Documente Academic
Documente Profesional
Documente Cultură
P
FOR VARIOUS CITIES OF MA
ADHYA PRADESH
PREPARED BY:
IDFC, DELHI
SUBMITTED TO:
URBAN ADMIN
NISTRATION AND DEVELOPMENT DEPARTMEENT (UADD)
GOVERNMENT OF MADHYA PRADESH
PROJECT COORDINATION:
CITY MANAGERS
M
ASSOCIATION, MADHYA PRADEESH
2013
2013
Town Brief
In one or two
sentences
Population
Historic importance
Land Use
Land Use
Residential
Commercial
Public - semi public
Agriculture
Industrial
Roads
Green area
Sensitive
Water bodies
Total
Latitude
Longitude
MM
Mts
Sq kms
Sq kms
Sq kms
Date
Town level
% Standard (as
per UDPFI)
50 to 55
2 to 3
8 to 10
IDFC
Mandav
Yes
22 20 11 N,
75 24 56 E
833.1
609.6
2.01
0.02
0.38
8.08
0.08
1.53
0.00
0.01
0.04
24.87
100.00
3 to 4
5 to 6
(transport)
15 to 18
8 to 10 (for
ecological uses)
131
2013
Ward #
Name of ward
Ward
Population
(2011)
Area (sq kms)
Density
(PPSqkm)
Male
Ward 1
Ward
12
Bhag
Rani
wans
Tarapur
Dariya
Jama
Eco-point
Neelkant
Rampura Lal Bangla
Roopmat h
Gate
Khan
Masjid
Ward
h Ward
Ward
Ward
i Ward Gate
Ward
Ward
Ward
Ward
Ram
Gadashah
Mandir
Ward
Ward
Jahaz
Mahal
Ward
Ward 6
Ward
13
Ward
14
Ward 15
Mansin
gi Ward
Kanadi
pura
Ward
Jahangir
pur Gate
Ward
Total
736
660
1011
527
745
666
422
994
521
811
595
777
705
795
694
10659
0.66
1.16
1.24
0.9
1.25
3.58
1.47
1.98
0.89
1.76
1.67
3.56
1.55
1.03
2.18
24.88
1115.2
569.0
815.3
585.6
596.0
186.0
287.1
502.0
585.4
460.8
356.3
218.3
454.8
771.8
318.3
428.4
335
342
456
262
382
335
204
516
280
420
312
418
372
403
348
5385
401
318
555
265
363
331
218
478
241
391
283
359
333
392
346
5274
SC (2001)
156
30
22
217
ST (2001)
304
205
375
180
380
398
364
807
397
713
493
593
592
579
448
6828
Female
BPL
Sex ratio
Literacy rate
(%)
7197
1233
773
929
970
903
865
954
977
971
972
1004
993
830
976
923
70.2
65.4
49.2
78.8
65.9
36
29.5
30.2
30.1
18.7
18.3
23.5
17
19.2
13.3
1
Private
school
15 primary
schools, 1 middle
school, 1 higher
secondary school,
2 tribal student
hostels, 1 Sanskrit
School
1 School
107
81
109
101
114
82
42
145
74
113
84
91
87
114
64
1408
agricult
ure
agricult
ure
agricultu
re
Agriculture
NA
NA
NA
NA
agricultur
e
NA
NA
NA
agricultureagriculture
NA
NA
NA
agric
agricultur agricultur agricultur
agricultur
agriculture
ultur
e
e
e
e
e
NA
NA
NA
132
NA
NA
NA
2013
NA
shop/re
staurant
owners
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
shop/
restaurant/
hotels for local
and tourist
requirement
yes
yes
yes
200
22
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
3,898
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
666
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
306
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
26
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
16.80%
49
29
60
69
207
133
2013
No. of
Individual
48
11
56
42
0
Septic tanks
No. of
NA
NA
NA
NA
NA
Community
Septic tanks
No. of
Community
NA
NA
NA
NA
NA
toilets
% of
population NA
NA
NA
NA
NA
Open
defecation
No. of Dust
NA
NA
NA
NA
NA
bins
Wardwise
Waste
138.368 124.08 190.068 99.076 140.06
generated
(Kgs)
Road
sweeping (1 once in 2 once in 2 once in 2 once in once in 2
time or 2
days
days
days
2 days
days
times)
Total no. of
sanitary
NA
NA
NA
NA
NA
workers in the
ward
Length of
Pucca road
NA
NA
NA
NA
NA
(Mts)
Length of
Kuccha road
NA
NA
NA
NA
NA
(Mts)
Length of
NA
NA
NA
NA
NA
State Highway
Length of
National
NA
NA
NA
NA
NA
Highway
Length of
Road side
NA
NA
NA
NA
NA
drains Pucca
(Mts)
157
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
152.468
111.86
146.0
76
132.54
149.46
130.472
2003.892
125.208
never
never
never
never
never
never
neve
r
never
never
never
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
15
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
14000
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
14000
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
134
2900
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
700
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
527
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
574
Rewa
Kund
Baz
Bahad
ur's
Palac
e,
Rupm
ati's
Pavili
on
Rewa
Kund
Baz
Bahad
ur's
Palac
e,
Rupm
ati's
Pavili
on
Fort
wall
Fort
wall
Jahangir
puri Gate
Royal
Complex,
Hoshang
Name of
Shah's
Royal
Ram Chappan
Tourist site if
Tomb,
Complex Mandir Mahal
any
GadaShah
Palace and
Shop,
Royal
Malik
Complex,
Hathi
Muglith's
Hoshang
Chappan
Mahal,
Name of
Shah's
Tarapur Mosque,
Mahal,
Royal Asharfi
Darya
Dai Ka
Heritage site if Tomb, Fort Wall
Songarh Gate, Jali
Chor Kot, Fort wall
Mahal, Dai
Complex Mahal
Khan's
any
GadaShah
Mahal ki Chhoti
Ek
Tomb, Lal
Palace and
Khamba
Behen ka
Sarai
Shop,
Mahal, Sarai
Baolis
Bus stop (No.)
0
0
0
0
0
0
0
0
0
0
Bus
stand(No.)
Parks (No.)
Playground(N
o.)
No. of
Residential
properties
No. of
Commercial
properties
2013
96
30
71
88
115
135
404
2013
Total Property
tax collection
(in Rs.)
Property tax
coverage(in
%)
Available
Government
land (Sq kms)
Remarks
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Sewerage
Drainage
SWM
Physical Infrastructure
Water Supply
SECTORAL ANALYSIS
Existing Source
Source
Tubewell
Well
No. of Tubewell / River / Well
26
Water Supplied by Tubewell / River / Well in MLD
Total water supply in the town (MLD)
Existing Supply rate (LPCD) considering distribution losses
Water Charges per household per month (Rs.) Flat/Metered
% Coverage under paid water supply
Whether any treatment plant exists (Y/N),If yes mention capacity (MLD)
Proposed source (Surface)
Total sewage generation (MLD)
Whether any treatment plant exists (Y/N),If yes mention capacity
Total no. of individual septic tanks
Total no. of community septic tanks
Total no. of Sewage/Mud pumps available with the ULB
Frequency of Cleaning Individual Septic tanks
Frequency of Cleaning Community Septic tanks
Name of natural nallah (Storm water drain)
Length of natural nallah (Storm water drain) Kms
Ultimate disposal point of nallah
Length of road side drain (Kms)
Coverage of road side drainage w.r.t roads (%)
Ultimate disposal point of Road side drains
Any treatment plant/procedure adopted
Per capita Solid waste generation (Considering Standards) (in gms)
Total SW generation (in Tons)
Frequency of SW collection by the ULB (1 time per day/2 times per day)
Collection efficiency of the ULB (%)
Any initiative for DTDC (Yes /No)
136
River/Lake
Sagar talab
2.5
2.5
100 lpcd
30 (flat)
16.80%
WTP (1x3 lakh litre)
More ponds to be constructed
0.19
No
157
NA
0
6 months (as per requirement)
NA
Rampura drain
NA
Sagar talab
2.9
NA
Sagar talab
No
250
2 MT
1
66
Yes
Traffic &
transportation
Street lighting
Power
Physical Infrastructure
Roads
Heritage &
tourism
Heritage &
tourism
137
2013
No
Ward no. 3, ahead of Dhoop Baodi near Lohani Caves
Allotted site
NA
In core Ward 4
Trolleys + tractor
not applicable
NH-3
39 kms
SH-31
13 kms
10
3
14
14
709
Yes
Jami Masjid junction
Junction near Jain Temple
None
527
NA
NA
NA
NA
NA
NA
Bagdi
217
94
Y
Plan to provide 24 hr electricity in core area - about 16 hrs at
present. Some wards do not have electricity connections
Over 60 structural monuments, and some caves - significant
ones - Gateways,Jahaz Mahal,Hindola Mahal,Tomb of
Hoshang Shah,Jami Masjid,Roopmati's Pavillion and 12
structures under MP Department of Archaeology
2013
Health
Environment
No. of Hospitals
Multispeciality hospital if any (Y/N)
Education
Social security schemes
Social Infrastructure
Name of Scheme
Social Security Pension (Samajik
Suraksha Pension)
Indira Gandhi Rashtriya Vriddhavastha
Pension Yojana
Indira Gandhi Rashtriya Nihshakt
Pension Yojana
Indira Gandhi Rashtriya Vidhwa Pension
Yojana
Rashtriya Parivar Sahayta
138
6
Beneficiaries
56
87
17
79
0
2013
651
40
5
2
951
SECTORAL ANALYSIS
NA
0
0
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Yes
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Yes
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Yes
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Yes
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
No
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
No
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
no
Unnotified
Unnotified
666
521
NA
No. of Handpumps
Yes
Ward population
NA
0
0
NA
NA
NA
3
1011
NA
660
2 NA
NA
736
Individual water
connections
Slum population
Unnotified
Unnotified
Notifie
d
Unnotified
Unnotified
Unnotified
Unnotified
NA
4
5
Notified/ Un-notified
Ward No
N
N
N
N
N
N
N
no
NA
No
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
No
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
139
2013
NA
10
NA
11
NA
NA
12
NA
NA
13
14
NA
NA
NA
NA
NA
NA
NA
15
NA
Total
NA
No
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
811
NA
No
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
595
NA
No
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
777
NA
No
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
No
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
No
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
No
No
No
No
No
No
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
No
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
No
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
705
Notifie
d
795
Unnotified
Unnotified
694
7971
N
N
N
N
N
N
N
N
N
N
N
N
N
N
306
Achieved
(Y/N)
2013-14
140
2014-15
2015-16
Preliminary
estimate (if any)
for
implementation
Implementing
agency
Capital Expenditures
Revenue Expenditure
Capital
Receipts
Revenue Income
MUNICIPAL FINANCE
Year
Rates and Tax Revenue
Assigned Revenues & Compensation
Rental Income from Municipal Properties
Fees (User Chargesc included under taxes)
Sale & Hire Charges
Revenue Grants, Contribution and Subsidies
Income from Investments
Interest Earned
Other Income
Total - Revenue Income
Grants, Contribution for specific purposes
Secured Loans
Unsecured Loans
Deposits
Deposit works
Total Capital Receipts
Establishment Expenses
Administrative Expenses
Operations & Maintenance
Interest & Finance Charges
Programme Expenses
Revenue Grants, Contribution and Subsidies
Miscellaneous Expenses
Transfer to Fund
Total - Revenue Expenditure
Fixed Assets
Capital Work-in-Progress
Investments -General Fund
Investments-Other Funds
Stocks/Inventory
Loans, Advances and Deposits
Other Assets
Miscellaneous Expenditure
Total Capital Expenditure
Total Income
Total Expenditure
2005-06
1a
1b
1c
1d
1e
1f
1g
1h
1i
2a
2b
2c
2d
2e
3a
3b
3c
3d
3e
3f
3g
3h
4a
4b
4c
4d
4e
4f
4g
4h
2006-07
35.57
0.74
33.76
2007-08
40.14
0.97
2.37
2008-09
37.85
1.49
11.65
2009-10
59.06
1.36
3.11
2010-11
80.43
1.26
3.99
70.07
31.1
43.48
34.06
50.99
58.26
63.53
43.13
85.68
117.48
31.1
14.89
21.79
19.49
34.06
12.66
19.82
6.54
58.26
14
16.41
2.68
43.13
20
17.08
15.71
117.48
19.89
21.63
16.03
188.44
150.62
200.6
202.58
378.19
1.96
1.1
1.92
0.57
246.57
190.74
235.61
255.94
435.74
2.89
1.66
1.89
1.44
1.84
2.89
101.17
249.46
1.66
77.54
192.4
1.89
109.25
237.5
1.44
106.66
257.38
1.84
203.16
437.58
Note: Refer Madhya Pradesh Municipal Accounting Manual for further details. Can be downloaded from "Download" Section of www.mpurban.gov.in.
141
2013
2013
Mandav, also known as Mandu, is a historic walled town spread over 24.87 square kilometers, located to the
North of River Narmada and West of NH3, in south eastern part of Dhar District. It is situated atop a plateau,
part of the Central Vindhyachal hilly region. Lying 600 metres above mean sea level, the town has a
picturesque location and indigenous species of flora such as Khurasani Imli, for which it is widely known.
The town was converted to an NP in 1997, though merging of surrounding villages with the village Mandav.
The current municipal boundary converges with the limits of the historic town, defined by fortification walls.
th
The town finds reference as a hill fort form the 6 century AD, known as Mandapadurg and Mandhavgarh. In
the subsequent centuries, Mandav had association with Gurjara Pratiharas of Kanauj, Parmaras, Imperial &
Malwa Sultanate, Mughals & Marathas. The town still retains parts of the outer and inner fortification walls
and numerous historical monuments. Of the existing monuments, 60 are centrally protected by the
Archaeological Survey of India while 12 are under the State Department of Archaeology. The Group of
Monuments at Mandu is on the UNESCO World Heritage Tentative List and the town is a significant tourist
destination for MP, being part of tourism circuit-Ujjain, Indore, Maheshwar and Omkareshwar.
The population density of Mandav is quite low at 2.53 ppha, as nearly 50% of the population is living in villages
scattered over forest land. With 81.6% ST population, the town has the resource of indigenous tribal
knowledge systems, with respect to flora including medicinal plants, arts and crafts. The majority of population
is dependent on agriculture, despite the conversion to NP and tourism forms the other source of income.
Some significant issues faced by the population are poor social and physical infrastructure facilities, poverty
due to poor access to education and employability or entrepreneurship and lack of industrial base.
Parameter
Existing
Projected by 2035
Population
10,659
18,400
Parameter
Existing
Projected by 2035
Details
Water supply
0.2 MLD
Details
3.11 MLD
Mallipura Talab
Sewerage
0.18 MLD
Discharged
untreated
into
2.33 MLD
forests
SWM
0.6 MT
6.82 MT
Composting sites +
(3.41 MT
2013
compostable
waste)
1400 DUs
Slum
population
regulations
Focus on insitu
upgradation according
to the requirement of
Interest Subsidy
persons
Economic Base: Enhancing tourism based economy, extending tourist season, extending economic
benefits of tourism to villagers, setting up solar and wind farms, better regional connectivity, literacy
drives, improved educational facilities, vocational training and capacity building of local population,
encouraging pisciculture, poultry and dairy, setting up HHIs and SSIs based on local resources, crafts
and traditions, promotion of drip irrigation, better market access to local products, provision of loans
for setting up small scale businesses, integration of tourism, heritage conservation, environmental
protection and livelihood generation,.
Water supply: Provision of new WTP and OHTs, consideration of water supply from Narmada,
desiltation and revival of ponds and creation of new ponds, conservation of catchment of ponds and
revival of water channels to ponds, provision of pond based irrigation system planned considering
ground terrain, increasing coverage of supply lines, development of more ponds, storage of storm
water runoff in ponds for irrigation, revival of kunds and baoris, introduction of drip irrigation.
Sewerage and sanitation: Development of interceptor drains to divert all waste water to reed bed
based systems (decentralized waste water facility), treated wastewater to be reused, laying of trunk
sewer along main road in core area, covering open drains with grating, provision of public toilets and
community toilets and their maintenance, appropriate maintenance and management of existing
public toilets, implementation of sanitation project to eliminate open defecation.
Storm water drainage: Desiltation of ponds and spreading fertile silt on farms, afforestation,
dedicated storm water network, conservation of ponds and natural drainage channels, especially
through Master Plan, development of recharge basins and rain water harvesting structures.
Transportation: Provision of Link to NH3 via Jhabri Village, possible rail link to the town to be
explored, widening and resurfacing of regional roads, strengthening of tourist circuit parking
provision and tourist transport hub at Dhamnod, preparation and implementation of a Traffic
ii
2013
Management Plan, provision of ropeway from Lohani Gufa to Songarh, initiating IPTs for villages,
provision of access roads to all monuments, regular maintenance of roads, provision of parking areas
at city and regional level, starting of tourist and luxury buses, pedestrianisation of congested core
area and alternate clean public transport provision for tourists, linking all existing and potential visitor
attractions with appropriate bus stop shelters.
Urban poor: Connectivity to all villages, revival of ponds for pisciculture and agriculture, provision of
water supply connection to peripheral settlements from Sagar Talab, insitu redevelopment in rural
settlements, increasing income generation of local population from tourism and alternate sources
such as industries based on local flora, crafts and traditions, provision of basic infrastructure to all
settlements.
Environment: Stopping deforestation and undertaking large scale afforestation with plantation of
indigenous species, fuel and fodder trees, provision of grazing grounds, desiltation of ponds, pond
catchment conservation, conservation of drainage channels, garden development along Sagar Talab,
cautious water front development of Sagar Talab as the pond is the source of water supply for the
town and should not be polluted, water front conservation with involvement of tribal population
dependent on these, creation of more ponds to restore water balance in the region, adequate
management of solid waste, development of gardens and revival of baoris, removal of encroachment
form forest land.
Land use, fire fighting and electricity: Afforestation and development of recreational areas, cautious
development to ensure continuity of heritage status and inscription as UNESCO World Heritage Site;
distribution of electricity to and street lighting for peripheral settlement areas and core area,
developing wind farms, solar farms and biogas plants, provision of 3 phase electricity and street
lighting of peripheral settlements, provision of 3 fire fighting vehicles and a fire station, provision of
LED based fixtures with automated switches, solar street lights in public places, provision of electricity
for tourist infrastructure needs (light and sound show etc) with 24 hr supply, APDRP required, control
of electricity theft.
Social infrastructure: Decentralised health and education facilities for the peripheral settlements,
provision of computer and tourism related training institutes, training centre for guides, development
of low cost accommodation for visitors, agriculture training institute/support centre, developing
institutions for technical education and training in handicrafts and HHI trades like stitching, agarbatti
making, souvenir making, etc., setting up training centres for womens empowerment through
livelihood generation, provision of community centre, setting up petrol pump in vicinity, developing
CHC with good health facilities for the town, developing gardens, playgrounds and greens for resident
population and tourists, provision of bank.
Heritage and Tourism: Preparation of Heritage Resource Management Plan that includes systematic
survey and documentation of all above and below ground structures, expansion of tourist circuit with
Dhamnod as transport and accommodation hub, connectivity with NH3 via Jhabri Village, better
access roads, increasing tourist season, increasing stay of tourist, information and interpretation
iii
2013
IEC and Urban Governance: Capacity building of NP officials, e-governance, NP/TCPO to undertake
detailed topographic surveys of municipal area, provision of dedicated development authority office,
housing board office, an Architect and designated Town Planning officer in the town, setting up of
Mandav Heritage Resource Management Authority, computerization of data, maintenance of regular
photographic record of NP Properties, mapping of services, single web portal to ensure coordination
between Government Departments, enforcement authority and staff to be provided to various
departments to ensure stricter enforcement. E.g.: Forest Department, Nagar Parishad.
Summary of CIP:
Total
S.
Sector of
Investment by
Investment by 2027
Investment by
Investment (In
No.
Investment
2017(In Crore)
(In Crore)
2037(In Crore)
Crore)
Water Supply
Sewerage
21.65
7.74
0.08
29.47
0.73
0.02
0.03
0.79
6.07
3.11
0.32
9.51
Storm Water
3
Drainage
Solid Waste
Management
0.55
0.00
0.00
0.55
Sanitation
2.88
1.07
0.48
4.43
30.55
9.93
0.00
40.48
12.29
21.17
23.78
57.25
0.58
0.08
0.13
0.79
5.88
6.72
0.00
12.60
30.63
24.76
36.78
92.16
1.27
5.08
8.28
14.62
34.50
38.90
32.66
106.07
Traffic &
6
Transportation
Electricity &
Street Lighting
Fire Fighting
Basic Services
9
10
11
Governance
Heritage and
12
Tourism
13
Education
3.94
2.92
1.59
8.45
14
Health
2.12
1.85
0.00
3.97
15
Social
1.13
0.39
0.00
1.52
iv
2013
Total
S.
Sector of
Investment by
Investment by 2027
Investment by
Investment (In
No.
Investment
2017(In Crore)
(In Crore)
2037(In Crore)
Crore)
Infrastructure &
Other Projects
Total
154.80
123.73
104.11
382.65
Investment
No.
Sector of Investment
Water Supply
(In Crore)
Responsible agency/deptt.
29.47
NP
Sewerage
0.79
NP
9.51
NP
0.55
Private Contractor
Sanitation
4.43
NP
40.48
57.25
Fire Fighting
0.79
12.60
NP
Beneficiaries + NP
Forest Department + NP + MNREGA Nodal Agency
10
Environment
92.16
+ MP Tourism
11
Urban Governance
14.62
NP + Private Party
MP Tourism + Mandav Heritage Resource
Management Authority + Private Party + ASI + State
12
Heritage
106.07
Department of Archaeology
13
Education
8.45
14
Health
3.97
1.52
Misc
Projects
Some of the key projects emphasized by the Citizens to be taken up in Phase 1 are:
Preparation of Heritage Resource Management Plan and Mandav Heritage Resource management
Authority, above and below ground surveys of heritage resources, creation of database on the
mapping of the resources, ownership and services, conservation and adaptive reuse and
interpretation of the protected and unprotected resources, leading to nomination as world heritage
site.
2013
Extending the stay of the tourists in keeping with carrying capacity, development of tourist
infrastructure that benefits the local population, promotion of livelihood opportunities based on local
culture, resources and knowledge systems.
Setting up of research and dissemination centre for cultural heritage resources including knowledge
systems and traditional arts and crafts.
Afforestation, conservation of water bodies, conservation and recharge of catchment areas, creation
of more ponds, provision of water supply to peripheral areas.
Insitu upgradation of houses in peripheral settlements and provision of basic services to these areas.
Vocational training to promote skill development and setting up of HHIs and SSIs, promotion of
agriculture and improved market access for local goods.
The cost of all projects is estimated at 366.49 Cr including projects on Economic base, Tourism and Social
Infrastructure (382.65 Cr including projects on social infrastructure and urban governance; and excluding
projects on economic base). For this, the NP would have to generate an amount of 19.73 Cr in first 5 years.
Since the NP can only generate around 9 or 10 Cr, the remaining amount is proposed to be given by State
Government as loan or grant to the ULB.
vi
2013
TABLE OF CONTENTS
PART I
Chapter 1 : Intr oduction
1. 1
1. 2
1. 3
1. 4
Pr oj ec t In trodu ct ion
S cop e of Wo rk
M eth odo logy Ad opt ed
Pr og r es s s o far
1
1
4
5
2. 1 In t rod u ct ion t o th e To wn
2. 2 Hi s tor ic al Im p ort an c e
2. 3 D i str ic t In fo r mat ion
2. 4 Lo cat ion
2. 5 Phy s iog raphy and La ndfo r m ( C en su s, 20 0 1; Analy ti cal not e and Di st ric t
Re s ou r ce Ma p s)
2. 6 M u n i cip a l A r ea a n d P la n n in g A re a
8
8
9
11
13
19
20
20
20
21
22
23
24
4. 1 S e x R ati o
4. 2 L it era cy Rat e
4. 3 A v er ag e H ou s eh ol d Siz e
4. 4 Wo rk fo rc e P art ic ipa tion
4. 5 In d u s tri al Ac ti v ity
4. 6 Trad e an d Co m m er c e
4. 7 Lab ou r
4. 8 Tou r i s m
4. 9 S WO T An a ly si s
4. 10 I ss u e s
4. 11 Ci ty Sp ec if ic St rat e gi e s an d A cti on P lan
24
24
25
25
25
28
29
29
30
31
31
33
5. 1 Sp ati al G ro wth T re n d s
5. 2 Sp ati al Di stri buti on of Popu lat ion
5. 3 Mu ni cipa l L e vel Ma p p in g and Ward D el in eat i on Ma p
5. 4 Lan d u se An aly si s
5. 5 M a st er Plan Pr o vi s i on s
5. 6 Hou s in g S c en ar io
5. 7 Pr e s en t an d Fu tu r e Hou sin g De ma n d
5. 8 Il l eg al Co lon ie s
5. 9 Fu tu r e gro w th P os s i b ili ti e s
5. 10 Ci ty Sp ec if ic St rat e gi e s an d A cti on P lan
33
34
35
36
37
40
41
42
42
43
44
i
2013
Chapter 7 : Sewerag e
54
7. 1 E x i stin g s e w era g e sy st e m
54
7. 2 M ea n s o f s ew a g e d i s p o s a l
55
7. 3 C o mp ar ati v e analy s i s wi th UD PF I, CPH EEO g u id eli n e s and Pr e se n t a nd Fut u r e
De m a n d a n d Su p p ly Ga p s
55
7. 4 S WO T An a ly si s
55
7. 5 I s su e s
56
7. 6 C ity sp e ci f ic st rat e gi e s an d A cti on P lan
56
Chapter 8 : Sanitati on
8. 1
8. 2
8. 3
8. 4
8. 5
8. 6
8. 7
8. 8
57
57
57
57
58
58
59
59
60
61
9. 1 Qua n ti ty o f W a st e G en era te d
61
9. 2 C on st itu en t s o f mu n ici p al w a st e
61
9. 3 C u r r en t p r a ct ic e s o f Sol id wa st e m a n a ge m en t a n d V eh i cl e s for sol id wa st e
col l ect ion and Tr an sp o r tatio n
61
9. 4 Wa s te stor ag e & se g re gat ion
62
9. 5 P r i ma r y a n d s e con d a r y c ol le ct io n
62
9. 6 Pr oc e s si n g an d d is p osa l
62
9. 7 R eu s e an d r e cy c lin g
62
9. 8 E sti m ati on o f wa st e col l ect ion
63
9. 9 S ta ff s tr en gth
63
9. 10 Co mp arat i v e an aly si s w ith U DP FI, C PHEEO guid e lin e s an d Pr e s en t and Fu tur e
De m a n d a n d Su p p ly Ga p s
63
ii
2013
9. 11 SW O T An aly s i s
9. 12 I ss u e s
9. 13 Ci ty Sp ec if ic St rat e gi e s an d A cti on P lan
63
64
64
65
10 .1 E xi st in g D rai n ag e S y st e m
65
10 .2 Maj or wa te r b o d i e s
66
10 .3 Pr im ary, seconda ry and t er tia ry dr ain s
66
10 .4 Fl ood p ron e a r ea s and f loo din g in ca tch m e n t ar ea of majo r na lla h
66
10 .5 Co mp arat i v e an aly si s w ith U DP FI, C PHEEO guid e lin e s an d Pr e s en t and Fu tur e
De m a n d a n d Su p p ly Ga p s
66
10 .6 Prop o se d P roj ec t s
66
10 .7 SW O T An aly s i s
66
10 .8 I ss u e s
67
10 .9 Ci ty Sp ec if ic St rat e gi e s and A cti on P lan
67
68
68
68
71
72
72
72
73
73
73
73
74
74
74
76
Chapter 13: Urban Poor and their Accessibi lity to Basic Services
82
13 .1 Po v erty in T ow n
82
13 .2 S epar at e i n for mat i on on BP L Po pula tion an d Sl um Popu lat ion
82
13 . 3 Slu m s in t h e To wn a n d Gen e r a l Ch a r a ct er i s t ic s o f S lu m s/ A r ea s w it h u r b a n
p oor
82
13 .4 Loc ati on o f Slu m s on To wn Map
85
13 .5 Sta tu s o f Slu m s
85
iii
2013
E d u c ati on
He alth
Sp o rt s an d R e cr eat ion
Co mp ari s on wi th U DP FI gu id e lin e s a n d CPH E E O Gu id e lin e s
SW O T An aly s i s
I ss u e s
Ci ty Sp ec if ic St rat e gi e s and A cti on P lan
94
94
95
95
95
95
96
96
96
98
17 .1
17 .2
17 .3
17 .4
89
89
89
90
91
92
92
94
Fl ora an d Fau n a
E n v ir on men tal C on ce rn s
Pol lu t ion Le v e l s
Ci ty Gr e en Sp a c es
Wat er F ron t D e v el op m en t an d Con s e r vat io n
E xi st in g e n vir on m e n tal re gu lat ion s
SW O T an aly s is
I ss u e s
Ci ty Sp ec if ic St rat e gi e s and A cti on P lan
Chapter 17
86
87
87
87
89
85
85
86
86
Institutional Framework
98
10 2
10 2
10 3
10 4
10 6
10 7
10 7
10 8
10 8
111
In tr od u c tio n
In sti tu ti on s an d O r gan i s ati on s
I ss u e s
Ci ty Sp ec if ic St rat e gi e s and A cti on P lan
11 1
11 1
11 5
11 5
117
18 .1 In tr od u c tio n
11 7
iv
R e ve n u e A cc ou n t / Fin a n c ial P o s it i o n
R e ve n u e C o mp o si ti on
E xp en d i tu r e P att er n
K ey Fina nc ial I ndi c at o r s
Maj or Ob s er vat ion s
2013
11 7
11 7
12 1
12 2
12 2
123
12 3
12 3
126
PART II
Chapter 21: INVESTMENT PRIORITIZATION AND IDENTIFICATION OF PROJECTS
21.1 Project Quantification and Phasing
21.2 Key Considerations
21.3 Economic Base
21.4 Water Supply
21.5 Sewerage
21.6 Sanitation
21.7 Drainage
21.8 Solid Waste Management
21.9 Urban Poor
21.10 Transportation
21.11 Environment
21.12 Land Use, Electricity and Streetlighting
21.13 Social Infrastructure
21.14 Heritage and Tourism
21.15 IEC Reforms
21.16 Institutional Reforms
133
134
134
136
139
142
142
143
145
146
147
150
152
155
157
166
167
169
169
169
176
181
182
184
187
189
191
194
198
203
206
220
222
224
228
v
2013
LIST OF ANNEXURE
Annexure I: List of Attendees in Kick of Workshop
vii
ix
xii
xiii
xvi
xx
xxi
xxiii
xxiv
xxv
xxvii
xxviii
xxix
xxxi
xxxii
xxxv
xxxvi
vi
xlv
2013
CHAPTER 1: INTRODUCTION
1.1 Project Introduction
Under the Madhya Pradesh Government initiative of Preparation of City Development Plan for various Cities
of Madhya Pradesh, IDFC was awarded the project for Preparation of City Development Plan for Mandav in
October, 2011 by the Urban Administration and Development Department of Government of Madhya Pradesh.
Aim of CDP
The City Development plans are dedicated to the goal of creating cities which are economically productive,
efficient, equitable and responsive. The City Development Plan will focus on the comprehensive development
of the city through the development of economic and social infrastructure, upliftment of quality of life for
urban poor, strengthening the Municipal bodies and their financing mechanisms, enhanced accountability and
transparency; and elimination of legal and other bottlenecks which have impacted the land and housing
market in the city. The City Development Plan will set the platform to usher the city towards urban sector
reforms which will initiate direct investment in the city infrastructure.
Demography
Economic base
Infrastructure
Water supply
Sewerage
Drainage
Street lighting
Urban poor
Housing
2013
The categories under Inadmissible components of the Jawaharlal Nehru National Urban Renewal Mission
(JNNURM) shall also be included. Based on the data collection and surveys, an analysis of the present status of
the city shall be done to identify the potential areas for development and the bottlenecks. Based on the
understanding of the evolution and functioning of the city, an analysis to understand the Citys Strengths,
Weaknesses, Opportunities and Threats (SWOT) shall be undertaken to identify the issues of concern and the
potential sectors for the citys development.
2) Development of a vision for the city
The City Development Plan would aim at developing a vision for the citys future based on consultations with
the citizens representatives. A city vision would be formulated based on an assessment of the existing
situation to determine where the city is and where it wants to go. Vision for the city shall be developed
based on assessing the strengths and weaknesses of the city and identification of the sectors where the city
has maximum potential for growth. This vision would bank upon the cities competitive advantages in the
local, regional and national context while considering the preferences of the citys residents.
A vision for the future development of the city over the next 25 years, which is based on consensus amongst
the citizens, shall be identified and all the future objectives, strategies and targets shall have to be aligned with
this vision. The outcomes and milestones for the vision would be defined within a time frame.
3) Sectoral goals and Strategies
In line with the vision formulated for the development of the city, the prime sectors would be identified which
need to be focused on in order to materialize the vision for the city. This would be done in consultation with
the citizens representatives. After identifying the priority sectors, a strategy for the development of each
sector shall be formulated in consultation with the citizens and based on this, the sectoral goal and targets
shall be defined. Mandatory and Optional reforms in governance, as listed under JNNURM, shall also be
proposed.
4) Prioritization of strategies and evaluation of alternate strategies
The Sectoral strategies and goals shall be prioritized and selected based on the relevance to the Vision and to
the upliftment of urban poor. A well defined prioritization strategy shall be formulated for selection of
strategies.
5) Identification and Prioritization of Projects
Based on stakeholder consultations, relevance to the vision and maximum impact, a set of projects shall be
identified which need to be implemented in order to attain the Vision. These projects shall be sectoral and
shall be prioritized based on strategic planning. A broad Master Plan for the city would also be prepared to
direct future growth of the city. This will also facilitate in aligning the future growth of the priority sectors with
the citys spatial framework.
2013
2013
Demography
Urban Poor
Economic base
Housing; Industries
Infrastructure
Financial
profile
of
the
Municipality
Water supply; Sewerage
Solid waste management
Drainage; Street lighting
Traffic and Transportation
INCEPTION REPORT
Sectoral Analysis
City Profiling
SWOT Analysis
Project costing
Determination of sources of funding
Scheduling of priority actions
Development of CIP
2013
List of deliverables
1) Inception report (including report of Kick off workshop)
nd
2) City Profile, Sector Analysis, City Vision, strategy and priority projects (including report on 2 Workshop)
3) Draft CDP (including City Level Workshop)
4) Final CDP
Team Structure
Experts
Team Leader
Economist
Governance Advisor
Municipal engineer
Urban Planner
1.4
Progress so far
The contract for the Project was signed in the third week of October and the Project team conducted a
reconnaissance survey of the city in the second week of November and initiated consultations with the Nodal
Officer, data collection and surveys.
2013
In order to ensure higher level of participations by the Urban Local Bodies (ULBs), a District level Meeting
th
under the Chairmanship of Collector, Dhar was conducted on 15 November, 2011 where the CMOs of 8
towns of Dhar district, including Mandav, were briefed on the process and outcomes of the City Development
Plan (CDP). Details of the meeting are given in Annexure.
The process of consultations and data collection for Mandav started with meetings with the CMO and other
ULB Officials. Collection of primary data available with the ULBs was initiated with the distribution of the list of
data identified in the toolkit. The project team contacted the ULBs in each city and collected the data that was
readily available, with a request for additional data required. Apart from the ULB, data collection from other
related departments at town and district level like Forest Department, DUDA, TCPD, etc. was also initiated. A
major thrust of the field-based research was to map the existing spatial and land use structure of the city and
to understand the socio-economic condition of the citizens.
Kick off Workshop and Inception Report
th
The kick off workshop for Mandav City Development Plan was conducted on 25 November, 2011 under the
Chairmanship of CMO, Mandav. The workshop was attended by NP Officials, Citizen representatives, Farmer
representatives, tribals, Journalists, traders, among others. The meeting began with a presentation by the IDFC
team introducing the scope, process and coverage of the City Development Plan. This was followed by a
briefing of the onsite observations made by the team. After the objectives, goals and process of CDP
preparation were explained to the attendees, the citizens were invited to give their views on the key issues,
status of infrastructure provision, condition of urban poor, growth potentials and other aspects of the city. The
inception report was submitted in November, 2011.
Second Stakeholder Workshop
Another trip of the town was conducted in January, 2012 for data collection and discussions with key officials
rd
and citizens. The second stakeholder workshop for City Development Plan, Mandav was held on 3 February,
2012 in NP, Mandav under the Chairmanship of Municipal President. The workshop saw a high turnout. The
participants included prominent Councillors, senior citizens, Government officials, NP officials, taxi drivers,
journalists; and others. The workshop began with a presentation by the IDFC team on the sectoral analysis,
SWOT (Strengths Weaknesses Opportunities Threats) analysis and understanding of the town. As a part of the
workshop, the vision for the town was also formulated and discussions on existing and proposed land use were
also undertaken.
The minutes of the meetings and list of participants are attached as Annexure.
Third Stakeholder Workshop
th
The third stakeholder workshop was held on 24 September, 2012 and the CDP was approved by the Parishad
in 2013.
2013
The planning for Mandav city has usually been done in a sect oral manner which focuses more on the
tourism and heritage aspects and pays little or no attention to the rural wards and agricultural areas
outside the core city
The villages that have been included in the Municipal boundary have still not been provided with basic
services but at the same time, due to inclusion in Municipal boundary, these villages cannot access the
facilities provided by the Gram Panchayat
The Southern point of Mandav, which is not even provided with a proper access road; has the potential
to be connected to the NH3. This alternate entrance to Mandav will not only ease the traffic access to
the town but will also provide more livelihood opportunities to villagers
The Temria pond, Sagar talab and other ponds in the town need to be desilted, the present capacity of the
ponds has been reduced due to siltation
Mandav has the potential to the included in the World Heritage Site listing
Presently, the tourist traffic to Mandav is limited largely to 3 monsoon months. The tourists stay in
neighbouring towns and visit Mandav for a few hours. Most tourists only visit a few monuments in the
core area. Hence, there is a need to extend the tourist stay in Mandav by introducing more tourist
activities like cultural events at night
Mandav needs to be provided with an alternate source of water supply as Sagar Talab dries out due to
siltation and water usage for irrigation
More employment generation and educational infrastructure needs to be undertaken for the tribal
population
The traditional trees of Mandav need to be restored as these are also a means of livelihood for the tribal
population. Deforestation along the slopes of the plateau has led to extensive erosion and siltation of
water bodies in the valley.
Activities like sound and light show and cultural events need to be introduced in Mandav to attract
tourists to spend more time in the town.
A walkway along the valley can be developed connecting NP guest house to Songarh fort. This would offer
the tourists with a beautiful view of the valley.
2013
Figure 2.1: Location of Mandav in the State and the District Dhar. Source: Census of India
The town of Mandav is located in Dhar District of Madhya Pradesh. Located strategically on a plateau,
historically the town was a military stronghold in the form of a hill fort. Parts of the fortification are still intact
and define the town boundary. It is an important place from tourist, archaeological and historical points of
view, with a number of monuments protected by the Archaeological Survey of India (ASI) and some more
under the State Department of Archaeology. Enclosed by forest areas that extend into the town boundary,
Mandav is dominated by tribal population and the economy is based on tourism and agriculture.
th
dynasty who ruled over Malwa from the 9 13 century, excavated the Munja Sagar at Mandav, also known
as Mandhavgarh and Mandu.
In the year 1305, A.D. the whole of Malwa passed into the hands of Al-ud-din Khalji when Dhar and Mandu
were also captured. Dhar continued to be under Delhi Sultans until the reign of Muhammed II. At that time,
Dilawar Khan Ghuri was the Governor of Malwa. In 1401 A.D. Dilawar Khan Ghuri, Governor of Malwa under
the imperial Sultanate assumed royalty and established an independent Kingdom of Malwa, with his capital at
Dhar. His son and successor, Hoshang Shah moved the capital to Mandu. Hoshang Shah died in 1435 A.D. and
was entombed in the splendid mausoleum which is still existing at Mandu. On Hoshang's death his son, Ghazni
Khan, succeeded him. He ordered his capital Mandu to be called "Shadiabad (the City of Joy). In 1436 AD,
Malwa came under Khalji Sultans who continued to rule Malwa till 1531 A.D. Later, Malwa was captured by
Sher Shah and was placed under the charge of Shujat Khan. Shujat Khan was succeeded by his son Baz
Bahadur. Mandu and its environs reverberated with the stories of romance of Rupmati and Baz Bahadur.
