Sunteți pe pagina 1din 10

EXPERIENCE LIST

ONSHORE GAS PROCESSING FACILITIES OYONG PHASE2

Owner
Client
Bidder role
Construction Location

:
:
:
:

Project Duration
Plant Location
Project Scope
Contract Value
Total Approx. Weight

:
:
:
:
:

SANTOS (SAMPANG) PTY. LTD


SANTOS (SAMPANG) PTY. LTD
Main Contractor
PT PAL Indonesias Shop.
PT. Indonesia Power Grati, Pasuruan Site Construction Location
19 (Nineteenth) Months, February 2008 September 2009.
PT. Indonesia Power Grati, Pasuruan
Engineering, Procurement, Installation and Commissioning (EPIC)
above 19 Million USD.
N/A

Brief Description
:
Onshore Gas Processing Facility
With major equipments :
1. Pressure Vessels & Tanks.
2. ESD System.
3. Process Control System
4. Chemical Injection.
5. Gas-gas Exchanger.
6. Dew Point Refrigeration Package.
7. Pig Receiver.
8. TEG Contactor.
14. Diesel Generator.
9. Separators.
15. Gas Turbine Generator.
10. TEG Regeneration Package.
16. Fire Detection System
11. Dew Point Chiller Package.
17. Fire Water System,
12. Gas Engine Generator.
18. Concrete Control Room
13. Gas Metering Package.
19. Telecommunication System.
Detail of Work
:
1. Front End Engineering Design Evaluation, optimization and verification.
2. Fabrication Engineering.
3. Procurement Services for Civil Structure, Static and Rotating Mechanical Equipment, Steel Structure
Raw Material, Piping & Instrumentation, Control System, Electrical and Bulk Material
4. Pressure Vessel, Piping and Structure Fabrication.
5. Static Mechanical Equipment Fabrication and Installation.
6. Piping, Electrical & Instrumentation, Control & System Installation.
7. Civil works for Plant Construction.
8. Tie-in with PT Indonesia Power Gas Receiving Mater.
9. Tie-in with Offshore Pipeline for Oyong Phase 2 Contractors.
10. Start-Up and Commissioning.

Experience
Page : 1 of 10
DIV. PP

EXPERIENCE LIST
ONSHORE FABRICATION SERVICE FOR KE-32 PLATFORM
Owner
Client
Bidder role
Construction Location
Project Duration

:
:
:
:
:

Platform Location
Project Scope

:
:

Contract Value
:
Total Approx. Weight :

KODECO ENERGY CO, LTD


KODECO ENERGY CO, LTD
Main Contractor
PT PAL Indonesias Shop.
12 (Twelve) Months, May 2006
May 2007
Madura Strain
Engineering, Procurement and
Construction (EPC)
above 4 Million USD.
1000 Tonnes consist of
Platform, Pile, Jacket &
Equipment

Brief Description
:
Monopod Platform.
With major equipments :
1. Pressure Vessels.
2. ESD System.
3. MPFM.
4. WHCP.
5. Scada System.
6. Close Drain System.
7. Chemical Injection.
8. N2 Bottle system.
9. Pedestal Crane Package, etc

Detail of Work
:
1. Engineering Evaluation and verification.
2. Fabrication Engineering.
3. Procurement Services for Steel Structure Raw Material, Piping & Instrumentation, Electrical
and Bulk Material.
4. Platform Steel Structure Fabrication.
5. Pile & Jacket Steel Structure Fabrication.
6. Mechanical Equipment Fabrication and Installation.
7. Piping, Electrical & Instrumentation Installation.
8. Pre-Commissioning, Load Out and Sea Fastening.

Experience
Page : 2 of 10
DIV. PP

EXPERIENCE LIST
WELLHEAD PLATFORM A UJUNG PANGKAH DEVELOPMENT PROJECT
Owner
Client
Bidder role
Construction Location
Project Duration

:
:
:
:
:

Platform Location

Project Scope

Contract Value
:
Total Approx. Weight :

AMERADA HESS
AMERADA HESS
PAL- RPE Consortium
PT PAL Indonesia Shop.
May 2005 - September
2006
Ujung Pangkah - Gresik
Madura Strain
Engineering, Procurement,
Construction
and
Installation (EPIC)
above 60 Million USD.
1300 Tonnes consist of
Platform, Pile & Jacket

Project Scope :
1. Engineering Evaluation and Verification.
2. Procurement Services for Equipment,
Steel, Super Duplex Material, Electrical,
Instrumentation and Bulk Material.
3. Fabrication Engineering.
4. Fabrication Pile & Jacket and Platform
Steel Structure.
5. Installation of Mechanical Equipment and
Piping, Electrical & Instrumentation
6. Fabrication and Installation Subsea Pipeline
18 (42 km).
7. Pre-Commissioning and Commissioning.

