HAZID CLOSE OUT ( AFCONS SCOPE)

Item
Guideword
Actions
Close out
No
Scope 2:- Field Preparation
Activity 1:- Jacket Preparation
Ensure Afcons/NPCC riggers have
2.1.12 Other / Planning
installed their part appropriately
without issue
HSE Induction will include all risks
involved in Personnel transfer on
Check HSE Induction includes all
jacket through work boat/ zodiac
risks
& Personnel working over the side
of jacket
Proper walkways with grating will
Install appropriate fall protections
be provided on either side of the
prior operation
jacket periphery with hand rails.
Assigned a proper crew boat for
Proper crew boat/ Zodiac assigned
transfer
for crew transfer.
2.1.13
Access/ Egress
Plan a stand by boat in vicinity of
Vessel Albatross 07 will be stand
jacket
by in the vicinity of the jacket.
Personnel transfer procedure to
Personnel transfer procedure is
be issued by Afcons and review
submitted to TPF for review
by TPF
Detail of Zodiac is mentioned in
Details of Zodiac to be provided
the Personnel transfer.
Yes the Workboat is suitable for
Check suitability of zodiac for
Boarding ladder of fjell
boarding ladder of Fjell
Specification mentioned in the
Personnel transfer procedure
Scope 3:- Vessel / Cargo Preparation & ship entrance in Field
Activity2:- Prior to Float over / Sea Fastening Removal
Check workers are experienced
Only experienced workers will
prior ops.
carry out the operation under
proper supervision.
3.2.12
Other/personnel Ensure supervision
Agree on sea fastening place and
time (before sailing away Mumbai
vs arrival in the field.)
Ensure Afcons Construction
Tools/ equipment will be inspected
Other/
3.2.13
Manager is aware of the needs
prior operations.
Equipment
and performs inspections
ERP submitted to TPF.
Activity3:- Ship Transporting Deck / Preparation of the Deck
All equipments (gas bottles & gas All equipments will be installed at
cutting equipment / fire blanket|)
field from supply vessel using Fjell
install before arrival at field
Crane or at port during the time of
3.3.12
Other/ Planning
onboard the FJELL.
Safety Audit
Check lists ( go / no go): one
before sail away &one after
customs clearance.

Activity 4:- Transfer of Installation Crew


Ensure HSE induction is done for
personnel transfer.

3.4.12

3.4.13

Access/Egress

Other/
Environment

Check procedure for personnel


transfer to FJELL/ KREUZ
GLORIOUS exists.
Check validated boat landing
design for FJELL/ KREUZ
GLORIOUS (validated during joint
parties inspection.)
Personnel transfer procedure to
be issued by AFCONS and review/
approved by TPF.
AFCONS to provide procedure and
details on boarding system
design.
Check that the HSE induction
includes the risks of personnel
Transfer by crew boat.

Back up crew boat


3.4.14

3.4.15

Other /
Equipment

Other/ In motion

Check that the HSE induction


includes the risks of personnel
Transfer by crew boat.
Ensure that life jacket is available.

Plan personnel transfer


supervision.
Scope 6: Deck Elevation ( Jacking up and Ballasting)
Activity 4:- transfer of crew to the jacket
Check HSE Induction of personnel
includes the risks of personnel
transfer by crew boat.
Assigned a proper crew boat for
transfer
Personnel transfer procedure
transfer to FJELL/ KREUZ
6.4.12
Other /Fall
GLORIOUS.
Validated boat landing design for
FJELL /KREUZ GLORIOUS
(validated during joint parties
inspection )

Procedure for personnel transfer


to Fjell/ Kreuz Glorious covered in
the HSE induction.
Personnel transfer procedure is
submitted to TPF for review.
An A frame gangway will be
provide instead of Boat landing
on both side of the Kreuz Glorious
Boarding ladder arrangement has
been done on both side of FJell
Personnel transfer procedure is
submitted to TPF for review
Details on boarding system design
got approval from TPF
Feasible weather condition for
transferring personnel mentioned
in the HSE induction. Wind speed
< 20 knots. Sea swells < 2 mtr.
Barge rolling <= 3 Degree.
Back up crew boat will not be
provided. ONGC Crew boat will be
available on demand.
HSE Induction covers the risks of
personnel transfer by Crew boat.
Sufficient quantities of Life Jacket/
Work vest will be available.
Personnel transfer will be carried
out under proper supervision.
HSE Induction will cover all risks
involved in the personnel transfer
by crew boat
Proper crew boat/ Zodiac assigned
for crew transfer.
Personnel transfer procedure is
submitted to TPF for review.
An A frame gangway will be
provide instead of Boat landing
on both side of the Kreuz Glorious
Boarding ladder arrangement has
been done on both side of FJell

Activity 5: - Working on the jacket


HSE induction of personnel shall
HSE Induction covers all the risks
include the risks of working on
of working on the HRD Jacket.
the HRD jacket.
6.5.12
Other
Provide drawing / evidence of
Approved drawing of HRD Jacket
handrails system in place (fall
attached herewith fyi.
protection).
Scope 7: Ship Docking into the jacket
Activity 1:- connection of the ship with the stern mooring lines in crossed configuration.
Other/ Critical
Provide approved
ONGC Vessel (DW) Safety Audit
7.1.13
Equipment
documentation / last inspection
reference will be given once it
Failure
audit reports.
done.
Activity 2 : -connection of the ship with the bow longitudinal mooring lines
7.2.23 Other
Provide lighting location / deck
drawings
Activity 4:- disconnection of AHTS from FJELL (portside & starboard side )
Provide approved
7.4.14
Other
documentation / last inspection
audit reports.
ACTIVITY 6: Connecting transversal mooring lines & Anti surge hawsers
Dimensional control (HRD Jacket
& HRC) will be provided to the
interested parties
Comparison to be carried out in
7.6.23
Other / Clash
two steps with dimensional
control before & after piling of the
jacket
Scope 11: Safety & Contingency Plans / Drills & competent/ trained crew
Activity 0:- FJELL personnel onboard during operation
Careful assessment of POB
MAGNOBAR system will be
11.2.1
monitoring: Afcons onboard barge followed for the POB Monitoring.
safety
0
& Dock wise superintendent on
The procedure of the system
Fjell.
included in the HSE Induction.

S-ar putea să vă placă și