2013
When Baz Bahadur was defeated and put to fight by the Mughal army, his beloved Rupmati took poison and
put an end to her life to escape dishonour.
In the administrative organization of Akbar, Dhar was the Chief town of a Mahal in Mandu Sarkar of the Subah
of Malwa. Akbar stayed at Dhar for seven days, while directing the invasion of Deccan. He also visited Mandu a
number of times. Mandu was also a favourite resort of Emperor Jahangir, who stayed here for over six months
in 1616 A.D. In his memoirs, Jahangir paid glowing tributes to the pleasant climate and pretty scenery at
Mandu. Noorjahan shot four tigers with six bullets, from the back of an elephant, near Mandu.
Along with these historical associations and political significance, the monuments at Mandav are architectural
landmarks and reflect a unique vocabulary of Islamic architecture. The architectural style of these forms an
important link in the development of the Indo Islamic architecture in the country in the medieval period.
At present, Mandav is one amongst the significant tourist destinations of Madhya Pradesh and the most
important one in the Dhar District. At the State level, there are four main tourist circuits, of which Mandu is on
the eastern most one that includes Ujjain, Indore, Maheshwar and Omkareshwar. There is potential to expand
the circuit to include destinations of cultural significance and eco-tourism as a complete package or on
thematic basis to more areas around Mandav such as Dharampuri and Burhanpur to the South, Dhar and
Mohankheda Tirth (near Rajgarh) to the North and North west, Bagh Caves and the Katthiwada region in
Alirajpur to the West.
Historically, the hill fort was connected to Dhar, being the military stronghold of the seat of power in Dhar.
Mandav has a number of places of tourist interest that includes areas of architectural significance, such as
Jahaz Mahal, Hindola Mahal, Tomb of Hoshang Shah, Palaces of Rani Rupmati and Baz Bahadur, Nilkanth
Palace, water tanks and stepwells; archaeological significance and those of environmental and religious
tourism. It has potential to be developed as an ecotourism and adventure sport tourist destination.
Dhar District is situated in the south western part of Madhya Pradesh and lies between 22 01and 23 09' North
0
latitudes and 74 29' and 75 42 east longitudes. It forms a part of Indore division and is 61 km. west of Indore.
Dhar derives its name from dhara-nagari which means the city of sword-blades, a name possibly given with
regard to its having been founded, conquered or held by the strength of the sword. Historically and culturally,
Dhar district has occupied an important place from the ancient to the modern period. Dhar city served as a
th
capital city for Parmara rulers upto the 13 century AD and later as capital of the Malwa Sultanate. It was an
important centre of revolt during the first war of independence in 1857.
Economy of the district is mainly dependent on agriculture and the district is famous for the group of
th
th
monuments at Mandu and the Bagh Caves with paintings dating back to 5 7 century period. Mandav is a
major tourism attraction in the district, bringing in national and international tourists.
2013
Dhar District has a higher growth rate, sex ratio and density compared to that of the State and a lower literacy
rate. The District ranks as 7th amongst the 50 districts of the State as per the decadal growth rate, with Indore
District having the highest growth rate of 32.7. It ranks 21st in terms of Literacy rate and 15th in terms of sex
ratio as per the 2011 Provisional Census Data.
Table 2.1: Demographics for Madhya Pradesh, 2011
State
Population
Growth Rate
Sex Ratio
Madhya Pradesh
72,597,565
20.3
930
Literacy
Rate
70.6
Density/sq.
km
236
Table 2.2: Demographics for the District Dhar, 2001 and 2011
27.3
Proportion of
population (0-6 years)
19.5
Sex
Ratio
955
Literacy
Rate
52.5
Density/sq.
km
213
25.53
16.0
961
60.57
268
Year
Population
Growth Rate
2001
1,740,329
2011
2,184,672
The population of the district has increased from a figure of 1,740,329 in 2001 to 2,184,672 in 2011. Although
the population has grown over the decade, the rate of growth has declined. Between 1991 and 2001, the
growth rate for the district was 27.3, whereas the rate is 25.53 in 2011. The proportion of children between
the age of 0 to 6 has also declined in the district. Sex ratio has improved and literacy rate is suggestive of
advancement. Density has also increased from 213 to 268 persons/square kilometre.
The 2001 Census information divides the District onto 7 tehsils, though as per information from the District
Statistical Handbook, 2009, the District is divided into 8 tehsils the additional one being Dahi (Source:
http://dhar.nic.in/admin.htm). The tehsils of the District are further divided into 13 CD Blocks. Mandav is a
part of the Dhar Tehsil that has the maximum area and population amongst all tehsils of the District as per the
2001 Census data as illustrated by the table below.
Table 2.3: Tehsil Details of Dhar District
1991
2001
Name of Tehsil
Population
Population
Area(sq.km)
Badnawar
Sardarpur
Dhar
Gandhwani
Kukshi
Manawar
Dharampuri
154,121
184,943
312,411
98,568
293,380
205,532
118,457
193,688
230,251
431,636
122,172
356,206
254,924
151,452
1010.44
1245.45
1678.58
452.56
1394.55
1025.00
398.70
Population per
square kilometre
192
185
257
270
255
249
380
The town of Mandav is a part of the Nalcha Block within the Dhar Tehsil that ranks 10th in terms of population
amongst the 14 blocks of the District and has the lowest sex ratio of 856, as seen in the following table.
10
2013
Block/District
Dhar
Tirla
Nalcha
Badnavar
Kukshi
Bagh
Nisarpur
Dahi
Manavar
Umarban
Gandhwani
Sardarpur
Dharampuri
Dhar District
Male
88210
36728
101942
98626
47153
45887
39247
47341
75454
53489
106132
72635
148844
961688
Population
Female
Sex Ratio
82179
932
35278
960
87299
856
95062
964
46268
981
45462
991
38627
984
46221
976
73438
973
52543
982
102384
965
71272
981
222724
1496
998757
1038
Total
170389
72006
189241
193688
93421
91349
77874
93562
148892
10832
208516
143907
371568
1960445
2.4 Location
Madhya Pradesh is located in the heart of the country, surrounded by the states of Rajasthan, Gujarat,
Maharashtra, Chhattisgarh and Uttar Pradesh. The district is situated in the south western part of Madhya
o.
Pradesh and lies between 22 01 and 23 .09 North latitudes and 74 29 and 75 42 East longitudes. District
Dhar is surrounded by tribal population dominated Jhabua and Alirajpur districts to the west. Ratlam district
lies to the north of the district, Ujjain to north east, Indore to east, Khargone to south east and Barwani district
its south.
The NH 59/SH22 cuts through the middle of the district while NH 3 cuts through its south east corner. Mandav
is located 300 kms from the state capital Bhopal, 35 kms from the district headquarter Dhar and approx 85
kms from Indore. Rail and air connectivity to Mandav is through Indore. Its geographical coordinates are
22207 N -752457 E.
11
2013
Mandav
12
2013
2.5 Physiography and Landform (Census, 2001; Analytical note and District Resource Maps)
The Dhar District extends over three
physiographic divisions- the Malwa
Plateau
in
the
north,
Central
the
central
part
has
the
maximum slope ranging from 20-80 mts/km. This is primarily because the ridge of the Vindhyas passes through
this part of the district. The southern part of the District is the lowest, being in the basin of River Narmada.
Mandav lies in the belt having a general elevation of 300-450 metres above MSL and a slope of 10-20 mts/km.
Mandav is a part of the Vindhyachal region. The Central hilly region comprises ENE-WSW trending ridges which
have steep slopes and scarp faces on the southern side. The highest elevation in the district i.e. 751 meters
above mean sea level is located in this region. A part of the Vindhyachal Range extends in the Dhar District in a
crescentic belt generally from south-east to north-west. A strip of hilly area represents the range 5 to 20
kilometres in width. It is about 5 km. wide near village Dhani, the south-eastern boundary near Mograbav in
the centre. It is about 10 km further widening to 20 km west of Tanda. To the west of Bagh and Kukshi, the
Range stands disconnected by the valley of the Mahi and Hatni. It restarts along the Narmada in the southwest. The northern spur (peak 543.76 metres) forms the boundary between the Sardarpur tehsil and Jhabua
district. It extends from the peak of Gomanpura (556.26 metres) to Bajrangarh in Jhabua. Another spur
extends towards Jhabua in the north-west. The great Vindhyachal range extends generally from west to east
and scarps at most of its length towards the south. In Dhar also the southward scarps are well marked the wall
rising from 400 to 600 metres. However, in the western part their faces have been eroded back into long and
deep rugged valleys of the tributary hills of the Narmada. In fact the strong currents of the small streams on
the steep southern side have cut back at their heads. The numerous streams of the Narmada valley find their
sources on the Malwa plateau. The main line of the highest peaks has been left to the south of their present
courses.
In the eastern and central parts of the Vindhyachal in Dhar the main hill range is continuous but in the west
deep channels of the rivulets dissect it. The range slopes towards the north and gradually meets the Malwa
13
2013
plateau. Numerous spurs also extend over the Malwa plateau in the north. But in the western half in the
district one may also find a series of denuded ridges alternating with the parallel stream-channels and running
for some kilometers from north to south. The phenomenon leads the marked excel of the Range into a local
confusion, unless one tries to trace the line of the main peaks. The highest peak of the district Mograba
(751.03 meters) lies in the central part Nikanth (702.26 meters) lies further east and Shikarpura hill raises up to
698.91 meters. The famous historical fort of Mandugarh towers (the flat topped) about 600 meters, above the
mean sea level.
Mandav is situated at the top of an offshoot of the Vindhyan Range, rising 2,079 feet above the sea level and
separated from the main plateau of Malwa by a deep ravine, which is forested with magnificent trees. The
gorge encircles the Mandu hill on three sides and emerges into the Nimar plain that lies 1200 feet below the
fort on the south. The top of the hill is almost flat, except a few knolls and extends 4.5 to 6 kms from north to
south and 6 to 7.5 kms from east to west. The table land is interspersed by many lakes and pools.
Drainage
The Central hilly region forms water divide between the Northward flowing rivers of Mahi and Chambal
drainage and the southward flowing tributaries of the Narmada River including Baghain, Uri, Man and Karam
rivers. The drainage pattern in the northern part is sub-dendritic to sub parallel, whereas it is dendritic with
local sub parallel pattern in the southern part.
The southern part of the district lies in the catchment area of the Narmada, which forms the southern
boundary. Chambal, Mahi and Bagh rivers flowing northerly drain the northern Malwa plateau region. The
Chambal and its tributaries drain the north eastern part; it forms the catchment area of the Ganga. The north
western part drains into the Mahi. The water dividing line between the Narmada and the Chambal and the
Mahi are separated by the off shoot range, which runs along the Sardarpur Jhabua boundary. Water from
Mandav drains into the Karam River, which is a tributary of the Narmada River.
The Narmada River flows along the southern boundary of the district in a different valley from east to west
o
with a southern inclination along a mega lineament. It rises from the Amarkantak plateau (22 40) of the
o
Satpura range in Shahdol district. Flowing to the west it touches the district at Lasangaon (75 31 East) at the
confluence with the Karam. It forms the southern boundary of the district along with that of the West Nimar
for about 107 kilometres. It receives Boad, Dob, Mahali and Crol on its left while Kamar, Man and Bagh join its
right bank.
14
2013
Geology
Dhar district consists of units of
extrusive origin, denudational and
fluvial origins. As seen in figure 2.5,
Mandav
lies
in
denudational
According to District
Mandav
this region.
In terms of lithology, Mandav is constituted by Indore Formation (Compound pahoehoe and Aa flows with
mega-porphyritic flow at the top 6 flows) and Kankaria-Pirukheri Formation (simple porphyritic flows with
mega-porphyritic flow at the top 7 flows) that come under the Deccan Trap (Malwa Group) group with
respect to strategraphic status (see figure 2.5). Iron-ore was reported to be found in Nimanpur itself but was
not worked. Other minerals found in the region are sandstone, red and yellow ochres, potters, clay and lime.
The iron-ore deposits in the district are found in irregular masses of breccias and important occurrence are at
Bagh in Kukshi Tehsil, but these deposits are not supposed to be large enough to make their exploitation
economical.
15
2013
16
2013
Aquifers
in
Figure 2.6: Soil Map, District Planning Series-Dhar District, MP, Survey of India
most
valuable
for
growing
characterized
as
bhuri
covers
the
old
valley into rugged and broken hills and valley with water sources and soil that is not too rich. The water
potential of the Mandav region is high in the foothills but owing to the location of town on top of a plateau
and underlying basalt rocks, the groundwater potential around the town is limited. According to District
Resource Map, the depth to water table in and around Mandav is between 6 to 9m.
17
2013
Climate
The district and the town enjoy a pleasant climate. It is generally dry except in the monsoon season. The year
may be divided into four seasons. The hot season from March to about the middle of June is followed by the
monsoon season lasting up to end of September. October and November may be termed the post-monsoon
season. The period from December to February is the cold season. There is no meteorological observatory in
the district. After February there is steady increase in temperatures. May is the hottest month with the mean
O
daily maximum at about 40 C. The days are very hot during the summer with the maximum temperature on
0
individual days sometimes rising up to about 44 C or 45 C. With the onset of the south-west monsoon by the
second week of June there is appreciable drop in temperature and the weather is cool and pleasant. In
September, day temperature rises and in October, it reaches a secondary maximum. After October, day and
night temperature decrease rapidly, January is generally the coldest month with the mean daily maximum at
O
about 27 C and the mean daily minimum at about 10 C. Cold waves affect the district in the area of passing
western disturbances across northern India and the minimum temperature may drop down occasionally to
o
about the freezing point of water. The average maximum temperature of Mandav is 44.5 C, average minimum
o
temperature as 18 C.
Figure 2.8: Climatic
Conditions Map,
District Planning SeriesDhar District, MP,
Survey of India
The average annual rainfall in the district is 833.1 mm. The southern and south eastern part of the district gets
less rainfall than elsewhere but in the southern parts in the region of Mandav the rainfall is higher. Over the
last five years, the rainfall has been lesser than usual, with an average rainfall of 750 mm (Source: NP,
Mandav), due to which there has been a scarcity of water.
Winds are generally light in the post-monsoon and winter seasons and strengthen in the summer and
monsoon seasons. Winds blow mostly from direction between southwest and north-west during the monsoon
18
2013
months. In the post- monsoon and winter seasons the winds are mainly north-eastern or eastern. By March
winds from directions between south-west and north-west appear and by April these become predominant
and continue in the rest of summer and the monsoon season.
potential
for
The main town is confined to a few houses along the central spine (spread over an area of approx. 5 sq kms),
which would account for a population of 3679. The remaining population is scattered in farmlands and forests
which spread across the NP boundary. This population comprises of tribals who live in hutments and practice
agriculture.
Discrepancies in NP area
According to NP documents, the NP area is approximately 42.2 sqkm. But when the Municipal boundary was
overlaid on satellite imagery, the Municipal area comes out to be 24.87sqkm.
A Master Plan for the town was prepared for the target year 2011. But this Master Plan has not been yet.
According to the Master Plan, the Investment area for the town comes out to be 25.74 sqkm. According to
superimposition on satellite imagery, the investment area comes out to be the same (25.74 sqkm).
19
2013
Year
Total
Male
Female
1991
2001
2011
6,660
8,544
10,659
4,370
5,385
4,174
5,274
Number of
Households
1408
1821
Household Size
Sex ratio
6.1
5.85
955
979
The number of households in the town is 1821 (Preliminary Census estimates, 2011). The population of
Mandav as per 2001 census was 8,544 and a sex ratio of 955. The population increased to 10,659 in 2011 and
the sex ratio increased to 979.
As presented in table 3.2, the decadal growth rate of Mandav from 2001 to 2011 is 24.75%. Decadal growth
rate was 28.28% between 1991 and 2001; hence, the decadal growth rate for the town has gone down over
the last decade. The growth rate for Mandav in 2011 is higher than the State and national rates over the same
decades. Mandavs decadal growth rate was higher than the District figure for 1991-2001 but lower than the
District figure for 2001-2011.
Year
Population
1991
2001
2011
6,660
8,544
10,659
Decadal
Growth Rate
(%)
28.28
24.75
Decadal Growth
Rate (%)India
23.86
21.34
17.6
27.24
24.34
20.30
Decadal Growth
rate (%) Dhar
District
29.3
27.3
25.53
Source: Decadal growth for India and MP from Census of India, 2001 and 2011
Year
Linear
Method
Exponential
Method
Weighted
Average
2015
11459
11836
11710
11689
2020
12459
13490
13171
13106
2025
13458
15377
14814
14682
2030
14458
17527
16663
16439
2035
15458
19978
18742
18400
20
2013
Projected Population
20000
15000
10000
5000
0
2015
2020
2025
2030
2035
Ward No.
Wards
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Gadashah Ward
Ram Mandir Ward
Jahaz Mahal Ward
Jama Masjid Ward
Rampura Ward
Lal Bangla Ward
Dariya Khan Ward
Neelkanth Ward
Tarapur Gate Ward
Eco-point Ward
Rani Roopmati Ward
Bhagwansh Gate Ward
Mansingi Ward
Kanadipura Ward
Jahangirpur Gate Ward
Total
Total
Population
736
660
1011
527
745
666
422
994
521
811
595
777
705
795
694
10,659
Ward Wise
Area (Sqkm)
0.66
1.16
1.24
0.90
1.25
3.58
1.47
1.98
0.89
1.76
1.67
3.56
1.55
1.03
2.18
24.87
Note: The wards highlighted in blue are predominantly urban in character; other wards are predominantly rural
in character.
The ward wise density was calculated on the basis of the actual areas attained on the basis of satellite imagery.
As can be seen from the table above, the ward wise density for Mandav is very low. The highest density is in
Ward 1 (11ppha). It can also be seen that except for Ward 9 and 14, the density of wards with urban character
is marginally higher than that of wards with largely rural character. The ward wise distribution of population in
2011 reflects that Jahaz Mahal Ward and Neelkath Ward have the highest population; whereas Dariya Khan
Mahal had the least population.
21
2013
Total population
Population of children aged 0-6
years
Sex ratio of children aged 0-6
years
Total schedule caste population
Total schedule tribe population
Percent schedule caste
Percent schedule tribe
Sex ratio of schedule caste
Sex ratio of schedule tribe
Mandav
8,544
2001
District Dhar
288184
1,813
47470
939
901
181
6,968
2.1
81.6
905
970
23052
50422
8
17.5
921
925
Mandav
10,659
2,003
2011
District Dhar
2,184,672
349,262
956
-
In 2001, 21.2% of the total population of Mandav were children aged 0 to 6. The sex ratio for this section was
939 and higher than 901, the district figure for the same. Table 3.6 shows that the sex ratio for 0-6 age group
has improved from 939 females per 1000 males to 956 females per 1000 males over the last decade.
Amongst all the towns of the District, Mandav has the lowest proportion of Scheduled Castes (2.1%) and
highest proportion of Scheduled Tribes (81.6%) as per the 2001 Census. The table also indicates that the
proportion of schedule caste for Mandav is much less than the district figure, but this reverses for the schedule
tribe percentage which is higher for the town in comparison to the district proportion. The sex ratio for the
town for schedule castes is lower than the district figure, but sex ratio of scheduled tribes is much higher that
the district figure.
Table 3.6: Ward wise SC/ST population (2001)
Ward
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Wards
Total
Gadashah Ward
Ram Mandir Ward
Jahaz Mahal Ward
Jama Masjid Ward
Rampura Ward
Lal Bangla Ward
Dariya Khan Ward
Neelkanth Ward
Tarapur Gate Ward
Eco-point Ward
Rani Roopmati Ward
Bhagwansh Gate Ward
Mansingi Ward
Kanadipura Ward
Jahangirpur Gate Ward
Total
701
438
710
532
770
398
364
807
406
713
493
593
592
579
448
8,544
Scheduled
Tribe
304
205
375
180
380
398
364
807
397
713
493
593
592
579
448
6828
22
Scheduled
Caste
156
30
22
09
217
Backward
classes
311
77
335
322
386
1413
General
Population
86
86
2013
The ward wise population distribution across casts reflects that the entire population of 9 out of the 15 wards
comprises of scheduled tribes. The Ram Mandir Ward has a high concentration of scheduled caste population.
5 wards have people from backward classes residing, while only one ward Gadashah Ward has general
population.
3.5 Issues
The high tribal population of the town needs to be seen as an asset and the impact of tourism growth on
the people is an important factor to be assessed.
Being under NP jurisdiction since 1997, the villages now cannot avail any of the Gram Panchayat (GP)
facilities and are not provided any facilities/services by the NP. The villagers expressed a willingness to be
included in the GP boundary again.
The HH size in the town is nearly 6. Though it has gone down over the last decade, it is still above average.
23
2013
2001
Total
8,544
Males
4,370
2011
Females
4,174
Sex ratio*
955
Total
10,659
Males
5385
Females
5274
Sex ratio*
979
Source: Census of India, 2001 and Preliminary Census Estimates for 2011
* No. of females per 1000 male population (Female pop./Male pop. X 1000)
The sex ratio for Mandav was 955 in 2001 which is better than the State average of 920 and National average
of 933 for India for the same decade. The sex ratio of Mandav has further improved to 979 as per Preliminary
Census Estimates of 2011. The corresponding value for MP is 930 and for India is 940 for 2011. This reflects
that the sex ratio of Mandav is much higher than the State and national levels. A key reason for this is that
since there are no employment opportunities in the town, the male population migrates to neighbouring
towns in search of work. Another reason for this could be the high status given to females in tribal culture.
Table 4.2: Ward Wise Male Female Population and Sex Ratio (2011)
Ward No.
Wards
Total
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Gadashah Ward
Ram Mandir Ward
Jahaz Mahal Ward
Jama Masjid Ward
Rampura Ward
Lal Bangla Ward
Dariya Khan Ward
Neelkanth Ward
Tarapur Gate Ward
Echo-point Ward
Rani Roopmati Ward
Bhagwansh Gate Ward
Mansingi Ward
Kanadipura Ward
Jahangirpur Gate Ward
Total
736
660
1011
527
745
666
422
994
521
811
595
777
705
795
694
10,659
Male
population
335
342
456
262
382
335
204
516
280
420
312
418
372
403
348
5385
Female
Population
401
318
555
265
363
331
218
478
241
391
283
359
333
392
346
5274
Sex Ratio
1197
930
1217
1011
950
988
1069
926
861
931
907
859
895
973
994
979
The ward wise analysis of distribution of male-female population reflects that Ward No. 1, 3, 4 and 7 have sex
ratios more than 1000. Hence, these wards would need more women centric capacity building and livelihood
generation (House hold industry based).
Total
population
No. of
literates
% of
literates
2001
2011
2,675
4,770
39.7%
44.75%
No. of
literate
Males
1,751
2,835
% of
literate
Males
51.0%
52.64%
Source: Census of India, 2001 for 2001 data and Preliminary Census Data, 2011
24
No. of
literate
Females
924
1,935
% of
literate
Females
28.0%
36.69%
Gap in MaleFemale
Literacy Rate
22.9
15.95
2013
As per the Census 2001 data, Mandav had the lowest literacy in the District. The literacy rates have improved
slightly to 44.75% over the last decade. The values from 2001 and 2011 reflect that the gap in male and female
literacy rate has reduced over the last decade. The increase in female literacy rate over the last decade is
significant. The literacy rate of India is at 74.04% and that of the state of Madhya Pradesh is 70.6% according
to 2011 Census data. The literacy rate of Mandav (44.75%) is extremely low compared to both the State and
national values.
1046
%
25.1
8.7
313
7.2
430
%
10.3
Total Workers
Number
%
3544
41.5
Persons
Male
Female
5000 (58.5%)
2302
2698
Cultivators
M
%
F
39,362 33.74 22,790
36,313 92.25 21,286
3,049
7.75
1,504
Agricultural Labour
Total
%
M
%
F
Dhar Tehsil 51,203 29.11 24,052 20.62 27,151
Dhar (Rural) 47,672 93.10 22,268 92.58 25,404
Dhar (Urban) 3,531 6.90
1,784
7.42
1,747
Total
%
Dhar Tehsil 62,152 35.34
Dhar (Rural) 57,599 92.67
Dhar (Urban) 4,553 7.33
25
Other Workers
Total
%
M
%
F
%
59,710 33.95 51,275 43.95 8,435 14.24
14,443 24.19 12,174 23.74 2,269 26.90
45,267 75.81 39,101 76.26 6,166 73.10
Workers in Household Industries
%
Total
%
M
%
F
%
45.85 2,810 1.60 1,970 1.69
840 1.42
93.57 1,775 63.17 1,215 61.68 560 66.67
6.43 1,035 36.83 755 38.32 280 33.33
%
38.49
93.40
6.60
2013
Other Workers
34%
Cultivators
35%
Agricultural
Labourers
29%
Workers in HH
Industry
2%
As per the 2001 census, the categorries of workers in the town are as tabulated below.
Table 4.7: Distribution of Workers by Sex in
n 4 Categories of Economic Activity (2001)
Household Industry
Other Workers
Workers
Persons Males Females Persons Males Females Persons Males Females Perssons Males Females
Cultivators
2140
1198
Agriccultural Labourers
942
677
295
382
%) (14.3%) (25.9%)
(60.4%) (57.9%) (63.8%) (19.1%
20 (0.6%)
13
(0.6%)
7 (0.5%)
70
07
562
145
Other Workers
20%
Workers in HH
industry
1%
Cultivators
60%
Agricultural
labour
19%
The 2001 Census data reflects that Mandav had the highest proportion of cultivators (60
0.4%) in the District.
Industrial Base
Currently, Mandav does not have any industrial base. The only industry that contributes to the economy of the
modity manufactured in
town is the Tourism industry. As per the Census 2001 data, the most important comm
t
The paper board
Mandav was Paper Board which waas also an important commodity exported out of the town.
factories are not operational any more.
m
Around 40 years ago, the town had a vibrantt handloom trade with
several tribal workers involved in making
m
cotton bed sheets, towels, etc. for supply to hospitals and most of
the tribals were involved in this handloom
h
trade. But there are hardly any artisans now.
n
Some Bagh print
artisans were also there but now only a few remain. Training programme in stitching was conducted a few
years ago but since the villagers do not have access to raw material, this could not be taaken up as a SSI as cost
cannot be recovered due to poor transportation facilities. Earlier tribals were also involved in Griha udyog
f
and cotton thread work. Details related to tourrism as an industry are
related to strengthening of cotton fibres
given in the Chapter on Heritage an
nd Conservation.
26
2013
Mandi
The town does not have a Mandi and is dependent on towns like Dhar and Dhamnod (35 kms away) for day to
day supplies. Since the town is located at a height, the truck drivers ask for triple the normal fare for delivery
of goods to Mandav. Hence, the town needs to be provided with an Up Mandi. Since Mandav is known in the
region for non grain crops, an Up Mandi for non grain items can be set up.
Agriculture
The tribals living in Mandav (81.6% tribal population in 2001) are primarily farmers. The 2001 Census reflects
that Wheat and soyabean were produced in significant quantities in Mandav. These continue to be produced
and exported out of Mandav. Other crops cultivated here are chana and cotton. Wheat, gram and peas are
produced in the Rabi season (winter harvest) and corn, soyabean, moong and chholey are produced in the
Kharif season (autumn harvest). The soil is fertile black cotton soil but due to soil erosion, the depth of soil is
low (2-3 feet). Drip and sprinkler irrigation were tried in the region but are not suitable for the main crops. A
variety of hybrid corn was also introduced a few years back. Agricultural loans are required for the farmers. In
general, the agricultural produce in the region is low and the population is dependent on the plains for their
basic needs. Khirni, Sitaphal and other such crops which are economically lucrative for the farmers are
seasonal and can only be grown once a year.
The crops for which Mandav is famous in the region include Mhau, Gond, Khirni (fruit), Khurasani Imli, Sitaphal
(Custard Apple) and Kheera Kakdi. Custard apple and long gourd (kakri) are produced in October-November.
These crops fetch the farmers a good price and are traded as far as Indore, Jaipur and Baroda. Dhavra gond
(tree) grown in the NP area fetches upto Rs. 500/kg and is in good demand but since the number of such trees
in on a decline, an intervention to revive the same is needed. Historically, the mangoes of Mandav were
acclaimed for their taste and flavour. Orchards of taimbru, mango, guava, amla and khirni trees may be
developed that would also help the economy.
Tribals grow fruits and vegetables including jadi bootis (herbs), salam misri, lal churan and dhuli musli which
fetch them good prices and have a good demand but due to poor condition of farmers, these crops are on a
decline. Incentives are needed to revive these crops. A number of the herbs have medicinal value such as
kuradia that is used for treating wounds and leaves of bekul that are a remedy for treating cough and cold.
There are individuals in the tribal community who have the knowledge system of how to use these. Hence, the
local herbs can form a base for small scale industry. Drip irrigation can be used for enhancing the cultivation of
herbs in the region.
Mahua is a significant produce of the town. It is a seasonal forest produce that sheds its corollas during MarchApril. Though it is classified as a forest produce, most of the production comes from non-forest land in the
agricultural fields and uplands. It is a food item for the forest dwelling population and is also used for brewing
alcohol. Each household is permitted to manufacture a maximum of 5 litres of the liquor that is also known as
27
2013
Mahua. There are many other uses of Mahua products, such as Mahua seed cake is used in manufacturing
soap. Mahua seed is also used as source of edible oil in certain parts of Chhattisgarh. The flowers and seeds
from the tree have economic value in the form of sales proceeds. Liquor is made out of the flowers and soap
out of the seeds of Mahua. At the regional levels, Ranchi is the most important market for Mahua flowers.
International trading companies such as Messrs Ferrero Trading of Luxemburg, Italy purchase Mahua flowers
in bulk from MP and Chhattisgarh through a Raipur based trading company. Messrs Ferrero Trading Company
produces mainly chocolates and other confectionary with consumers in several countries and has established
their first unit in Asia at Baramati, Maharashtra. The company is considering setting up a unit in MP.
28
2013
4.7 Labour
In the Dhar Tehsil, of the 29% working population that is in to agricultural labour, 93% are in the rural areas
while about 7% are in the urban areas, as per the 2001 Census. In comparison, the proportion of agricultural
labour in Mandav was at 19% of the towns working population. Presently, about 2000 people are estimated to
be working as agricultural labour. People go from Mandav to Indore, Ujjain, Dhamnod, Dharampuri and Dhar
for trade or to work as agricultural labour during cropping season.
4.8 Tourism
Tourism is the biggest industry in the town and a significant part of the main town population is dependent on
tourism for livelihood. Three groups of monuments under the Archaeological Survey of India are ticketed. The
revenue from the tickets goes directly to ASI. The only earning that the NP gets from tourism is revenue from a
parking operated by NP (@10 lakh/annum) and 2 low cost rest houses which are run by the NP.
Most of the tourists coming to Mandav dont spend more than 3 or 4 hours in the town. Maximum tourist
traffic to the town is in August. During peak season, all the accommodation in the town is full and tourists stay
in the nearby towns of Dhar or Dhamnod and visit Mandav for a few hours. People visiting Mandav visit the
monuments in core city and the front part of the monument and return. They should be encouraged to
explore more monuments in and around the city. This would increase the time tourists spend in Mandav and
would help increase the towns earnings from tourism. Details such as visitor numbers, trends, issues and
potentials for developing tourism in the town are discussed under Chapter 16.
Potential industries
There are no agro based industries in the town. There is potential for setting up small scale industries and
household industries such as manufacturing of incense sticks, candles, jute products, bamboo based products
such as baskets, lac udyog, wooden or earthen sculpture and stitching. Since the sex ratio in the town is good,
it is important that the women are involved in these activities. Bee farming also has potential in the town. The
town has a high potential for Pisciculture due to the presence of numerous ponds and traditional fishermen
who used to survive off fishing in these ponds. But due to desiltation, the ponds dry fast and the fishing period
has reduced to 2 months a year. The cattle and chicken population in the town is relatively high and hence, a
29
2013
dairy and poultry farms can be set up in the town. Animal rearing also needs to be revived in the region. The
traditional handloom work in Mandav needs to be revived as a HH industry, especially for women. But since
the tribals are poor and donot have any training, loans and initial training need to be provided with by the
implementing agency. During the second stakeholder workshop, the stakeholders expressed interest in
training to make cotton cloth, Maheshwari saree, bagh printing work, etc. Bagh printing artisans can hardly be
found now but tribals can be trained in Bagh printing.
Weaknesses
Low work participation rate, even lower in
female population
Low literacy levels, even lower in female
population
Low contribution of house hold or small scale
industries based on indigenous materials, skills
and crafts towards the economy
Lack of agro based industries
Shortage of tourist infrastructure
Poor market channels for raw materials and
products from the town
Threats
Depletion of forests and flora that is potential
base of a number of industries
Outmigration and socio-economic stagnation of
remaining population due to poor literacy levels
and lack of livelihood opportunities
30
2013
4.10 Issues
Tourism is the main income generator in the town but only a specific segment currently benefits from
tourism. A large segment on the town population and almost the entire village population does not
benefit at all from tourism
Low work participation rate. Female work participation rate is very low.
There are no small scale industries and agro based industries in the town.
Tourists come for day trips mostly, do not spend the night in the town. The earning from tourism is also
limited.
Poor market access (due to location) of the town makes it difficult for the produce from the town to be
traded.
Pisciculture is on a decline due to siltation of ponds. Animal rearing is also on a decline. Local trees like
Khurasani imli which are a source of income for the tribals are also decreasing.
Low employment opportunities in the town. People have to commute to neighbouring towns in search of
work.
There is a strong need for literacy drives especially for female population - that may be based on
incentives.
Scope for setting up HH industries and SSIs. Poultry and dairy can be set up.
Better educational facilities need to be provided, especially for tribals. Focus on computer education and
vocational courses also needed.
The town needs a sustainable economy that is not just based on tourism but other economic drivers as
well. There is a need to integrate tourism, heritage conservation, environmental protection and livelihood
generation.
It is important to establish industries in the town for providing livelihoods to the local population. There is
a strong need to generate livelihood opportunities using local skills and crafts such as production of herbal
medicines, consumer products and tribal craft based products. Initial support may be required through
involvement of specialised organisations for research and development that can help in viable product
development. NGOs for capacity building of the local population need to be promoted. The female
population needs to be encouraged and trained to set up household industries such as production of
agarbattis (incense sticks), lac products and stitching. Handloom work can be revived as a HH industry for
females. Workers can be provided with training to make cotton cloth, Maheshwari saree, bagh printing
work, etc. Market channels need to be opened up for the products.
31
2013
Tourism based economy to be enhanced by increasing night stay of tourists, increasing tourist season and
increasing income generation of locals from tourism. More activities can be promoted to increase the
tourist season and generate more livelihood opportunities based on tourism. More affordable tourist
accommodation, Community halls and dormitories can also be provided. There is a need to develop
models of participation where the local population can have a stake in the initiative through direct
ownership and management of a particular segment of tourist accommodation. Training and regulation
will be important components for such models to be successful. Such models can ensure that the local
population does not get marginalised but becomes an active participant in the process. A detailed
market/visitor study would be required to derive the actual need across various segments. Also, since
Dhamnod is being proposed as an accommodation hub for the regional tourist circuit, it must be ensured
that any additional accommodation being provided in Mandav is not incoherent and does not have any
negative impact on the ecology and social fabric of the town.
There is a need for research and development in the area of agriculture. Since nearly half the population
is dependent on agriculture, it is important to address issues such as the soil depth and scarcity of water
and devise innovative means to counter these. Any plantations (reviving orchards, planting Mahua 201112 having been declared as the Mahua plantation year by the Forest Division, Dhar) must be carried out
with the knowledge and understanding of the indigenous species and their suitability to the context. Drip
irrigation and sprinkler systems were not successful for other crops in the areas but may be tried for
cultivation of herbs, with appropriate and consistent training of the local population.
Setting up of agro based industries, production of bio gas etc can also help in sustainable development of
the people in social and economic terms.
Better market access needs to be provided, as a number of indigenous raw materials (such as mahua
flowers) perish before reaching the market and industry is also unable to flourish. It is important that as
far as possible, indigenous materials be used in the industries, to reduce dependence on external factors
in the production process.
Bee farming, pisciculture (after reviving the ponds), reviving cattle rearing and setting up dairies.
Setting up solar and wind farming are to be encouraged as these are activities that do not have any
negative impact on the ecological balance of the area.
Training is an important requirement for any initiative to be successful in the town. Be it regarding
provision of skills based on tourism industry or other indigenous material based HHIs and SSIs, there is a
need for involvement of NGOs and specialised organisations that can conduct programmes (workshops or
research) for capacity building, product development and socio-economic strengthening of the local
population.
32
2013
Since the NP boundary is spread over 42.2 sq kms, of which a large percentage is forest land; the population
concentration in the town is low. The core town spreads over nearly 2 sq kms and a large percentage of the
built form in this area falls under monuments. In terms of settlements, there are scattered pockets of
hutments/slums across the core area. A key consideration for development in this area is that due to the
presence of listed monuments, most of the land in the core town falls under the 100 or 300m radius
(prohibited and restricted developments) under ASI. A large part of the built mass is mostly only monumental
and unauthorized encroachments in restricted areas. There is a little bit of institutional and commercial
activity along the main road.
Mandav was historically a very important place and at present, due to tourism, ribbon development has taken
place along the main road and the roads connecting to various monuments.
33
2013
The Master Plan for the town was prepared for target year 2011 but has not been implemented yet. It is said
that nearly 9 lakh people inhabited Mandav during Mughal era and the remains of their houses are still found
in the town. Most excavations for new foundations in the town are stopped when remains of old houses are
found during construction work. Most of the houses in the town are kuccha and are not permitted to be made
pukka because they fall within the 100m or 300m periphery of monuments. Hence, most of the existing houses
in the town are kuccha and hardly any new constructions are coming up; hence, the built form of the town is
nearing stagnation.
34
2013
most of the people chose to stay in the outskirts and village area, near their farms and ponds where they could
do fishing. Hence, the density in the whole town is very low.
Figure 5.3: Map of NP Area, Mandav showing Municipal and Ward boundaries. Source: NP, Mandav.
The town comprises of 15 wards. Of these only wards 1 to 5 comprise the main town, accounting for 3679
persons living in the main town. The remaining population is spread over the Municipal area, largely in forests
and villages; where they live in near isolation. Most of these villages dont have any infrastructural provision
and dont even have a proper access road. These villages are located amidst forests or scrubland and are
entirely based on agriculture.
35
2013
Figure 5.4: Ward Map of Mandav, Source: IDFC; based on NP map and satellite imagery
36
2013
institutional
and
residential
uses,
interspersed
with
monuments.
Along
comprises
of
and
Dharamshala.
which
gradually
Hotels and Dharamshalas being G+1. The settlement is a low rise low density settlement. There is a very dense
slum housing just next to Jami Masjid. However, due to ASI restrictions, this slum is being shifted and the slum
dwellers are now encroaching on the right of way. There is one government guest house, student hostels and
4 main private hotels in the town. Religious structures include 2 Jain temples and 1 Hindu temple, besides the
Jami Mosque and small community level temples. The Proposed Master Plan for Mandav (prepared by TCPO)
is attached as annexure.
The Master plan proposed development of 234ha of area, accounting for 19.5%
37
2013
Table 5.1: Land use existing and proposed (Mandav Master Plan, 2011)
S.No.
Land Use
Present (1999)
1
2
3
4
Residential
Commercial
Industrial
PSP
10.08
5.12
1.12
14.85
18.33
9.31
2.03
27.00
5
6
7
Public uses
Recreational
Toursim
related
premises
Transportation
and others
1.00
2.00
0
1.82
3.64
0
0.14
0.29
0
2.0
57.5
38.0
0.9
24.6
16.2
0.17
4.79
3.17
20.83
37.87
2.98
45.0
19.2
3.75
55
100
7.86
234
100
19.5
Total
Proposed (2011)
Land
Use/Utilization
%
1.44
0.73
0.16
2.12
Area
Area
55.0
10.0
0.5
26.0
23.5
4.3
0.2
11.1
Land Use/
Utilization
%
4.58
0.83
0.04
2.17
UDPFI Standards
(%)
50 to 55
2 to 3
3 to 4
8 to 10
15 to 18
5 to 6 for trans; 8
to 10 for
ecological uses
The Master Plan proposes that the developed area in the town should be increased by nearly 4 times from
55ha in 1999 to 234ha in 2011. Compared to standards, residential land use under the 1999 land use and
proposed land use for 2011, both were lower than standards (although the area under proposed residential
use is proposed to increase from 10ha to 55ha under proposed Master plan). It is recommended under the
CDP that area under residential land use in the town be increased and the existing housing stock be upgraded.
