Sunteți pe pagina 1din 11

LOS ANGELES COMMUNITY COLLEGE DISTRICT

DEPARTMENT OF FACILITIES PLANNING AND DEVELOPMENT


SUSTAINABLE BIUILDING PROGRAM

SPR1
S1

Section

Credit/Prerequisite Description
(S)

Support from

Credit No.

Consultant
Responsible

LEED POINT SUMMARY

Submittals Required

Sustainable Sites
Erosion and Sedimentation Control
Credits
Site Selection
Do not build on land falling under
any of 5 criteria

S2
S3
S4

Urban Redevelopment
Minimum density 60,000 sf/acre
Brownfield Redevelopment
Alternative transportation
4.1
4.2
4.3
4.4

S5

Reduced Site Disturbance


5.1
5.2

S6

Form CC-0090

1/2 mile to rail station or within 1/4


mile 2 bus lines
Bicycle facilities and showers for 5%
occupants
Alternative fueling station for 3%
vehicles
Minimum parking by zoning, or no
new parking
Limit site disturbance of natural
areas
Exceed local open space
requirements by 25%

Stormwater Management

Page 1 of 11

Rev.1.23.2010

LOS ANGELES COMMUNITY COLLEGE DISTRICT


DEPARTMENT OF FACILITIES PLANNING AND DEVELOPMENT
SUSTAINABLE BIUILDING PROGRAM

S7

6.2
Landscape and Design to reduce Heat Islands
7.1

Section

Credit/Prerequisite Description
6.1

Support from

Credit No.

Consultant
Responsible

LEED POINT SUMMARY

Submittals Required

No net increase of water runoff from


existing or if >50% imperviousness,
decrease 25% stormwater runoff
Treatment system 80% tss, 40% tp
Non-roof surfaces - Shade or lowalbedo

02751

Cut sheet showing reflectance value of sidewalk


pavement
OR

02700
7.2

Energy-Star compliant roof


07313,
07511,
07620

cut sheets for the pervious paving system,


demonstrating that it is at least 50% pervious
Cut sheet for roofing material, highlighting the
emissivity, the initial reflectance and the reflectance
after 3 years.
OR
cut sheets highlighting the green vegetated roof system

S8

Light Pollution Reduction


Do not exceed IESNA footcandle
levels and zero direct-beam
illumination leaves site

(W)
W1

Form CC-0090

Water Efficiency
Credits
Water Efficient Landscaping

Page 2 of 11

Rev.1.23.2010

LOS ANGELES COMMUNITY COLLEGE DISTRICT


DEPARTMENT OF FACILITIES PLANNING AND DEVELOPMENT
SUSTAINABLE BIUILDING PROGRAM

1.1

W2

1.2
Innovative Wastewater Technologies

high efficiency irrigation technology,


OR, use captured rain or recycled
site water for 50% reduction
Use only captured rain or recycled
site water for an additional 50%
reduction (100% total reduction) of
potable water for site irrigation
needs, OR, do not install permanent
landscape irrigation systems.

Section

Credit/Prerequisite Description

Support from

Credit No.

Consultant
Responsible

LEED POINT SUMMARY

Submittals Required
Cut sheets for high-efficiency irrigation equipment

02810

Reduce the use of municipally


provided potable water for building
sewage conveyance by a minimum
of 50%, OR, treat 100% of
wastewater on site to tertiary
standards.
W3

Water Use Reduction


Employ strategies that in aggregate
use 20% less water than the water
use baseline calculated for the
building (not including irrigation)
after meeting Energy Policy Act of
1992 fixture performance
requirements.

3.1

Form CC-0090

Cut sheets for all water consuming fixtures necessary


for the occupancy use of the building, with water
conservation specifications highlighted to show that the
fixtures meet or exceed fixture performance
requirements of the Energy Policy Act of 1992 - for
baseline, refer to table 1 in 01101.1.03

15050

Page 3 of 11

Rev.1.23.2010

LOS ANGELES COMMUNITY COLLEGE DISTRICT


DEPARTMENT OF FACILITIES PLANNING AND DEVELOPMENT
SUSTAINABLE BIUILDING PROGRAM

3.2
(E)
EPR1
EPR2

Section

Credit/Prerequisite Description

Support from

Credit No.

Consultant
Responsible

LEED POINT SUMMARY

Submittals Required

Exceed the potable water use


reduction by an additional 10% (30%
total efficiency increase).

Energy and Atmosphere


Prerequisites
Fundamental Building Systems Commissioning
Minimum Energy Performance

01810

refer to the commissioning spec

Meet ASHRAE 90.1-1999 or local


code, whichever is more stringent.
EPR3

CFC Reduction in HVAC & R


Equipment
Use no CFC refrigerants in new
construction. Phase out in reused
systems.

