
466.735
466.835
4.50
2.50
1.20
1.000
D-16
Grid-16
18 meters
Nos
SS-D6
16+153.746
466.906
9.000
LS
-2
466.726
465.926
466.026
4.50
2.50
1.20
1.000
D-17
Grid-16
18 meters
Nos
SS-D9
17+573.400
465.192
9.000
LS
-2
465.012
464.212
464.312
4.50
2.50
1.20
1.000
10
D-17
Grid-16
18 meters
Nos
SS-D8
17+442.500
464.488
9.000
LS
-2
464.308
463.508
463.608
4.50
2.50
1.20
1.000
20
24
10.000
10.000
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Approved By:
Consultant Representative
Saudi Arabian Parsons Ltd. (SAPL).
Consultant Representative
Saudi Arabian Parsons Ltd. (SAPL).