Area under commercial land use is higher than standards; even this can be considered justified as Mandav is a
tourist destination. The proposed land use for 2011 suggested that the land use under commercial be
increased from 5ha to 10ha. This is recommended as the area catering to tourists in Mandav is low. Area under
industries is extremely low (@2.03% in 1999 and proposed to reduce to 0.02% under Master plan, 2011). This
is also not recommended. It is proposed that the area under industrial should be retained at around 4% but it
should be made sure that the industries set up in Mandav are only HH indusitres/ Laghu udyog/ SSIs. No large
scale industries should be permitted, except tourism. Area under PSP and public uses is high (@27% in 1999
and 11.1% in 2011). It is proposed that atleast 11% area (12 ha; as proposed under Master plan) should be
retained under this use. Area under Traffic and others is high in Mandav (@20.83ha in 1999 and proposed to
be increased to 45ha under Master Plan). This could be due to the high percentage of land under ponds and
other uses. Since Mandav is a hilly region, it is proposed that the area under greens, forests and ponds should
be marked separately and should be conserved and increased. Area under monuments has been clearly
demarcated under the proposed Master plan and should continue to be considered as a separate category.
The proposed Master Plan also suggests that nearly 16ha area be brought under tourism related activities. This
is recommended under the CDP.
38
Transportati
on and
others
19%
Toursim
related
premises
16%
Residential
24%
Recreational
25%
PSP
11%
Commerccial
4%
Industrial
0%
Public uses
1%
39
2013
2013
40
2013
Houses in villages are made of bamboo and thatch. According to the NP, there are a total of about 1500
houses in the town out of which about 100 are pukka and 1400 are kuccha. It is important that the character
of these traditional houses be understood and in any in-situ upgradation schemes it is ensured that the
character is not lost. Consultations with villagers suggested that they want to continue living at the same spot
and only want the structure of the house to be made pukka.
The number of properties on which property tax is levied are 58 in number, while properties on which Samekit
Kar or Integrated Tax is levied are 403 in number, as per a survey undertaken in 1997-98. The ward wise
distribution of these properties is listed in Table 5.1.
Table 5.2: Ward wise distribution of properties on which tax is levied
Ward
No
1
2
3
4
5
9
10
Total
No. of properties on
which Property Tax is
levied
20
2
3
18
11
1
3
58
No. of properties on
which Integrated Tax is
levied
96
30
71
88
115
1
3
404
The above table reflects that the properties on which property or integrated taxes are levied are essentially
within Ward 1 to 5 as only these wards are largely urban in character and are provided services by NP. Other
wards have scattered population which is largely in the form of villages and NP does not provide any service to
these areas, except water supply.
41
2013
Year
2015
2020
2025
2030
2035
Population
11689
13106
14682
16439
18400
HHs
1997
2239
2508
2809
3144
As can be seen from the table above, the absolute housing shortage in Mandav would be 3044 DUs by 2035. In
terms of meeting this housing shortage, a few considerations have to be made
Most residents want insitu redevelopment and infrastructure provision for their DUs
The DUs should be only G/G+1
The DUs for villagers should also be based on insitu redevelopment
Since construction of fresh DUs is suspended by ASI when excavation for foundations hits red soil;
alternate construction technologies should be used to ensure that the foundations donot require
much excavation and alternate means of construction like high plinth, etc should be promoted.
The town is on the UNESCO World Heritage Tentative List and has the potential of being declared a World
Heritage Site, though the nomination can go through only if there is a strong management plan in place. As the
current NP boundary is the same as the limit of the historical hill fort of Mandavgarh, there is a need for a
cautious approach for any further development across the NP area. Any initiatives towards the growth of the
town must address the fact that the town has layers of history under it that may be a rich source of
archaeological evidence for the country and the region.
Hence, it is proposed that in case of Mandav, instead of developing new lands, the focus should be on
potential upgradation of existing fabric, where possible (where the fabric is outside the 100/300m circle). Any
42
2013
new constructions should be made such that they donot disturb the layers of history which lay embedded in
the soil.
Decentralized development whereby, the villagers are provided DUs within the village, instead of
developing group housing clusters for all villagers
Alternate construction tech technologies should be adopted that can reduce excavation for foundations.
Master plan for the town could not be implemented. Hence, during first phase, emphasis should be laid on
reviving the existing properties and utilizing them to their full potential and during 2
nd
phase, new
Action Plan
Land use to be compatible with guidelines in the Integrated Heritage Resource Management Plan (IHRMP)
for Mandav.
Removal of encroachments that are negatively affecting the cultural and natural resources.
Land ownership and use to be mapped and integrated with GIS database.
Master Plan to demarkate zones (Core area, Modular development Zone, NP area, Heritage zone, Tourist
zones).
Development of Dharamshala.
43
2013
During second stakeholder consultation, it was pointed out by the stakeholders that the OHT is becoming
structurally weak and needs replacement. Even the WTP is not functional now and the water quality supplied
by the NP is poor. Water is supplied to the villages by water tankers but the villagers in some cases even resort
to sending the tanker back as the water is insufficient to cater to their demands.
There are a number of small ponds, water from which is used directly by the residents around for irrigation
and other purposes. Some tribal residents, also have private bores. Due to a drop in rainfall and siltation, the
ponds do not hold as much water as before. The ponds have undergone siltation over a period of time.
Another key concern is that for the winter crop, water from Sagar talab is used for irrigation and hence, the
talab dries out around February/March. Siltation of Sagar Talab, deforestation in its catchment area and
construction on drainage channels to the talab is leading to reduced retention capacity of the pond.
44
2013
It was also reported that the quality of water supplied is poor because the WTP is not functional and hence,
better storage and treatment facilities need to be provided for the town. For the tribal areas, water tankers.
The tribal areas are supplied water through tankers which are filled from Sagar Talab.
45
2013
hand pumps. The villages and slum areas are not provided with water supply connections but handpumps in
and near these villages have been provided.
6.5 Other sources and Water Resources in and around the town
Bore wells are not viable because of the hilly terrain but in remote tribal areas within the NP boundary, people
are dependent on natural waterfalls, ponds and bore wells for water requirements. The main source of water
in the town is ponds: Sagar Talab and Malipura pond. There are 17 ponds that are under the NP, Mandav.
Ponds in the town, including Sagar talab and Mallipura are also used for irrigation and pisciculture. All the
ponds are presently suffering from siltation, deforestation in the catchment area and blockage of drainage
channels which lead to the ponds. Hence the water retention capacity of these ponds has gone down
significantly.
There are a number of ponds in and around the town. Some of the main ones are Sagar Talab, Lamba Talab,
Munj Talab, Kapoor Talab, Ek Khamba Talab, Samad Talab, Suraj Talab and Singori Talab, while there are many
more small ones within the NP boundary. The town also has historic stepwells and kunds such as Champa
Baori, Andhera and Ujala Baori and Rewa Kund (with water lift to supply water to the palace of Baz Bahadur).
During second stakeholder consultation and interviews with villagers, it was emphasized by the citizens that
there is a strong need for Desiltation of ponds. At the same time, it was also pointed out that funding for
desiltation of ponds has been sanctioned several times but the work has still not been started. The
stakeholders also emphasized the need to revive the catchment area of the ponds and revive drainage
channels to the ponds. The fishermen community pointed out that due to siltation, the ponds only retain
water for 5 to 6 months. The fishermen introduce fish eggs in the ponds which take upto 4 months to mature
and hence, the fishermen can only earn through fishing for 2 months a year; fishing used to be their main
occupation earlier. Now, they have to go to neighbouring towns to work as daily wage workers. The
stakeholders also pointed out that since rainfall in the region is on a decline, water supply to the town can be
sourced from Narmada and all the ponds can be used for irrigation. The Mandav Master Plan lists 22 water
bodies in the Planning Area, covering an area of 87 hectares (3.38% of the Planning Area), of which 7 are
manmade while the remaining are natural.
46
2013
S.No.
1
2
Line
Water supply Mains
Jahaz Mahal, Dhar road, Neel,
Lal bangla road
Road/Area Name
Roopmati road
Length (m)
1800m
Diameter (mm)
150mm
4,3,2 inch
6.9 Comparative analysis with UDPFI, CPHEEO guidelines and Present and Future Demand and
Supply Gaps
As per UDPFI guidelines, the minimum supply for small towns in 70 lpcd and desirable supply is 100 lpcd for
domestic purposes (with additional supply for other uses). The current supply to the town is inadequate at
23.45 lpcd and is lower than the absolute minimum standards. Hence, it is proposed that the town should be
supplied water @135 lpcd (including supply for other uses) for future demand. The town is presently supplied
47
2013
2.5 lakh litre of water but the present demand @70 lpcd (absolute minimum) is 7.5 lakh litre or 0.75 MLD
(@70 lpcd for 10,659 population) and the desirable value is 1.07 (@100 lpcd for 10,659 population) on basis of
the UDPFI guidelines.
For future projections, the water supply for Mandav has been projected @135lpcd till 2035. Since Mandav is a
prominent tourist destination, an additional 25% supply has been considered for water supply to tourists.
According to ASI data, nearly 7 lakh tourists visit Mandav each year. Assuming that nearly 70% of these visit
Mandav during the tourist season in Monsoons (July to September), nearly 4.9 lakh tourists visit Mandav over
3 months or 1.6 lakh/month. This can be interpreted as an additional 5444 or 5,500 persons per day in
addition to the town population. Hence, an additional 25% supply has been considered to meet the tourist
demand. Since most of these tourists wont be staying in Mandav for the entire day (as the carrying capacity
of Mandav in terms of tourist accommodation is limited and cannot be increased drastically due to
ecological and heritage constraints), a minimum of 60 lpcd can be considered for nearly 60% of the tourist
population. Based on these assumptions, an additional supply of 25% has been added to the total water
supply requirement for the town (provision of 135 lpcd for an additional 3000 persons in 2015 and so on).
Since it is being proposed that the tourist season be extended to attract more tourists to Mandav, although
the total tourist traffic to Mandav is proposed to increase in future, the per day tourist traffic is proposed to
remain stable in order to promote sustainable tourism without impacting the ecology of Mandav.
Table 6.2: Projected demand as per standards
2015
Projected
Population
11689
2020
13106
1.77
2.21
2025
14682
1.98
2.48
2030
16439
2.22
2.77
2035
18400
2.48
3.11
Year
Water requirement
@135 lpcd (MLD)
1.58
Hence the town needs to be provided with 3.11 MLD water by 2035.
48
2013
A scheme to supply water to Dhar from Narmada has been sanctioned recently at a cost of 25 Crores. During
the Second Stakeholder Consultation, the stakeholders proposed that provision of water supply to the town
through this network can also be considered.
49
2013
only sources of water for the village are a hand pump in the
primary school, a pond and a well made in the pond bed. All of
these sources dry up around summers. The pond is presently
dry (Feb, 2012) and is being used for cultivation. A water
supply line from Sagar Talab to the village was laid around 20
years ago. This supply line needs to be repaired and revived
and immediate supply from Sagar talab needs to be initiated.
For
irrigation
purposes
desiltation
of
Tarapur
pond,
afforestation of its catchment and diverting the catchment runoff into the pond are required.
Sagar Village
The residents of this village are
primarily dependent on agriculture for
their livelihood and owing to lack of
irrigation facilities, these people are
only able to grow one crop a year and
have to migrate to neighbouring towns
in search of work. These people mostly migrate to Rajasthan, Pithampura and Indore after summers to work as
construction labour. During summers, they work within Mandav as agricultural labour. The village is not
connected to the water supply network and has to rely on ponds and handpumps in nearby areas for drinking
water. The pond in Sagar village needs to be desilted and another pond can be constructed on the drainage
channels in the area
Songarh Village
Residents of Songarh village have to commute approximately 2 km to get water from the school handpump at
Tarapur gate. During summers, they have to commute
uphill even further, upto NP to get water from baories and
other sources. Songarh village pond needs to be revived
Jhabri village
This village suffers from extreme water scarcity. The
village used to have a pond which does not retain much
water now owing to siltation and diversion of drainage
channel to the pond. The catchment area of the pond has
50
2013
irrigation to ensure availability of drinking water during summers. But water in this kund is also polluted and
people also use this kund for bathing and washing. A nallah from the middle of pond in Jhabri village drains
into the valley near Tipkiya talab. The village does not have a pukka access road
Opportunities
Appropriate watershed management
is required with conservation of
catchment areas of the ponds
Desiltation and revival of ponds
including Sagar Talab
More ponds can be constructed in the
valley area
Afforestation,
incl.
afforestation
around ponds
Sourcing water from Narmada River
Provision of new OHTs, WTP and
distribution lines
Weaknesses
The forest cover is depleting, leading to siltation of ponds
Water levels in baoris and kunds need to be revived
Peripheral wards are not connected to the water supply
network. These areas are supplied by water tankers that
lead to high fuel consumption and air pollution
Land availability for pond construction is limited in and
around the main town. Valleys have scope for
development of ponds.
High pumping costs for water supply from Narmada
WTP and OHT are old and defunct. More OHTs are
required to supply water to the entire NP area
Poor quality of water being supplied
Extremely poor condition of water supply in peripheral
areas
Threats
Deforestation causing siltation and drying of ponds
Climate change low rainfall causing scarcity of water
6.15 Issues
Sagar Talab is the main source of water supply to the town and continued abstraction for water supply
and irrigation has led to drying of the pond. Hence, an alternate supply for future is required.
Extremely low per capita supply @23.45 lpcd. Water supplied only to 67% of the town population on a
daily basis.
The peripheral villages live in extreme water scarcity and have to resort to drinking water from extremely
unhygienic kunds, dig wells or travel to Tipkiya gufa to get water. Ponds and wells in the peripheral
villages need to be revived on priority basis
Only 16.8% of the town population is connected to the piped supply network.
51
2013
Peripheral areas with predominant rural character are served by tankers, which in turn, leads to heavy
expenditure on transportation, fuel consumption and air pollution. The villagers emphasized provision of
water through direct supply from Sagar talab on a priority basis.
Existing ponds, kunds and baories are suffering from issues such as siltation, eutrophication and pollution.
Desiltation of ponds has been approved several times but no work has been undertaken.
WTP not functional; hence, quality of water supplied by NP is poor. Presently water is being supplied after
bleaching only.
Desiltation of ponds has been proposed many times but no action has been taken so far.
Existing ponds might not be able to provide ample water to meet future requirements, especially due to
reduction in rainfall. Direct supply from Narmada can be considered.
A scheme to supply water to Dhar from Narmada has been sanctioned at a cost of 25 Crores. Mandav can
be linked to this scheme.
Ponds need to be revived through desiltation, conservation of catchment area and reviving drainage
channels to the pond.
Ponds in the town can be reserved for irrigational purposes, water supply to villages and for tourism
purposes.
Village areas should be provided with water supply lines from Sagar talab on priority basis.
More OHTs need to be provided for the town. One OHT can be provided near Jahaz Mahal and one near
Chisti complex (close to Mallipura dam) on Dhar road; more OHTs can be provided for tribal areas
Revival and desiltation of ponds is needed, including Sagar Talab. The silt can be used in agricultural fields
to improve soil depth.
More Ponds can be developed in the valley areas like Jamia Phata from where water can be pumped to
Sagar Talab. Potential for pond construction can also be explored near Neelkanth Mandir and Jamnia
nallah. Another pond can be constructed at Maratha Nallah on Jahangirpuri road (big pond can be made
at this site; can serve at least 5 villages). Forest land in Mandav has many nallahs on which ponds can be
constructed. Construction of check dams needs to be avoided.
Drip irrigation to be introduced to reduce irrigation demand and hence, reduce pressure on water
resources.
Revival of Tarapur pond, pond in Sagar village, Jhabri village pond, Songarh pond and Kaldipura pond. A
pond can be constructed near the Jamnia nallah.
52
2013
Action Plan
Water supply from Narmada (Directly or to be included under Dhar water supply scheme)
Prohibition of use of water from Sagar and Mallipura Talab for irrigation
WTP
Feasibility study with focus on Environment to study potential for drawing water from Reva Kund near
Jamnia and from Sakalda Pond
Mapping of all existing and proposed supply pipelines and linking to GIS database
DPR for rain water harvesting, recharging ground water through infiltration ponds and revival of wells and
baories
Provision of hand pumps with overhead storage in all villages @ 3 handpumps per village
Provision of handpumos with overhead storage tanks in all Schools, PHC and institutional buildings
DPR for water supply network and topography based supply zones
Awareness generation for water conservation, rain water harvesting, prevention of water pollution
53
2013
CHAPTER 7: SEWERAGE
7.1 Existing sewerage system
There is no underground sewerage system in Mandav. The
town has 2000 mts of open drains. Since the town population
is low, the drains dry out by the time they reach the forests.
Hence, wastewater percolates into the ground. Only during
monsoons, wastewater from houses finds its way into the
forests.
into these drains were common. Most houses in the town donot have HH toilets and the ones with toilets
generally have septic tanks.
54
2013
The villages have not even been provided with a drainage network. The villages are characterized by a small
cluster of kuccha houses with no toilet facilities. Most of the villagers resort to open defecation and
wastewater from these households drains along natural flow paths in the forest and farmlands.
7.3 Comparative analysis with UDPFI, CPHEEO guidelines and Present and Future Demand and
Supply Gaps
UDPFI and CPHEEO guidelines propose sewage generation @75-80% of the water supply to the town. Since
there is no measure of actual sewage generation in the city, these standards have been used for estimating
sewage generation in Mandav. The demand has been calculated for the projected population up to 2035,
including tourist population that is taken as 25% of the resident population.
The total water requirement for the town has been estimated at 3.11 MLD by 2035 (including additional 25%
requirement for tourists). Considering that wastewater generation is nearly 75% of the total water
consumption, the total wastewater generation for the town till 2035 can be estimated at 2.33 MLD.
Table 7.1: Wastewater generation for the town by 2035
Year
2015
Population
11689
Water requirement
@135lpcd (MLD)
1.58
2020
13106
1.77
2.21
1.66
2025
14682
1.98
2.48
1.86
2030
16439
2.22
2.77
2.08
18400
2.48
3.11
2.33
2035
Since wastewater generation in the core town would be around 1 MLD only and the remaining would be
confined to villages spread across the forests, it is proposed that decentralized wastewater treatment facilities
should also be considered because of the decentralized nature of settlement as well as low wastewater
generation (STPs require 8 to 10 MLD wastewater generation for efficient working).
Weaknesses
Combined network for sewage and storm water
No sewerage network and treatment plant
55
2013
Opportunities
Scope for decentralised waste water
Treatment
Open drains to be covered
Provision of public toilets
7.5 Issues
Large open drains which are a hazard for the public and also a source of foul odour.
No sewage network
Decentralized nature of settlement, especially in villages
No wastewater treatment facility
Decentralized wastewater treatment facility needed for core town on immediate basis
Diverting existing nallahs into the treatment plant in the short term and provision of sewerage network in
the long run.
There is a need for provision of separate storm water and waste water network.
Action Plan
56
2013
CHAPTER 8: SANITATION
8.1 Existing sanitation system
Most of the houses in the town are kuccha and donot have a toilet facility. The houses which have toilet
facilities are connected to the road side drains and wastewater empties into open drains which flow across the
town and empty into the forest area. Data from Nagriya Swacchta Sarvekshan, 2008 shows that only 16% of
the HHs have toilets and only 12% of the population has access to public toilets. Hence, nearly 88% of the town
population resorts to open defecation in farms and forests. Toilet facilities for tourists are also a key concern
and need to be provided on an immediate basis.
The current sanitation alternatives in Mandav slum area essentially comprise of individual pour-flush latrines
and to a much lesser extent, public latrine blocks. Most houses do not have toilets. Residents who do not have
access to individual or community/public toilets, resort to open defecation (Source: Integrated Low Cost
Sanitation Scheme for Mandav).
Besides public toilets, NP has also installed around 2 to 3 mobile toilet units across the main town. These are
used at present but lack proper drainage facilities, lighting and water provision. Wastewater from these toilets
also empties in the open areas. Community toilets for villages are also needed on priority basis.
57
2013
Year
2015
2020
2025
2030
2035
Population
11689
13106
14682
16439
18400
HHs
1997
2239
2508
2809
3144
HH toilets
175
HH toilet shortage
1822
2064
2333
2634
2969
Special emphasis should be laid on provision of HH toilets and community toilets in village areas. Provision of
HH toilets in public places is also needed on priority basis.
Septage Management
Septage management is needed on an urgent basis in the town. A considerable proportion of households
depend on on-site sanitation facilities and their construction, regular cleaning, and safe disposal of septage
remain haphazard. The septage is let out untreated which harms the health and environment of the town. It is
most likely for the number of septic tanks to increase in the town , hence a separate policy or regulation for
septage management is required for the town.
For effective Septage Management Plan, data on septage arrangements, their quantity and locations of its
generation etc. are required. The ULBs would need to make arrangements to collect baseline data type of
latrine disposal, effluent disposal arrangement, size, age, when it was last cleaned, availability of access,
arrangement for disposal of effluent if any) of existing installations, to plan for workable desludging schedules.
It is advisable to divide the town into different sanitary zones and carry out the baseline survey in one or a few
of these zones, pilot desludging schedules by area to learn operational issues and devise solutions, before
upscaling to the entire ULB. The selection of zone could be based on availability of septage disposal sites
existing STPs could be potential septage disposal/application sites or trenches provided in solid waste landfill
sites or suitable urban forestry sites where the septage trenches would serve to fertilize the plants. In order to
be economical and financially competitive, it is suggested that households in demarcated septage
management zone should be within 5 kms travel distance from identified treatment and disposal sites.
58
2013
The name of the scheme is Achieving Open Defecation Free status in Mandav Municipal Area. The nodal
agency for the project is Urban Administration and Development Department (UADD), Govt. of Madhya
Pradesh and the implementing agency is Nagar Parishad, Mandav. The project cost is Rs. 114.31 lakhs, for the
994 units proposed. The funding pattern for the project is:
Considering a total demand for 2969HH toilets by 2035, the town needs to be provided with an additional
1975 HH toilets, over and above those proposed under Integrated Low Cost Sanitation Scheme.
Opportunities
Provision of public toilets for tourists
Provision of community toilets in villages to be
taken up on priority basis
Provision of adequate sanitation infrastructure
to cater to the demands of tourists
Provision of HH toilets
Short term measures to control the flow of
sewage into the drainage network
Using successful models for maintenance and
management of community and public toilets
Weaknesses
Defecation along open drains
Shortage of community toilets
Existing public toilets are poorly maintained
Toilet facilities for tourists are needed
Only 9.6% HHs have toilets
Villages dont even have community toilets and
have to resort to open defecation
Threats
Pollution of soil and water from septic tank
overflow and open defecation
Failure to develop the town as a tourist
destination due to poor sanitation
8.7 Issues
Unlined drains and nallahs lead to percolation of sewage and hence, cause groundwater contamination.
Mobile toilets not used properly due to lack of proper drainage, water and electricity
59
2013
Provision of public toilets for tourists on priority basis. These public toilets should be operated on pay and
use basis to ensure maintenance
Existing public toilet needs to be maintained and managed properly using successful models.
Sewage discharge into open drains needs to be diverted in the short term.
Action Plan
Provision of HH toilets
Provision of Community toilets (Can be provided along the lines of Deluxe Toilets: Build, Operate and
Transfer basis). Mobile toilets can also be provided
60
2013
The collection efficiency according to the NP was 100% but this collection is confined only to the urban wards.
Hence, the overall collection efficiency of the NP can be estimated at 66% @2 MT collection from 10 wards. As
per 2001 data available from the Report on Integrated Low Cost Sanitation Scheme for Mandav, (UADD) only
0.5 MT of solid waste was collected per day; which indicates a collection efficiency of 16.66%. Hence, the
collection efficiency of the NP has increased over the decade.
Waste is usually collected via the door to door service along the main spines. In internal areas, some open
dumping is also practiced. Villagers dispose off their waste in the forest areas.
9.3 Current practices of Solid waste management and Vehicles for solid waste collection and
Transportation
Free door to door collection facility was started in the town two years ago across Ward 1 to 10 and has
improved the sanitation levels along the core areas. Door to door collection is carried out through 6 hand carts
and 1 door to door collection vehicle (door to door collection vehicle is used for collection along main road)
from properties along main roads and in the evening through 2 cycle rickshaws collect waste from properties
along internal roads. A total of 15 sanitary staff members are employed with the NP. The remaining 5 wards
are not covered under the collection system. Two tractor trolleys with a total capacity of 1000 Kg carry the
collected waste to the trenching ground. No attempts have been made towards composting of waste.
As per the Report on Integrated Low Cost Sanitation Scheme for Mandav (2001), a household survey
presented a bleak picture of the solid waste management chain, at the primary collection and transfer end.
Analysis of responses from 2100 households (across the 15 wards) indicated that a bulk (91%) of the
households disposed garbage in the open or in drains. Only a small proportion of households practiced proper
disposal in solid waste bins (a little over 8%) or door to door pickup (less than 10%). Ward wise data analysis
61
2013
indicated that the use of solid waste bins for garbage disposal was well practiced only in 2 municipal wards
where more than 2/3
rd
households reportedly used municipal solid waste bin. In contrast, nearly 22%
households in two wards disposed garbage in drains (Source: Report for Integrated Low Cost Sanitation
Scheme for Mandav, 2001). According to Nagriya Swacchta Sarvekshan, 2008; nearly 84% of the total
population resorted to open dumping whereas only 15% resorted to waste disposal in bins. In most of the
cases, the distance of dumping ground was 50 to 100 ft from the HH. Nearly 73% residents reported that waste
is not collected from their premises by the NP. Hence, it can be said that the SWM scenario in the town has
improved considerably since 2001 and 2008, as presently waste is being collected from nearly 66% HHs.
Waste dumping near water bodies was not significant. But waste disposal in the open and in forest areas is a
common practice for the villagers.
62
2013
9.10 Comparative analysis with UDPFI, CPHEEO guidelines and Present and Future Demand and
Supply Gaps
As per UDPFI guidelines, waste generation in small towns is approximately 250g/capita/day and that for
medium towns is between 250 to 500g/cap/day. CPHEEO guidelines state waste generation for a small town
@250g/capita/day. According to this, the waste generation in Mandav is slightly higher than standards
@282g/capita/day. Waste generation for the town has been projected till 2035 based on the consideration
that waste generation would increase @1% years 5 years. Since Mandav is a predominant tourist town, an
additional 25% waste generation has been estimated for tourists. Since the waste composition for Mandav is
not known, it has been assumed that nearly 50% of the waste would comprise of organic waste which can be
composted and nearly 10% of the waste would comprise of recyclable material, especially plastics. Hence,
compost and recycling plant can be established in or around the town to reduce the waste to landfill. It is also
proposed that the trenching ground should be developed as a sanitary landfill site.
The town has already received a total of Rs 12.12 lakhs from the Govt. of India for solid waste management.
Table 9.1 : Projection of waste generated up to 2035
63
Weaknesses
There is no collection of solid waste in the
outer wards and village areas of the town
2013
Opportunities
Waste segregation
Composting
Recycling
Decentralised treatment of waste
Biogas generation
Awareness generation
9.12 Issues
Despite mandatory provisions under the Municipal Solid Waste Management (Handling and Disposal)
Rules, 2000, hardly any urban local body in Madhya Pradesh is in a position to claim 100% compliance of
the said rules. The lack of segregation of bio-degradable and non-degradable waste at source, lack of
proper collection, transportation and scientific disposal lead to compounded problems of garbage piling at
all public spaces.
Dumping site needs to be shifted from its present location near Lohani Caves as this is a tourist destination
with waterfalls.
Sanitary landfill site required.
Only 66% coverage
Presently, waste is spread over a large area which looks unsightly and needs to be compacted.
Action Plan
Composting plant
Sale/reuse of Recyclable waste and inert waste
Awareness generation through media
Proposed Trenching ground near Doob Baori (near Lohani Caves) to be banned
Training of local population in decentralised solid waste management
Placing of gps/gprs vehicle tracking system on door to door collection vehicle for monitoring
Collection from bins at tourist nodes and from common collection bins in ward
Waste collection bins;
DPR for SWM
64
2013
The town has many ponds, including Sagar Talab which are located within the NP boundary and the
Investment area boundary. Most of these ponds are the only source of water for the villagers and are used for
irrigation, drinking and other purposes. Most of these ponds are silted and dry out around January end when
water is used for irrigation of winter crops. Revival of ponds, kunds and baolies in the town is needed.
65
2013
10.4 Flood prone areas and flooding in catchment area of major nallah
During monsoons, Dharampuri Mandav road which links the town to NH, gets water logged in Monsoons and
runoff from the surrounding hills flows through this road. Owing to the topography, flooding within or around
the town is not a major problem. The road side drains are also wide enough to carry the runoff.
10.5 Comparative analysis with UDPFI, CPHEEO guidelines and Present and Future Demand and
Supply Gaps
As discussed earlier, the total road length in the town is approximately 28km implying a need for provision of
56km of drainage network (both sides of the road). But the existing length of drains in Mandav is 3.6km
implying a shortage of 52.4km. Hence, at present the town only has 6.4% coverage of drainage network and
needs to be provided with 52.4km of drains to meet the existing demand. With provision of more roads in
future, the extent of the drainage network would have to be increased.
Weaknesses
water
Siltation of ponds
66
2013
Eutrophication of ponds
Opportunities
Threats
Afforestation
10.8 Issues
Drainage needs be addressed for Dharampuri Mandav road that links to NH gets water logged in
Monsoons
Afforestation
Conservation of ponds
Action Plan
Diverting the drainage channels to existing surface water bodies or recharge basins
67
2013
0.02
t
vehicular
that 2 wheelers dominate the total
2 wheelers
4 wheelers
Truck
68
Tractors
Buses
2013
Figure 11.2: Road Map of Mandav. Source: Primary survey, Nov. 2011
69
2013
70
2013
The town needs another link to NH3 to enhance connectivity. A road linking the south eastern part of Mandav
near Gujri to the SH-31 that further meets at a short distance with the NH-3 already exists. The road from
Jahangir pura gate is pukka to some distance and there is a road which was made under PM gram Sadak yojna
which is nearly from Jhabri village. A kuccha road exists which connects the Jahangir pura gate to Jhabri
village and connects Jhabri village to PMGSY road. Hence, this link needs to be strengthened and made pukka
as an alternate access road to the town. This will not only provide direct connectivity to Mandav from NH3 but
will also improve the quality of life in Jhabri village.
Road under PM
Gram Sadak Yojna
Jhabri
Slope
71
2013
While it is true that historically Mandav only had a strategic road linkage with Dhar, as it was a military
stronghold for the rulers of Dhar up to the early medieval period. The opening up of the linkage towards SH-31
and hence NH-3, would help in encouraging heritage tourism and providing market access that can be the
means of enabling economic vitality for the town in the current context.
The villages are located at a significant distance from the main town and students have to commute daily for
upto 2 hrs (one way) to reach the school located in town. There are no vehicular services (public or private) to
provide connectivity between main town and the village areas and the same is needed on priority basis.
72
2013
Connectivity with Dhar is good and buses ply almost every half an hour from Dhar to Mandav from 8 am to 7
pm on a daily basis. 17 buses go from Mandav to Dhar while there are 4 buses to Indore, 1 to Ujjain, 1 to
Petlawad and 1 to Umarvan. There are no bus services suitable for tourists and bus services linking Mandav to
Dharampuri and Dhamnod (general and tourist special buses) need to be started.
11.10 Comparative analysis with UDPFI, CPHEEO guidelines and Present and Future Demand and
Supply Gaps
More parking areas, traffic management plan, widening of roads and provision of pedestrian facilities are
needed for future development of the city. At present the town lacks access roads to a number of villages such
as Lal Bangla (700 seerhi; tourist spot), Lamba talab, Tipkiya road, Tarapur gate to Neelkanth Phata, 1000 bigha
population in Lalbagh; Kalakot plantation and Sakharam Bhai Gali in Ward 9. The present road length in
Mandav is around 28kms. Considering the standards for an environment friendly town, nearly 10 to 12% land
should be under transportation (4.2 sqkm @10% of 42.4sqkm). in case of Mandav, around 100sqm to 150 sqm
land is under transportation, which is much below standards is one considers the entire NP area. The main
town is spread over approximately 5sqkm, even for this the area under transportation is much below
standards and can be increased further, especially for provision of parking spaces.
73
2013
11.11 Issues
Transportation problem due to elevation and low demand. Trucks are not interested in carrying
commodities to Mandav as the demand is low and the fuel consumption is high due to the elevation. The
truck drivers ask for triple the rates and hence, cost of commodities to the tourists increases.
Road from Mandav to Maharashtra via Dharampuri is in poor condition. Dharmapuri road that links
Mandav to NH3 is kuchcha in parts and gets water logged during monsoons.
During peak season, the main Dhar road becomes congested and there is a pressing demand for parking
spaces.
Opportunities
Widening of regional roads
Improving connectivity to NH3 through Jhabri
village. This will not only improve quality of life
in the village but will also provide direct
connectivity to NH3
Rail Link needed
IPTs to connect villages to main town
More parking spaces should be created
Weaknesses
Hilly terrain
Poor condition of regional roads, especially
Dharampuri road
Some of the regional roads get damaged due to
high run off.
Parking spaces and management is an issue
No parking management plan
Better connectivity to NH3 needed
No road and transportation to link the villages
to the main town
Threats
Poor condition of regional roads and poor
parking provisions can impact the tourist inflow
to the town
Rail Link to the town can solve the traffic issues to a great extent
Madav to be developed as a part of the tourist link between Omkareshwar, Maheshwar, Dharampuri,
Mandav, Kukshi and CSA Nagar. Hence, regional level parking provisions and tourist buses can be
organized to reduce load on the town
74
2013
Action Plan
Traffic and Transport Management Plan for Mandav Planning Area (to be coordinated with other plans
and as per vision and policies outlines in IHRMP)
Construction of Road connectiong Jali Mahal, Jhabri Village, Jahangirpur Gate of Mandav with NH 3 and
SH 31, following a strategic impact assessment (Via Masidpura village)
IPT Service (like Tata Magic) or City Bus Service to be started to cater to villages
Improvement of road between Mandav and Dharampuri : Increased tree cover, Resurfacing and drainage
provision
Access walkway to Boorhi Mandav and Songarh Fort to be provided parallel to the valley (near NP Raen
Basera)
Pedestrianisation of 1 km of road stretch starting from Jami Masjid crossing and extending to the south of
the crossing
Development of organised areas for informal sector - mobile vendors near proposed Visitor Centre for
tourists
75
2013
76
77
2013
2013
Name of Village
No. of Transformers
Flour Water
(within Mandav Domestic Comm
mercial
Irrigation St/Lt SLP Total
(XMer 25/
Mill Works
NP)
63/100/200 KV)
Mandav
205
94
4
9
4
7
2 253 574
9
Rampur
1
0
0
0
0
0
75
76
0
Lal Bangla
0
0
0
0
0
0 101 101
0
Ranglav
0
0
0
0
0
0
51
51
0
Neelkanth Sagar
0
0
0
0
0
0 150 150
0
Sagar
0
0
0
0
0
0 215 215
0
Nandlalpura
0
0
0
0
0
0
72
72
2
Jamania
0
0
0
0
0
0 107 107
1
Kanedipura
0
0
2
0
0
1 223 226
3
Jhabri
2
0
0
0
0
1 110 113
2
Kalighati
0
0
0
0
3
0
80
83
1
Singodi
0
0
0
0
0
0
0
0
0
Lamba Talab
0
0
0
0
0
0
0
0
0
Ambapura
0
0
1
0
0
0
53
54
2
Malipura
9
0
1
0
0
0
36
46
2
152
Total
217
94
4
13
4
10
4
1868
22
6
Figure 12.2: Category wise consumers of ele
ectricity in Mandav NP
12
Domestic
Commercial
Flour Mill
Water Works
82
Irrigation
St/Lt
SLP
Malipura
Lamba Talab
Kalighati
Kanedipura
Total consumer
connections
Nandlalpura
Neelkanth Sagar
Lal Bangla
Mandav
0
78
2013
The distribution of connections across the 15 villages within the NP boundary clearly reflect that the core town
has the largest share of consumer connections while settlements such as Lamba Talab, Singodi have no
connections at all. Hence, there is a lot of inequity in terms of coverage in the core town and peripheral
settlements.
12.4 Comparative analysis with UDPFI, other guidelines and Present and Future Demand and
Supply Gaps
The UDPFI guidelines quote the standard demand for electricity as 2 KW per household for Delhi. Considering
the context of the Mandav, the demand is assumed at 0.3 KW per household. On this basis, the present
demand for 1821 HHs comes to 3198 KW. The current min and max peak load is 1 MW an
d 3 MW, that
is 1000 KW and 3000 KW respectively for Mandav (including Nalcha). Therefore, the maximum peak load at
present is comparable to the calculated present requirement. Future demand is calculated and listed in Table
12.4.
Table 12.2: Projected electricity requirement up to 2035
Year
Projected
Population
2015
11921
2038
611
2020
13700
2342
703
2025
15739
2690
807
2030
18080
3091
927
2035
20771
3551
1065
The demand for electricity is projected as 1065 KW by 2035. Additional demand for electricity will be
generated due to the development of the town as a tourist destination, increasing the tourist season and
tourist stay in the town. According to the UDPFI Guidelines, there must be provision of 1 electric sub station
for 11 KV per 15,000 population as per UDPFI Guidelines. Hence, for the population of Mandav (10,659) the
one 11 KV sub station is sufficient as per standards.
UDPFI guidelines suggest 1 fire station or sub fire station within 1 to 3km for 2 lakh population. Currently the
town does not have any fire engine. Since the area of the NP is about 42 sq kms, more than one fire vehicles
are needed in the town, especially to cater to peripheral areas. As all the areas do not have access roads that
would permit fire engines to reach, alternative systems need to be devised such as longer hoses. Hence, it is
proposed that Mandav be provided with atelast 3 fire vehicles: one for the rural areas and 2 for the core town
and the tourist areas.
Presently, the town has 527 streetlights. Considering a total road length of 28km, the town should have 924
steetlights (@33SLs/km). The present coverage can hence, be placed at 57%.
Weaknesses
Poor coverage of town in terms of street
lighting
79
2013
sanctioned
Opportunities
Tapping wind and sun for energy
Biogas energy production
Three phase electricity connections in the
villages
12.6 Issues
Electricity theft is an issue with 30-40%of the electricity being stolen. This can go upto 70% in rural areas
Neelkanth temple area has not been provided with a 3 Phase electricity connection as yet. The area is still
served by a single phase (v. low voltage) electricity connection.
The villagers require a 3 phase connection to run pumps and motors for irrigation.
Increased use of renewables by developing wind farms, solar farms and biogas plants
Decentralisation of distribution of electricity and street lighting for peripheral settlement areas and core
area.
Need for provision of 3 phase electricity connection for villages on immediate basis
Need for provision of 3 fire fighting vehicles: one for the villages and 2 for the core town and tourist areas.
Provision of solar street lights in public places (secured) to ensure safety during night time.
Provision of additional electricity supply to address demand due to tourist infrastructure needs and
activities such as sound and light shows in the evening.
APDRP needed for Mandav as cables in the town are very old (nearly 50 yrs old) and need replacement
Action Plan
Electricity & Street Lighting
Solar haat within or near Mandi complex
Solar Farms
Annual energy audit
Streetlighting: SLs to meet current shortage & SLs for proposed roads
Wind and solar hybrid water pumps for irrigation
Establishment of 1to 10 MW Wind Mills or Wind Solar Hybrid to generate 3 Phase Electricity for
supply to Heritage areas and farmers in Mandav. 3 Phase electricity to be supplied to all village
clusters and all wards of Mandav
APDRP to be prepared for Mandav
Provision of electricity in all villages till the wind farms are set up
Solar street lighting along regional roads (CAN BE COMBINED FOR DHAR AND ALIRAJPUR DISTRICTS
TO CLAIM CARBON CREDITS)
Provision of streetlighting in peripheral settlements/hamlets
80
Fire Fighting
Provision of Fire vehicles
Provision of Fire Fighting Personnel
Fire equipment and training to staff
81
2013
2013
The slum population of the town is 3,898. As per the NP, Ward no. 2, 13 and 14 are defined as slum wards.