E1

E2

Cut sheets from all HVAC&R equipment, highlighting


refrigerant data
15050

Credits
Energy Efficiency
1.1
1.2
1.3
1.4
1.5
Renewable Energy

Exceed ASHRAE 90.1-1999 by 20%


new, 10% old
by 30% new, 20% old
by 40% new, 30% old
by 50% new, 40% old
by 60% new, 50% old
5% total building energy load

2.1

Form CC-0090

16200

Page 4 of 11

Provide cut sheets for on-site renewable energy


systems

Rev.1.23.2010

LOS ANGELES COMMUNITY COLLEGE DISTRICT


DEPARTMENT OF FACILITIES PLANNING AND DEVELOPMENT
SUSTAINABLE BIUILDING PROGRAM

Section

Credit/Prerequisite Description

Support from

Credit No.

Consultant
Responsible

LEED POINT SUMMARY

10% total building energy load


2.2

16200

Provide cut sheets for on-site renewable energy


systems

16200
01810

Provide cut sheets for on-site renewable energy


systems
refer to the commissioning spec

15050

cut sheets for all HVAC&R equipment, highlighting


refrigerant data

15050

cut sheets of sensors and the data collection system


used to provide continuous metering per IPMVP
standards

20% total building energy load


E3
E4

E5

2.3
Additional Commission
Elimination of HCFC's and Halons

Submittals Required

Measurement and Verification


See USDOE IPMVP Standards.

E6

Green Power
2 year contract with green-e labeled
power

(M)

Conserving Materials and Resources


Prerequisites

MPR1
M1

Storage & Collection of Recyclables


Credits
Existing building rehabilitation
1.1
1.2

Form CC-0090

Maintain 75% of original structural


shell
Maintain 100% of original structural
shell

Page 5 of 11

Rev.1.23.2010

LOS ANGELES COMMUNITY COLLEGE DISTRICT


DEPARTMENT OF FACILITIES PLANNING AND DEVELOPMENT
SUSTAINABLE BIUILDING PROGRAM

M2

1.3
Construction waste management

2.1

M3

2.2
Resource reuse

Section

Credit/Prerequisite Description

Support from

Credit No.

Consultant
Responsible

LEED POINT SUMMARY

Submittals Required

Maintain 100% of original structural


shell
AND 50% non-shell
Waste plan plus recycle or salvage
at least 50% (by weight) of
construction, demolition, and land
clearing waste.
Recycle or salvage an additional
25% (by weight) of construction,
demolition, and land clearing waste.

Sellen construction waste management plan, refer to


section 01505
all
divisions
all
divisions

Sellen construction waste management plan, refer to


section 01505

Specify 5% salvaged or refurbished


materials
Divs 212

3.1

M4

3.2
Recycled content

4.1

Specify additional 5% salvaged or


refurbished materials
Specify a minimum of 25% of
building materials that contain in
aggregate, a minimum of 20%
postconsumer recycled content
material, OR, a minimum 40% postindustrial recycled content material.

Cut sheets or submittals shall clearly indicate whether


the material is a salvaged or reused material
GC to provide LEED Calculator spreadsheet

Divs 212

Cut sheets shall clearly indicate whether the material


contains post-consumer or post-industrial recycled
materials or both.
GC to provide LEED Calculator spreadsheet

Form CC-0090

Page 6 of 11

Rev.1.23.2010

LOS ANGELES COMMUNITY COLLEGE DISTRICT


DEPARTMENT OF FACILITIES PLANNING AND DEVELOPMENT
SUSTAINABLE BIUILDING PROGRAM

M5

4.2
Local / Regional Materials
5.1

M6

Specify an additional 25% (50%


total) of building materials that
contain in aggregate, a minimum of
20% post-consumer recycled
content material, OR, a minimum
40% post-industrial recycled content
material.

Form CC-0090

Submittals Required

Divs 212

Cut sheets shall clearly indicate whether the material


contains post-consumer or post-industrial recycled
materials or both.

Divs 212

Cut sheets shall clearly indicate location of


manufacture, highlighting those materials manufactured
within a 500-mile radius.

Divs 212

Cut sheets shall clearly indicate rapidly renewable


materials contained in the product

20% materials manufactured within


500 miles
50% of the above 20% that are
extracted, harvested, or recovered
within 500 miles.

5.2
Rapidly Renewable Materials
Specify rapidly renewable building
materials for 5% of total building
materials.

M7

Section

Credit/Prerequisite Description

Support from

Credit No.

Consultant
Responsible

LEED POINT SUMMARY

Certified Wood

Page 7 of 11

Rev.1.23.2010

LOS ANGELES COMMUNITY COLLEGE DISTRICT


DEPARTMENT OF FACILITIES PLANNING AND DEVELOPMENT
SUSTAINABLE BIUILDING PROGRAM

Section

Credit/Prerequisite Description

Support from

Credit No.