Brief Description
:
Four (4) Legs Platform, with major equipments :
1. Pressure Vessels.
2. ESD System.
3. PCS System.
4. F&G Detection System.
5. MPFM.
6. WHCP.
7. Scada System.
8. Close Drain System.
9. Chemical Injection.
10. N2 Bottle system.
11. Pedestal Crane Package.
12. Diesel Generator Package, etc

Experience
Page : 3 of 10
DIV. PP

EXPERIENCE LIST
ZELDA F PLATFORM FABRICATION FOR SES GAS PROJECT
Owner
Client
Bidder role
Construction Location
Project Duration
Platform Location

:
:
:
:
:
:

Project Scope

Contract Value
:
Total Approx. Weight :

CNOOC SES LTD


CNOOC SES LTD
Main Contractor
PT PAL Indonesia Shop.
June 2005 - January 2006
South East Sumatera Gas Project
(Zelda F) - Madura Strain
Engineering, Procurement and
Construction (EPC)
above 4 Million USD.
685 Tonnes consist of Platform,
Pile, Jacket & Equipment

Brief Description
:
Monopod Platform.
With major equipments :
1. Pressure Vessel.
2. Heat Exchanger.
3. ESD System.
4. MPFM.
5. WHCP.
6. Scada System.
7. Dew Point Control System.
8. Close Drain System.
9. Chemical Injection.
10. N2 Bottle system.
11. Pedestal Crane Package, etc

Detail of Work
:
1. Fabrication Engineering.
2. Procurement Services for Steel Structure Raw Material, Piping & Instrumentation, Electrical
and Bulk Material
3. Platform Steel Structure Fabrication.
4. Pile & Jacket Steel Structure Fabrication.
5. Mechanical Equipment Installation.
6. Piping & Instrumentation Installation.
7. Pre-commissioning, Load Out and Sea Fastening.

Experience
Page : 4 of 10
DIV. PP

EXPERIENCE LIST
TOTAL TUNU PHASE VII, VIII, XI / PKG1
Owner
Client
Equipment

: TOTAL INDONESIE
: TOTAL INDONESIE
: Turbo Compressor Module
Package.
Quantity
: 2 (two) Units
Bidder role
: Contractor
Activity Location
: GE Nuovo Pignone Florence &
Massacarrara - Italia
Project Duration
:
Phase XI Oct 2006 Febr. 2008.
Phase VIII Sept. 2001 - April 2003
Phase VII August 1998 - April 2000
Project Scope
:
Management, Engineering, Procurement,
Construction and Commissioning
Contract Value

Phase XI
Phase VIII
Phase VII

Total Approx. Weight

800 Tonnes

above 38 Million USD.


above 28 Million USD
above 31 Million USD

Brief Description
:
Compressor for Wellhead Gas Lift
With major equipments :
1. Gas Turbine.
2. Compressor.
3. Instrumentation.
4. Electric and Control System.
5. Steel Structure etc
Detail of Work
:
1. Basic and Detail Engineering.
2. Fabrication Engineering.
3. Procurement Services for Steel Structure Raw Material, Equipment, Piping &
Instrumentation, Electrical and Bulk Material
4. Steel Structure Fabrication.
5. Mechanical Equipment Installation.
6. Piping & Instrumentation Installation.
7. Electrical Installation.
8. Load Out and Transportation.
9. Package Installation.
10. Commissioning.
11. Project Management.
Equipment Destination :

Experience
Page : 5 of 10
DIV. PP

East Kalimantan - Indonesia

EXPERIENCE LIST
ARII CCO-341 PROJECT
Owner
Client
Equipment

: ARCO INDONESIA
: ARCO INDONESIA
: Compressoion Modules Train
C and D.
Quantity
: 2 (two) Units
Bidder Role
: Contractor
Activity Location
: PT PAL Indonesia Shop
Project Completion : 1997
Project Scope
: Engineering, Procurement, and
Construction.
Contract Value
: above 3 Million USD
Total Approx. Weight : 600 Tonnes
Brief Description
:
Compressor for Wellhead Gas Lift with dimension of 20 (L) x 75 (W) x 12 (H)
With equipment :
1. Gas Turbine.
2. Compressor.
3. Instrumentation.
4. Electric and Control System.
5. Steel Structure.
Detail of Work
:
1. Fabrication Engineering.
2. Procurement Services for Steel Structure Raw Material, Equipment, Piping &
Instrumentation, Electrical and Bulk Material
3. Steel Structure Fabrication.
4. Mechanical Equipment Installation.
5. Piping & Instrumentation Installation.
6. Electrical Installation.
7. Load Out and Transportation.
Equipment Destination

Experience
Page : 6 of 10
DIV. PP

Bontang - Indonesia

EXPERIENCE LIST
ARII CCO-300 PROJECT
Owner
Client
Equipment
Quantity
Bidder Role
Activity Location
Project Completion
Project Scope
Contract Value
Total Approx. Weight
Brief Description :
Detail of Work
1.
2.
3.
4.
5.