Based on observations, it can be said that these wards are primarily rural wards with agriculture as the
economic base. The settlements in these areas are characteristic of village settlements and need to be
upgraded. It might not be appropriate to call these areas as slums and these areas can be termed as special
areas which need immediate attention in terms of infrastructural provision and housing upgradation. All
peripheral villages are more or less, similar in character and need immediate attention.
13.3 Slums in the Town and General Characteristics of Slums/Areas with urban poor
The slum areas in the town are in a poor condition and hardly have access to housing and infrastructure. There
are 2 categories of slum areas/ areas with urban poor in the town
As discussed earlier, the peripheral villages cannot be termed as slums and need to be termed as special areas
and treated accordingly. Details of condition of some of the peripheral villages are listed below
Sagar Village
The village population comprises largely of people of Rajasthani origin who have migrated to Mandav in search
of livelihood. These people are primarily dependent on agriculture for livelihood. But since the area only has
one pond which dries out due to siltation, the villagers cannot grow more than one crop a year and hence,
males have to commute to neighbouring towns (like Pithampur, Indore and even to Rajasthan) to work as
82
2013
Need for provision of an Anganwadi closer to their village as they have to commute for 3 to 4 km to
get their children to the Anganwadi.
The villagers donot have water connections or handpump and are dependent on Kali Baori, a monument; but
during summers when this Baori dries out, the villagers have to commute long distances to get water. All
houses in the village cluster are kuccha and cannot be made pukka due to proximity to kali Baori (within 100m
radius). The villagers also expressed a need for provision of community or public toilets as they presently have
to resort to open defecation.
Many of the villagers are educated and still have to work as labour due to lack of opportunities. Villagers gave
preference to computer based education for their children which
Jhabri village
Jahbri village is one of the most remotely located villages in Mandav. It is located along the southern edge of
the town and does not even have an access road. The present access is through a kuccha rasta which is full of
large and small boulders and is not even walkable. The villagers are largely involved in agricultural and own
some livestock. The village had a pond which has dried out and is now used for agriculture after monsoons.
The water supply situation in the village is so poor that the villagers have to travel along the edge of a steep
ridge to Tipkiya Gufa to access water. There is no provision of sewage management, waste management or
83
2013
drainage. The waste is thrown in the open and open defecation is the only option available for the villagers.
The area needs to be provided with a road and water supply provision on immediate basis. The condition of
houses is also kuccha and these need to be upgraded. There is no electricity provision in the village.
Urban poor in core area
Most of the urban poor in core town work as daily wage labour and dont benefit from tourism in any way. The
core town also has a significant percentage of fishermen who have been dependent on the ponds for their
livelihood but with the drying up of ponds, are now having to resort to other means of livelihood like working
as manual labour in Dhar and Bagedi. The Majhis emphasized the need to revive all ponds in the town so that
pisciculture can be revived. At present, the fishing season is only limited to 4 months as the fishermen
introduce fish eggs (buy from Sundrail) in the ponds when the ponds fill up during monsoons and these fish
take upto 4 months to mature. Fish are sold in Dhar, Nimad, Dhamnod, Dharampuri and Kukshi and are in high
demand. The only pond in the region that retains water for most part of the year is the Malipura pond but this
pond has been reserved for fishing by Adivasis. The fishermen expressed concern over the need to revive Sagar
Talab and other ponds in the region. Excavation of ponds approved many times but no work has been
undertaken yet.
The urban poor in core area donot own agricultural land but have pattas for their houses. Most of these
houses are semi pukka and are typical of the housing stock in the town.
Tarapur village
The village is accessible by a kuccha road from Tarapur gate, on Dharampuri road. The village comprises of
clusters of kuccha houses and is served by the Tarapur pond and well. Owing to siltation, the pond and well dry
out during summers and the villagers have to commute 2km to the school to get water and sometimes, even
to the main town. NP tanker comes to the village to supply water but the quantity of water is so low that at
times the villagers send the tanker back. The villagers were also supposed to be provided with gas connections
but no work has been done in this regard. Krishi vibhag Gram sevaks dont give seeds now to the villagers as
there is no source of irrigation in the village.
The pond needs to be desilted and revived and the well needs to be deepened. A pipeline has already been
laid on Tarapur road and needs to be repaired and restarted after providing connection from Sagar
talab/Narmada. Catchment area of the pond and drainage channels to the pond need to be conserved. Farm
and village tourism would help increase the villagers income. Doodh talai talab on Dharampuri road also
needs Desiltation.
84
2013
85
2013
13.8 Urban basic services in slums (in line with JNNURMs 7 point charter)
Details of provision of basic services in slum clusters, villages and area with urban poor have been given in the
sections above. Slum wards in the town are not slums, except in ward 2. These are villages which have come
under NP boundary but still have hutments, characteristic of rural lifestyle. The condition of infrastructure
provision in these areas is poor and they donot even have access to water supply and are dependent largely on
local ponds and wells for irrigation and water. After these sources dry up in summers, villagers have to
commute upto 6km to get water. The waste from these areas is not collected and they donot have any
drainage. The houses are kuccha hutments made of bamboo and thatch and dont have any HH toilets. Most
slum dwellers have ownership documents.
Table 13.1: JNNURMs 7 pointer charter for all wards (based on observation)
Slum
ward
no.
2
13
14
Tenure
security
Improved
housing
Water
supply
Sanitation
Education
Health
Social
security
90%
70%
70%
25%
15%
10%
70%
40%
20%
70%
50%
40%
80%
60%
50%
50%
20%
15%
50%
20%
20%
No. of beneficiaries
56
87
79
17
0
651
6
8
40
5
2
951
13.10 Comparative Analysis with UDPFI, CPHEEO guidelines and Present and future housing
demand
According to the NP, there are a total of about 1500 houses in the town out of which about 100 are pucca and
1400 are kuccha. Hence, the present housing shortage is 1400 DUs and that for 2035 is 3044 DUs. The town
has 7197 BPL persons accounting for 67% of the town population. It has been assumed that the % of BPL in the
town would decrease and the town would become slum free by 2035. Based on this assumption, the town
would need around 1373 DUs for urban poor by 2035.
86
Projected
Population
2015
11689
1897
60
1138
2020
13106
2139
45
109
2025
14682
2408
30
81
2030
16439
2709
15
45
2035
18400
3044
DU Demand
2013
% BPL
Total
1373
Opportunities
Promoting farm and village tourism as a
potential source of earning for the villagers
Promoting decentralized tourism with stake of
tribals
Employment generation
Better access and infrastructure provision
Weaknesses
Poor condition of housing and infrastructure in
peripheral villages
Have to travel long distances for water
Kuccha houses in all villages
No employment opportunity within town
No income for urban poor from tourism
Threats
So far, tourism development of Mandav and
poverty alleviation of inhabitants of Mandav
have been considered as 2 different topics. If
this trend continues, Mandav town would
continue to ignore its urban poor
13.12 Issues
Based on NP data, the BPL population for the town was nearly 57% (based on 2003/04 survey) but the
participants pointed out that the BPL population of the town at present is nearly 60 to 75%. Only around
30% of the town population has been issued BPL cards
Some of the villages have also been considered as slums. These should be treated as special areas with
immediate need for housing and infrastructure
Poor access to Jhabri village and immediate need to revive pond in the village
87
2013
Infrastructure
Social
Infrastructure
Housing
Women can be trained in stitching, tailoring, papad making, etc. Women would
have to be formed into SHGs, provided adequate training and loans for this
purpose.
Increase income from tourism; Farm tourism and village tourism to be promoted
Green house farming can be initiated to increase earning
Need job opportunities for their children who are educated
Loan for small businesses needed: Sabzi thela, fruit thela, etc
Revival of pisciculture and animal rearing
Drip irrigation equipment manufacturing plant. Will facilitate distribution of
drip irrigation equipment. Sprinklers can also be promoted
The villagers only have access to 2 phase electricity and need to be provided with
3 phase electricity on an immediate basis.
Desiltation of ponds
Water supply provision from Sagar Talab through piped supply
Public toilets and community toilets
IPTs for transportation to village areas
Provision of wells/handpumps in each village cluster
Computer based education
Decentralized health facilities
Insitu redevelopment with provision of pukka houses and infrastructure
Action Plan
Provision of decentralised infrastructure in the peripheral hamlets (Sagar, Rampura, Nandlalpur, Jamanya
and Jhabri villages)
88
2013
14.2 Health
As per the 2001 Census data, Mandav had 5 beds in medical
institutions per 10,000 population. This is the lowest number,
compared to other towns of the district (in comparison, Dhar city,
the number is 75 per 10,000 population). The town has a Primary
Health Care Centre with 6 beds. The closest hospital is in Nalcha
that is 10 kms away and since Mandav is located atop a plateau, the
route is through hilly terrain. Patients from Mandav are usually
referred to Dhar (20 km) for further treatment. The present PHC serves only as a preliminary first aid centre
and faces a shortage of doctors and staff. Since Mandav is a prominent tourist destination, the town should be
provided with adequate health facilities. The village areas have not been provided with any health facility and
need to commute to the core town (at least 2 hrs walking) to avail health facilities. Hence, decentralized
treatment facilities for villages are also needed. There are no veterinary facilities in the town although life
stock ownership in the town is high.
89
2013
for low end tourists. The town has no parks or cinema halls. There is no petrol pump in Mandav and hence,
black marketing of petrol is common. There are no greens and playgrounds for the town population and for
the villagers.
90
Senior Secondary
School
Integrated school
with hostel facility
School for
handicapped
Norm
1 for 7500
1 for 90,000
to 1 lakh
Present
Requirement
2013
Existing
stock
Requirement
by 2035
Additional
requirement
2035
1
by
1
0
1 for 45,000
0
1 for 1.25
lakh
Colleges
population
0
Technical College
1 for 7500
0
In terms of health facilities, though the town has adequate facilities as per standards, the town population has
expressed an immediate need for a bigger hospital and health facilities for tourists and villagers.
Category
Intermediate
Hospital (200 bed)
Polyclinic with
observation beds
(0.2 ha)
Nursing home, child
welfare and
maternity centre
Norm
Present
Requirement
Existing
stock
Requirement
by 2035
Additional
requirement by
2035
1 for 1 lakh
1 for 1 lakh
1 for 0.45
lakh
1
1
0
0
1 for 0.15
Dispensary
lakh
1
1
1
As per standards, the town has adequate health and education facilities but based on consultations with
town population, the town needs to be provided with better facilities owing to its large area and its
significance as a tourist centre. The town should be provided with 1 senior secondary school for the villagers
and a vocational college for the town (esp. computer courses). By 2035, the town needs to be provided with
another senior secondary school for main town and one for the villages. Another vocational college can also
be set up. In terms of health facilities, the existing PHC needs to be upgraded to a 30 bed CHC with provision
for emergency facilities. A CHC needs to be provided in the village areas. By 2035, another PHC should be
provided in the villages.
Opportunities
Provision of decentralized health and education
facilities
Provision of computer based education and
agricultural diploma courses
Weaknesses
Poor health facilities
All facilities located at 1 to 2 hr walking distance
from villages
No recreational areas for town population
No petrol pump
Threats
Tourism related development of the town can
ignore the needs of the town people
completely
91
2013
14.6 Issues
Better health and education facilities are required for the town. The town had a PHC (Primary health
centre) but now there is a severe shortage of doctors.
There is a need for a play ground and a public garden in the town.
The guides in Mandav donot have licences and hence, their earning is low. NP can provide licences to
these guides. This would increase the earnings for NP and the guides
Decentralized health and education facilities need to be provided for the villagers
Better educational facilities need to be provided, especially for tribals. Focus on computer education and
vocational courses also needed
Only 1 bank in the town. Works only for 2 days a week. Nationalized bank needed
The town used to have a Grameen bank but this was shifted to Nalcha due to lack of business. This bank
needs to be revived along with SHG formation and awareness generation amongst tribals.
Action Plan
Education
Women oriented Literacy Programmes
Training programmes for tribal population (Certificate courses)
Senior Secondary School
Development of Library
Upgradation of existing Schools by provision of additional floor
English Medium School
Provision of High School
Provision of Anganwadi for Sagar Village and Jhabri Village
Agricultural education to be promoted through NGOs, agriculture and horticulture department
Upgradation of existing schools to incorporate more students
Need to hire Contract staff to fill vacant posts for Teachers
Health
Upgradation of existing PHC to 30 bed CHC
Provision of Emergency services in upgraded PHC
92
Others
CHC
PHC
Provision of Dispensaries (0.08 to 0.12 ha)
Provision of small Vet Facility
Nursing home, Child welfare and Maternity Centre (25 to 30 beds)
Police Posts along regional roads
Additional greens @14% of Municipal Area
Provision of Petrol Pump in or near Mandav
Provision of Grameen Bank in or close to Mandav
Provision of gas agency to reduce dependence on fuel wood
Provision of Cyber Cafes and Photocopy shops
93
2013
2013
But in the past few years, forest land is being cleared illegally due to lack of initiative by related government
departments. Illegal felling in the forest lands of the region for agriculture and settlements (reportedly, pattas
have been allocated to villagers on forest land which has further aggravated the problem) has led to
environmental implications which include high erosion levels, siltation of ponds, increased runoff and lower
water retention capacity. Existing ponds are getting choked due to deforestation and related siltation. The
green cover in the valley is also reducing due to afforestation and this can adversely impact tourism to the
town. In order to restore the balance, afforestation and construction of more ponds can be undertaken in the
region. All felling in the NP limits and surrounding area needs to be stopped immediately and completely.
Plantation of fruit bearing trees and flowering trees can also increase tourism and livelihood opportunities in
the region and afforestation can provide the following employment opportunities:
Tribals grow fruits/vegetables like jadibootis, salam misri and Dhuli Musli which fetch good prices and
have a good demand but due to poor condition of farmers, these crops are on a decline. Incentives are
needed to revive these crops.
Mahua, Charoli, Tendu and Bamboo trees can be planted to initiate SSIs in the region.
94
2013
Seetaphal, Khirni and Khurasani Imli are fruits for which Mandav is known and plantation of these
trees/ plants needs to be promoted
The khirni trees are reducing due to deforestation and need to be planted and conserved as these take a
long time to grow.
A biodiversity park can also be set up in the valley areas to attract tourists and to conserve the environment.
Wildlife can also be introduced in this biodiversity park to increase the tourism potential.
Air: Air pollution is not a concern due to very low motorised vehicle ownership in the town. Air quality
may be measured during peak tourist season when there is an influx of motorised tourist vehicles is high.
SPM content is slightly high near the bus stop.
Water: There is threat of pollution of water bodies due to garbage dumping and open defecation. Existing
ponds in the area are getting choked due to deforestation and related siltation. The silt at the base of
ponds is very fertile and hence, ponds should be desilted and the silt should be spread over agricultural
fields.
Soil: As regular maintenance of the septic tanks is not undertaken, leachette from the ttank can cause soil
and groundwater pollution.
Sagar talab is the main pond in the town and Malipura pond is located along the foothills. Sagar talab is
presently being used as a tourist attraction, though on a small scale. Some boating facility has been provided
here. Waterfront development along Sagar talab is possible but would have to be undertaken with due
consideration to environment. This is also important because this pond acts as a source of water supply to the
town.
95
2013
will enable landowners and gram panchayats/sabhas to take responsibility for certain forested areas. Other
guidelines applicable to Mandav are:
Wild Life (Protection) Act 1972: For effectively protecting the wild life and to control poaching,
smuggling and illegal trade in wildlife and its derivatives. The objective is to provide protection to the
listed endangered flora and fauna and ecologically important protected areas.
The Water (Prevention and Control of Pollution) Act, 1974: For maintaining or restoring
wholesomeness of water bodies. Environmental Protection Act, 1984: Umbrella Act for all
environmental parameters
Municipal solid waste rules, 2000 for safe management and disposal of Municipal waste
Weakness
Encroachment and distribution of pattas on on
forest land
Depletion of forests due to illegal felling of
trees
Threats
Environmental degradation as the carrying
capacity of the town is exceeded
15.8 Issues
Distribution of pattas in forest areas is a major issue resulting in deterioration of forest cover.
Forest land is being cleared illegally due to lack of initiative by related government departments and is
leading to depletion of forest cover.
Water bodies suffering from siltation and eutrophication need desiltation, catchment conservation and
conservation of drainage channels
96
2013
Encroachments on forest land should be removed. Forest land being cleared for construction of houses
and farms.
New trees for Khurasani imli need to be planted and since this tree takes around 20 to 25 years to mature
and needs a lot of care till maturity, the planters need to be secured by providing tree guards around
them
Fuel and fodder trees need to be planted so that tribals dont have to rely on the forests for fuel and
fodder. Grazing grounds should also be created to reduce encroachment on forest land.
Action Plan
Large scale afforestation on forest land and non forest land- Joint Forest Management.
Conservation of lakes and ponds and their catchment area within NP boundary and at foot hill (including
SAGAR TALAB AND Mallipura Talab)
Strategic EIA for water supply, industries and other environmental parameters
97
2013
Roopmati pavilion
Jahaz Mahal
While numerous monuments from various periods in history spread over the hill top, some of the significant
ones are listed as follows:
Gateways: The 45 km parapet of walls that encircles Mandu is punctuated by 12 gateways. Most notable
of these is the Delhi Darwaza, the main entrance to the fortress city, for which the approach is through a
series of gateways well fortified with walled enclosures and strengthened by bastions such as the Alamgir
and Bhangi Darwaza, through which the present road passes. Rampol Darwaza, Jehangir Gate and Tarapur
Gate are some of the other main gateways.
98
2013
Jahaz Mahal: This 120 mt long "Ship Palace" built between the two artificial lakes, Munj Talab and Kapur
Talab is an elegant two storeyed palace. With its open pavilions, balconies overhanging the water and
open terrace, Jahaz Mahal is an imaginative recreation in stone of a royal pleasure craft. Viewed on
moonlit nights from the adjoining Taveli Mahal, the silhouette of the building, with the tiny domes and
turrets of the pavilion gracefully perched on the terrace, presents an unforgettable spectacle. There are
some historians who believe the Jahaz Mahal was built by Sultan Giasuddin as his Harem Mahal. Whereas
there are some who believe it was the summer resort of Malwa King Munjdeb.
Hindola Mahal: Sultan Ghiyasud-din Khilji built the Hindola Mahal, or the Swinging Palace. It got this name
from its sloping walls which looked like the trestle supports of a swing. It was a great audience hall of the
King of Mandu. There are several unidentified buildings to the west of the Hindola Mahal which still bear
traces of their past grandeur. Amidst these is an elaborately constructed well called Champa Baoli which
is connected with underground vaulted rooms where arrangements for cold and hot water were made.
Other places of interest in this enclave are Dilawar Khan's Mosque, the Nahar Jharokha (tiger balcony),
the two large wells the Ujali (bright) and Andheri (dark) Baolis and Gada Shah's Shop and House, all worth
a visit.
Tomb of Hoshang Shah: Retains the masculinity and majesty of the Afgan ruler. The white marble tomb is
a product of mixed architectural and cultural blend of Hindu, Muslim, Afghan styles. It has a beautiful
dome, marble lattice work, porticos, courts and towers. Hoshang Shah started constructing his own tomb
but it was completed by his son five years after his death in 1440. In 1659, Shajahan visited the tomb and
was amazed by its beauty. He had sent his architects to study the design of and draw inspiration from the
Tomb. Among them was Ustad Hamid, who was also associated with the construction of Taj Mahal.
Jami Masjid: Inspired by the great mosque of Damascus, the Jami Masjid was conceived on a grand scale,
with a high plinth and a huge domedporch projecting in the centre, the background dominated by similar
imposing domes with the intervening space filled up by innumerable domes. One is struck by the huge
proportions and the stern simplicity of its construction. Its construction was started by Hoshang and
completed by Mahmud Khalji in 1454 A.D. The great court of the mosque is enclosed on all sides by huge
colonnades with a rich and pleasing variety in the arrangement of arches, pillars, number of bays, and in
the rows of domes above.
Roopmati's Pavillion: Roopmati Pavilion was built by Baj Bahadur. The pavilion has an Afghan style of
architecture. It has two Chabutara, or high tombs. They were built in order to watch and observe
movements of the enemy. However Roopmati, the beloved wife of baj Bahadur used the pavillion to
worship and perform her rituals the Narmada (Mokshoda) river, flowing far away (26 km) at Nimar valley,
from the 365 metre high mahal. The ambience at the pavillion is soothing. The sunset and the moonlit
night add more to the beauty.
There are many agencies involved in the heritage and tourism development of Mandav and few Conservation
and restoration works are also ongoing; but due to lack of funds and coordination between various agencies,
99
2013
Mandav is still an under developed city in terms of heritage and tourism Infrastructure. The agencies related
to heritage conservation, management and promotion are as follows:
Archaeological Survey of India (ASI): ASI provides protection to cultural heritage all over the country. There
are 61 ASI protected monuments in Mandav including gates, palaces, baodis, tanks, tombs, mosques, caves
and others, as listed in Table 16.1.
Table 16.1: Centrally protected monuments in Mandav
Typology
Gates
Alamgir Gate, Bhagwania Gate, Bhangi Gate, Delhi Gate, Gadi Darwaza,
Lohani Gate, Jahangirpur Gate, Hathi Pole Gate, Rampol Gate, Songadh
Gate, Tarapur Gate, Tripolia Gate
Ancient Hindu Baodi, Andheri Baodi, Ujali Baodi, Champa Baodi, Hammam,
water structures
Kapoor Talao and the ruins on its bank, Hammam, Somavati Kund
Hoshang Shah's Tomb, Chor Kot Mosque, Darya Khans Tomb, Dilawar
Khan's Mosque, Jama Masjid, Mahmud Khilji's Tomb, Malik Mughith's
Mosque, Mosque near Sopi Tank, Mosque north-west of Darya Khan's
Tomb, Mosque near Tarapur Gate, Nameless Tomb west of Shila Tank,
Mosque opposite Rampol Gate, Tomb & Mosque between Chor Kot
mosque & Chhappan Mahal, Tomb north of Darya Khan's Tomb, Tomb
north of Alamgir Gate
Palaces
Ashrafi Mahal, Baz Bahadurs Palace, Chisti Khans Mahal, Dai ka Mahal, Dai
ki Chhoti Bahan ka Mahal, Ek Khamba Mahal, Gada Shah's Palace, Hathi
Mahal, Hindola Mahal, Jahaz Mahal, Jali Mahal, Nahar Jharokha, Royal
Palace in the west of Champa Baodi, Roopmati's Pavalion, Taveli Mahal,
Water Palace
Others
100
2013
Figure 16.1: Lists the status of chemical conservation works for which funds have been sanctioned by the Central Government. Some
other works of chemical conservation have been completed recently by the ASI.
Table 16.2: Chemical Conservation by ASI
Name of monument
Jami Masjid
Baz Bahadur palace
Entrance & exterior of
Baz Bahadur Palace
Tomb north of Dariya
Khan
Sanctioned amount
1,700,000
951,000
130,000
(for current year)
100,000
(for current year)
Amount spent
1,500,000
863,782
Status
Work stopped
Total 10 Lakh estimate
Total 7.5 Lakh estimate
Directorate of Archaeology, archives and Museums, Madhya Pradesh: The main objective of this department
is to safeguard and protect those monuments which have cultural and historical importance in Madhya
Pradesh. At present there are 13 monuments under this department, as listed in Table 16.3.
Table 16.3: State protected monuments in Mandav
Period
th
16 century
th
16 century
th
16 century
th
16 century
th
16 century
th
16 century
th
th
15 -16 century
th
16 century
th
16 century
th
16 century
th
th
16 -17 century
th
16 century
101
Monument Category
B
B
B
B
B
B
B
C
B
B
B
C
2013
Under the 12
Finance Commission, funding has been made available for physical conservation of two
monuments in Mandav. The summary of the estimate for these is tabulated below.
Table 16.4: Estimate for works in Mandav for which funding is available under the 12th Finance Commission
Monument
No. of DPRs
1
Amount (Rs in
Lacs)
5.00
Andhi Ka Mahal
Andha ka Mahal
5.00
10
Ministry of Tourism, Govt. of India: Under the Capacity Building for Service Providers Scheme (CBSP), the
Ministry of Tourism gives financial assistance for the training of SC/ST people in the field of hospitality, to
encourage tourism (3-6 month training programmes).
Department of Tourism: The tourism policy of MP Tourism Department provides exemption in commercial
taxes and entertainment tax; and availability of government land for tourism projects. In this endeavour, the
main aim is to promote tourism as an industry to ensure employment generation along with tourism
development, with stress laid on encouraging private investment. Through the Department the state
government has sanctioned Rs. 5 Crore as a part of Destination Development Fund for the town.
Other organisations active in the field are the District Archaeological Association, Dhar and Indian National
Trust for Nature, Arts and Heritage (INTACH). The Group of Monuments of Mandu are also a part of the
UNESCO World Heritage Tentative List of India since 1998. While the nomination process for Mandav is not
active as of now, it is imperative that any development decisions are taken keeping in mind the potential of
the town in being declared a world heritage site.
102
2013
construction activity of any kind is permitted. Every area, beginning at the limit of prohibited area in respect of
every ancient monument and archaeological sites and remains, declared as of national importance under
sections 3 and 4 and extending to a distance of two hundred metres in all directions shall be the regulated
area, where repair of structures, modifications and new construction can be undertaken only with permission
from the competent authority i.e. the National Monuments Authority as per amendment of the Act in 2010.
This single Central Level Act with its Amendment in 2010 ensures complete protection of the properties and
their surroundings up to 300 metres from the property boundary.
The MP Department of Archaeology was established in 1956 with the objective to safeguard and protect the
heritage monuments in Madhya Pradesh. For the preservation of Ancient and Historical Monuments and
Archaeological Sites and Remains; and for the regulation of excavation of archaeological sites, Government of
India passed the Madhya Pradesh Ancient Monuments and Archaeological Sites and Remains Act, 1964. The
Act was further amended in 1970. Under the Act, the Madhya Pradesh Ancient Monuments and
Archaeological Sites and Remains Rules, 1975 were formulated. The Act
monuments that are defined as being of historical, archaeological or artistic interest and has been in existence
for not less than 100 years (as per the the 1970 amendment, prior to which it was not less than 50 years). The
protection can include the remains of such a monument, the site of such a monument, such proportion of
land as may be required for fencing or covering in or otherwise preserving the monument, and the means of
access to, and convenient inspection of such monument. For the preservation of amenities of protected
monuments, the State Government is enabled to notify the area comprising or adjacent to the site of the
monuments as the controlled area. The State Government can prohibit or restrict any construction, erection
or execution of buildings, structures and other works within the controlled area or the alteration or extension
of any such buildings, structures or works that may materially affect their external appearance. The
Government can also regulate the external appearance of buildings, structures and other works in the
controlled area.
MP also has a State Eco and Adventure Tourism Policy, 2001; and a heritage policy which was formulated in
2002. A Comprehensive Heritage Policy is also being prepared (presently in draft stage).
With associations from the 6 century AD, the site can also be explored as a
source of archaeological evidence. It is imperative that the built heritage is
documented and listed and addressed at the local body level. The culture and
built heritage of the local population also needs to be studied so that the values
imbibed in these may not be wiped out in the name of development of the
town.
103
2013
It is said that the fortified town was inhabited by a population of 9 lakh historically. While not all listed
monuments are in a good state of preservation, with their adjacent areas encroached upon, there are a
number of un listed historic structures above as well as below the ground lying neglected and unidentified.
Excavations for new construction undertaken in the past have resulted in finding of red soil that is indicative of
a layer of historic structures below the ground. In such an event, construction work is stopped by the ASI.
Hence, it is important that the local population is made aware of the wealth of heritage and involved in the
heritage management process so that they identify with the heritage as a resource and not a liability that is
hindering the growth of the town.
Year
Total Tourists
Domestic Tourists
International Tourists
2007
2008
2009
2010
411,181
522,139
628,745
760,683
403,874
514,892
621,863
753,712
7,307
7,247
6,882
6,971
% of international
tourists
1.8
1.4
1.1
0.9
Source: MP Tourism
Figure 16.2: Proportion of total, domestic and international tourists from 2007-2010
800,000
No. of Tourists
700,000
600,000
500,000
400,000
Total Tourists
300,000
Domestic Tourists
200,000
International Tourists
100,000
0
2007
2008
2009
Years
104
2010
2013
2003-04
2004-05
2005-06
2006-07
India
n
visito
rs
6127
9
1337
33
1318
34
3268
46
2007-08
2008-09
India
n
visito
rs
1206
03
2040
88
2128
75
5375
66
2009-10
2010-11
India
n
visito
rs
1673
18
2692
26
3002
78
7368
22
2011-12
Tourist season in Mandav spreads over 4 months from Monsoons to Jan/Feb. Maximum tourist traffic to the
town is in August. During Monsoons (from July to September), mostly Gujarati and local tourists visit Mandav
to enjoy the lush green view of the valley and rolling hills. During winters (October to Jan/Feb), mostly
International tourists visit the town. Most of the tourists coming to Mandav dont spend more than 3 or 4
hours in the town. It is important to extend the tourist season from 4 to 8 months and also increase the stay of
the tourists in the town.
An annual music and dance festival is organised in Mandav during the winter period, to attract visitors. The
festival is clubbed with activities such as adventure sports. Such initiatives need encouragement and may be
expanded, though these need to be supported by appropriate infrastructure and facilities for the visitors. The
town has a dominant tribal population (81%) residing here through generations. The tribal population has a
distinct living heritage music, dance, arts, crafts and traditional knowledge systems about the indigenous
fauna. There is an attempt to link the tribal performing arts to tourism by including their performances in the
upcoming annual music and dance festival. Such opportunities can be extended to integrate other tribal arts
and crafts. The natural heritage and unique topography of the town presents opportunities for ecotourism and
adventure sports. This potential can be developed further.
The accommodation facilities in the town include 2 MP Tourism hotels, 2 NP rest houses, 2 dharamshalas (1
Jain, 1 Hindu) and 5 small private hotels. The Jain Dharamshala attached to the Jain temple is at a prime
location but is available only to Jain visitors.
District
Archaeology
Association
and
State
th
105
2013
been made to represent the invaluable historical heritage of Dhar district dating from Stone Age to the 20
th
century. This heritage includes the one and a half millennium old Bagh cave frescos, stone age relics, Bhil
culture, the glory of King Bhoj and Dharanagari, the acme of the Sultans of Malwa, the immortal love of
Roopmati and Baz Bahadur and the martyrdom of Rana Bakhtawar Singh.
A fossil museum Ashmadha (Literally Seated in stone) has also very shortly been thrown open. A showroom
Roopayan has been started to cater to demand of the tourists for exclusive and exotic art and craft indigenous
to the region. Spardha, an adventure point providing the entire range from trekking, rappelling, skating, gear
biking to TT, Pool or Badminton is also proposed. There is a mobilization of funds of over Rs. 150 million from
the District administration.
Mandav is on the UNESCO Tentative World Heritage List of India, since 1998. It appears as a prominent
destination on the World Tourism map and measures to preserve its beauty, restore its monuments and
increase its tourism potential are needed. There is a need to devise a tourism plan for the city and highlight the
tourism potential of the town that may include the provision of extra accommodation, parking, signage,
training of guides, appropriate interpretation and information facilities for the visitors, encroachment removal
and development of picnic sites. The town lacks an information/orientation and interpretation centre. The
potential of the town is presently not being explored to its full extent. But at the same time it is important that
the heritage resources of the town do not suffer a negative impact as a result of the increase in visitor
numbers. Innovative models such as the dispersed hotel concept can be use in Mandav where the temporary
(tents) or hutments can act as dispersed accommodation with the front of the house, back of the house and
hotel facilities centralized. This can be applied on a public private partnership model with active participation
of the local population, hence enable them to benefit from the tourism industry.
106
2013
Figure 16.3: Tourist circuits in MP, Source: MP State Tourism Development Corporation Ltd.
The development of regional tourist circuits requires strengthening of the regional linkages in terms condition
of roads, transportation (tourist buses), better tourist accommodation and interpretation at these
destinations. The current circuit links Mandav with Ujjain, Indore, Omkareshwar and Maheshwar. Circuits can
be developed in the immediate vicinity of Mandav linking Nalcha that has heritage significance (group of state
protected structures), Budhi Mandav (archaeological site) and other such tribal and rural settlements. This can
help increase length of stay of the tourists with in the town. At a regional level, Mandav has strong potential to
be linked with Dharampuri (to south), Dhar and Bagh Caves along with Ujjain, Indore, Omkareshwar and
Maheshwar. This can take place through improved connectivity to the NH3 and better roads all across with
Dhamnod as a tourist accommodation hub.
107
Weaknesses
Encroachments on historic built fabric
and natural heritage
Lack of representation of indigenous
2013
Opportunities
Public-private partnerships in a variety of areas in
addition to hotels and accommodation for tourists
Practice of ecological tourism and heritage sensitive
tourism
Models such as dispersed hotel with temporary
structures to be introduced
Increasing tourist season and tourist stay in Mandav
Strengthening regional tourist circuit through better
road connectivity, transport, accommodation and
interpretation
Enabling the active participation and benefit of local
population from tourism
Heritage awareness generation of local population
and training of local population
tribal culture
Poor involvement and benefit of local
population from tourism industry
Built heritage above and below the
ground and the 300 mts regulation
around ASI protected monuments
poses limitation for tourist
infrastructure development
Number of tourists showing drop due
to poor infrastructure
Threats
Negative impact on the historical built
fabric
Socio-cultural impact of excessive
tourist influx on the local population
Further drop in tourist numbers due to
inability to provide appropriate tourist
facilities and infrastructure
16.9 Issues
Tourists just visit Mandav for 2 to 3 hrs and return. They either stay in Dhar or Nalcha
Developing a tourist circuit connecting Omakreshwar, Mandav, Maheshwar, Dharampuri, Kukshi (Dinosaur
National Park) and Ujjain. Tourist accommodation and parking to cater to Mandav can be provided in
Dhamnod and tourist buses and luxury buses can ply from Dhamnod to Mandav
Connectivity from Mandav to NH3 via Jhabri village needs to be developed on priority basis
Adventure sports like paragliding. Paragliding was initiated around 2 years ago as a part of
Mandav Utsav but was not a part of the festival this year
Camping
Nature trails
Cultural events
108
2013
Gardens should be developed in the town. These gardens should be handed over to the community or
official agencies for maintenance.
Public-private partnerships to take place in a variety of areas in addition to hotels and accommodation for
tourists such as:
Restaurants
Cleaning and renewing existing lakes and lake beds and possibly, historic water channels.
There is a need to set up a cultural heritage interpretation center with multimedia presentations and
prepare and disseminate heritage information on history, architecture, and culture to local people and
tourists.
Guides in Mandav donot have licences. NP can issue licences to these guides. This will increase the income
of guides and can also be a source of earning for the NP
Action Plan
Integrated Heritage Resource Management Plan for Mandav Planning Area (IHRMP) - dymanic document
Periodic review and updation of the IHRMP for Mandav Planning Area
Landscape Plan
Preparation of Dossier for Nomination as World Heritage Site - to be prepared through consultative
process. The IHRMP to act as support document/documentation base for the Dossier
109
2013
Introduction of IPT for Tourists - connecting all visitor attractions within Mandav
Ropeway connecting Lohani caves to Songarh Fort can be provided, if approved by Mandav Heritage
Resource Management Authority
Access walkway to Boorhi Mandav and Songarh Fort to be provided parallel to the valley (near NP Raen
Basera)
ASI can provide for public toilets and other amenities within the ASI listed Monuments' premises
Resource Centre, Design innovation and training centre and Haat (for continuity of traditional knowledge
systems and promoting these as means of livelihood)
Signage on all internal roads and regional roads to indicate directions to Mandav and directions to
Monuments
110
2013
of the 74 amendment, the role of parastatals such as Public Health Engineering Department (PHED) has been
reduced substantially. Responsibility for planning, extension and day to day service provision within municipal
limits now rests with the municipal staff.
Mandav Nagar Parishad has a sanctioned strength of 27 employees and all the staff positions are filled. The
Municipality is responsible for provision of basic services, namely water supply, sanitation, street lighting and
maintenance of roads, parks and recreational facilities. The municipality is also responsible for planning and
sanctioning housing plans and layouts. The NP Mandav owns the following properties, vehicles and
equipment:
111
2013
Sumpwell House
17 Ponds
112
2013
The activities of the department include preparation of development plan for investment areas of towns,
preparation of regional plans for investment regions, control and inspection of planning for uniform
development of small and medium-sized cities, development of infrastructure of towns, guidance in execution
of development plans, check on unauthorized development of cities, guidance in policy making to
development authorities/ special zone development authorities/ housing board and other institutions,
guidance and assistance to state government and other institutions for management/ land planning/ selection
of place and state nodal agency for nation urban information.
The town does not have a TCP department but a Master Plan for the town for the target year 2011 was
prepared by the TCP Department, Indore.
Eight Circle Offices headed by Deputy Housing Commissioners (Superintending Engineer) located three at
Bhopal, one each at Ujjian, Gwalior, Indore, Jabalpur and Rewa, of which Dhamnod comes under the
Indore Circle.
One Electrical Circle Office headed by Deputy Housing Commissioner (Electrical) located at Bhopal.
Twenty-Nine Divisional Offices headed by Executive Engineers and Seventy-Three Sub Divisional Offices
headed by Assistant Engineers.
Three Electrical Division Offices headed by Executive Engineer (Electrical) located at Bhopal, Indore,
Jabalpur and Eight Electrical Sub-Division Offices located at each Circle headquarters headed by Assistant
Engineers.
Four Estate Management Offices headed by Estate Officers located at Four Rajbhogi towns and TwentyNine Estate Managers located in all Divisions.
113
2013
Mandav does not have a housing board office and no initiatives have been taken up thus far by the Housing
board to improve the housing situation in the town.
114
2013
Tourism Department
MP tourism department is a key stakeholder in case of Mandav and undertakes several development activities
around the monuments but the department does not have an office in Mandav
17.3 Issues
Single window system absent in all departments All departments including Nagar Parishad should publish
annual reports.
Nagar Parishad should conduct training programmes for Nagar Parishad officials
E Governance
The Nagar Palika and/or TCPO should undertake a detailed exercise for topographic surveys of Municipal
area
A dedicated Development authority office, housing board office, an Architect and designated Town
Planning officer need to be provided in the town to ensure planned development and implementation in
accordance with the plans.
Computerization of data
Mapping of services (water distribution network and proposed sewerage distribution network maps to be
prepared and regularly updated through digital media)
115
2013
Other departments
Staff shortage is a major problem in most other Government departments. Hence, computerization would
help reduce the load on these departments.
Enforcement Authority and staff to be provided to various departments to ensure stricter enforcement.
E.g.: Forest Department, Nagar Parishad.