Consultant
Responsible

LEED POINT SUMMARY

50% certified materials per FSC

Submittals Required
Cut sheets highlighting certified wood-based materials
installed. Provide wood certification documentation
from manufacturer declaring conformance with FSC
guidelines for certified wood building components.

06105,
06150,
06402,
08211,
09640,
(Q)
QPR1

Indoor Environmental Quality


Prerequisites
Minimum IAQ Performance
minimum requirements of voluntary
consensus standard ASHRAE 621999.

QPR2

Environmental Tobacco Smoke (ETS) Control

Q1

Credits
Carbon Dioxide (CO2) Monitoring

Q2

Increase Ventilation Effectiveness

15050

Cut sheets for CO2 sensors and monitoring system

Provide for the effective delivery and


mixing of fresh air to building
occupants to support their health,
safety, and comfort.
Q3

Form CC-0090

Construction IAQ management plan

Page 8 of 11

Rev.1.23.2010

LOS ANGELES COMMUNITY COLLEGE DISTRICT


DEPARTMENT OF FACILITIES PLANNING AND DEVELOPMENT
SUSTAINABLE BIUILDING PROGRAM

Section

Credit/Prerequisite Description

Support from

Credit No.

Consultant
Responsible

LEED POINT SUMMARY

Prevent indoor air quality problems


resulting from the
construction/renovation process, to
sustain long term tradesman and
occupant health and comfort.

3.1

Q4

3.2
Low-Emitting Materials

Submittals Required

1 & 15

Cut sheets for all filtration media used during


construction, highlighting MERV values of at least 13.
Provide photographs of construction IAQ management
measures such as protection of ducts and on-site stored
or installed absorptive materials

all
sections

Cut sheet and MSDS for each adhesive and each


sealant used in the building, highlighting the VOC limits.

09900

Cut sheet and MSDS for each coating used, highlighting


VOC and Chemical component limits.

09681

Cut sheets for each carpet system element installed,


highlighting VOC limits.

06402

Cut sheets for each composite wood or agrifiber product


used, highlighting urea-formaldehyde resin limits

Advanced Plan - reduce construction


contaminants specify flush out
Meet VOC limits for adhesives,
sealants

4.1
Meet VOC limits for paints and
coatings - green seal
4.2
Meet CRI's green label for carpet
systems
4.3
No added urea-formaldehyde in
glues for composite wood products
4.4
Form CC-0090

Page 9 of 11

Rev.1.23.2010

LOS ANGELES COMMUNITY COLLEGE DISTRICT


DEPARTMENT OF FACILITIES PLANNING AND DEVELOPMENT
SUSTAINABLE BIUILDING PROGRAM

Q5

Design to minimize crosscontamination of general occupancy


areas by chemical pollutants.
Q6

6.2
Thermal Comfort

7.1

Q8

Form CC-0090

12484

Submittals Required

Cut sheet for the doorway walk off mats

Controllability of Systems

6.1

Q7

Section

Credit/Prerequisite Description
Indoor Chemical and Pollutant Source Control

Support from

Credit No.

Consultant
Responsible

LEED POINT SUMMARY

7.2
Daylight and Views

Provide a minimum of one operable


window and one lighting control
zone per 200 s.f. for all occupied
areas within 15 feet of the perimeter
wall.
Provide controls for each individual
for airflow, temperature, and lighting
for 50% of the non perimeter,
regularly occupied areas.
Comply with ASHRAE Standard 551992, Addenda 1995 for thermal
comfort
Install a permanent temperature and
humidity monitoring system
configured to provide operators
control over thermal comfort
performance and effectiveness of
humidification and/or
dehumidification systems in the
building.

Page 10 of 11

Cut sheets for operable windows and lighting controls


08520,
08800,
13800
13800,
15050

cut sheets for airflow, temperature, and lighting controls

15050

cut sheets for the elements of the permanent


temperature and humidity monitoring system

Rev.1.23.2010

LOS ANGELES COMMUNITY COLLEGE DISTRICT


DEPARTMENT OF FACILITIES PLANNING AND DEVELOPMENT
SUSTAINABLE BIUILDING PROGRAM

8.1
8.2

Section

Credit/Prerequisite Description

Support from

Credit No.

Consultant
Responsible

LEED POINT SUMMARY

Submittals Required

Diffuse sunlight to reach 75% of all


regularly occupied spaces
Direct line of sight to vision glazing
while seated from 90% of all
regularly occupied spaces
TOTAL CORE CREDIT POINTS

(D)
D1
D2
D3
D4
D5

Form CC-0090

Innovation
Innovation
Innovation
Innovation
LEED Certified Designer

Page 11 of 11

Rev.1.23.2010