:
ARCO INDONESIA
:
ARCO INDONESIA
:
Monopod Platform and Pipespool.
:
ea 1 (one) Unit.
:
Contractor
:
PT PAL Indonesia Shop
:
1995
:
Procurement and Construction.
:
above 1 Million USD
:
N/A
Fabrication of KLC Monopod Platform and Pipespool
for MMC-A Enhancement
:
Fabrication Engineering
Procurement Services.
Machining
Construction.
Load Out and Transportation.

ARII CCO-283 PROJECT


Owner
Client
Equipment
Quantity
Bidder Role
Activity Location
Project Completion
Project Scope
Contract Value
Total Approx. Weight
Brief Description

:
:
:
:
:
:
:
:
:
:
:

Detail of Work
:
1. Mobilization
2. Transportation.
3. Installation.

Experience
Page : 7 of 10
DIV. PP

ARCO INDONESIA
ARCO INDONESIA
Package.
1 (one) Set.
Contractor.
PT PAL Indonesia Shop
1995
Installation.
above 1 Million USD
N/A
KNA/BM Relocation

EXPERIENCE LIST
MODULAR PACKAGE OF RECOVERY PLUS FOR BLUESKY PROJECT

Owner
Client
Equipment
Quantity
Bidder role
Construction Location
Equipment Delivery
Project Scope

PERTAMINA UP VI BALONGAN
UOP
Glycol Regeneration Package.
1 (one) Unit
Subcontractor
PT PAL Indonesia Shop
August, 2004
Engineering, Procurement,
Construction & Pre-Commissioning
Contract Value
: above US$. 1,500,000
Total Approx. Weight : 100 Tonnes

Brief Description
:
The package consist of :
1. Steel Structure.
2. Heat Exchanger
3. Pressure Vessels.
4. Tanks.
5. Piping.
6. Electrical.
7. Instrumentation.
8. Bulk Materials.
Detail of Work
1.
2.
3.
4.
5.
6.
Destination

Experience
Page : 8 of 10
DIV. PP

:
Detail Engineering.
Fabrication Engineering.
Procurement Services.
Fabrication, Machining and Construction.
Installation.
Pre-Com, Load Out & Transportation.
: Balongan

:
:
:
:
:
:
:
:

EXPERIENCE LIST
GLYCOL REGENERATION PACKAGE PROJECT
Owner
Client
Equipment
Quantity
Bidder role
Construction Location
Project Duration
Project Scope

:
:
:
:
:
:
:
:

Contract Value

Total Approx. Weight :

Brief Description
:
The package consist of :
1. Steel Structure.
2. Interchanger.
3. Pressure Vessels.
4. Tanks.
5. Burner.
6. Piping.
7. Instrumentation.
8. Bulk Materials.
Detail of Work
1.
2.
3.
4.
5.
Destination

Experience
Page : 9 of 10
DIV. PP

:
Detail Engineering.
Fabrication Engineering.
Procurement Services.
Fabrication, Machining and Construction.
Load Out and Transportation.
: South Lhoksukon, Aceh

MOBIL OIL
MOBIL OIL
Glycol Regeneration Package.
2 (two) Units.
Contractor
PT PAL Indonesia Shop.
October 1995 - July 1996
Engineering,
Procurement,
and Construction.
above 1,500,000 Million USD
Approx.
80 Tonnes

EXPERIENCE LIST
NILAM, SEMBERAH S-13 AND PAMAGUAN GAS COMPRESSION
Owner
Client
Equipment
Quantity
Bidder role
Construction Location
Project Duration
Project Scope

:
:
:
:
:
:
:
:

BRITISH PETROLEUM
VICO INDONESIA
Air Cooled Heat Exchanger
1 (One) Unit
Contractor
PT PAL Indonesia Shop.
July 1998 - December 1998
Engineering,
Procurement,
and Construction.
above USD 500,000.
95 Tonnes

Contract Value
:
Total Approx. Weight :

Brief Description
Detail of Work
1.
2.
3.
4.
5.
Destination

: N/A
:
Detail Engineering.
Fabrication Engineering
Procurement Services.
Fabrication, Machining and Construction.
Load Out.
: Franco On Barge

SINGLE BUOY MOORING KODECO


Owner
Client
Equipment
Quantity
Bidder role
Activity Location
Equipment Delivery
Project Scope
Contract Value
Total Approx. Weight
Brief Description
Detail of Work
:
1. Fabrication Engineering
2. Procurement Services.
3. Repair
Destination

Experience
Page : 10 of 10
DIV. PP

: N/A

:
:
:
:
:
:
:
:
:
:
:

KODECO ENERGY CO. LTD


KODECO ENERGY CO. LTD
Oil Mooring Barge.
One (1) Unit
CONTRACTOR
PT PAL Indonesia Shop
August, 2001
Repair and Maintenance.
150 Tonnes
N/A.

S-ar putea să vă placă și