Action Plan
Infrastructure mapping with annual updation in digital form - to be linked with GIS database being
generated and maintained for heritage mapping under Mandav Heritage Resource Management Authority
(HRMA)
116
2013
Financial Position
Revenue
Expenditure
Surplus/Deficit
250
200
Revenue
150
Expenditure
100
Surplus/Deficit
50
0
2010-11 2009-10 2008-09 2007-08 2006-07
117
2013
Revenue Composition
Tax
%
Non tax
%
Transfers
%
TOTAL REVENUE
201
10-11
80
0.43
39
9.59
5..25
2..58
117
7.48
57
7.83
203
3.16
2009-10
59.06
55.37
4.47
4.19
43.13
40.44
106.66
2008-09
37.85
34.39
13.4
12.18
58.26
52.93
109.51
2007-08
40.14
51.77
3.34
4.31
34.06
43.93
77.54
2006-07
35.57
35.15
34.52
34.11
31.1
30.73
101.19
140
120
100
Tax
80
Non tax
60
Transfers
40
20
0
2010-11
2009-10
2008-09
2007-08
2006-07
43%
45%
Tax
Non tax
12%
Transfers
Category
Tax On Vehicles
Drinking water Vehicle Tax
%
Rs(Lakhs)
2010- 2009- 2008- 2007- 20061
11
10
09
08
07 2010-11 2009-10 2008-09 2007-08 2006-07
8.09
7.02
2
7.2
1.2
4.8
1
118
4.7
2.75
10.06
0.00
11.89
3.39
19.02
3.17
11.96
2.49
13.21
7.73
56.23
0.55
0.34
1.08
0.15
0.13
0.33
0.01
0.61
12.45
0.17
0.29
80.43
43.63
1.21
0.17
1.18
0.04
0.01
0.3
2.09
0.73 0.2 1.11
1.77 0.87 2.4
0.44 0.9 0.37
0.56 1.09 0.52
59.06 37.85 40.14
2.35
1.01
1.12
1.26
1.28
35.57
2013
60
50
2010-11
40
2009-10
30
2008-09
2007-08
20
2006-07
10
0
Rs(Lakhs)
Category
Shulabh Complex
Market Fee
From Slaughter House
Food License Fee
Audit Objection
Night Shelter
Building, Inn Rent
Miscellenous
Compromise Fee
2010-11
0.34
0.01
0.05
0.09
0.65
0.61
2.67
0.01
119
201011
0.00
6.69
0.20
0.98
1.77
12.80
12.01
52.56
0.20
200910
0.00
9.13
0.24
21.39
4.57
16.83
15.87
23.56
1.44
%
200809
0.00
0.16
2.40
0.08
0.23
4.88
6.67
2.40
0.16
200708 2006-07
0.29 57.97
9.43 0.96
0.29 0.06
0.29 0.03
4.00 0.00
12.86 0.58
14.86 1.56
16.57 7.53
0.00 0.00
2013
0.06
0.2
0.42
0.13
0.04
0.02
0.08
2.29
0.00
15.43
5.71
0.23
0.00
0.98
0.32
0.47
0.05
0.37
0.35
0.54
0.2
0.01
0.04
5.25
4.47
0.21
0.47 0.27 0.20 0.96 1.63 13.43 0.78
10.26
10.01 0.00 0.00 79.53 0.00 29.00
13.4
3.34 34.52 103.35 107.45 103.88 95.43 100.00
25
20
2010-11
2009-10
15
2008-09
10
2007-08
2006-07
5
0
Rs(Lakhs)
Category
2010-11 2009-10 2008-09 2007-08 2006-07 2010-11
BRGF Plan
13.04
11.10
Basic Fac.
46.98
12.41
19.06
12.11
8.66
39.98
CC Road
11.16
9.50
Literacy Drive
3.26
2.77
Road Upkeep
3.35
3.68
2.65
2.25
4.64
2.85
Fin. Comm.
14.44
7.72
14.61
8.3
10.54
12.29
MP/Leg. fund
2.14
0.00
Dev.Grant
5
3.48
0.00
Mid day meal
11.8
6.04
2.5
1.67
1.51
10.04
Family Help
1.5
2.2
2.05
2.5
2.4
1.28
Pen. Plans
11.95
6.08
4.27
5.9
3.35
10.17
Water Sys.
7.5
1.33
0.00
117.5
43.13
58.26
34.06
31.1
100.00
120
2009-10
0.00
28.77
0.00
0.00
8.53
17.90
0.00
11.59
14.00
5.10
14.10
0.00
100.00
%
2008-09
0.00
32.72
0.00
0.00
4.55
25.08
3.67
5.97
4.29
3.52
7.33
12.87
100.00
2007-08
0.00
35.55
0.00
0.00
6.61
24.37
0.00
0.00
4.90
7.34
17.32
3.90
100.00
2006-07
0.00
27.85
0.00
0.00
14.92
33.89
0.00
0.00
4.86
7.72
10.77
0.00
100.00
2013
2010-11
2009-10
2008-09
2007-08
2006-07
Rs(Lakhs)
Category
Ordinary Government
Revenue Collection
Public Security
Public Health & Facilities
Public Construction
Miscellenous
Special Loan & Expenditure
201011
30.99
11.22
1.16
14.87
42.53
1.45
1.84
104.1
200910
29.81
5.93
8.72
6.99
28.98
1.91
1.44
83.78
200809
21.45
10.84
0
2.68
42.07
2.18
2.4
81.62
200708
18.87
13.32
0.62
5.92
32.1
1.39
1.66
73.88
121
%
200607 2010-11 2009-10 2008-09 2007-08
23.04 29.78 35.58 26.28 25.54
13.3 10.78
7.08
13.28 18.03
13.24 1.11
10.41
0.00
0.84
6.25 14.29
8.34
3.28
8.01
32.25 40.87 34.59 51.54 43.45
2.3
1.39
2.28
2.67
1.88
2.89
1.77
1.72
2.94
2.25
93.27 100.00 100.00 100.00 100.00
200607
24.70
14.26
14.20
6.70
34.58
2.47
3.10
100.00
2013
45
40
35
2010-11
30
2009-10
25
2008-09
20
2007-08
15
2006-07
10
5
Special Loan
& Expenditure
Miscellenous
Puplic
Construction
Public Health
& Facilities
Public
Security
Revenue
Collection
Ordinary
Government
Financial position of Mandav NPP is quite stable and it has enough surplus to promote development
in required fields. Increase in income from own revenue has been lower than revenue under
transfers, indicating a decline in fiscal autonomy of NPP.
Income from tax source is more than non-tax sources, which is a positive trend.
In terms of tax sources, Octroi compensation, Heritage Deposit & Tax on Vehicles are major
contributors.
The major non-tax contributors are the real estate related sources Building rent & Night Shelters. The
next major contributor is market Fee & lake lease.
Under transfers, major contributors are grant for basic facilities followed by grants from State Finance
th
Commission & 12 Finance Commission.
In terms of expenditure, a major share of expenditure is incurred on Public Construction & General
Administration. Expenditure on Grants and Public Education accounts is nil & therefore the
expenditure under these heads needs to be increased.
It was found that in some cases, the total under certain heads of the Municipal budget was not
accurate. Hence, in such cases, the sum of components was considered as final.
122
2013
123
2013
124
125
2013
2013
th
required. The table below shows the status of implementation of the Act. Until recently, due to a High Court
ruling, Mandav was being governed jointly by the CMO and SDM; and the Municipal Council had been
suspended. But elections to the Council were held in January 2011 and a new Council, headed by a Municipal
President is now in place.
th
Constitution of municipalities
Yes
Yes
Yes
NA
NA
Yes
126
2013
citizens can come with their complaints and grievances. Ward Councilors elected under the 74 CAA are the
elected representatives for each ward and are responsible for voicing citizen concerns. Other than this, citizens
are free to visit the NP to register complaints or give suggestions.
4. E-governance
For transparent administration, quick services, effective MIS and general improvement in service delivery,
reforms in e-governance are required to be undertaken by the states/cities. The types of services covered by Egovernance applications are:
1.
2.
3.
4.
5.
6.
E--procurement
7.
8.
Payment of Property Tax, Utility Bills and Management of Utilities that come under the ULBs.
9.
NP is in the process of undertaking the E governance reform and has 1 Computer. Around 2 to 3 of the staff
members in the NP are computer literate, including a computer operator. Some of the NP data is available in
digital form. The digitization of spatial data is yet to be undertaken. Accounts related information is not
available in digital format yet. None of the above functions are being undertaken through E governance yet.
Only the recent lok sewa guarantee scheme is being operated online. Under this scheme registration for a few
schemes like provision of water supply connections, ration cards, Samajik suraksha pension and Rashtriya
Pariwar Sahayata pension, kshramik nijoyan yojna are being managed through online entries.
5. Municipal Accounting
UIDSSMT requires the municipalities funded by them to adopt double-entry accrual principles for accounting
on the basis of National Municipal Accounting Manual (NMAM). This system has been introduced as the
single entry system suffers from the following flaws:
127
2013
1.
Full picture of Assets & Liabilities are readily not available in one statement.
2.
Inadequate managerial attention, e.g. on speedier collection of receivables due to lack of information
or delayed information.
3.
4.
Expenses did not match revenues for the period making determination of surplus/deficit for the
period a difficult task.
5.
Certain capital expenditures treated as revenue items e.g. roads, bridges, drainage etc.
6.
Did not present a proper picture of the financial health of the ULB.
7.
8.
Inadequate information on to what extent, the assets of the ULB have been used up
Mandav NP is still working on the basis of Single entry system. The Accountant has been trained twice in
Double entry system at Bhopal and Lekha Niyam Sanshodhan booklet is also available with the NP but NP has
not yet been able to quantify its assets and liabilities. Hence, the NP has not yet been able to prepare a
balance sheet. Post elections, the NP has requisite staff trained in double entry system and hence, can soon
start with double entry accounting.
6. Basic Services for Urban Poor
Presently, the NP does not have a separate allocation for Urban Poor in the budget but since one of the slum
ward lies within core town, development works are also undertaken in this ward. No works are undertaken by
NP in peripheral slums (villages).
7. Property Tax Reforms
Property tax surveys have not been undertaken by NP and the data from last surveys (conducted around 2004)
is being used after annual updation. Adoption of unit area method and transfer of information on GIS platform
has not been initiated yet. Since the NP does not provide services to the villages, no taxes are being imposed in
these areas as yet. Since the number of taxable properties in the town is extremely low, progress on this
reform is slow.
Table20.1: Tax collection information (2011/12). Source: Mandav NP
Tax Category
% collection
INR
% collection
INR
Property tax
80.70%
60932
24.65%
45471
Consolidated Tax
70.66%
33930
49.64%
30336
Water Tax
65.10%
71616
62.74%
16572
128
2013
Other Reforms1
Status of Mandatory and Optional Reforms in Mandav Nagar Parishad
Reforms
Components of reforms
Existing situation
Mandatory Reforms
At Urban local body level
1 Reform
for Introduction of Double-entry accrual
Municipal
system
accounting
system
2 E-governance
Listed services and NP data to be made
available in digital format
Levy
of
reasonable
user charges.
Property tax
reform based
on GIS
Internal
earmarking for
urban poor
Provision
of
basic services
to urban poor
Optional Reform
1
Revision of byelaws
and
simplification of
procedures.
Introduction
of
Property
Title
Certification
System in ULBs.
No. Updation of
Not in villages
Reform includes:
1. To make rain water harvesting
mandatory in all buildings and adoption of
water
conservation
measures.
2. Streamlining, building approval process
to establish a simple, transparent and
lesser time consuming process that
encourages development.
The objective of the reform is to create a
public record of titles which describe the
property as well as the title and has a
system for reflecting any transaction in real
time.
129
No
no
2013
Simplification of
legal
and
procedural
frameworks for
conversion
of
agricultural land
for
non
agricultural
purposes
Earmarking
at
least 20-25% of
developed land in
all
housing
projects
(both
Public and Private
Agencies)
for
EWS/LIG
category with a
system of cross
subsidization.
Introduction
of
computerized
process
of
registration
of
land
and property.
Administrative
reforms
Structural
reforms.
Encouraging
Public
Private
Partnership.
Revision
of
byelaws to make
Rain
Water
Harvesting
mandatory for all
buildings
10
No
No
No
130
2013
Sector of Investment
Water Supply
Sewerage
Storm Water Drainage
Solid Waste Management
Sanitation
Traffic & Transportation
Electricity & Street Lighting
Fire Fighting
Basic Services for Urban Poor
Environment
Urban Governance
Heritage and Tourism
Education
Health
Social Infrastructure & Other Projects
Total
S. No.
1
2
3
4
5
6
7
8
9
10
11
Sector of Investment
Water Supply
Sewerage
Storm Water Drainage
Solid Waste Management
Sanitation
Traffic & Transportation
Electricity & Street Lighting
Fire Fighting
Basic Services for Urban Poor
Environment
Urban Governance
12
Heritage
106.07
13
Education
14
Health
15 Social Infrastructure & Other Projects
8.45
3.97
1.52
133
2013
Phase 1: First 5 years (Till 2017). This was further subdivided into first 2 years and Projects to be taken up till 2015. This was done to identify the projects that need
to be started on an immediate basis
Phasing of projects was done such that projects for upgradation of existing infrastructure are taken up in the first phase, those for provision of new infrastructural
facilities are taken up in the second phase and those for infrastructural provision for additional population are taken up in the third phase.
Citizen Group: Though not mandatory, but the town can elect and form a Citizens group to oversee implementation and DPR preparation of all projects. This Group
can comprise of Senior Citizens, Intelligentsia, Representatives of Urban Poor, industrialists, etc. The NP would be the nodal agency for this Citizen Group. The main
aim of the group would be to ensure that the DPRs prepared and implementation of projects is in the interests of the town and does not overlook the common
interests of the town. At the same time, this Committee has to ensure that the Projects are not biased towards any individual or group.
Integrated Sectoral projects for Government Funding: Instead of seeking government funding for individual projects under each sector, the NP should combine the
projects which need to be implemented together, e.g. all projects under transportation sector can be clubbed together to seek funding. This should be especially
done for projects for which funding is being sought from the same source. This will (a) Reduce procedural work for each project (b) Funding for correlated projects
can be taken up simultaneously so that interrelated projects can be implemented simultaneously.
Monitoring: NP should undertake construction phase and post construction phase monitoring of projects through citizens participation.
134
2013
Since paucity of land is a key constraint for all ULBs, it is advised that acquisition of land against will should be avoided in all cases. A 3 way methodology should be
adopted for this
1.
2.
3.
Integrated administrative complex should be set up in each town by vacating all government plots and centring all government buildings in 1 or 2 large
complexes. The land so vacated, should be used for development projects in the town.
Revenue land in and around the town should be taken up before private land
In case private land is to be taken up for development projects, a PPP based approach should be adopted. For eg: If a bus stand is proposed to be
constructed on Private land, then the ULB can enter into a contract with the owner of the land. The plot should be developed such that apart from bus
stand, a commercial complex should also be constructed on the site. The land owner should be given a percentage of the constructed shops and a mutually
agreeable percentage share in the bus fee collected from all buses using the bus stand. Similarly, in order to create parking areas for town, a PPP based
approach can be adopted whereby, the private party would given their land for parking and in return, collect parking fee from all vehicles. The NP would be
the regulatory and supervising authority for all such PPP projects.
Some Best Practices that can be emulated in the towns (Source: Childfund Action Report on Fluoride, www.unicef.org)
Solar Powered Handpumps
Double Drum
Fluoride Filter
135
2013
Promotion of urban
agriculture
Derivation
Priority
Promotion of
Large scale plantation of Khurasani Imli, Mahua,
cultivation of
indigenous and Dhavra Gond, Khirni, Tendu, Bekul and Charoli trees
as source of livelihood through NWFP for tribal
other
population
horticulture
produce to
cater to local Mango and custard apple orchards using drip and
sprinkler irrigation
and
tourist/commer
Cultivation of vegetables using drip and sprinkler
cial demand
irrigation (typical land holding size is 0.03 sq kms)
(raw and
cooked forms)
Local
Setting up small nursery propagation of
knowledge
indigenous species of herbs
system about
medicinal
Cultivation of herbs through organic farming
herbs such as
(SHGs/cooperatives) using drip and sprinkler
dhuli musli,
irrigation cost is per annum indicative only as
salam misri, lal
varies per species
churan, bekul
and kuradia
Existing ponds
and practice of
pisciculture and Composite Fish Culture cum waterchestnut faming
water chestnut
cultivation
High ownership
Setting up Poultry Farms
of poultry
High cattle
Setting up dairy farm
ownership
Phase 1
First 2 years
Till 2017
Phase 2
2027
Phase 3
2037
Total
Unit
0.1
0.1
0.2
sq kms
0.25
0.25
0.5
sq kms
No.s
1
Very High
Preparation of Biodiesel
Mahua Oil Biodiesel can be used as substitute in diesel engines used
from Mahua seed oil
in transportation and agriculture sectors
136
Hectares
No.s
No.s
No.s
At State Level
Drying platforms
Storage godown/warehousing
Very High
To be specifically formed in
Sagar village, Jhabri village, Can help SHGs start small businesses
Rampura village, Tarapur like Papad making, herb collection and
village and Songarh Village
supply, wool supply, etc
in Phase 1
Establishment of
Can specifically train
Handloom training and
women in villages to
HHI centre for making provide additional income
Maheshwari Sarees
to HH
Loans to villagers to start
small businesses like Haath
thela, Fruit and vegetable
thela
Villagers should be given
subsidies in taxes for the
next 25 years + More
incentives should be given
to Villagers as they can not
avail benefits and
subsidies from GPs
Value addition and market
linkage for herbs and other
For AYUSH system of medicine or extraction of commercially viable
plant based products of
products such as oil from khirni seeds
medicinal or commercial
value
Propagation of Organic
Farming
Propagation of Green
House Farming
Very High
Very High
Very High
No.s
1
Stakeholder
selection,
identification
of activity and
formation of
2 SHGs
No.s
33
SHGs
70
nos
10
20
20
50
Very High
Very High
Medium
Medium
137
2013
Sagar Village
Jhabri village,
Rampura
Village
2013
Apiculture related to
forests in Mandav
Training in Apiculture
Bee Farming
Promoting Prawn Culture
to increase revenue
Implemented in Bhadbhada Can be promoted in existing and new
generation for tribals and Farm, Madhya Pradesh
ponds
Majhi Samaj
Basket and other innovative products
Bamboo based
from bamboo
papad, badi, pickles, jams etc from local
Agro produce based
Establishment of women
produce
based SHGs for
Local herb and NWFP based products
HHIs/cottage
Herb based/ NWFP based
such as churan, mouth fresheners,
industry/cooperatives with
confectionary etc
NGO support
candle making, incence sticks, paper
Other
plates, jewellery making, embroidery,
stiching, sewing etc
Through NGOs and
Microfinance Institutes at
District Level
Women SHGs for Micro
MFIs
to
provide easy loans
Credit and Micro finance
Combined for the entire District
on quarterly installments
systems
High
10
12
Very High
Bee Fams
High
Very High
1
1
1
1
Covered under transport
138
1.0
2.0
1.0
No.s
No.s
No.s
High
High
2013
Pisciculture
Urban agricultural techniques and practices such as organic farming,
drip and sprinkler irrigation
Training programmes for
tribal population
Repair of agricultural equipment
Travel, tourism and hospitality related
Food processing
Project
Derivation
Priority
Phasing
Phase 1
Phase 2
First 2 years
Till 2017
2027
Total
Units
Kms
12 Kms
12
Kms
MLD
3.16
MLD
MLD
Phase 3
2037
Very High
Very High
5 Kms
3.16
WTP
Very High
3.2
3.2
Environmentally
sustainable option to be
chosen
Very High
139
2013
nos
nos
nos
nos
15
km
nos
57
nos
High
5
2
2
1
5
Very High
Very High
140
existing
proposed
3 in public
areas
25
25
25
25
nos
20
nos
nos
Very High
High
Highest
15
30
45
nos
Highest
Songarh
village school,
Tarapur
Village School
nos
nos
15 wards
Very High
15
2013
141
2013
21.5 Sewerage
Phasing
Projects
Diverting sewage to
decentralised sewage
treatment System
Derivation
Priority
Very High
First 2 years
Till 2017
Phase 2
Phase 3
2027
2037
Unit
Total
km
Decentralized wastewater
Constructed Wetland
treatment
system / Reed bed system
Reuse of treated
wastewater
Phase 1
High
High
Derivation
Priority
21.6 Sanitation
Phasing
Projects
Provision of HH toilets
Very High
Phase 1
Phase 2
Phase 3
First 2 years
Till 2017
2027
2037
Covered under 'Urban Poor'
Total
Provision of Community
toilets (Can be provided
along the lines of Deluxe
Toilets: Build, Operate and
1 community toilet (6
Transfer basis). Mobile seater + 2 bath) for each of
toilets can also be
the 8 rural
provided
clusters/hamlets) -
Very High
5
142
Unit
Provision of Modular
deluxe toilets / Mobile
Toilets
Communtiy Toilets to be
particularly provided in
Rampura Village, Jahangir
Pura Gate and Jhabri
Village
One public toilet for
tourists (Deluxe Toilet on
BOT basis or Sulabh
Shauchalaya) with
proposed visitor and
interpretation centre near
Chappan Mahal, portable
toilets at other locations
Decentralized wastewater
Constructed wetland
treatment facility
system/ Reed bed system
3 nos
Very High
Modular construction
High
Very High
2
1
Portable
toilets 4
Deluxe
seater near
Toilets /
Roopmati
Sulabh Toilets
pavilion,
(10 seater)
Jahaz mahal
Complex
1.5
2013
Annual
Annual
Maintena Maintenan
nce
ce
2.5
MLD
Development and
implementation of a
Septage Management Plan
Implemen Implement
Preparation Implementati
tation of ation of
of Septage on of Septage
Septage Septage
Management Management
Managem Manageme
Plan
Plan
ent Plan
nt Plan
Generation of awareness
towards sanitation
21.7 Drainage
Projects
Natural drainage channels
to be conserved
Diverting the drainage
channels to existing
surface water bodies or
recharge basins
Desiltation of existing
Derivation
Phasing
Priority
High
Phase 1
Phase 2
Phase 3
First 2 years
Till 2017
2027
2037
To be included in Master Plan/ Covered under
'Environment'
Very High
Desiltation of Sagar Talab
Highest
143
Total
Unit
Km
nos
2013
nos
nos
nos
15
nos
No's
15
Catchment conservation
for catchment areas of all
ponds
Development of Recharge
Basins
Kund in Ward 15 to be
maintained
Very High
High
Sagar Village
3 nos
4 Recharge
basins with
recharge
shafts to be
developed
Annual
Annual
Annual
Annual
Maintena Maintenanc
Maintenance Maintenance
nce
e
1
High
144
1
1
Estimate has been
prepared,
construction work
needs to be started
5
1
1
1
1
5
Very High
2013
km
Total
Unit
Composting plant
Sale/reuse of Recyclable
waste and inert waste
Derivation
Priority
Awareness generation
For segregation at source, and to reduce, recycle and reuse waste
through media
Proposed Trenching
ground near Doob Baori Located close to water source
Zero landfill based waste
(near Lohani Caves) to be
and tourist attraction
management proposed
banned
145
Phase 1
First 2 years
Till 2017
Phase 2
2027
Phase 3
2037
2.1
1.4
3.5
MT
0.5
0.5
MT
nos
Very High
Very High
Very High
Highest
Immediate
administrati
ve measure
2013
Training of local
population in
decentralized solid waste
management
Placing of gps/gprs vehicle
tracking system on door to
door collection vehicle for
monitoring
Collection from bins at
tourist nodes and from
1 more Van to be introduced
common collection bins in
ward
Waste collection bins
Very High
High
Very High
no.s
10
10
nos
High
nos
Project
Derivation
Priority
Phase 3
2037
Total
Units
Very High
funding under IHSDP to upgrade their
DUs on their own (for the most
marginalized segment - 10% of the
eligible HHs)
Interest Subsidy to be given on loans
Upgradation of housing
through grant/loan/subsidy
conditional to construction of
HH toilets and retention of
tenure for 20 years.
Phasing
Phase 1
Phase 2
First 2 years Till 2017
2027
Very High
Roads
Very High
Drains
146
30
60
50
140
HHs
270
2 km CC
roads
540
8 km CC
roads
450
10 km CC
roads
1260
20 km
roads
HHs
20 km
drains
covered
with
grating
40 km
drains
Very High
Jhabri,
Jamanya,
Nandlalpur
Sagar,
Rampura
Very High
Very High
Very High
2013
rural
clusters/ha
mlets
21.10 Transportation
Phasing
Project
Derivation
Priority
147
Phase 1
First 2 years
Till 2017
Phase 2
2027
Phase 3
2037
Very High
Total
Units
Very High
High
10
Administrative Measure
10
Kms
2013
Jain mandir
Lal Bangla area
Singhodi
Access roads to be
Narsinghpura
provided for some areas
Piplia
Ram Mandir to Piplia
Jamnia to Jahangirpura gate
Farashpura
Especially needed during
IPT Service (like Tata
school timing. To ply along
Magic) or City Bus Service
Dhar road, Jhabri road,
to be started to cater to
Tarapur road and Sagar
villages
Village road
Main spine
Resurfacing of existing
Neelkanth Tarapur Road
roads
Jhabri Road
Improving road from
Mandav to Kakarda with
appropriate drainage
Safety along regional
roads to be ensured
High
Very High
3
2
2
Very High
3
2
2
Very High
Particularly along roads connecting
Mandav with Dhar, Indore and
Dhamnod
Very High
2 along
2 along Dhar
proposed
Road, 1
road
along road
connecting to
to Kakarda
SH31
High
148
Very High
Km
nos
26
km
16
26
km
26
26
52
km
Very High
2013
Very High
Access road to
Brahmanpuri can be
Development of Tarapur Gate
developed
Road from Jahaz Mahal to
NP to be made 4 lane
4 laning of road to Reva
Kund
Pedestrianization of 1 km
of road stretch starting
To relieve congestion at Jami
from Jami Masjid crossing
Masjid and Jain Dharamshala
and extending to the south
of the crossing
Redesigning of Jami Masjid
Design and implementation as per Traffic and Transport
Crossing
Management Plan for Mandav Planning Area
Development of organised
areas for informal sector As per Interpretation and Use
mobile vendors near
plan
proposed Visitor Centre
for tourists
12 bigha
land near
Roopmati
Palace has
been
secured. Can
be used for
parking and
landscaping
Medium
10
10
Very High
Very High
Medium
149
1 near
proposed
visitor centre
km
2013
21.11 Environment
Phasing
Project
Derivation
Phase 1
Priority
First 2 years
Integrated Environment DPR for integrated planning for forest and non forest land that are
management Plan
within and outside NP
Formation of Environment
Cell within NP
Very High
Phase 3
2027
2037
Very High
Till 2017
Phase 2
Total
Units
1
No.s
10
sq Kms
40
Kms
12
sqkm
150
40
Sagar Talab 0.4 sqkm of
afforestation
2013
45
500
nos
sqkm
1000
acre
350
sq Kms
60
km
Very High
240
200
Very High
High
1 sqkm
High
200
Use of Polyethene to be
banned in Mandav
High
Catchment Conservation
and large scale
afforestation in Mandav
Planning Area
Very High
15
40 Kms to Dhar
High
800
Administrative and
Promotional Measure
through awareness
generation and regulation
High
High
10 Kms proposed road from Mandu
to Gujri; 10 Kms road from Mandu to
road from Manawar to NH3
151
20
2013
Derivation
Priority
Phase 1
First 2 years
Till 2017
Phase 2
2027
High
High
To be undertaken by TCPD
High
Very High
Proper documentation of
Land ownership and use to
government land to be
be mapped and integrated undertaken to identify areas
with GIS database
where pattas have been
alloted
High
High
Integratio
Survey and documentation at
n with GIS
District Level
database
Espansion
Development of
Dharamshala
Phase 3
2037
High
152
Total
Units
2013
High
High
Administrative Measure
Priority
Phase 1
First 2 years
Till 2017
Solar Farms
Derivation
Phase 2
2027
Phase 3
2037
High
Medium
Total
Units
Very High
SLs to meet current shortage
397 SLs
High
397
397
165
165
10
Nos
3 or more
MW
High
Highest
Feasibility
Study
1 MW
1 MW or
more
153
1 MW or
more
2013
Existing electricity
APDRP to be prepared for
infrastructure is nearly 50 yrs
Mandav
old
High
Provision of electricity in
all villages till the wind
farms are set up
Through provision of
solar/wind powered small
setups
30 km to Dhar
20 km to Dhamnod
Energy efficiency
programme
Increase in electricity
supply
Highest
Preparation of APDRP
20 (Sagar
Village,
Tarapur
Village, Jhabri
village)
50
Medium
High
Propagation of use of automated switches
Propagation of LED lighting
Lights with
automated sensors
Use of energy efficient
fixtures
2016 KW supply required by
2035
Implemen
tation of
APDRP
300
370
900
900
SLs
640
640
SLs
25
SLs
Total
Units
25
High
High
Fire Fighting
Phasing
Project
Derivation
Priority
High
High
High
154
Phase 1
Phase 2
First 2 years
Till 2017
2027
1 for
2 for core town
peripheral
and heritage
settlements/c
structures
lusters
4
Phase 3
2037
Derivation
Priority
Phase 1
First 2 years
Till 2017
Phase 2
2027
Phase 3
2037
Total
Education
Women oriented Literacy
Programmes
High
Pisciculture
Urban agricultural techniques and practices such as organic farming,
drip irrigation
Training programmes for
Very High
Repair
of
agricultural equipment
tribal population
(Certificate courses)
Food processing
Computer Education
Travel, tourism and hospitality related
High
Senior Secondary School
High
Development of Library
Medium
Additional floor can be
Upgradation of existing constructed using light weight
Schools by provision of or temporary material like Tin
additional floor
sheets, PVC boards or
wooden boards, et c
High
Very High
Very High
High
Agricultural education to
be promoted through
NGOs, agriculture and
horticulture department
High
Upgradation of existing
schools to incorporate
more students
High
155
1
1
Through
Agricultural
Through NGOs
and
Horticultural
department
5
3
1
2013
2013
Very High
Phasing
Project
Derivation
Upgradation of existing
PHC to 30 bed CHC
Provision of Emergency
services in upgraded PHC
Priority
Very High
Phase 1
First 2 years
Till 2017
Phase 2
2027
Phase 3
2037
Total
Very High
For peripheral settlements/rural
clusters
CHC
PHC
High
Medium
Medium
1
1
High
For Block Level Tribal Population
Medium
1
1
Others
Phasing
Project
Derivation
Phase 1
Priority
First 2 years
Police Posts along regional
roads
Additional greens @14%
of Municipal Area
Provision of Petrol Pump
in or near Mandav
Phase 3
2025
2035
Very High
High
Till 2015
Phase 2
High
High
High
Very High
156
Total
2013
Derivation
Priority
Very High
Integrated Heritage
Resource Management
Plan for Mandav Planning
Area (IHRMP) - dymanic
document
157
Phase 1
First 2 years
Till 2017
Phase 2
2027
Phase 3
2037
Total
Unit
Consultancy
Project for
Finalization of
formulation of
guidelines as
guidelines (Can
part of
be
Building
subcontracted
byelaws
or done by
MHRMA)
Covered under 'Institutional'
Year 1
350 sq
kms
sq kms
2013
High
High
Landscape Plan
158
In year
2016,
Iin year
2018, 2026, 2028,
2020, 2030, 2032
2022 and and 2034
2024
Generation of tourist
survey database - data
linked to website
159
2013
2013
160
10
2013
ORGANIZING CULTURAL
EVENTS AT NIGHT TO EXTEND
Establishing
TOURIST STAY:
the
Organization
Can be organized along the lines of
Events like Classical Music
institutional of Cultutural
'Jahan E Khusrao' organized annually in
Very High
Concerts or Dance Festivals or
and
events at
Delhi. Can also attract tourists to
Plays can be organized during
infrastructural
night
Mandav during Winters
tourist season + can be
framework
organized once a month
round the year
Risk Management Plan
Preparation of Plan
161
20
43
64
Monuments
2013
Integrated Environment
Management Plan
Development of Small
Scale Herbal Park to
attract Tourists
No.s
No.s
10
No.s
12
No.s
10
No.s
nos
10
nos
km
High
High
Medium
Medium
Medium
162
1
Other
villages/fa
Tarapur
rmers who
Village,
Sagar village,
want to
Rampura
Jahangir Pura
earn
Village, Jhabri gate village,
through
Village
farm
tourism
Designing of
Buggies
10
T shirts, Souvenirs of
Monuments, Curios,
Miniature Monument
Replicas, etc
Provision of Information
centres in Monuments
6 nos
Conservation of Water
bodies in Jahaz Mahal
2013
Medium
2.5
2.5
km
km
High
Access walkway to Songarh Fort
In forest areas
To be identified by MP Tourism
Very High
Discussed above
Discussed above
Discussed above
To be sold at
Separate
ASI and MP
TRIBAL ART AND WOODWORK TO BE
To be sold at
temp
Tourism
PROMOTED THROUGH THE SOUVENIR Very High the ASI shop at
kiosks for
Ticket
SALE
Jahaz Mahal
sale of
Counters and
souvenirs
at Sagar Talab
Very High
Very High
Can also be undertaken by NP
Revival of all ponds in Jahaz Mahal
including the one at the entrance
Very High
163
2013
High
Very High
164
Payment basis
Promotion
Already Proposed
State Level Initiative
2013
Very High
Signages
between
Very High Mandav and
Manpura (5
nos)
Potential solution for PPP for light and sound show (based on approximate calculations)
Total cost of sound and light show: Capital cost approx 3 Cr
Running cost of sound and light show: 30 lakh/ annum
Cost per ticket: 400
Number of tickets: 200 to 500 (assuming 200 tickets sale on average)
Shows per year (during peak season) = 30 x 3 = 90 shows
Total earning per year = 90 shows x 200 tickets x Rs. 400/ticket = INR 72 Lakh/yr
Recovery period for capital cost: 4.16 yrs
O&M Cost for 4.16 yrs = 124.8 Lakh or 1.24 Cr
165
Along other
regional
roads: Dhar
road,
Dharampuri
road (20 nos)
25
nos
2013
Project
Awareness generation regarding the skewed sex
ratio, especially amongst tribals
Awareness generation for heritage and traditional
knowledge systems of tribal population
Awareness generation regarding built heritage
and Do's and dont's of its management
Promotion of Mandav Planning Area as
ecotourism and rural tourism destination
Awareness generation on use of renewable
sources of energy
Awareness generation on population growth
Derivation
Project Details
and Sub Projects
From phase 2
Phasing
Priority
Phase 1
First 2 years
Till 2017
Units
Phase 2
2027
Phase 3
2037
Very High
Very High
Very High
High
Very High
Very High
Very High
Very High
166
Total
2013
Better agricultural
practices
Promoting cultivation
of herbs based on the
exisitng knowledge
system of the local
community and
technological
innovations
Organic Farming
Green house farming
Derivation
Priority
Phase 1
First 2 years
Single computerized
Single window system in Nagar
counter for all enquiries,
Palika
submitting forms, etc
All proposals to be
The Authority to have experts
mplemented in Mandav
Interdepartmental Coordination
from all sectors to ensure
(by any department) to
comprehensive development of
to be ensured by Mandav
get approval from
Mandav. Proposals not approved
Heritage Resource Management
Mandav Heritage
Authority
by MHRMA should not be
Resource Management
implemented
Authority
Phase 3
2027
2037
High
Highest
Till 2017
Units
Phase 2
Very High
Very High
167
Formation of
MHRMA
Total
2013
Very High
Very High
Restructuring of institutional and fee structure of NP employees shall be undertaken in accordance with the new Municipal Cadre (given in Annexure). Since the NP would not
be able to bear the additional costs of the NP restructuring, these costs would have to be directly borne by the State Government and are hence, not included in the CIP.
168
2013
Project
Derivation
Funding (Lakhs)
Estimated
Phase 1 Phase 2 Phase 3 Total
cost/unit
(Lakhs)
(Lakh) First 2 Till
2027
2037
years 2017
Source of
funding
Implementing
Agency
35
3.5
3.5
15
3.75 3.75
First 2 Till
2027
years 2017
Total
(Lakhs)
2037
7.5
169
State Forest/
State Forest/
Horticulture
Horticulture
department +
department; local community +
MNREGA
local
entrepreneur
4.0
4.5
0.0
0.0
8.5
4.2
4.8
0.0
0.0
9.1
2013
1.5
Existing ponds
and practice of
pisciculture and
water chestnut
cultivation
2.2
4.4
8.8
High ownership
of poultry
High cattle
ownership
State Govt
State Govt forest/
forest/
agriculture/
agriculture/
horticulture
horticulture
4
department;
department;
National
National
Medicianal Plants
Medicianal
Board
Plants Board
AYUSH Scheme
of National
Bhopal
Medicinal Facilitation centre
Plants Board;
of National
Contract
Medicinal Plants
6
Farming
Board + State
through
forest/
industry linkup; agriculture/
govt subsidy on horticulture
drip irrigation
department
equipment
Rani Durgawati
Anusuchti
Jati/Anusuchit
MP Department
Jan Jati
of Fisheries +
13.2
Swarojgar
Private
Yojana (RDSY)
Entrepreneur
for SC/ST +
SC/ST
entrepreneurs
RDSY for SC/ST;
Subsidy under
poultry Farm Industries Dept +
10 scheme of MP
Private
Cooperative,
Entrepreneur
esp for SC/ST
entrepreneurs
10
170
Subsidy under
dairy farm
scheme of MP Industries Dept +
Cooperative, esp
Private
for SC/ST
Entrepreneur
entrepreneurs;
DRDSY for SC/ST
4.5
0.0
0.0
0.0
4.5
3.4
3.9
0.0
0.0
7.3
5.0
11.4
0.0
0.0
16.3
5.7
6.5
0.0
0.0
12.1
5.7
6.5
0.0
0.0
12.1
Processing
for herbs and
indigenous
produce
At State Level
At State Level
Drying of herbs,
mahua flowers
etc
Drying platforms
10
10
10
Storage after
drying
Storage godown/warehousing
10
10
10
Setting up of
To be
Self Help
sepcifically
Groups to
formed in Sagar
start small
village, Jhabri
Can help SHGs start small
businesses
village,
businesses like Papad making,
(Women
Rampura
herb collection and supply, wool
based) +
village, Tarapur
supply, etc
Training and
village and
loan to be
Songarh Village
given to
in Phase 1
SHGs
Establishmen
t of
Can specifically
Handloom train women in
training and
villages to
HHI centre
provide
for making
additional
Maheshwari income to HH
Sarees
20
40
50
68
50
171
2013
Subsidy by
National
Private
Medicinal
entrepreneur/
Plants Board;
State Govt
PPP
Central
Warehousing
Corporation
Funding;
CWC + Private
Subsidy by
Entrepreneur
National
Medicinal
Plants Board;
PPP
Funding under
Swarna Jayanti
Shehri Rozgar
Yojna (SJSRY)
based on 75:25
funding pattern Through SHG
/ Urban Self
formation
employment
Program
(UNEP) based
on loan and
subsidy
Cluster
development
Scheme (IICS)
or NGO
Funding
Through SHG
formation and
Scheme / NGO
Funding
11.3
0.0
0.0
0.0
11.3
11.3
0.0
0.0
0.0
11.3
2.3
7.8
38.9
126.8
175.8
0.0
0.0
56.5
56.5
2013
Loans to
villagers to
start small
businesses
like Haath
thela, Fruit
and
vegetable
thela
Villagers
should be
given
subsidies in
taxes for the
next 25 years
+ More
incentives
should be
given to
Villagers as
they can not
avail benefits
and subsidies
from GPs
Value
addition and
market
linkage for
herbs and For AYUSH system of medicine or extraction of
other plant commercially viable products - such as oil from
based
khirni seeds
products of
medicinal or
commercial
value
40
Funding under
Swarna Jayanti
Shehri Rozgar
Yojna (SJSRY)
based on 75:25 Through SHG
funding pattern Formation or
140
/ Urban Self
through
employment Collectorate/ NP
Program
(UNEP) based
on loan and
subsidy
100
45.2
129.3
0.0
0.0
Administrative Measure. To be
integrated in NP budget and to
subsidies to be given by
District Collectorate
Administrative Measure. To be
integrated in NP budget and to
subsidies to be given by District
Collectorate
To be undertaken at District
Level (through Govt and/or
private industry support)
To be undertaken at District
Level (through Govt and/or
private industry support)
172
174.5
Propagation
of Green
House
Farming
Propagation
For
Drip irrigation plant to subsidise
of drip and conservation of cost of equipment. Equipment
sprinkler water resource to be given on 3 installment
irrigation and better yield
basis instead of 1
Apiculture
related to
forests in
Mandav
Training in
Apiculture
14
49
70
70
84
173
State
Incentives to promote organic
Agriculture State Agriculture farming practices by Agriculture
department + department + PPP
Department and Organic
PPP
Certification
Horticulture
Department
Funding, PPP to Horticulture
develop green Department +
7.9
18.1 95.4
0.0
house farming
Farmers
practices for
exotic varieties
Sprinkler and drip irrigation
plant is proposed to be
developed in the Proposed
Dhamnod/Dharampuri SEZ
MP State Agro
Department: To
encourage
purchase of
superior bee
colonies,
subsidy support
is being
provided at the
rate of 25% of
the cost subject
to maximum MP State Agro
Rs. 2.50 & to
Department +
7.9
9.0 136.3
0.0
encourage
Entrepreneur
purchase of
standard bee
hives with
related
beekeeping
equipment
subsidy support
at the rate of
25% of the
subject to Rs.
350.
2013
121.4
153.2
2013
Bee Farming
Promoting
Prawn
Culture to
Implemented in
increase
Bhadbhada Can be promoted in existing and
revenue
Farm, Madhya
new ponds
generation
Pradesh
for tribals
and Majhi
Samaj
Establishment
of women
based SHGs for
HHIs/cottage Bamboo based
industry/coop
eratives with
NGO support
18
18
36
72
174
Beekeeping
Orientation
Training
Courses
conducted by
MP State Agro
Department
MP Rural
Livelihoods
Programme
Funding for
Prawn
Cultivation OR
Prawn-cumFish Seed
Production
Project by
Ministry of
Fisheries OR
MPRDP or
Marine Product
Fisheries Dept OR
Export
MPEDA
Development
Authority
(MPEDA) will
provide Rs 5
lakh for
hatchery
development,
Rs 1 lakh for
construction of
ponds and a 30
per cent
subsidy.
RDSY for SC/ST;
NGOs like
State Govt.
AVINASH in
Bamboo artisan partnership with
Yojana of MP
its allied
Cooperative, institution, the
esp for SC/ST National Centre
entrepreneurs
for Human
or SGSY
Settlements and
20.3
23.3
70.1
0.0
113.7
0.0
1.3
1.9
0.0
3.2
15
Other
Through NGOs
and
Microfinance
Institutes at
Women
District Level
SHGs for
MFIs to provide
Micro Credit
easy loans on Combined for the entire District
and Micro
quarterly
finance
installments
systems
NGOs to help
women start
small
businesses
Flour Mill
10
Internet caf
Medical
store
20
175
MFIs + NGOs
2.3
2.6
3.9
0.0
8.7
2.3
2.6
3.9
0.0
8.7
5.7
6.5
9.7
0.0
21.8
20
Environment
(NCHSE), has been
PMEGY+RDY;
working in Dhar
Can be
District; Training
subcontracted
and SHG
for entire Dhar
formation for all
and Alirajpur
these activities is
District to 1
needed; to be
NGO
facilitated by local
NGOs
2013
Medical store
scheme of MP
Cooperative,
esp for SC/ST
entrepreneurs
Private
entrepreneur
0.0
25.9
0.0
0.0
25.9
Private
entrepreneur
5.7
0.0
0.0
0.0
5.7
Private
entrepreneur
5.7
0.0
0.0
0.0
5.7
2013
Organised
space for
mobile
vendors
Tourism
related
projects
Cattle
breeding to
increase
cattle
productivity
Strategic EIA
for town
including
industries
Demarcated space
Centre to be established by
State Vet Dept
Centre to be established by
State Vet Dept
Pisciculture
Training Urban agricultural techniques and practices such
programmes as organic farming, drip and sprinkler irrigation
for tribal
Repair of agricultural equipment
population
Travel, tourism and hospitality related
Food processing
Total
480.37
360.12 126.83
967.33
Funding (Lakhs)
Project
Derivation
Estimated
Project Details and Sub
cost/unit
Projects
(Lakh)
Desiltation and
Current intake from
conservation of Mallipura
Water supply
Sagar Talab = 0.25
and Sagar Talab
from
MLD. Current shortage
multiple
Additional intake from
= 2 MLD. Requirement
sources
Sagar Talab - upgrading
upto 2035 = 3.16 MLD
intake
Phase 1
Phase 2
First 2 Till
years 2017
2027
Phase Total
3 (Lakhs)
Source of
funding
Implementing
Agency
Phase 1
First 2 Till
years 2017
2037
Phase 2 Phase 3
2027
Total
(Lakhs)
2037
25
25
176
0.0
32.3
0.0
0.0
32.3
25
25
2.5
Cr/MLD
3.16 MLD
125
125
0.0
161.6
0.0
0.0
161.6
300
300
0.0
0.0
584.0
0.0
584.0
20
20
0.0
0.0
38.9
0.0
38.9
CM
Infrastructure/
Subcontracted by
7900 Water supply
NP
Scheme
Provision
790
To be enforced by NP through
legal framework
Existing WTP to be
redeveloped
37
Feasibility
study with
focus on
Environment
Any small check dam
to study
Environmentally
construction required at
potential for
sustainable option to Reva Kund should only be
drawing water
be chosen
permitted after suitable
from Reva
environmental analysis
Kund near
Jamnia and
from Sakalda
Pond
10
10
Repair /reconstruction of
existing OHT (0.3 MLD) +
expansion of sump to
capacity of ) 0.6 MLD
15
185
177
892.7
892.7
To be enforced by NP through
legal framework
37
OHT based
water supply
2013
State PHED
PHED Engineers
0.0
47.8
0.0
0.0
47.8
0.0
12.9
0.0
0.0
12.9
0.0
19.4
0.0
0.0
19.4
2013
30
90
90
30
30
30
10
50
25
50
MNRE
/UIDSSMT like
Modality
0.0
116.4
0.0
0.0
116.4
Subcontracted by
NP
0.0
38.8
0.0
0.0
38.8
NP
0.0
0.0
97.3
0.0
97.3
125
125
0.0
161.6
0.0
0.0
161.6
50
50
0.0
64.6
0.0
0.0
64.6
50
50
0.0
64.6
0.0
0.0
64.6
25
25
0.0
32.3
0.0
0.0
32.3
125
125
0.0
161.6
0.0
0.0
161.6
5.7
6.5
0.0
0.0
12.1
NP
178
NP
Large scale
propagation
of Rain
Water
Harvesting
0.3
1.8
0.9
10,000/
structure
0.2
0.5
25
2.5
25
10
20 nos
15
45
179
2.5
2.7
PPP (Public
contributions/
NP)
5.7
50
2.0
1.2
0.0
0.0
3.2
0.2
0.6
4.9
7.9
13.7
Ministry of
MHRMA and
Culture/State
State Department
Department of
of Archeology
Archaeology
0.0
32.3
48.7
0.0
81.0
Subcontracted by
11.3
NP
0.0
0.0
0.0
11.3
58.2
0.0
0.0
75.1
10
NP funding
60
MNREGA
Funding/ MLA
Fund
NP
2013
MLA/NP
17.0
2013
Feasibility
study for
construction of
small check
dam at Jhabri
Provision of
hand pumps
with
Provision of 3
overhead
handpumps per ward /
storage in all
village cluster
villages @ 3
handpumps
per village
Provision of
handpumos
with
overhead
storage tanks
in all Schools,
PHC and
institutional
buildings
Development
of identified
existing ponds
infiltration
ponds/
recharge
basins
DPR for water
supply
network and
topography
based supply
zones
10
15 wards
10
3
lakh/hand
mpump
with
Overhead
storage
45
90
3
lakh/hand
mpump
with
Overhead
storage
21
NP funding
Consultants hired
11.3
by NP
Solar Powered
Handpumps: This
UNICEF Funded
project
undertaken in
Shivpuri District
135
of MP and ha
successfully
provided water
to 480HHs. A
solar power
driven electric
pump, drives
water from a UNICEF and other
handpump and
NGOs
stores it in a 1500
litre tank where
water is stored at
a height and
made to reach 4
27
taps at the
ground level. This
provides for
water storage,
water pressure
and can work
without external
electricity.
0.0
0.0
0.0
11.3
50.9
116.4
0.0
0.0
167.2
6.8
27.1
0.0
0.0
33.9
10
10
180
NP Funding
NP
11.3
0.0
0.0
0.0
11.3
2013
2165.4
774
2947
22.4 Sewerage
Cost with Inflation and
Contingency (Lakhs)
Funding (Lakhs)
Projects
Diverting
sewage to
decentralise
d sewage
treatment
System
Derivation
Estimated
Project Details and Sub
cost/unit
Projects
(Lakh)
To divert wastewater
from open drains into
the treatment
Construction of
plantbefore it reaches interceptor drains with
water bodies. Treated
grating
wastewater to be used
in agriculture
Provision of
grating over
the drains
Decentralize
Constructed Wetland
d
system / Reed bed
wastewater
system
treatment
Reuse of
For horticulture,
Construction and
treated
agriculture and other maintenance of diversion
wastewater
secondary uses
canals (mud)
20
lakh/km
Phase 1
Phase 2
First 2 Till
years 2017
2027
40
Phase Total
3 (Lakhs)
Source of
funding
Implementing
Agency
Phase 2 Phase 3
First 2 Till
2027
years 2017
2037
20
Phase 1
60
PPP with
Farmers
(Farmers can
be given
Subcontracted by
treated
NP or PPP
wastewater for
irrigation) or
UIDSSMT Like
Modality
45.2
25.9
0.0
2037
0.0
NP + PPP with
Farmers
NP + Farmers
Total
181
1.1
73.5
1.3
Total
(Lakhs)
71.1
1.9
3.2
7.5
1.9
3.2
78.6
2013
22.5 Sanitation
Cost with Inflation and
Contingency (Lakhs)
Funding (Lakhs)
Projects
Derivation
Estimated
Project Details and Sub
cost/unit
Projects
(Lakh)
Provision of
HH toilets
Phase 1
Phase 2
First 2 Till
years 2017
2027
Phase Total
3 (Lakhs)
Source of
funding
Implementing
Agency
Provision of
Community
Contractor to be paid by
toilets (Can
community
be provided
1 community toilet (6
respresentative. In case
along the
20 lakh
seater + 2 bath) for
of non maintenance,
lines of
each of the 8 rural
per block
community can hold
Deluxe
clusters/hamlets) payment and cancel
Toilets: Build,
contract
Operate and
Transfer
basis).
Mobile
toilets can
also be
provided
Communtiy Toilets to
be particularly
provided in Rampura
Village, Jahangir Pura
Gate and Jhabri Village
3 nos
NP Funding
NP + Mandav
Heritage
Resource
Management
Authority
(MHRMA)
Deluxe toilets
are being made
in several parts
of MP. Some of
the companies
undertaking
this work are
140
Arya Bhatt
Seva Sansthan,
Akhil Bhartiya
Prayavaran aur
Private
Gramin Vikas
contractor under
Sansthan, and
NP supervision
Vasundhara
(on BOT Basis)
Sanrakshan
Smajik Sastha.
OR
PPP basis with
Contractors
like Sulabh;
60
The Contractor
can earn
through
advertisements
on walls of
40
60
182
Total
(Lakhs)
2037
100
Phase 2 Phase 3
First 2 Till
2027
years 2017
2037
Phase 1
5.7
0.0
0.0
0.0
5.7
0.0
129.3 77.9
0.0
207.1
0.0
77.6
0.0
77.6
0.0
2013
community
toilets or
through
monthly
collection of 10
to 30Rs/family
One public toilet for
7.5 lakh
for 10
seater
7.5
6.8
9.7
0.0
0.0
16.5
Decentralize
Interceptor drain to carry
1 lakh/0.1
d
Constructed wetland
wastewater to the
wastewater system/ Reed bed treatment plant. Treated MLD or 10
treatment
system
wastewater from here lakh/MLD
facility
should be reused
DPR for
Decentralize
d
wastewater
treatment
facility
Developmen
t and
implementati
on of a
Septage
Management
Plan
Generation
of awareness
towards
sanitation
15
10
10
10
10
10
35
Integrated
Urban
Sanitation
Programme
Private
contractor under
NP supervision
17.0
12.9
9.7
15.9
55.5
10
NP Funding
Subcontracted by
NP
11.3
0.0
0.0
0.0
11.3
35
Integrated
Urban
Sanitation
Programme
Private
contractor under
NP supervision
11.3
6.5
19.5
31.7
68.9
48
443
183
Total
287.9
107
2013
22.6 Drainage
Cost with Inflation and
Contingency (Lakhs)
Funding (Lakhs)
Projects
Derivation
Estimated
Project Details and Sub
Phase 1
cost/unit
Projects
(Lakh) First
Till
2
2017
years
Natural
drainage Delineation of natural
channels to drainage channels
be conserved
Diverting the
drainage
channels to
existing
surface
water bodies
or recharge
basins
bagh road
2 Singodi talab on Lal
Bagh road
3 Lal bangle talab
4 Saman talab on Lal
Bagh road
5 Raglav talab on Hathi
paga/ Roopmati Road
6 Doodh Talai on Neel
2027
Phase
Total
3
(Lakhs)
Source of
funding
Implementing
Agency
15
Phase 1
Phase 2 Phase 3
First 2 Till
2027
years 2017
2037
20
Desiltation of Sagar
Talab
Desiltation of Jhabri
and Kaldipura talab
Desiltation of Tarapur
Talab on Neelkanth
Road
Small pond in Sagar
Desiltation of
Village
existing
15 ponds
ponds
1 Lamba talab on Lal
Phase 2
Total
(Lakhs)
2037
20
MNREGA
Funding, CGWB
funding under
Ground water
Contractor under
management
NP supervision
and regulation
funding/ Govt
of MP Subsidy
for RWH
17.0
6.5
0.0
0.0
23.4
6.8
0.0
0.0
0.0
6.8
6.8
0.0
0.0
0.0
6.8
6.8
0.0
0.0
0.0
6.8
6.8
0.0
0.0
0.0
6.8
0.0
108.6
0.0
0.0
108.6
84
84
184
MNREGA
Funding, CGWB
funding under
Subcontracted by
Ground water
NP under
management
superivison of
and regulation
Collectorate
funding/
Collectorate
Funding
2013
Kanth Road
7 Badi Doodh Talai on
Neel Kanth Road
8 Ek Khamba near
Chappan Mahal
9 Lendiya Talab on Main
Road (Ward 5)
10 Pipliya pond near
Ram Mandi
11 Maan Singh Ji Talab
near Kaldipura road
12 Moon Talab near
Jahaz Mahal
13 Songarh pond
14 Kaldipura pond
15. Jamnia Pond
Catchment
conservation
for
catchment
areas of all
ponds
Kund in
Ward 15 to
be
maintained
Construction
of new
ponds
12
2
Sagar Village
Jamia phata,
Neelkanth Mandir,
Jamnia nallah
Small pond to be made
on Khacha Khoderia
12
10
10
30
25
MNREGA
Funding, CGWB
funding under
Contractor under
Ground water
NP supervision
management
(Environment
and regulation
Cell)
funding/ Govt
of MP Subsidy
for RWH
NP Funding
NP
30
3 nos
90
90
30
30
185
MNREGA
Funding,
Subcontracted by
Collectorate
NP
Funding, BRGF
13.6
0.0
0.0
0.0
13.6
2.3
3.9
19.5
31.7
57.3
33.9
0.0
0.0
0.0
33.9
0.0
116.4
0.0
0.0
116.4
0.0
38.8
0.0
0.0
38.8
2013
Covering
large open
drains with
grating
30
30
0.0
38.8
0.0
0.0
38.8
30
30
0.0
38.8
0.0
0.0
38.8
30
30
0.0
38.8
0.0
0.0
38.8
30
30
0.0
38.8
0.0
0.0
38.8
30
30
0.0
38.8
0.0
0.0
38.8
30
30
0.0
38.8
0.0
0.0
38.8
150
0.0
0.0
292.0
0.0
292.0
6.8
0.0
0.0
0.0
6.8
311
32
950.5
150
186
607.4
2013
Funding (Lakhs)
Project
Derivation
Estimated
Project Details and Sub
cost/unit
Projects
(Lakh)
Phase 1
Phase 2
First 2 Till
years 2017
2027
Phase Total
3 (Lakhs)
Source of
funding
Implementing
Agency
Phase 2 Phase 3
First 2 Till
2027
years 2017
2037
2 decentalised vermi
composting sites to be
developed. The area
Current
under pits shall be
25000/MT 0.53 0.35
1.13
compostable
waste = 2.1 increased in a phase wise
Composting plant
MT; projected manner with increase in
waste generation
as 3.41 MT by
Private sector
2035
Decentralised composting
can sell the
pits at community level in 25000/MT 0.13 0.13
0.25
manure
Ward 10 to 15
generated.
2 small (5mx5m) storage dhalaos to be
made for recyclable waste and inert
15
15
30 Private sector
would also
waste for Ward 1-7 and 8-15
earn
from door
Networking with Recycling units
to
door
waste
Recyclable waste to be sent to Recycling
in Indore to be established.
Sale/reuse of
collection
fee
Recyclable waste (Paper, Metal,
Recyclable waste and Plants in Indore/Ratlam once or twice a
after first
Plastics
and
Glass)
to
be
month;
Networking
with
Recycling
units
inert waste
Phase.
transported to Indore twice
to be established by Private Party
/month
Phase 1
Private party
under NP
supervision
2037
0.6
0.5
0.0
0.0
1.3
0.1
0.2
0.0
0.0
0.3
17.0
19.4
0.0
0.0
36.3
Located close
Proposed Trenching
to water
ground near Doob
Zero landfill based waste
source and
Baori (near Lohani
management proposed
tourist
Caves) to be banned
attraction
Immediat
e
administr
ative
measure
187
Total
(Lakhs)
2013
Training of local
population in
decentralised solid
waste management
Placing of gps/gprs
vehicle tracking
system on door to
door collection
vehicle for
monitoring
Collection from bins
at tourist nodes and
1 more Van to
from common
be introduced
collection bins in
ward
0.3
5.7
0.0
0.0
5.7
5000/bin 0.5
0.5
10
10
NP Funding
NP through
consultant
Total
188
0.0
0.6
0.0
0.0
0.0
0.6
11.3
0.0
0.0
0.0
11.3
55.5
55.2
2013
Funding (Lakhs)
Project
Derivation
Estimated
Project Details and Sub
cost/unit
Projects
(Lakh)
Upgradation of
housing through
grant/loan/subsidy
conditional to
construction of HH
toilets and retention
of tenure for 20
years.
Phase 1
Phase 2
First 2 Till
years 2017
2027
Phase Total
3 (Lakhs)
Interest Subsidy to be
given on loans
33
55
Interest subsidy at 5% p. a.
189
Phase 1
Phase 2 Phase 3
First 2 Till
2027
years 2017
10
66
Implementing
Agency
2037
10
State and
funding under IHSDP to Central
Govt
upgrade their DUs on
their own (for the most funding
marginalised segment - @90,000
10% of the eligible HHs) to 1.1
lakh/DU
Source of
funding
NP Funding,
Subcontracted by
UIDSSMT like
NP
modality
Funding under
ISHUP/along the
lines of ISHUP:
Subsidized loan
@5% interest of
1 lakh given to
slum dwellers for
payback over 15
to 20 years. Has
been successful
in Ratlam
OR
154
Along IHSDP
pattern/RAY
State and Central
Govt grant of
Slum dwellers
upto 1.1 lakh
under NP
INR/DU can be
supervision
given to the Slum
HHs for
upgradation of
DU on their own
Central Govt
Interest
subsidy on
loans - ISHUP
model through
National
Housing
Board/HUDCO
11.3
0.0
0.0
37.3
85.3 107.1
Total
(Lakhs)
2037
0.0
11.3
0.0
229.7
Interest subsidy at 5% p. a.
2013
10 village
wards;
Assuming
Drains and roads for Provision of 2
village wards
km of roads
and 4km of
drains per
village ward
Provision of
decentralised
infrastructure in the
peripheral hamlets
(Sagar, Rampura,
Nandlalpur, Jamanya
and Jhabri villages)
MFIs (Micro Finance
Institutions for Urban
Poor)
Employment
generation for tribals
and Urban Poor
HHIs for women
Roads
25
lakh/km
50
200
Drains
2 lakh/km
32
50
25
250
40
500
80
UIDSSMT like
Subcontracted by
modality / IHSDP
NP
Funding
75
MLA Fund + NP
Subcontracted by
NP
56.5
258.6 486.7
0.0
801.7
9.0
41.4
77.9
0.0
128.3
56.5
32.3
0.0
0.0
88.8
190
588.2
672
1260
2013
22.9 Transportation
Total
(Lakhs)
Funding (Lakhs)
Project
Derivation
Estimated
Project Details and Sub
cost/unit
Projects
(Lakh)
Phase 1
Phase 2
Phase
3
First 2 Till
years 2017
2027
2037
Source of
funding
Implementing
Agency
Phase 1
19.4
Administrativ
e Measure
RTO
191
2027
2037
0.0
0.0
Total
(Lakhs)
19.4
MNREGA
Funding/
UIDSSMT like
Subcontracted by
Modality/
282.5
NP
PMGSY/
Collectorate
Funding
250
Phase 2 Phase 3
First 2 Till
years 2017
District
Administration
Distict
/State Tourism Administration
Department
15
25
RTO
0.0
Administrative
Measure
0.0
0.0
282.5
2013
Jain mandir
Lal Bangla
area
Singhodi
Resurfacing of
existing roads
25
lakh/km
Especially
needed during
school timing.
To ply along
Can be redulated during
Dhar road,
tourist season
Jhabri road,
Tarapur road
and Sagar
Village road
Main spine
3km
Neelkanth
Tarapur Road
2km
Jhabri Road
2km
125
14
50
lakh/km
50
lakh/km
200
14
100
100
25
UIDSSMT like
Subcontracted by
Modality or
84.8
NP
IHSDP Funding
161.6
Private Pliers.
Private
entrepreneurs
from Mandav /
farmers can
28
Private party
15.8 18.1
run vehicles on
Pay and use
basis. Can
charge Rs. 2
per trip
UIDSSMT Like
150
169.5
Modality / MP
Tourism
Subcontracted by
100
113.0
Funding / CM
NP
Infrastructure
Scheme
100
113.0
Funding
MNREGA
Funding/ Subcontracted by
25
28.3
0.0
UIDSSMT like
NP
Modality
150
50
lakh/km
25
Particularly along roads
connecting Mandav with
Dhar, Indore and
Dhamnod
75
192
Police
Department
Funding
Police
Department
3.4
2.6
0.0
0.0
246.4
0.0
0.0
33.9
0.0
0.0
169.5
0.0
0.0
113.0
0.0
0.0
113.0
0.0
0.0
28.3
0.0
0.0
6.0
Resurfacing
50
2013
50
26km
50
lakh/km
1300
26 km
10
lakh/km
100
160
260
26km x 2
2 lakh/km
52
52
104
1300
0.0
64.6
0.0
0.0
64.6
1469.1
0.0
0.0
0.0
1469.1
113.0 206.8
0.0
0.0
319.9
58.8
0.0
0.0
126.0
Increased Tree
Provision of parking
areas on PPP basis
10
10
193
67.2
25
Development of
Roopmati
Parking can be
done by MP
Tourism to
generate
revenue. Other
parkings: PPP
basis: Land
owner can open
land parcel for
parking and
charge a
minimum
parking fee. Land
still remains with
the owner.
Private party
5.7
12.9
19.5
0.0
38.0
2013
Access road to
Development
Brahmanpuri can be of Tarapur
developed
Gate
50
lakh/km
UIDSSMT like
Modality / CM Subcontracted by
500
Infrastructure
NP
Fund
500
0.0
0.0
973.3
0.0
10
District
State Tourism
Administration Department /
/State Tourism
District
Department Administration
15
10
10
Total
973.3
0.0
12.9
0.0
0.0
12.9
0.0
19.4
0.0
0.0
19.4
0.0
12.9
0.0
0.0
12.9
993
4048.1
3055.3
22.10 Environment
Cost with Inflation and
Contingency (Lakhs)
Funding (Lakhs)
Project
Integrated
Environment
management Plan
Derivation
Estimated
Project Details and Sub
cost/unit
Projects
(Lakh)
10
Phase 1
Phase 2
First 2 Till
years 2017
2027
10
Phase Total
3 (Lakhs)
Implementing
Agency
Phase 1
First 2 Till
years 2017
2037
10
194
Source of
funding
State Govt
Funding/
Ministry of NP - Environment
Environment
Cell
and Forests
(MoEF)
11.3
0.0
2037
0.0
0.0
11.3
12
0.32
60
60
12.8
15
122
120
158
Plantation of leguminous
plants to reduce fertilizer
consumption such as
Gliricidia sepium
195
2013
State CAMPA +
State CAMPA
Forest
(State
department and
Compensatory
Local tribal
Afforestation
communities
Fund
(Joint Forest
Management
Management) and Planning
Access of NWFP
Authority)
to the tribal
Funding + CSR
population
As part of
proposed Land NP- Environment
24.8
Use + MLA
Cell+ Forest
Fund + Forest
Department
department
MoEF National Lake
State Forest
Conservation Department + GP
Plan (70% GOI
+ NP + 30% NP/CSR)/ Environment Cell
np funding
280
67.8
77.6
0.0
0.0
145.4
14.5
2.6
9.7
15.9
42.6
178.5
0.0
316.4
137.9
2013
Catchment Conservaton
of Tipkiya Gufa and
Maintenance of Tipkiya
Gufa
Integrated
Watershed
Management
Programme +
Annual
Forest
Maintenance of Department + NP
Tipkiya Gufa to
be undertaken
by NP/Forest
Department
7.5
Allocation of pattas
to villagers on forest
land to be regulated
Catchment
Conservation of
Tarapur Pond
Afforestation and 1000 acre land
Tourism, plantation and
promotion of
on Lamba
grazing
Ecotourism
Talab
22.5
120
50
24
100
250
50
96
120
196
MP Tourism
Department's
Destination
Development
Fund /
Integrated
Watershed
Management
Programme /
MNREGA
Funding
Tourism
Department /
Irrigation
Department /
Horticulture
Department
Forest
Department
Forest
Department
Forest
Department
56.5
0.0
0.0
0.0
56.5
Forest
Department
27.1
124.1
0.0
0.0
151.2
Integrated
Watershed
Management
Programme
Integrated
Watershed
Management
Programme
8.5
29.1
233.6
317.1
588.2
Use of Polyethene to
be banned in Mandav
Catchment
Conservation and
large scale
afforestation in
Mandav Planning
Area
12
Gardens can
be handed
Parks and
over to the
Playgrounds
community
for
maintenance
Garden can be
handed over
Revivial of Garden
to the
around Sagar Talab Community
for
maintenance
Strict enforcement to Through
stop illegal felling of participation
trees
of tribals
40 Kms to
Dhar
1680
420
1050
1050
NP + ASI + MP
Tourism
Administrative
and
Promotional
NP + ASI + MP
Measure
Tourism
through
awareness
generation and
regulation
State CAMPA
(State
Compensatory
Afforestation
Fund
Management
and Planning
Authority)
Funding + CSR
State CAMPA
10
10
20
MP Tourism +
Annual
NP + Community
maintenance + MP Tourism
by community
11.3
Annual Annual
12.9 Mainte Mainte
nance nance
24.2
15
2.3
3.9
9.7
15.9
31.7
14.5
8.3
0.0
0.0
22.7
19.20
197
7814.8
Annual Annual
Mainten Maint
ance enance
2013
MLA Fund/
State PWD
Fund
MLA/ PWD
2013
10
10.00
State Govt
Funding
Subcontracted by
NP
11.3
0.0
3062.8
0.0
0.0
2475.5 3678.1
11.3
9216.5
Funding (Lakhs)
Project
Derivation
Estimated
Project Details and Sub
cost/unit
Projects
(Lakh)
Land use to be
compatible with
guidelines in the
Integrated Heritage
Resource Management
Plan (IHRMP) for
Mandav
Planning
area/Investment Area
to be revised as per
proposal in CDP
Phase 1
Phase 2
First 2 Till
years 2017
2027
Phase Total
3 (Lakhs)
Source of
funding
Implementing
Agency
Phase 1
First 2 Till
years 2017
2037
2037
To be undertaken by TCPD
To be undertaken by TCPD
Removal of
encroachments that are
negatively affecting the
cultural and natural
resources
Clear demarcation of
forest land
Proper
documentation Supervision by NGO to
ensure that land
Land ownership and of government
documents are made
land to be
use to be mapped
undertaken to properly and no forgery
and integrated with identify areas
cases of transferring
GIS database
where pattas tribal land to non tribals
have been
take place
alloted
30
20
198
50
Under Collectorate
District
Administration Supervision +
External monitoring
Funding or
to be ensured by
State Level
NGO to ensure
Funding or NP
accurate
Funding
documentation
33.9
38.9
0.0
72.8
Development of
Dharamshala
Ganga Jamuna
Rest House
Office has
large chunk of
land which Can be undertaken on
can be
PPP basis
redeveloped
to provide
accommodati
on
Can be
developed as
a single 3 floor
hotel or a
Redevelopment of NP series of small
Raen Basera as Hotel
tent like
based on
decentralized/
decentralized /
distributed
distributed hotel accomodation
s along the
concept
lines of those
developed by
Taj Group of
Hotels
High
PPP
basis
(Privat
e
develo
per to
pay
land
owner
a
certain
fee on
annual
basis)
50
50
PPP basis by a
Private Hotel
Group.
Approx. cost
10 to 50 Cr
based on the
scale of
development
199
TCPO
TCP + ASI + MP
Tourism + NP
2013
PPP basis.
Private
developer can be
given a small
part of the land
on lease basis by
the land owner. Private developer
In lieu, the
+ Owner of Ganga
100 develoepr pays a
64.6
Jamuna Rest
certain fee
House
annually to the
land owner. The
developer
recovers the
capital cost of
construction
from user fee
PPP basis.
Private Hotel
developer like
Taj group of
hotels or other
international
Hotel chains can
take land from
PPP basis by a
NP on lease and
Private Hotel
can develop a
distributed Private Developer Group. Approx.
development
under NP
cost 10 to 50 Cr
hotel. The hotel
supervision
based on the
can recover
scale of
capital and O&M
development
costs through
providing
charged
accomodation to
high end
National and
International
Tourists
97.3
0.0
162.0
2013
Should obtain
prior
NP and MP Tourism
permission
to be given
from Mandav
permission to extend
Heritage
activities in Revenue
Resource
Land
Management
Authority
District
Collectorate in
collaboration
with farmers.
Administrative
Collectorate
Farmers
Measure
permission to be
mandatory
before transfer of
land
98.5
Administrativ
e Measure
136
235
Funding (Lakhs)
Project
Derivation
Estimated
Project Details and Sub
cost/unit
Projects
(Lakh)
Phase 1
Phase 2
First 2 Till
years 2017
2027
Phase Total
3 (Lakhs)
Solar Farms
35
Streetlighting
35
70
MNRE + State
Urja Vikas
Vibhag +
Private
Developers
MNRE + Private
sector through
advertisements
on lanterns
0.1
39.7
16.5
200
39.6
45.2
2037
0.0
0.0
84.8
To be set up by private
developers along the model of
WBREDA which has set up solar
farms to sell electricity to the
grid
ESCO based
funding
Phase 1
First 2 Till
years 2017
To be set up by private
developers along the model of
WBREDA which has set up
solar farms to sell electricity to
the grid
SLs to meet
current
shortage
SLs for
proposed
roads
Implementing
Agency
2037
Source of
funding
ESCo + NP
39.7
44.9
0.0
0.0
0.0
44.9
16.5
0.0
0.0
32.1
0.0
32.1
Can be
Can be developed as a
located along
Wind Farm or as a wind
Jhabri road.
solar hybrid farm.
Energy
Combination of Solar PVs
generated to
of 10KW each are being
Establishment of 1to be used for
used to generate 12.5HP
town,
10 MW Wind Mills or
to run a 3 phase motor all
Wind Solar Hybrid to monuments,
day for farmers in S.India.
farmers and
generate 3 Phase
Wind mills that can
Electricity for supply excess can be
0.75/Kw
generate 3 phase
or
to Heritage areas and supplied to
electricity are also used
farmers in Mandav. 3 Pithampur.
750/MW
in India and can supply
Phase electricity to be LOCATION OF
power to farmers for
supplied to all village WIND MILLS
pumping and other uses.
clusters and all wards
TO BE
Any surplus energy can
of Mandav
APPROVED BY
also be sold in the market
MANDAV
but the key use would be
HERITAGE
to meet local
RESOURCE
requirements for
MANAGEMEN
heritage and villagers
T AUTHORITY
Existing
electricity
APDRP to be
infrastructure
prepared for Mandav
is nearly 50
yrs old
Through
Provision of
provision of
electricity in all
solar/wind
villages till the wind
powered small
farms are set up
setups
Solar street lighting 30 km to Dhar Provision @20 SLs/km 8,000/fixt
along regional roads
ure after
20 km to
(CAN BE COMBINED
MNRE
Provision @20 SLs/km
Dhamnod
FOR DHAR AND
subsidy
16
16
10
750
20
MNRE + State
Urja Vikas
MNRE + Private
Vibhag +
sector
Private
Developers
18.1
20.7
15.6
0.0
54.3
750
MNRE Subsidy
+ PPP for
Carbon Credits
+ Investment
by NGOs. Can
be taken up as
a Multi party
MNRE + Private
Investment.
Sector like
2260
Energy
11.3
Schneider Electric
generated to
or Suzlon
be used for
town,
monuments,
farmers and
excess can be
supplied to
Pithampur
969.6
1460
2378.1
4819.
194.7
0.0
217.3
100
10
2013
60
72
51.2
201
750
Actual amount
subject to
120 APDRP: To be
funded by
MPEB
TERI's lighting a
billion lives
initiative or
74
Solar powered
lamps under
MNRE subsidy
72 MNRE Subsidy +
51.2
MPEB
NGOs
MNRE + Private
sector
22.6
4.5
12.9
116.8
0.0
134.2
0.0
0.0
140.2
0.0
140.2
0.0
0.0
99.7
0.0
99.7
2013
ALIRAJPUR DISTRICTS
TO CLAIM CARBON
CREDITS)
Provision of
streetlighting in
peripheral
settlements/hamlets
10,000/fix
2.5
ture
10
20
30
60
Increase in supply to be
funded by MPEB
ESCOs + NP
ESCO basis
MPEB Funding
MPEB
2.8
0.0
0.0
0.0
2.8
11.3
25.9
58.4
0.0
95.56
2117.3 2378.1
5724.8
Fire Fighting
Cost with Inflation and
Contingency (Lakhs)
Funding (Lakhs)
Project
Derivation
2 for core
town, 1 for
Provision of Fire
peripheral
vehicles
settlements/h
amlets
2 per vehicle;
Provision of Fire
salary
Fighting Personnel @10,000/mon
th
Estimated
Project Details and Sub
cost/unit
Projects
(Lakh)
12
Phase 1
Phase 2
First 2 Till
years 2017
2027
Phase Total
3 (Lakhs)
Source of
funding
Implementing
Agency
Phase 1
First 2 Till
years 2017
2037
2037
24
12
36
Municipal
Budget/State State Govt + NP
Govt Funding
27.1
15.5
0.0
0.0
42.6
4.8
2.4
7.2
Municipal
Budget/State State Govt + NP
Govt Funding
5.4
3.1
0.0
0.0
8.5
202
14
Municipal
Budget/State State Govt + NP
Govt Funding
3.4
3.9
58.4
2013
7.8
12.7
27.7
13
78.9
Funding (Lakhs)
Project
Derivation
Phase 1
Phase 2
First 2 Till
years 2017
2027
Phase Total
3 (Lakhs)
Source of
funding
Implementing
Agency
Phase 1
First 2 Till
years 2017
2037
2037
Education
District Level NGO Funding /
Through Evening/Afternoon
classes: To be undertaken in
colaboration with Schools and
Colleges
Women oriented
Literacy Programmes
Pisciculture
Urban agricultural techniques and practices such as
organic farming, drip irrigation
Training programmes
Repair of agricultural equipment
for tribal population
Food processing
(Certificate courses)
Computer
Education
Travel, tourism and hospitality related
Senior Secondary School
40
20
60
20
20
40
10
50
10
20
50
Development of Library
Additional floor
can be
constructed
Upgradation of
using light
existing Schools by
weight or
provision of
temporary
additional floor material like Tin
sheets, PVC
boards or
10
35
50
150
40
40
10
30
203
22.6
0.0
0.0
67.8
25.9
0.0
0.0
48.5
6.5
38.9
0.0
56.7
56.5
0.0
97.3
158.5
312.4
MP Tourism
0.0
0.0
77.9
0.0
77.9
11.3
12.9
19.5
0.0
43.7
State
State Education
Education Dept Department
2013
English Medium
School
30
Provision of High
School
Provision of
Anganwadi for Sagar
Village and Jhabri
Village
30
5 Cr already
sanctioned
25
Agricultural
education to be
promoted through
NGOs, agriculture and
horticulture
department
15
Upgradation of
existing schools to
incorporate more
students
Need to hire Contract
staff to fill vacant
posts for Teachers
PPP Basis
through
Private
Entrepreneurs
on Payment
Basis
Private
Developers
25
50
35
50
50
50
To be undertaken by State
Education Department
State
State Education
Education Dept Department
0.0
0.0
58.4
5 Cr already
sanctioned
32.3
0.0
0.0
60.6
NGO Funding,
State
Agricultural NGO, Agricultural
and
and Horticultural 17.0
Horticulture
department
Department
Funding
45.2
0.0
0.0
62.2
0.0
0.0
0.0
56.5
State
State Edu Dept
Education Dept
State
State Edu Dept
Education Dept
56.5
To be undertaken by State
Education Department
394.0
292
159
844.6
394.0
Cost with Inflation and
Contingency (Lakhs)
Funding (Lakhs)
Upgradation of
existing PHC to 30
bed CHC
0.0
28.3
Health
Project
58.4
Derivation
Phase 1
Phase 2
First 2 Till
years 2017
2027
15
30
Phase Total
3 (Lakhs)
Implementing
Agency
Phase 1
First 2 Till
years 2017
2037
45
204
Source of
funding
State Health
Department
Funding
State Health
Department +
BMO
17.0
38.8
2037
0.0
0.0
55.7
15
For peripheral settlements/rural
clusters
CHC
Can be
provided in
Jhabri Village
1 needed for
Provision of
Projected
To cater to block level population
Dispensaries (0.08 to
town
0.12 ha)
population
To cater to the
Provision of small Vet large cattle
Facility
and livestock
population
Nursing home, Child
welfare and
For Block Level Tribal Population
Maternity Centre (25
to 30 beds)
2013
15
30
17.0
19.4
0.0
0.0
36.3
30
30
0.0
38.8
0.0
0.0
38.8
15
15
0.0
0.0
29.2
0.0
29.2
30
45
17.0
0.0
58.4
0.0
75.3
50
0.0
64.6
0.0
0.0
64.6
50
0.0
0.0
97.3
0.0
97.3
185
397.4
PHC
15
50
50
212.5
Others
Funding (Lakhs)
Project
Derivation
Phase 1
Phase 2
Phase Total
3 (Lakhs)
Source of
funding
Implementing
Agency
First 2
2015 2025 2035
years
Covered under
'Transportation'
TCPO
Private
Developer
50
50
205
2037
PPP
basis
Presently
located in
Nalcha
Phase 1
First 2 Till
years 2017
To be developed as part of
Proposed Land Use
Provision of Petrol
Pump in or near
Mandav
Provision of Grameen
Bank in or close to
Mandav
To be developed as part of
Proposed Land Use
PPP
basis
Private Developer
Grameen Bank
Grameen Bank
Funding
0.0
64.6
0.0
0.0
64.6
2013
Provision of gas
agency to reduce
dependence on fuel
wood
Provision of Cyber
Cafes and Photocopy
shops
20
20
20
60
State Govt
Funding / PPP
(Entrpreneurs
from town can
come forward
to set up a gas
agency in
town)
MP Tourism
Department or
Private Party
State Govt
MP Tourism /
Private Party
22.6
25.9
113.1
38.9
0.0
87.4
38.9
0.0
152.0
Project
Derivation
Funding (Lakhs)
Estima
ted
Phase Total
Phase 1
Phase 2
cost/u
3 (Lakhs)
nit
First 2 Till
(Lakh)
2027 2037
years 2017
20
206
20
47
Implementing
Agency
Phase 1
First 2 Till
years 2017
Ministry of
Culture + State State Department
Department of of Archaeology
Archaeology
5.7
2.6
Phase 2 Phase 3
2027
2037
38.9
63.4
Total
(Lakhs)
110.6
Admini
strativ
20
e
Measu
re
20
ASI / MP
Tourism
Funding
Admini
strativ
Subcontracted by
22.6
e
ASI / MP Tourism
Measu
re
70
0.0
0.0
2013
22.6
70
79.1
0.0
0.0
0.0
79.1
56.5
25.9
0.0
0.0
82.4
50
20
70
207
2013
15
10
25
208
25
15
17.0
0.0
0.0
0.0
17.0
10
11.3
0.0
0.0
0.0
11.3
50
0.0
0.0
48.7
79.3
127.9
2013
Area
Landscape Plan
Preparation of
Dossier for
Nomination as
Through Consultative
World Heritage
Process: MHRMA and NP
Site - to be
cell will need to be involved
prepared through To be made after as implementing agencies
consultative
IHRMP has been
along with State
process. The
made
Department of Archeology.
IHRMP to act as
The dossier may be
support
prepared through
document/docume
Consultants.
ntation base for
the Dossier
As per vision,
Archaeological excavation
policies and
and scientific clearance of
prioritization in
sites
IHRMP and as
per NARA
Revival of historic water
Document on
structures and systems
Authenticity,
1994 and
Landscaping of sites around
Conservation of
national and
heritage structures/
heritage structures
international
enclosures (flora to be
and landscapes
charters for introduced should be part of
conservation.
landscape plan)
Prioritization in Physical conservation of
IHRMP to be on
heritage structures the basis of
including the Parkota (Fort
significance and Wall) and adaptive reuse
condition
Revival of historic gardens
assessment.
10
10
35
35
100
100
100
100
100
100
100
100
100
100
209
0.0
ASI/Ministry of
Culture + State
Department of
Archeology
State
Department
of
200
Archaeology/
Ministry of
Culture
200
(National
Culture Fund)
State
Department of
200
Archaeology/
Ministry of
Culture
(National
200 Culture Fund) +
PPP (Adopt a
Monument
Scheme)
200
12.9
0.0
0.0
45.2
12.9
45.2
0.0
0.0
194.7
317.1
511.7
0.0
0.0
194.7
317.1
511.7
0.0
0.0
194.7
317.1
511.7
0.0
0.0
194.7
317.1
511.7
0.0
0.0
194.7
317.1
511.7
2013
For domestic as
Essential objective data well as
Tourist visit data in terms of
international
age groups, gender, location
tourists Generation of
Multilingual
tourist survey
(English, Hindi
Optional subjective data database - data
and others)
expectations, level of
linked to website survey formats
satisfaction, suggestions,
to be designed mode of transport to the
on site at exit
site, reason for visit etc
and post visit
online options
Interpretation and Use Plan preparation as per
vision and policies of IHRMP for Mandav
Interpretation and
Planning Area - including landscape and
Use Plan (IUP)
circulation plan ensuring that continuity of
preparation and
historic landscape and circulation is
possible projects
maintained and provision of universal access
(especially for the physically challenged)
Setting up of a Heritage
House* for capacity building
of local community and NP
towards heritage awareness
and safeguarding,
interpretation, traditional
knowledge systems,
Adaptive reuse
ecotourism, sustainable
of heritage
structures, sites development, maintenance
and repair of historic
Possible projects
or zones and
structures etc
that may be
construction of
proposed under new structures
Interpretation Centre:
the IUP
for
Already Proposed at Tabeli
interpretation
Mahal by NTPC
and visitor
facilties
10
10
10
10
23
Ministry of
Culture/State
Tourism
Department
2.3
1.3
19.5
31.7
54.7
10
Mandav Heritage
ASI /National
Resource
Culture Fund+ Authority + NP
State
Heritage Cell
Department of
through
Archeology Consultants/Tech
nical cell
0.0
12.9
0.0
0.0
12.9
10
Ministry of
Culture + State
Tourism
Department
0.0
12.9
0.0
0.0
12.9
0.0
38.8
0.0
0.0
38.8
0.0
0.0
Mandav Heritage
Resource
Authority + NP
State Tourism
Heritage Cell +
Department +
30
ASI + MP Tourism
PPP + ASI and
MP Tourism
PPP BASIS. For
sound and
Light show,
250 ticketing @400
INR/ticlet.Base
d on ASI data 7
lakh visitors
30
250
210
0.0
323.2
323.2
2013
visit Mandav
annually,
assuming 10%
viits to Sound
and Light
show, 70000
visitors per
year @400 rs
per ticket = 70
lakh. Assuming
a return of
50%, 35 lakh
profit per year
can be
assumed. At
this rate,
payback period
for
investments in
Sound and
Light show
would be 8 to
10 years.
Visitor facilties centre (with
cloak room, wash rooms, rest
areas, vending machines,
snack counters or cafe, ATM,
internet access, drinking
water for day visitors) and
Orientation centre
A small shopping area can be
developed on PPP basis. Can
be made by putting an
existing heritage structure to
reuse
Information, RFID and ticket
counters at entry and exit
points
20
20
15
40
80
15
80
211
200
State Tourism
Department +
PPP + ASI and
MP Tourism
0.0
25.9
0.0
0.0
25.9
0.0
19.4
0.0
0.0
19.4
45.2
103.4 155.7
0.0
304.4
2013
25
75
100
0.0
32.3
146.0
0.0
178.3
50
50
0.0
0.0
97.3
0.0
97.3
20
20
0.0
25.9
0.0
0.0
25.9
0.0
6.5
0.0
0.0
6.5
10
10
0.0
12.9
0.0
0.0
12.9
75
75
0.0
97.0
0.0
0.0
97.0
50
50
0.0
64.6
0.0
0.0
64.6
0.0
64.6
0.0
0.0
64.6
50
50
212
State Tourism
Department +
GP Nalchha +
PPP
GP Nalchha
Cost of electricity to be
subsidized and to be borne
by MP Tourism department
and ASI
Preparation of Plan
10
30
20
60
NP
NP
0.0
12.9
58.4
63.4
134.7
10
20
20
50
State Tourism
Department +
PPP
NP
0.0
12.9
38.9
63.4
115.3
640
Subsidized by
MPEB + To be
shared
MPEB + MP
between MP
Tourism
Tourism
Department + ASI
Department
and ASI
0.0
12.9
389.3 1363.5
500
530
District Level
Funding +
Tourism
Department
Funding
MP Tourism +
Collectorate
33.9
646.4
0.0
0.0
680.3
10
10
Ministry of
Culture+
Ministry of
Mandav Heritage
Resource
Authority + NP
0.0
12.9
0.0
0.0
12.9
10
30
2013
200
213
430
1765.7
2013
Tourism+ State
Tourism
Department
100
10
100
Mandav Heritage
Resource
Authority + NP
Heritage Cell +
NGOs
20
26
13
16
20
20
39
25
35
25
25
50
0.0
194.7
0.0
6.5
19.5
15.9
41.8
0.0
33.6
25.3
0.0
58.9
0.0
20.7
31.1
0.0
51.8
0.0
25.9
38.9
0.0
64.8
0.0
32.3
68.1
0.0
100.5
0.0
32.3
48.7
0.0
81.0
NP
PPP
214
194.7
Private Players
32
Ministry of
40 Tourism + State
Tourism
Department +
PPP
60
50
0.0
PPP
16
0.0
50
MP Tourism in
MP Tourism +
collaboration
Small Industries
with Indore
Herbal Park. Can Service Institute +
be developed as Indore Herbal
an extension of
Park
Indore Herbal
0.0
0.0
97.3
0.0
97.3
2013
Park
Farmers can
clear a part of
their farms
during non crop
Tourists would have to pay
season to
for this to the farmers.
tourists. Tourists
Propagation of
Societies of local farmers can
can set up camps
farm Tourism with
be formed to facilitate
in these areas.
AC and non AC
booking of farms and
Farmers can
tents
coordination with tourists
provide food to
through MP Tourism or other
these tourists.
agencies
Mobile toilets
can be provided
for such selected
farm sites
Provision of
Development of
luxury Air
Distributed Tourist
Conditioned Fo high end and international
Accommodation by
tourists
tents in
big hotel groups
scattered
like Taj
accommodation
Ecoforest
development along Afforestation Area reserved for forest land
Lamba Talab
Ghoda buggy can
be started as
tourist vehicle
Ropeway
connecting Lohani
caves to Songarh
Fort can be
To promote
provided, if
tourism round
approved by
the year
Mandav Heritage
Resource
Management
Authority
30
30
30
90
10
100
300
215
33.9
38.8
58.4
0.0
131.1
Private Sector
Investment like
Taj group or
other Hotel
Groups
Large hotel
groups
50
Forest
Department
Forest
Department
97.3
97.3
110
MP Tourism
MP Tourism
11.3
129.3
0.0
0.0
140.6
0.0
0.0
584.0
0.0
584.0
Private
Sector
50
Funding
needing for
propagation of
farm tourism
and training of MP Tourism and
farmers to host
Farmers
foreign
tourists: MP
Tourism
Department
Private
Sector
2013
Development of
Biodiversity Park in
Can attract
the valley along
Foreign Tourists
Western side of
Mandav
200
Permeable
pavers with
Access road to Boorhi
Mandav
Access walkway to railing on either
side.
Boorhi Mandav
and Songarh Fort
35
Adequate
lakh/k
to be provided
provision for
parallel to the
m
pedestrian
valley (near NP safety; Pathway Access walkway to Songarh
Fort
Raen Basera)
to be made
100m away from
the ridge
Ecotrails /
Nature Trails
Temporary
Camping sites
(AC and non AC
tents)
Extending tourist Paragliding and
season from 3
Adventure
months to 8
Sports
months
Trolley/Ropeway
between Lohani
Caves and
Songarh
Farm Tourism
Cultural events
at night
200
87.5
87.5
70
70
MP Tourism
MP Tourism
MP Tourism +
ASI (Can be
included for
funding under MP Tourism + ASI
Destination
Development
Fund)
0.0
0.0
389.3
0.0
389.3
0.0
113.1
0.0
0.0
113.1
0.0
90.5
0.0
0.0
90.5
In forest areas
20
30
50
MP Tpurism +
Private Party
MP Tpurism +
Private Party
22.6
38.8
0.0
0.0
61.4
To be identified by MP
Tourism
30
30
60
MP Tpurism +
Private Party
MP Tpurism +
Private Party
33.9
38.8
0.0
0.0
72.7
50
50
100
MP Tpurism +
Private Party
MP Tpurism +
Private Party
56.5
64.6
0.0
0.0
121.1
T shirts,
Souveneirs of
TRIBAL ART AND
Souverneirs for
Monuments,
WOODWORK TO BE
Curios, Miniature PROMOTED THROUGH THE
Mandav
Monument
SOUVENEIR SALE
Replicas, etc
25
Discussed above
Discussed above
Discussed above
Discussed above
Discussed above
Discussed above
25
75
216
PPP Basis.
Private Sector
to be involved
through display MP Tourism +
125
of
PPP + ASI
advertisements
on T shirts, etc
and can earn
206.6
28.3
32.3
146.0
Provision of
Information
centres in
Monuments
Training and
licences to guides
6 nos
40
Training
programmes for
Guides
Issue of Licences
through sale of
souveneirs +
MP Tourism
MP Tourism +
ASI (Can be
included for
120 funding under MP Tourism + ASI 45.2 103.4
Destination
Development
Fund)
Ministry of
50 Culture, State
113.0
Torism
Heritage Cell in
Department
NP or ASI
and District
20
33.9
Govt./ ASI
80
100
Can also be undertaken by
NP
30
50
50
100
Payment basis
+ Promotion
by MP
Tourism
Department
10
ASI Funding
MP Tourism
10
20
217
MP Tourism +
State Geology
Department
ASI + Forest
Department
56.5
64.6
2013
0.0
0.0
148.6
0.0
0.0
113.0
0.0
0.0
33.9
0.0
0.0
121.1
0.0
0.0
24.2
Payment basis
MP Tourism + + Promotion by
Villagers
MP Tourism
Department
MP Tourism +
State Geology
Department
11.3
12.9
2013
Parking and
viewpoint to be
developed at
Neelkanth
Monuments
State Department under State
of Archaeology to Archaeology
play a more active Department to
role
be conserved
and maintained
ASI can provide for
public toilets and
other amenities
within the ASI
listed Monuments'
premises
Resource Centre Maintaining database in
for traditional
continuity with that
knowledge generated as part of IHRMP systems linked to Mandav heritage
Medicinal
resource website
properties of
herbs and other
Resource Centre,
plant resources;
Design innovation
Agricultural
and training centre
practices; Local
Library and Research cell to
and Haat (for
food processing
encourage research for
continuity of
techniques and
sustaining these resources traditional
cuisine; Art and
grants and scholarships
knowledge
craft traditions
systems and
(including
promoting these as
building crafts
means of
and performing
livelihood)
arts)
Training programmes in
traditional arts, crafts and
Design
design
Innovation and
Organising workshops for
Training Centre
local and regional artists and
crafts persons
Already Proposed
Already Proposed
State
State Department State Level
Department of
of Archaeology
Initiative
Archaeology
State Level
Initiative
10
10
20
ASI
SDA+ MHRMA+
NP Heritage Cell
50
25
75
MP Tribal
Development Tribal Research
Department + and Development
Ministry of Institute, Bhopal
Tourism + MP (Govt of MP) +
State Tourism
NP
Department
50
25
75
218
11.3
12.9
0.0
0.0
24.2
0.0
56.5
28.3
0.0
84.8
0.0
64.6
48.7
0.0
113.3
2013
Particularly
between
Mandav and
Manpura
50
0.5
lakh/si 2.5
gnage
25
10
75
Crafts Council
of India + State
Tourism
Department +
PPP
NP
0.0
64.6
48.7
0.0
113.3
12.5
MP Tourism
Department
Tourism
Department
2.8
12.9
0.0
0.0
15.8
3890
3266
10607
Total
219
3450
2013
22.14 IEC
Cost with Inflation and
Contingency (Lakhs)
Funding (Lakhs)
Project
Awareness
generation
regarding the
skewed sex ratio,
especially amongst
tribals
Awareness
generation for
heritage and
traditional
knowledge systems
of tribal population
Awareness
generation
regarding built
heritage and Do's
and dont's of its
management
Promotion of
Mandav Planning
Area as ecotourism
and rural tourism
destination
Awareness
generation on use
of renewable
sources of energy
Awareness
generation on
population growth
Derivation
Phase Total
3 (Lakhs)
Phase 1
Phase 2
First 2 Till
years 2017
2027
2037
2.5
2.5
1.5
1.5
From phase 2
2.5
2.5
10
7.5
Tribal Welfare
Department
Funding
7.5
1.5
2.5
2.5
7.5
1.5
2.5
2.5
7.5
220
Implementing
Agency
Phase 1
First 2 Till
years 2017
10
Source of
funding
Tribal Welfare
Department
Phase 2 Phase 3
2027
2037
Total
(Lakhs)
1.1
1.9
4.9
7.9
15.9
Ministry of
Culture/Touris NP Heritage Cell
m + State
and Mandav
Tribal Welfare
HRMA
Department
1.1
1.9
4.9
7.9
15.9
Ministry of
NP Heritage Cell
Culture+ State
and Mandav
Department of
HRMA
Archaeology
2.3
3.9
9.7
15.9
31.7
0.0
0.0
19.5
31.7
51.2
1.1
1.9
4.9
7.9
15.9
1.1
1.9
4.9
7.9
15.9
State
Department of
State Tourism
Tourism +
Department
Ministry of
Culture
Ministry of
New and
Subcontracted by
Renewable
NP
Energy
NP Funding
Subcontracted by
NP
Awareness
generation
Programmes through Media,
Schools, Colleges
10
10
30
Awareness
Generation
funding under
Subcontracted by
IHSDP/Grant
NP
based on
UIDSSMT
Pattern
District Level
Funding,
Collectorate,
Government
Subcontracted by
Schemes for
NP to NGOs
Awareness
generation
30
District Level
Funding, Mandi
Funding/Indust
Collectorate,
ry CSR,
Subcontracted by
Government
NP to NGOs
Schemes for
Awareness
generation
5.7
6.5
19.5
2013
31.7
63.3
31.7
63.29
Transport
Initiate Formation
of NGOs and MFIs
10
10
5.7
6.5
19.5
221
42.64
87.60 142.69
272.93
2013
Funding (Lakhs)
Project
Derivation
Single window
Single computerized
D isplay board with name
system in Nagar counter for all enquiries, and responsibility of each
Palika
submitting forms, etc
staff in Nagar Palika
Interdepartmental All proposals to be
The Authority to have
Coordination to be implemented in Mandav experts from all sectors to
ensured by
(by any department) to
ensure comprehensive
get approval from
development of Mandav.
Mandav Heritage
Resource
Mandav Heritage
Proposals not approved by
Management
Resource Management
MHRMA should not be
Authority
Authority
implemented
Can be empaneled by NP on contract basis. Cost of
approval of plan by Architect to be borne by Building
Architect and
Owner
planner in Nagar
Palika
Phase 1
Phase 2
First 2 Till
years 2017
2027
Phase Total
3 (Lakhs)
Implementing
Agency
Phase 1
First 2 Till
years 2017
2037
2
NP Funding
NP
2.3
0.0
Phase 2 Phase 3
2027
2037
0.0
0.0
Covere Admini
Admini
d strativ Administr
strative
under
e
ative
Measu
'Herita Measu Measure
re
ge'
re
Admini
Covered
Adminis Adminis
strativ
under
trative trative
e
'Heritag
Measur Measur
Measu
e'
e
e
re
Total
(Lakhs)
2.3
NP
12
120
120
276
Formation of
Environment Cell
under NP
24
12
120
120
276
10
10
222
10
TCP Funding
Formation of
Heritage Cell under
NP
Infrastructure
mapping with
annual updation in
Proper topographic survey including contour
digital form - to be
demarcation and municipal boundary delineation.
linked with GIS
Infrastructure mapping for water supply, sewerage,
database being
drainage, roads and SWM
generated and
maintained for
heritage mapping
Source of
funding
35
Ministry of
Culture
Funding
Ministry of
Environment
and Forest
Funding
NP
27.1
15.5
233.6
380.5
656.7
NP
27.1
15.5
233.6
380.5
656.7
11.3
6.5
19.5
31.7
68.9
State Govt
Funding (50% Subcontracted by
in phase 1)/ NP
NP
Funding
2013
under Mandav
Heritage Resource
Management
Authority (HRMA)
Service centre to
be constituted for
complaint
redressal
Restructuring of
Municipal Cadre
1.2
1.8
15
NP Funding
NP
1.4
2.3
11.7
19.0
34.4
10
25
Private Party
11.3
6.5
9.7
15.9
43.4
To be borne by
State
Government
NP
To be borne by State
Government
Total
To be borne by State
Government
126.7
508
828
1462.4
Restructuring of institutional and fee structure of NP employees shall be undertaken in accordance with the new Municipal Cadre (given in Annexure). Since the NP would not
be able to bear the additional costs of the NP restructuring, these costs would have to be directly borne by the State Government and are hence, not included in the CIP.
223
2013
Phase 1
480.37
2165.43
Phase 2
360.12
Phase 3
126.83
73.48
287.92
607.36
55.21
588.22
3055.33
3450.43
773.78
1.95
107.06
311.46
0.00
671.58
992.77
3890.32
7.93
3.17
47.56
31.71
0.00
0.00
0.00
3062.78
1229.37
58.43
2475.55
2117.32
7.79
42.64
15156.98
87.60
11797.29
TOTAL
With Inflation
INSTITUTIONAL
3265.94
3678.15
2378.11
12.68
142.69
Total (Lakhs)]
967.33
2947.14
78.60
442.55
950.52
55.21
1259.80
4048.10
10606.70
9216.48
5724.81
78.90
272.93
36649.04.
9694.77
Phase 1
126.74
Phase 2
508.06
Phase 3
827.58
Total (Lakhs)
1462.39
Phase 1
Phase 2
Phase 3
Total (Lakhs)
Other Factors
With Inflation
EDUCATION
HEALTH
OTHER SOCIAL INFRA
394.03
212.45
113.10
291.99
184.93
38.93
158.54
0.00
0.00
844.56
397.38
152.03
224
ELECTRICITY + ST.
LIGHT
16%
FIRE FIGHTING
0%
IECINDU
USTRY
SEWERAGE SANITATION DRAINAGE
1% 3%
%
0%
SWM 3%
1%
WATER
%
8%
0%
SLUMS
3%
TRANSPORT
11%
ENVIRONMENT
25%
HERITTAGE AND
TO
OURISM
29%
Out of these, the NP contribution under various sectors (@10% approximately) is listed below:
With Inflation
INDUSTRY
WATER
SEWERAGE
SANITATION
DRAINAGE
SWM
SLUMS
TRANSPORT
HERITAGE AND TOURISM
ENVIRONMENT
ELECTRICITY
FIRE FIGHTING
IEC
TOTAL
Phase 1
Phase 2
P
Phase 3
Total (Lakhs)
139.32
7.35
19.94
6.82
11.30
46.56
294.51
12.93
13.79
72.02
0.19
0.97
19.47
0.00
56.45
97.33
58.40
17.85
0.00
0.32
1.59
31.71
0.00
0.00
0.00
63.42
0.00
211.35
7.86
22.50
57.99
11.30
103.01
391.84
134.74
31.64
58.43
7.79
12.68
78.90
4.28
6.81
11.10
22.19
615.23
337.29
120.81
1073.33
225
2013
2013
With Inflation
INSTITUTIONAL
Phase 1
23.71
Phase 2
31.15
Phase 3
50.73
Total (Lakhs)]
105.59
With Inflation
Phase 1
Phase 2
Phase 3
Total (Lakhs)]
EDUCATION
HEALTH
OTHER SOCIAL INFRA
Hence, the NP needs to generate 6.38 Crore in Phase 1 to meet the cost of implementation of projects and undertake institutional reforms. Apart from this, the NP would also
need an amount of 13.35 Cr to meet the O&M expenses of projects created under CDP. Hence, the NP is required to generate a total amount of 19.73 Cr in Phase 1 to meet the
CapEx, Institutional reforms and O&M of projects.
226
2013
Summary of CIP
S. No.
Sector of Investment
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Water Supply
Sewerage
Storm Water Drainage
Solid Waste Management
Sanitation
Traffic & Transportation
Electricity & Street Lighting
Fire Fighting
Basic Services for Urban Poor
Environment
Urban Governance
Heritage and Tourism
Education
Health
Social Infrastructure & Other Projects
Total
Investment by 2015
(In Crore)
21.65
0.73
6.07
0.55
2.88
30.55
12.29
0.58
5.88
30.63
1.27
34.50
3.94
2.12
1.13
154.80
S.
No.
1
2
3
4
5
6
7
8
9
10
11
Water Supply
Sewerage
Storm Water Drainage
Solid Waste Management
Sanitation
Traffic & Transportation
Electricity & Street Lighting
Fire Fighting
Basic Services for Urban Poor
Environment
Urban Governance
Total Investment
(In Crore)
29.47
0.79
9.51
0.55
4.43
40.48
57.25
0.79
12.60
92.16
14.62
12
Heritage
106.07
13
14
15
Education
Health
Social Infrastructure & Other Projects
8.45
3.97
1.52
Sector of Investment
Investment by 2025
(In Crore)
7.74
0.02
3.11
0.00
1.07
9.93
21.17
0.08
6.72
24.76
5.08
38.90
2.92
1.85
0.39
123.73
Investment by 2035
(In Crore)
0.08
0.03
0.32
0.00
0.48
0.00
23.78
0.13
0.00
36.78
8.28
32.66
1.59
0.00
0.00
104.11
Responsible agency/deptt.
NP
NP
NP
Private Contractor
NP
State PWD + Private Contractor + MP Tourism
MPEB + Private Party
NP
Beneficiaries + NP
Forest Department + NP + MNREGA Nodal Agency + MP Tourism
NP + Private Party
MP Tourism + Mandav Heritage Resource Management Authority +
Private Party + ASI + State Department of Archaeology
State Education Dept
State Health Dept
Misc
227
Total Investment
(In Crore)
29.47
0.79
9.51
0.55
4.43
40.48
57.25
0.79
12.60
92.16
14.62
106.07
8.45
3.97
1.52
382.65
2013
CAGR has been used to project the data till 2017 in order to attain a uniform value for growth rates.
In terms of NP income and expenditure, in cases where unrealistic growth rates were attained due to irregularities in collection/expenditure, etc.; the growth rates in
such cases, were normalized to realistic values. Growth rates of more than 10% have been normalized for income as well as expenditure
Income
Octroi compensation has been assumed to increase at 10% as against 21% (as per CAGR). This has been done to avoid unrealistic projections and since Octroi
compensation forms a large part of Municipal income, projections on higher side can lead to over prediction of Municipal Income.
Grants for provision of basic services have been assumed to grow at 5%
Over the study period, income and expenditure under Other Transfers Return have been nearly equal. Since growth rates for income and expenditure under
Other Transfers Return are more than 40% as per CAGR, the growth rates have been adjusted such that income from this source becomes equivalent to
expenditure under this head.
th
Installments for pension under 6 Pay Commission have been assumed to discontinue in the first phase.
228
2013
Expenditure
One time project based expenditures like construction of water tank have been discontinued under phase 1
Expenditure on public construction would increase at 10%
Expenditure under BRGF has been assumed to increase at the same rate as income from this source.
Growth rates for expenditure under Other Transfers Return have been rationalized, as stated above.
Tax Revenue
If the Nagar Parishad does not introduce any reforms and continues to collect taxes at the present rate, then the NP earnings in 2017 from tax sources would reach
approximately 1.42 Crores. But a critical point here is that more than 70% of this earning would come from Octroi compensation.
Non Tax Revenue
The NP earnings from Non tax revenue under base case scenario would reach approximately 17.7 lakhs by 2017.
Transfers/Capital Income
Transfers would account for approximately 1.26 Crore by 2017 of the total revenue as against their present contribution of 92.23 lakhs. Grant under MP Legislator Fund
would contribute to nearly 35% of this amount.
Other income
Income under extraordinary and loans would account for approximately 32.25 lakhs by 2017.
Expenditure including Capital Expenditure
The expenditure of NP without any curtailment in costs (but assuming that growth rate under none of the major heads exceeds 10%) is likely to stand at 2.19 Crores by 2017.
229
2013
BASE CASE
Revenue
Expenditure
Surplus/Deficit
Cumulative Surplus/Deficit
2012
2013
248.61
152.88
95.74
259.80
163.61
96.18
2014
2015
271.98
285.23
175.56
188.81
96.42
96.42
578.45
2016
2017
299.64
203.50
96.14
317.30
219.74
97.56
615.23
1335.01
Cumulative Expenditure on O&M
Cumulative expenditure on
Institutional Projects
23.71
1973.94
Total NP Contribution
2012
2013
2014
2015
2016
2017
Tax
97.33
104.77
112.99
122.04
132.01
142.97
Non-Tax
15.96
16.06
16.19
16.34
16.51
17.71
Transfers
109.67
112.65
115.81
119.14
122.66
126.37
Miscellaneous
25.66
26.31
26.99
27.71
28.46
30.25
Total Income
248.61
259.80
271.98
285.23
299.64
317.30
Expenditure
152.88
163.61
175.56
188.81
203.50
219.74
Surplus/Deficit
95.74
96.18
96.42
96.42
96.14
97.56
Cumulative Surplus/Deficit
578.45
Hence, if the NP continues its earnings and expenses under the base case scenario, the NP would be able to generate a cumulative profit (from 2011 to 2017) of 5.78 Crores
by 2017 as against the required 19.73 Cr.
230
2013
CAGR has been used to project the data till 2017 in order to attain a uniform value for growth rates.
In terms of NP income and expenditure, in cases where unrealistic growth rates were attained due to irregularities in collection/expenditure, etc.; growth rates in such
cases, were normalized to realistic values.
Income
Income from property tax and water tax has been assumed to increase as follows:
Property Tax
Water Tax
Samekit Kar
Present
collection
efficiency
(2008/09)
Properties
paying property
tax
Properties paying
property tax by 2017
80.01%
1211
out of 1500
3125 approx
Number of connections at
present (2008/09)
Present Coverage
(%)
% increase in coverage
1200
91%
Present Coverage
(%)
Increase in
number of
connections by
2017
2500
80.7%
7% per annum
3728 by 2017
231
Rs./year/HH by 2017
4258 by 2017
Rs./ HH by 2017
2013
Expenditure
It has been assumed that the rate of growth for administrative expenses (salary, allowances, contingency, incidental expenses, etc.) under all heads would not
exceed 9%
Expenditure on public construction would increase at 9%
Expenditure under BRGF has been assumed to increase at the same rate as income from this source.
Growth rates for expenditure under Other Transfers Return have been rationalized, as stated above.
Based on the above assumptions, the data for NP finances was projected for 6 years using CAGR.
Tax Revenue
If the NP introduces property tax, consolidated tax and water tax reforms, the earnings from Tax sources are likely to increase to 1.52 Cr by 2017 as against a cumulative of
1.42 Cr under Base Case Scenario. Octroi would contribute to more than 70 % of these earnings.
Non Tax Revenue
Income from non tax revenue would remain the same, 16.78 lakhs by 2017.
Capital Income/ Transfers
Income under transfers would also remain same at 1.26 Cr.
Other income
Income under miscellaneous is likely to remain the same at 30.03 lakhs.
232
2013
2012
250.21
150.98
99.23
2013
261.41
160.46
100.95
Cumulative Surplus/Deficit
2014
2015
273.62
170.92
102.71
2016
2017
286.93
182.42
104.52
301.42
195.04
106.38
325.74
208.89
116.84
2015
2016
2017
630.62
615.23
1335.01
Cumulative expenditure on
O&M of projects
Cumulative expenditure
on Institutional Projects
23.71
1973.94
Total NP Contribution
2012
Tax
Non-Tax
Transfers
Miscellenous
Total Income
Expenditure
Surplus/Deficit
Cumulative Surplus/Deficit
97.55
16.09
109.67
26.90
250.21
150.98
99.23
2013
105.13
16.18
112.65
27.44
261.41
160.46
100.95
2014
113.50
16.29
115.81
28.02
273.62
170.92
102.71
630.62
122.71
16.43
119.14
28.65
286.93
182.42
104.52
132.85
16.59
122.66
29.32
301.42
195.04
106.38
152.56
16.78
126.37
30.03
325.74
208.89
116.84
Hence, under Some Reforms Scenario, the Nagar Parishad can generate 6.30 Cr. Hence, a surplus of 52.17 lakhs can be generated by the NP by introducing water, property
tax, consolidated tax reforms and measures to reduce expenditure.
233
2013
23.1 Conclusion
In order to meet the costs of CDP projects, the NP would be required to generate an amount of 19.73 Crores over the first 5 years. It was found that under the base case
scenario (where no reforms are implemented to increase income and reduce expenditure), the NP would be able to generate only 5.78 Crores. It is proposed that to further
increase the revenues, the NP should implement the Some Reforms Scenario, whereby reforms to increase property tax, consolidated tax and water tax & measures to
decrease expenditure would be implemented. The NP would be able to generate upto 6.30 Crores (an additional revenue of 52.17 lakhs) through implementation of these
reforms.
Despite this, the NP would still be short of nearly 14 Cr (total required is 19.73 Cr). Hence, it is proposed that the NP should undertake PPP Projects like redevelopment of
NP complex hotel or Dharamshala or commercial complex on lower 2 floors and NP office can be made on top floor. This can help NP generate a revenue of upto 4 Cr.
Other PPP projects like advertisements, organizing guided tours or parking tax can also be collected by NP to generate more revenue from tourism. The remaining amount
of nearly 10 Cr needs to be given by State Government as a Grant or a loan to the ULB.
234
vii
2013
2013
viii
ix
2013
2013
xi
2013
2013
xii
xiii
2013
2013
xiv
xv
2013
2013
xvi
xvii
2013
2013
xviii
xix
2013
2013
xx
xxi
2013
2013
xxii
xxiii
2013
2013
xxiv
xxv
2013
2013
xxvi
xxvii
2013
2013
xxviii
xxix
2013
2013
xxx
xxxi
2013
2013
Revised Municipal Cadre for Revenue and Finance Departments under MP Rajya Nagriya Vitt Sewa
xxxii
xxxiii
2013
2013
xxxiv
2013
xxxv
2013
SH1
SH3
SH3
SH3
SH3
SH
SH3
SH2
SH
district to Ajmer in Rajasthan. NH 3, which connects Agra to Mumbai, touches the South-East corner of Dhar
district, between Indore and Dhule in Maharashtra. .A number of state highways (SH) also cross the district. SH
18 connects Bhopal to Ahmedabad, via Sehore, Ashta, Dewas, Ujjain,Badnawar and Petlawad. SH26 connects
Badwani on the South with Alirajpur in the neighbouring district and Vadodara in Gujarat. SH 31 connects Dhar
with Bhusawal in Maharashtra and onwards to Nayagaon. SH 39 runs Northwards from Badwani through
Kukshi and Jobat to Kushalgarh in Rajasthan.
Madhya Pradesh has a high dependence on road transport. However, the road density in the state is 47
1
th
(km/100sqkm area), which is much below the national average of 98. The state is ranked 16 in comparison
with other Indian states in this regard. At the same time, the number of registered motor vehicles per
thousand population in the state is 80, which is considerably higher than the national average of 68. This puts
http://www.infrawindow.com/reports-survey/road-density-in-india-disparity-persist_15/
xxxvi
2013
a lot of pressure on its roads, perhaps indicated by the fact that more than 10% of all accidents in India happen
in Madhya Pradesh. While detailed data regarding Dhar district is not available at present, it can be observed
that the intensity of road usage is high, and would probably reflect the overall situation in the state.
In 2005, the ILO (International Labour Organization)
conducted a situation analysisassessing the quality of
the road surface and its maintainabilityof 116
roads/tracks, including national highways, state highways
and major district roads (MDR), village roads, other district
2
roads and tracks in Dharblock of Dhardistrict. While the
state of NHs, SHs and MDRs, which are 19.8 percent of the
road network, is largely good and it was found that the
other roads are in poor condition. About 31 percent of the
network provides full access (i.e. the road is fully
maintainable). The study noted that the allocation of funds
for road maintenance has reduced drastically, dropping to
less than 50% from 1997-98to 2002-03, with an increase in
the shortfall in expenditure, compared to funds required
as per norms, from a level of 50 percent in 1997-98 to 75
percent in 2002-03. Poor condition of roads is particularly harmful to rural inhabitants, because it impacts their
access to health care facilities and increases the time spent on daily chores, thereby affecting agricultural
output. One of the key issues that has emerged during the planning and initial implementation of the PMGSY is
the need to preserve the infrastructure through effective maintenance. While contractors are responsible for
maintenance for 5 years after the construction, the responsibility for maintenance reverts to the implementing
agencies thereafter. This places a lot of financial pressure on the ULBs in the district and requires proper
financial planning, otherwise the economic activities in the cities of the district would be adversely affected.
Observations of the state of roads in all the cities support this conclusion, as the ULBs are able to maintain a
very small percentage of the roads within their jurisdiction.
PROVISIONING OF TRANSPORT SERVICES
Dhar district has easy access to air travel through the Devi Ahilyabai Holkar Airport in Indore, which is served
by most of the major domestic airlines of the country, such as Jet Airways, Jet Lite, Indian Airlines and
Kingfisher. These connect Indore with the main Metros and with all parts of the country. The district is
deprived of rail connectivity, for which it has to depend once again on Indore to the East and Ratlam on the
North. While Ratlam is 107 kms to the North of Dhar city, it provides access to four major railway routes, which
connect Ratlam to Mumbai, Delhi, Ajmer and Khandwa. Similarly, Indore also provides rail connectivity to
Mumbai, Pune, Nagpur, Delhi, Jaipur, Ahmedabad, Vadodara, Howrah, Bhopal, Ujjain, Gwalior, Bhind,
Jabalpur, Bilaspur, Khandwa, Lucknow, Varanasi, Patna, Ambala, Jammu, Dehradun and Trivandrum. Regional
transport is road-based and buses ply between Dhar, Indore, Mandu, Mhow, Ratlam, Ujjain, and Bhopal.
Rented cars and taxis are freely available within the district, and provide convenient access to Indore, Mhow,
Ratlam, Ujjain and Bhopal.
It can be said that Dhar district is well connected even though it depends on adjoining districts for air and rail
connectivity. However, it is significant that in 2000, 70.5% of the villages in the district were still not connected
3
with pucca roads. At 25.3 kilometres road length per 100 square kilometres (in 1999), the road density in the
district is even lower than the states average. With the pressures of development on all sides, the district will
2
3
International Labour Organization, Situation Analysis of Rural Road Maintenance in Madhya Pradesh, 2005
th
From the webiste of Pradhan Mantri Gram Sadak Yojana, http://pmgsy.nic.in/pmg1218.asp, retrieved on 19 Feb 2012
xxxvii
2013
be faced with the challenge of upgrading its infrastructure as well as planning the intercity transportation
within the district such that development pressures do not have a detrimental effect.
PRESSURES OF REGIONAL DEVELOPMENT
The upcoming Delhi Mumbai Industrial Corridor (DMIC)
and the concomitant Dedicated Freight Corridor (DFC)
will have a profound impact on Dhar district and all the
cities within the district. While the DMIC itself does not
contain Dhar district and the DFC does not enter the
district, the impacts are inevitable. The DMIC and DFC
strategy envisages a network of regional transport
linkages and a network of investment regions that will
feed the corridors. No. 24 in the series of investment
nodes is the Dhar- Pithampur-Mhow Investment
Region, which is located to the east of the DMIC
alignment. It leverages the air and rail connectivity
provided by Indore and the presence of NH-3, which
passes close to all three cities. It will also enjoy the
proximity to steel plants at Bhilai and Nagpur and the
close proximity to ports in South Gujarat, such as
Hazira, Dahej and Maroli.
Through the Audhyogic Kendra Vikas Nigam (AKVN),
Indore, a specialized corporation dedicated to
integrated industrial development, the state
government has been developing a Special Economic
Zone at Indore since 2000one of the first in the countrywhich is expected to be a major hub for vehicle
and components manufacturing. This region already has the presence of companies like Hindustan Motors,
Kinetic Honda, Eicher Motors, Bajaj Tempo, and other industries such as Kores India, Crompton Greaves,
Bridge Stone Tyres and Pratap Steel. The state government also plans to develop a Pharma Cluster, Apparel
Park, Gems & Jewellery Park, Software Technology Park, Herbal Park and Bio-technology Park within the new
investment region. Other related developments will be a Knowledge City and Skills Development Center to
cater to the training needs of the industries, Integrated Township/s, and an integrated logistics hub with
container depot, truck terminal and warehousing facilities.
The CDP for Indore envisages an investment of INR 2746 Crore for the upgradation of infrastructure (transport,
water supply, environment management) in the urban agglomeration around Indore. Indore Airport is being
augmented to become an international airport. The Dhar-Pithampur-Mhow Investment Node will also need to
connect with the DMIC through feeder roads connecting with national highways and the Golden Quadrilateral.
Feeder rail linkages will also be developed. There is a plan to construct a 196km long Broad Gauge line
connecting Dahod, Sardarpur, Dhar and Indore. Other developments include guage conversion for the Chhota
Udepur- Pratapnagar (100km) and the Indore-Khandwa (138.76km) lines. There is also a proposal to connect
Dhar and Chhota Udepur (100kms).
xxxviii
2013
The DMIC is expected to profoundly impact the patterns and nature of traffic flowing through Dhar district and
its constituent cities, especially the cities of Badnawar, Dhamnod, Dharampuri, Kukshi and Sardarpur-Rajgarh,
in addition to Dhar itself. All these cities can gain from being in the catchment of the DMIC investment region.
Within a 200 kms radius, these cities can develop live links with other cities like Vadodara and Dahod in
Gujarat, and other hubs in Madhya Pradesh, such as Ratlam, Neemuch-Nayagaon, Shajapur and Dewas.
A definite impact will also be felt through the setting up of Ujjain as a knowledge city and RatlamNagda as an
investment region, which would directly influence growth in Badnawar, as it is 66 kms from Ujjain and about
45 kms from Ratlam. Ujjain may also supply domestic tourists to the district, whose tourism infrastructure is
still being developed. The state Tourism Policy mentions a Transport Departments notification exempting
tourist buses from payment of Motor Vehicle Tax if they ply on designated tourist routes for 2 years. A large
number of tourist circuits include the ancient capital of Mandu, and a new inclusion is a tourism circuit around
Badnawar, connecting Indore, Ujjain, Badnawar and Ratlam with Mandsaur and Neemach. The rich cultural
heritage and tourism destinations in and around the district promises great potential to attract domestic and
international tourists, and this will further enhance the pressure on the transportation networks of the district.
Dharampuri can be developed as an important transit point on the tourism circuits in the district, as well as
provide a vital link in the rail and industrial freight corridors being proposed.
The policy framework for mobility and transport is also changing in the state and will have its impact on the
district. The Madhya Pradesh Transport Policy 2010 is a timely response, in the spirit of the National Urban
Transport Policy (NUTP),to the rapidly increasing vehicle numbers and chronic problems of lack of planning
and effective management of traffic and transportation, which can become impediments to growth and
destroy the quality of life of all cities. Notes that there has been rapid increase in numbers of motor vehicles in
the state. In the previous decade (2000-2010) there has been 12.81% increase in gross numbers. The Policy is
directed towards better provision of services and better management of operations.
The thrust is on provision of public transport and buses in all regions, especially rural and remote areas, by
following a liberal policy in terms of providing bus permits, while ensuring healthy competition between
private operators. While the Madhya Pradesh State Road Transport Corporation was disbanded in 2005 and
presently only operates a few inter-state routes, it is only a matter of time before most bus operations are
privatised. The policy also intends to improve Bus Stands in all locations, under the PPP mode of financing and
development. Goods carriers will be handled carefully to ensure safety.
xxxix
2013
To improve management and to elicit greater participation from the Public in fixing appropriate fares and
monitoring the performance of the bus operators, the Policy envisages the setting up of various bodies. A
Disrict Transport Authority is envisaged under the command of the District Collector. The policy also
recommends the formation of City-level Unified Metropolitan Transport Councils (C-UMTC) and Dedicated
Urban Transport Funds (DUTF) in all cities. The policy further recommends the setting up of a Traffic
Information Management & Control Centre (TIMCC) in all cities and aligning the preparation of mandatory City
Mobility Plans (CMP) with the provisions of the City Development Plans (CDP) to ensure proper coordination
between them.
A significant initiative of the State Government is the Draft Parking Policy, which highlights both the lack of
awareness among all parties about the importance of parking. It identifies the multiplicity of parking rules and
regulations in different cities, the shortage of appropriate sites for parking and no comprehensive appraisal of
existing parking sites, lack of proper transport plans, lack of capacity within the ULBs to deal with parking
issues, multiple uncoordinated agencies dealing with parking, lack of successful PPP models in parking
provision, irrational parking rates, encroachments on public lands and limited application of advanced
technology as key challenges facing the ULBs. The proposed policy includes provisions for the following
reforms and actions by the ULBs:
1. Parking rates to be calibrated as per the value of land in different areas of the city
2. Vehicle registration to be conditional on the availability of parking space
3. Comprehensive Mobility Plans (CMPs) and Comprehensive Traffic and Transportation Master Plans
(CTTMP)for each city, after proper appraisal of existing and future requirements for parking
4. Provision of adequate temporary parking and handicapped parking
5. Multi-storey parking at designated locations, with park and ride provisions, video security, etc.
6. Truck terminals and by-passes to be constructed in all cities
7. Application of ITS (Intelligent Transport System)
8. IEC activities to be undertaken to increase public awareness
9. Building construction permissions to be linked with parking provision
10. Private vehicles to pay for night-parking on city roads
11. Freeing carriageways of parked vehicles, and limiting the off-street parking as per available right-ofway (minimum 12m)
12. Promotion of park-and ride principle.
URGENTISSUES FOR TRANSPORTATION IN DHAR DISTRICT
Quality of roads
It has been noted earlier that the overall quality of the highways, district roads and especially the internal
roads in the cities is poor, thus access to many parts of the city is seriously hampered throughout the year but
especially in the monsoon. Most internal roads are in need of repair and resurfacing and currently unable to
cater to motorized traffic. Many are not able to support non-motorized modes even. As most people travel by
foot and use bicycles and motorized 2 wheelers, this puts pressure on ULBs to improve the provisioning and
maintenance.
Lack of public transport
Dhar district has the registration for 345 cars, 254 jeeps, 86 taxi cabs, 531 three wheelers, 109 passenger
vehicles, 1037 goods vehicle, 90591 two wheelers, 11518 tractors, 8658 trailers, 698 other vehicles and a total
4
of 113827 motorized vehicles. These figures might be lower than the actual motorized vehicle figure as
residents of the district also go to nearby districts to register their vehicles. Residents of the towns under
contract generally rely on non-motorized modes like walking and bicycling and two wheelers for intercity
travel or travel to areas in the vicinity of towns. For distant places, they rely on private buses and hired cabs as
4
xl
2013
do tourists who visit these towns. In the absence of public transit and intermediate public transit options like
shared autos in most towns, people are often restricted to these modes.
It is significant that out of the total of 1966 temporary permits issued to private transporters in Dhar district in
2008-09, almost 60% (1170 nos.) were issued to operators of contract carriages, who operate buses between
cities and villages of the district. Only 7 permits were sought for operating auto rickshaws, which indicates the
low feasibility of such local modes, explained by the high number of private two-wheelers.
Public transit is absent in all these towns and as such travel options are limited to non motorized modes that
can span for about 1-2 km, creating a problem of accessibility and limiting mobility of the citizens, preventing
them from undertaking economic activities in other parts of their city or the district. The dependence on
privately owned vehicles is too high, and there is great need for public transport for local and intercity travel.
Lack of parking
One of the most prominent issues is the lack of designated parking areas. Even in towns that have demarcated
some parking, it is clearly inadequate. The cities in Dhar district are developing at a rapid rate, putting them on
a trajectory where motorized modes of travel will become essential for commuting for work and tourism and
the parking needs will only increase in the future. As per the Parking Policy described earlier, this problem
requires a comprehensive and holistic planning.
Bus stands that serve the intercity buses are inadequate and often placed at inconvenient locations. In the
case of Rajgarh and Sardarpur, which are in close proximity, there is a bus stand only in Rajgarh, forcing the
citizens of Sardarpur to find their own last mile linkage to their town.
Removal of encroachments
Encroachments on road space are commonplace in all the cities. This adds to congestion by restricting the right
of way of the streets, worsening the already chaotic and constrained conditions of these streets. Truck and bus
traffic also need to be regulated. Dharampuri and Dahi have a lot of trucks that carry sand from quarries to
major cities in the region and this along with the private buses adds to congestion and chaos on the main
roads. As traffic management in towns is meant to be handled by the traffic police, and there are few or no
personnel who perform this duty, the regulation of bus and truck traffic is almost non existential and prone to
the operation of local mafias.
Construction of by-pass roads
While it is observed that some towns like Dahi may need a bypass, others like Sardarpur may actually lose out
on trade opportunities from passengers in buses and cars that would bypass the business areas and site-seeing
hotspots if there is a by-pass. The provision of a by-pass must be carefully considered, and its precise location
and length should be designed to enhance rather than reduce the economic activity in the areas that it
circumvents.
Road safety and awareness
The data on road accidents in Dhar reveals neglected aspects of planning and governance that easily get
overlooked. Of the total 43852 accidents that occurred in 2008-09, there were 5861 fatalities. Of these, more
than 50% accidents happened at T and Y junctions in roads. 90% happened at intersections without any lights
or traffic control provisions. 67% accidents happened on single lane roads without dividers. 70% were during
perfectly fine weather. Of the fatal accidents (5861) and grievous injuries (5422), in both cases around 60% of
the accidents were caused due to over-speeding, which probably explains why 30% of overall accidents were
due to head-on collisions. Of the total 43852 accidents, almost 35% were due to overloading or improper
loading of the vehicles. If we examine the locations of accidents, this reveals that Almost 50% are in locations
in or around residences, markets and institutions.
xli
2013
S.No.
Location type
% of accidents
1
OPEN AREA
21.9
2
Near or Inside a Village
19.9
3
Residential Area
15.1
4
Bazar
9.5
5
Near School or College
5.7
6
Other locations
27.9
In evaluating the overall scenario, it would not be wrong to say that the roads are actually unsafe by design,
and most of the accidents are happening as a result of normal circumstances. Better planning of the road
network can enhance the safety of the citizens, who suffer most. Road dividers, properly marked intersections
with appropriate signaling, and a strict control on speeding and overloading of vehicles is called for.
The State Transport Policy of 2007, noted that close to 95% of the accidents are due to the drivers human
error, and most of the remaining were due to vehicle faults. It was found that general awareness and proper
training of drivers is a must, Fitness certificates need to be made mandatory, and the testing of vehicles should
be done through PPP. However, in 2009, there was only one registered driver training school in the whole of
Dhar district, and not even a single pollution-checking centre.
PROPOSAL FOR SETTING UP A DISTRICT LEVEL TRANSPORTATION AUTHORITY
An assessment of the ground conditions and the issues and potentials related to transportation in Dhar district
indicates that improvements can be brought about by focusing on specific areas of intervention. Broadly
speaking, these include the devising of PPP models for investment, enhancing the technical and financial
capacity of ULBs to manage the development and operations & maintenance of transportation, strict
enforcement, parking policies, removal of encroachments, proper planning of the road network (arteries, bypasses, neighbourhood roads), etc.
City Development Plan for 8 towns in Dhar district is being prepared, namely Mandav, Dhamnod, Dharampuri,
Kukshi, Dahi, Badnawar, Sardarpur and Rajgarh. All these are small towns with populations ranging between
7000 to 20000. All these towns suffer from typical transportation related problems like encroachment, lack of
parking spaces, poor regional connectivity, lack of public transportation and transportation facilities for
existing and potential tourists. At the town level, the Urban Local Bodies and to some extent Police
department are the only agencies responsible for traffic management and none of these are equipped to
handle the transportation related problems: technically, financially or administratively . Hence, it is proposed
that a District Level Authority be set up to regulate transportation Management at the district level. The key
advantages of constitution of such an agency would be:
Coordinated transportation planning, implementation and management at the district level
Ease of channelizing PPP based funding through development of multiple projects, i.e., PPP based
funding for development of 8 major parking sites in the district would be more sustainable and
economically feasible as compared to development of parking spaces in individual towns by individual
investors
Management of transportation infrastructure at District level
Integrated planning for freight corridors at district level
xlii
2013
Badnawar
Sardarpur
Rajgarh
Mandav
Dhamnod
Dahi
Kukshi
Dharampuri
T
Agency
Figure: Proposed Projects at District Level to be developed by the District Level Transport
xliii
2013
REFERENCES
Government of Madhya Pradesh, Motor Transport Statistics of Madhya Pradesh 2008-2009, Gwalior: Office Of The
Transport Commissioner, GoMP
Government of Madhya Pradesh, Transport Policy (Parivahan Neeti) 2010, Bhopal: Transport Department, GoMP
Government of Madhya Pradesh, Draft Urban Parking Policy, retrieved from Slideshare on 19thFeb 2012
Government of Madhya Pradesh, Draft Policy on UMTA and DUTF, retrieved from Slideshare on 19th Feb 2012
http://www.infrawindow.com/reports-survey/road-density-in-india-disparity-persist_15/
International Labour Organization, Situation Analysis of Rural Road Maintenance in Madhya Pradesh, 2005
Pradhan Mantri Gram Sadak Yojana, http://pmgsy.nic.in/pmg1218.asp, retrieved on 19th Feb 2012
Lea Associates South Asia, DPR for Pithampur-Dhar-Mhow Investment Region of Madhya Pradesh sub-region of
DMIC, retrieved on 19th Feb 2012
xliv
2013
xlv
2013
These proportions vary across the district, with Mandav Nagar Palika having as much as 81.6% tribal
population and Dharampuri NP having the lowest, at 6.5%.Sardarpur, Jobat and Bhavra had over 25% tribal
population. It is expected that this number would have changed drastically with the 2011 census. The city of
Dahi, in Dhar district, has become a Nagar Panchayat now, but it was a village as per the 2001 Census, and was
grouped with villages with 51-75% of ST population.
The percentages of ST population in different cities in these two districts are tabulated below:
Name of District
Name of UA/Town
Dhar
Badnawar (NP)
Alirajpur
Bagh (CT)
23.8
Dhamnod (NP)
18.3
Dhar (M)
13.5
Dharampuri (NP)
6.5
Kukshi (NP)
23.4
Manawar (M)
18.0
Mandav (NP)
81.6
Pithampur (NP)
12.6
Rajgarh (NP)
18.2
Sardarpur (NP)
28.5
Alirajpur (M)
27.8
Bhavra (NP)
52.0
Jobat (NP)
25.9
xlvi
2013
transport. While poverty, social differences and low literacy levels keep the tribes isolated, they are
nevertheless directly impacted by all the processes that have become associated with urbanization in India,
especially the decline in crop production due to scarcity of water, the depletion of forests due to illegal felling
of trees, and the low level of effectiveness of government schemes due to poor implementation and
monitoring mechanisms.
The scheduled tribes are highly susceptible to the vagaries of development, climate change and socioeconomic changes in the mainstream of Indian society because of a number of key reasons. Firstly, while their
assimilation into the mainstream has been a national mission since Independence, due to a mismatch between
value systems, social mores and lifestyles, and the lower level of urbanization of tribal areas, these societies
have experienced certain isolation from the larger political system and social discourse. Development
pressures have further marginalized them, as they tend to be the victims of large industrial and infrastructural
projects, which affect their natural habitat and deprive them of the organic links with the land that they have
enjoyed for centuries. This also creates a resentment that has surfaced in recent decades in the form of violent
protest and subversion. Therefore, it has become imperative that the tribes are incorporated into the national
framework in ways that are sensitive to their unique and ancient cultures, and that they are not displaced from
their habitat due to development pressures.
During the 1970s, the impacts of industrialization on the ecology and environment of the country became hot
issues for public involvement. The protection of the environment also coincided as a concern with the
protection of native societies that were experts at maintaining a sustainable equilibrium between their life
needs and the environment. Thus, over the last few decades, the central and state governments have
concentrated on protecting the rights of the tribes to the forests that they inhabit, and to maintain a less
intrusive and welfare role in the areas dominated by the tribes. Education, healthcare, agricultural support,
communications and employment have been the main tools for the assimilation of tribes into the mainstream
of Indian society, with mixed results.
Close dependence on the ecosystem
Tribal communities live in forest areas with a very close relationship to their ecological landscape. They are
dependent on the natural resources and their biodiversity for their sustenance at various levels such as
religious, social and economic. As the tribal communities have sacred associations with the natural landscape,
they have traditionally maintained a sustainable balance with their environs and do not engage in the overexploitation of resources that has become a hallmark of modern development in India. The illegal felling of
trees in the forest areas is resulting in depletion of the forest cover and disturbs the balance.For any
development decisions that concern natural landscapes and their biodiversity, it is important to assess the
eco-cultural context and analyse the possible pathways, to come up with sustainable means that benefit the
6
traditional societies and ecosystem in a broader way.
Erosion of Traditional Knowledge Systems
The tribal population is dependent on the natural resources as raw material for the practice of their arts and
crafts traditions. The forest areas are rich in biodiversity and the tribals have inherent knowledge systems with
regards to medicinal and other properties of the flora of the region. The traditional knowledge systems are an
integral part of the tribal culture and need to be documented and promoted with a cautious approach to avoid
over exploitation. There is potential for encouragement of traditional arts and crafts produced by the tribal
population, which are based on the use of non-timber forest produce, by-products of agricultural processes,
and other activities. Also, their knowledge systems could be researched and mainstreamed for the production
of herbal medicinal and consumer products.
5
6
TRIFED 2010
Quoting Ramakrishnan (2011)
xlvii
2013
The key challenge is to prevent the erosion of traditional knowledge with the advent and promotion of modern
education. School curricula need to be devised for harmonious integration with such knowledge, without
losing the values of either system.
Means of Livelihood Generation
While it is clear that the developmental needs of tribal communities encompass basic needs like education,
drinking water, health, employment generation, communication and infrastructure development which are
linked with the most critical area for intervention: food security this in turn depends on means of sustainable
agriculture through irrigation, and promotion of animal husbandry and horticulture.
The livelihoods of the tribal communities have undergone a sea change since the 1990s, with shifts in
agriculture patterns, the seasonal nature and reduced availability of agri-based livelihoods, and the lifestyle
changes that accompany the exposure of the scheduled tribes to the modernization of the economy. We
discuss the transformed livelihoods scenario in greater detail in a later section on urbanization of tribal areas.
First, we would draw attention to the various successful projects under the MPRLP project, which show that
the livelihoods for the tribes in MP can achieve a bottom-up and sustainable dimension if handled with care.
LESSONS FROM THE MADHYA PRADESH RURAL LIVELIHOODS PROJECT
In order to gain a better understanding of the models and success stories that have been achieved in the area
of development for the tribal communities, we briefly discuss the experiences of the Madhya Pradesh Rural
Livelihoods Project (MPRLP), supported by the GoMP and DFID, which concluded in 2011. The MPRLP focused
on nine districts (Dhar, Jhabua, Barwani, Alirajpur, Anuppur, Shahdol, Mandla, Dindori and Sheopur) where
there is a high proportion of scheduled castes and scheduled tribes and where female literacy is poor.In Phase
1, MPRLP reached around 50,000 households in 815 villages. Phase 2 of MPRLP, which started in July 2007,
reached nearly 4,000 villages, including the villages covered in Phase 1.
MPRLP identified the main problem in tribal areas to be their vulnerability. The rural poor in the tribal districts
are farming on marginal and under-productive landholdings. They suffer periodic droughts, do not have
secure land tenure, and rely on seasonal work in agriculture and forests. In some districts, low population
density, relative isolation and inadequate infrastructure mean higher prices for agricultural inputs, poor
extension services, credit and markets, and a dearth of information. These difficulties limit their
opportunities.
Rural poverty is pervasive and fiscal resources at national and state levels are inadequate. Eliminating rural
poverty is thus extremely challenging and can only be a sustainable endeavor if the stakeholders are fully
involved and empowered to give direction to the changes in their lives. The project routed funds through the
Gram Sabhas and emphasized the importance of the Gram Kosh (village fund) as the primary organ through
which change can be affected. It strengthened the capacity of Gram Sabha to plan and manage resources, to
ensure equity in distribution of funds, and to protect the interests of the poor and vulnerable. The project
cultivated an ethos of accessibility and informed participation among the stakeholders.
xlviii
2013
An audit team of DFID, on a visit to Dhar,inquired about the organization of Gram Sabha meetings, the
decision-making process in the Gram Sabha, participation of women, and access to information. Most villagers
shared the liberation they experienced through the knowledge that they are all members of the Gram Sabha
and can fully participate in its activities. The team was impressed by the financial transparency that had been
achieved in the MPRLP villages. In one village, the fund available in the Gram Kosh and the balance of accounts
are written on the exterior wall of the school building to inform all the villagers. On the subject of repayment
of money borrowed from the Gram Kosh. A floriculture project in the Sahariya community in Sheopur has
demonstrated the ability and willingness of the tribalsto make responsible use of the gram kosh. They have
become aware of the advantages of maintaining a robust fund, and because of transparent practices and
proper management by the stakeholders themselves, the idea of tribals being irresponsible with loans has
7
been completely demolished.
The MPRLP demonstrates a variety of different ways in which empowerment can happen through literacy,
information and participation. It reveals the profound change in attitude that comes from financial security at
a community level, which empowers the villagers to take risks and to be enterprising with their futures. For
example, poor farmers having small land holdings have shed conventional farming to take up cash crops like
8
cumin and ginger. Three farmers of Dhehri village of Jhabua district grew grown cumin and earned hefty
profits. Other successful examples include cultivation of ginger in the Tirla cluster in Dhar, cumin cultivation in
the Kaththivada cluster in Alirajpur, and cultivation of fennel seeds (saunf) using organic manure, which
fetched a good price at the Van Melain Bhopal.
The empowerment of women to participate and lead the gram panchayats was a key success of the MPRLP. At
a meeting in Badnawar with the District Collector of Dhar, Smt. Lilabai of Padunia village asked the district
9
collector why her village had no stop dam. The Collector praised her for raising the issue and instructed the
relevant officers to transfer Rs. Two lakhs into the Gram Kosh. Encouraged by Lilabai, other Panchas and
Sarpanchas have also started speaking out. They convene special meetings of women, have motivated 30
illiterate women to learn reading and writing between 7 to 8 pm, and attend every Gram Sabha meeting. They
also handle finances and raise much-neglected gender issues in their villages. The women claim now that the
Gram Sabha cannot take any decision without seeking their opinion.
st
xlix
2013
10
11
st
2013
the Scheduled Areas) Bill, 2001 was introduced in RajyaSabha on 30 July 2001. It was thereafter referred to
the Standing Committee on Urban and Rural Development.
The Statement of Objects and Reasons appended to the Bill mentions the following modifications (the most
significant items have been highlighted in bold):
(i)
Urban Local Bodies under Scheduled Areas may be designated as Nagar Panchayats, Municipal
Councils, Municipal Corporations and Industrial or Mining Townships;
(ii)
Seats may be reserved for Scheduled Tribes in proportion to their population or one-third
whichever is higher;
(iii)
In all programmes of developments like housing colonies, trading centres, etc., and also in
educational institutions, industrial training institutions, reservations shall be made for the tribal
people in proportion to their population;
(iv)
There shall be constituted a Standing Committee for Tribal Affairs and a Standing Committee for Rural
Development in each Municipality;
(v)
Municipality in a Scheduled Area shall be endowed with powers and responsibilities of preparing five
year development plan and annual plan for development of human resources and socio-economic
advancement of the community;
(vi)
No land may be acquired except for specific purpose. Where land is acquired, reasonable and
adequate compensation shall be paid and alternative means of livelihood to an affected person
shall be made available, so, however, that no Scheduled Tribe is rendered landless on such
acquisition;
(vii)
No urban tax shall be leviable on a tribal who continues to live in his traditional style as per the
norms as prescribed in the Bill; and
(viii)
Functional power as mentioned in clause 4 of the above Bill would also be devolved on Urban Local
Bodies in the Scheduled Areas.
The Fiftieth report of the standing committee on Urban and Rural development of the Thirteenth LokSabha
(2003) noted that, after the notification of Scheduled Areas in 1950, there had been too long a gap between
the first review of Scheduled Areasas mandated by Article 339 of the Constitutiondone by the Dhebar
Commission of 1960, and the second review by the Commission constituted in July 2002. During this gap of
four decades, it was observed that there would have been a sea change in the standards of life and the socioecnomic conditions of the Scheduled Areas. The Committee recommended a review of the Scheduled Areas.
Thereafter, there has been a Third report of the Standing Committee on Urban and Rural Development of the
Fourteenth LokSabha (2004-2005) and the Tenth report, which has the Action Taken report by the
12
Government of India. The issue is still pending resolution.
It is clear that the issue of acceptability of the urban system in the scheduled areas will remain contentious for
some time to come. However, a display of commitment from the government towards the possible benefits,
and an understanding by the tribes can create an atmosphere of communication and debate, which alone can
bring positive outcomes. According to a study of the impact of the PESA conducted by Society for Resource
Integration and Development Action (SRIDA), Jabalpur, in two tribal districts, there is a critical need for
13
awareness generation among the tribal community and the larger public. The study concludes that, among
other things, the Act needs to be implemented in all respects, in spirit and word. The current system of
governance, still largely colonial in nature, has been unable to accept this radical change. Significantly, it
states: there is a need that Gram Sabha institutions should be developed as institutions of self-governance
12
The description of the legislative history of the PESA issue has been taken from: Joy Elamon, Urban Local Bodies in Fifth
th
Schedule Areas Experiences, http://www.nird.org.in/brgf/Community%20Exchange4.html, Retrieved on 18 Feb 2012
13
Planning Commission (Socio-Economic Research Division): Study on the impacts of the Provisions of the Panchayats
(Extension to the Scheduled Areas) Act, 1996 towards Tribal Development in Mandla and Dindori districts of Madhya
Pradesh
li
2013
14
15
lii
2013
The peculiarity of the urbanization may also be explained by a few clues in addition to the in-situ urbanization
that we have tried to explain as a result of changes in classification. For this, we again refer to the MPHDR of
2002, where we find a detailed discussion of livelihoods in the state after a decade of economic liberalization.
In the section entitled Livelihood challenge, the MPHDR 2002points out that, while the GDP of the state has
increased after liberalization, there was a slowdown in employment growthtouching as low as 0.9% per
annum in the late-1990smainly because of a slowdown in public sector employment. Higher growth rates in
the private sector could not compensate for the loss of workforce in the public sector. The report highlights
16
the crucial differences between the organized and unorganized sectors of employment. Around the mid1990s, 22 lakh workers in the state, around 6% of the total workforce, were in the organized sector, whereas
the overwhelming majority (94%) were in the unorganized sector, which includes agricultural labour,
construction labour, workers in traditional industries like leather-tanning, forestry, fishing, bidi-rolling,
household workers and village artisans. Agriculture and allied activities,which account for 35% of the states
GDP,have to support 75% of the rural workers. Although the remuneration received from most livelihoods in
MP is low,the incomes are require to sustain more members of the households. The National Sample Survey
(NSS) estimates indicated that an approximate 17% of rural children in MP in the age-group 10-14 years are
working to supplement the household incomes.
The MPHDR 2002 concludes that the development challenge in MP is not just creating new jobs, but
generating new livelihoods in the rural areas and making existing livelihoods stronger and more
sustainable.The most critical implication of such a focus would be the change in approach to forest-based
livelihoods. Nearly 40% of the states villages are either forest villages or are situated close to forests;
however, it is difficult to estimate the exact number of people dependent on forests. What needs highlighting
is the fact that in the case of persons collecting Non Timber Forest Produce (NTFP), the period of direct
person-days of employment may be as little as 10-15 days to a month in a year. While there has been some
change in this scenario with the granting of nistari rights and the promotion of Joint Forest Management
(JFM), the conflict between villagers and the authorities still exists and has been witnessed in a large number
of cases throughout the state and the country. The report concludes that a more people-friendly forest
management regime needs to be evolved between the local people, forest management and government
regulations.
It can be suggested that, with the application of municipal governance in new urban areas, which were rural till
the recent past, a new approach would need to be formulated to the balancing of peoples rights and
opportunities with the exigencies of urban development. There is a crisis of interpretation in this context, as
tribals are assumed to be rural, and all policies for socio-economic development for them are centered on
their agricultural and forest-based economy. The urban tribal is a category that has yet to be fully understood
and provided for in policy.
POLICY FRAMEWORK FOR DEVELOPMENT IN TRIBAL AREAS
The policy environment for tribes is focused on their relationship with the agriculture and forest produce.
There are a large number of policy provisions for tribes that focus on their dependence on, and their access
and privileges regarding the non-timber forest produce and other activities that are unique to the tribes. The
MP Public Forestry Act 2001gives provision for preparation of management plans for the
vrikshachchaditkshetras and MP Public Forestry Rules 2002under the 2001 Act enable the local bodies or
land-owners to manage such areas. The other acts that apply to this area are the Biological Diversity Act
2002, the MP Agro Processing Policy 2006 and the MP Herbal Products Policy.
16
liii
2013
While there are a host of policies to cater to the rural development of tribals, it is the 74 Amendment that
provides the key policy and legislative framework for the development of scheduled tribes within the urban
areas of Dhar and Alirajpur. The strengthening of the municipal governance model in communities that have to
adopt an urban outlook while being essentially rooted in the agri- and forest-based economy needs to be the
thrust of the policy framework. There is an inherent conflict between the urban and rural policies, and this
needs to be dealt with appropriately. An illustration of this conflict can clarify this aspect further. A significant
example is the MP State Plan, which identifies a number of key issues that form the basis of the proposed
development schemes and programs. One of these key issues is identified as Forestry and Wild Life, under
which the Plan document highlights that fact that MP is rightly famed for its rich forest wealth, its wildlife and
biodiversity. 30.8% of the land area in the stateis under forests, and this is the highest amongst all the States.
It is significant that the Plan identifies this as a problem rather than an asset: there is little recognition of the
huge opportunity cost of maintaining this wealth for the environmental health of the country and, indeed, the
global community.Going further, the document states the following:
States like Madhya Pradesh are required to retain a large area under forests and also bear the cost of
maintenance of this forest cover. There is however no return on such investment as "conservation"
and not the "exploitation" is the objective as well as legal imperative. The people of the country share
the benefits but the state and its people often suffer as a result of its rich forest wealth. In fact major
developmental projects pertaining to roads, irrigation, and electricity are hampered, delayed and
become very expensive for the state as a result of involvement of forest land in these projects. An
equitable arrangement would be to calculate the cost of forest assets by capitalising the stock,
attributing it a value and making incremental return available to the state as a rate of return. The
judgement of the Supreme Court regarding compensation to States having above national average
forest cover is a significant step towards maintaining the ecological balance and the costs thereof. On
the basis of suggestion of Supreme Court of estimating Net Present Value (NPV), the excess forest of
33036 square kilometers above the national average @ Rs. 5.80 lac per hectare would be equal to Rs.
1,65,172 crore of capital stock. Even at 5% rate of interest, this capital stock would yield an annual
return of Rs. 8,285 crores. The Hon'ble President of India also has recently mooted the idea of "forest
credit" which needs to be followed through. The Government of India has also regularly used this
argument at all international forum in national interest.
Forest fringe people living in and around protected areas suffer huge costs in terms of crop loss,
denial of access to the forest resources and injuries and loss of human life and livestock. To mitigate
man-animal conflicts, there should be a national policy providing for adequate financial support to the
State Governments for payment of compensation.
The Plan document further mentions the problem with wildlife protection legislations, and ends on an
ominous note:
There is also a need to rationalise the legal provisions of the Wildlife (Protection) Act 1972 in order to
provide respite to the local people who are mostly tribals. The Act prohibits people, living within the
limits of PA, to sell or purchase their private land; recent judicial pronouncement ban even small
development works on private land as well as revenue land contained within the limits of the
sanctuary. This has generated a lot of public resentment against wildlife and protected areas, which
doesnt augur well for the conservation of wildlife. Suitable amendments in the Act need to be made
urgently else it will become increasingly difficult to contain Naxalism in these areas.
The City Development Plan is a means to balance the conflict between the developmental thrust of urban
development, and the seemingly resistive thrust of natural resource management. It is possible to do this only
with a concerted effort to synergize both types of development, by viewing the city as essentially a special
condition that can be harmonious with rural development. Thus, the agricultural activities and forest-based
activities can be incorporated into the city development, defining an approach of reconciliation rather than
conflict.
liv
2013
lv
2013
industries in the short and long term respectively as bamboo is a fast growing plant while Mahua takes time to
grow into a tree.
DEVELOPMENT SCHEMES
While there is clear potential for the tribal communities to fit within the ambits of eco-tourism, which has
been accepted at Central and State levels as a fast-emerging sector of the tourism economy, it is important to
focus on the need to build capacity within the communities to be able to make tourism as a non-intrusive
activity that does not come at the cost of losing the integrity and vitality of such communities, in which the
crafts and performing arts are embedded within a fragile socio-cultural context.
The Ministry of Tourism, GoI, has recently brought out the Revised Guidelines of Tourism Development (rev.
09/12/2011) containing a Scheme of Capacity Building for Service Providers for Rural Tourism. The scheme
provides for a range of capacity building activities, with the strict provision that the activities should be
initiated with local community Participation initiated through stakeholder meetings. The activities covered
are as follows:
1. Baseline survey of the site local community.
2. Enhancing local community awareness of the tourism process.
3. Gender sensitization
4. Capacity building/design inputs related to art & craft skills, cultural & natural heritage
5. Gurukul process
6. Capacity building for various aspects of visitor handling
7. Convergence with other yojanas/schemes in the site
8. Environment care and access to cleaner technology with local material, local skills and local
traditional styles
9. Marketing convergence including the travel trade for domestic and international visitors.
The scheme also attaches an indicative list of various software items that can be undertaken under the broad
ambits of the above. The software falls within three main groups:
TRAINING OF TRIBAL STAKEHOLDERS
SECTORAL CAPACITY-BUILDING
lvi
2013
The 11 Plan emphasizes fiscal provisioning for the development of rural areas, with a number of existing
schemesmainly schemes initiated by the GoIsuch as the National Rural Employment Guarantee Scheme
(NREGS), the Indira Gandhi Garibi Hatao Yojana (DPIP), the Pradhan Mantri Gram Sadak Yojana (PMGSY), and
the Backward Regional Grant Fund (BRGF). In addition, it proposes New Schemes for rural connectivity, the
Mukhya Mantri Awas Yojna, the state governments own SGSY for roads, and a Working Plan for Water
Storage.
INDUSTRY AND EMPLOYMENT
In the sector of Industry and Employment, the 11th Plan had a number of provisions that can have a direct and
profound impact on the livelihoods of tribal communities.
Under Khadi and village industries, the Plan provided for subsidy to spinners, subsidy on khadi production,
assistance to family-oriented units, marketing assistance and assistance for raw material. In the area of
Handicrafts, the Plan provided for training to artisans, tools subsidy to craftsmen, subsidy for work sheds, the
organization of workshops for technical and design guidance, support for sample production to train artisans
in new designs, and the provision for procurement of job-work performed by the artisans as per market
demand. The Plan also provided for study tours of successful craft clusters and metro markets, and instituted a
state award for artistic creations. There is insufficient data about how many individuals/communities availed
of these schemes; however, they can provide guidance to future provisioning.
In the area of Sericulture, the Plan supports the development of sericulture as an industry that supports other
subsidiary cottage and village industries, providing supplementary employment in the rural areas during the
lean agriculture period. The two activities under sericulture included forest base Tussar cocoon production
from Saja and Arjuna trees and agro-based Mulberry.
The ways in which subsidies may work in the sector of industry is illustrated by the Industrial Promotion Policy
2004 and Action Plan (including the Provisions as Amended in 2007) framed by the Department of Commerce,
Industry and Employment, GoMP. There were special provisions for entrepreneurs who belong to a scheduled
caste or scheduled tribe, andfor women:
Interest subsidy to SC/ST and Women Entrepreneurs would be provided at the rate of 5% for a
period of 5 years without any maximum limit and irrespective of the category of the district.
Small Scale Industries set up by SC/ST and Women Entrepreneurs in advanced districts would be
given investment subsidy at the rate of 15% of Fixed Capital Investment to a maximum of Rs. 5
lacs.
lvii
2013
17
In the area of art & culture, the 11 Plan made provision for Grants-In-Aid to Tribal Welfare Institutions. If
the citizens of the CDP cities in Dhar and Alirajpur can create institutions for the purpose, then such grants can
assist them in bringing out the special potential for the promotion of tribal art and culture.
HEALTH AND FAMILY WELFARE
th
The broad targets for the 11 Plan in the sector of health were to reduce growth of population while also
reducing infant mortality and offering maternity care. The focus was on implementing the schemes covered
under National Rural Health Mission, such as the Janani Suraksha Yojana (for maternity health), the Prasav
Hetu Parivahan Evam Uphar Yojana (mobility for pregnant mothers), the Vijay Raje Janani Beema Kalyan
18
Yojana (maternity insurance), and the Deen dayal Chalit Aspathal Yojna (mobile hospitals). The Deendayal
th
scheme for mobile hospitals has been discontinued, and the fate of other schemes in the 12 Plan is not
known. However, this is a vital component of the welfare activities that need to be undertaken in the tribal
districts like Dhar and Alirajpur.
WELFARE OF SCHEDULED TRIBES
The vision for the welfare of scheduled tribes has as its goal to bridge gap between tribes and non-tribes
having considering Human Development Indices. The specific objectives in pursuance of this goal all
th
emphasize education as a means for development. Specifically, the 11 Plan provided for promotion of literacy
in tribal communities in general and ST girls in particular with special attention to low female literacy pockets,
striving for 100% enrolment of all children in the elementary level between the age group 5 to 14 years,
converting 150 elementary Schools into Ashram Schools, and, since drop-out rates is a major intriguing
problem, arresting drop-out tendencies through various support schemes like Mid Day Meal, Free Uniform,
19
Sweater, Shoes, Socks, Scholarship, Distribution of bicycles and Free Text Books etc.
URBAN DEVELOPMENT
th
In the area of urban development, the 11 Plan had concentrated on the JNNURM and HSDP programs of
th
Government of India, which were started in the last year of the 10 Plan. The schemes did not have provision
specifically for towns in underdeveloped and developing areas of the state. As has been discussed in this
paper, specific schemes are needed to address the problems of emerging urban areas in tribal districts.
EDUCATION
The Tribal Development Department of the GoMP has defined the development agenda for tribes in the state
through the following action points:
1. to make tribals come up to the same education and economic status as rest of society
2. to make the most backward of the tribals communities upto the level of more developed tribes
3. to emphasize educational schemes for tribals
17
Government of Madhya Pradesh, Planning, Economics and Statistics Department, Draft Eleventh Five Year Plan (20072012), p.186
18
Government of Madhya Pradesh, Planning, Economics and Statistics Department, Draft Eleventh Five Year Plan (20072012), p.192
19
Government of Madhya Pradesh, Planning, Economics and Statistics Department, Draft Eleventh Five Year Plan (20072012), p.224
lviii
2013
4.
to give importance to the culture of tribes in the school curriculum, and to encourage the women
workers through cooperatives through Antyoday self-employment schemes and other schemes
under the schemes financed by state departments, to create employment opportunities
5. to increase number of residential schools for the tribals
6. to create grain banks in tribals areas and to improve food security
7. to improve human development indicators for tribals
8. to bring about qualitative improvement in the education of tribals
As can be seen from the above, most of the points are concerning education, which is seen as a necessary
condition for the advancement of the tribal communities, intrinsically connected with their human
development and livelihoods based on self-help groups (SHGs) and cooperatives.
The Eklavya Model Residential Schools (EMRS) for ST students take their place among the Jawahar Navodaya
Vidyalayas, the Kasturba Gandhi Balika Vidyalayas and the Kendriya Vidyalayas. These are set up in States/UTs
with grants under Article 275(1) of the Constitution of India. The education is provided entirely free of cost.
The objective of EMRS is to provide quality middle and high level education to Scheduled Tribe (ST) students in
remote areas, not only to enable them to avail of reservation in high and professional educational courses and
as jobs in government and public and private sectors but also to have access to the best opportunities in
education at par with the non ST population. The means of achieving this are described as comprehensive
physical, mental and socially relevant development of all students enrolled in each and every EMRS Students
will be empowered to be change agent, beginning in their school, in their homes, in their village and finally in a
larger context.Admission to these schools will be through selection/competition with suitable provision for
preference to children belonging to Primitive Tribal Groups, first generation students, etc.The number of seats
for boys and girls are equal in number.
In Dhar district, there is only a single EMRS school, located in Kukshi, called the Kanya Shiksha Parisar. The
present (2012) enrolments are as follows: 1 boy in Class 6, 60 girls in Class 6, 57 girls in Class 7 and 59 girls in
Class 8.
Under the GoMPs Kanya Saksharta Protsahan Yojna (KSPY), the state government provides financial
assistance to encourage girls into schools to reduce the girls fallout rate from schools. After clearing the board
th
th
th
exams of 5 , 9 and 10 standards, the girls are given 500, 1000 and 3000 rupees, in two installments, in April
and December. In order to ensure that the scheme benefits the poor, the daughters of those
parents/guardians who are tax-payersare not eligible. Present enrolments in Dhar district are 56 girls in Class
6and 59 girls in Class 9. There have been no enrollments in Alirajpur district.
RECOMMENDED STRATEGY
The Central and state governments have initiated a number of schemes and policies under various
departments specially formulated for tribal development. It is important to see how these schemes and
initiatives can be accessed by the tribal population. The low literacy levels in tribal population result in low
awareness levels towards accessing these benefits. It is important that the capacity of local bodies be
increased for them to assist the tribal population in realising the potential opportunities that they can avail for
socio-economic development.
At the same time, it must be highlighted that, given the sustained backward linkages that urban tribal
communities will share with their rural and forest-based counterparts, there is tremendous potential for
planned and structured utilization of such supply chains for enhanced economic activities that benefit the
tribes.
A variety of schemes are available for the development of tribal areas. However, the key initiatives can be
grouped under the following:
lix
2013
Sanjiv J Phansalkar and Shilp Verma, Improved Water Control as Strategy for Enhancing Tribal Livelihoods, Economic
and Political Weekly, July 31, 2004, pp 3469-76.
21
Central Chronicle 2011
lx
2013
lxi
2013
SELECT BIBLIOGRAPHY
Forest Governance Learning Group, Mahua: NTFP Enterprise and Forest Governance, Centre for Peoples
Forestry, viewed December 2011, <http://pubs.iied.org/pdfs/G02279.pdf>.
National Scheduled Tribes Finance and Development Corporation 2009, Ministry of Tribal Affairs, Govt. of
India, viewed December 2011, <www.nstfdc.nic.in>.
Ramakrishnan, P S 2011, Eco-Cultural Issues and Sustainability, Context: Built, Living and Natural, Vol.
VIII, No. 1, pp. 35-40.
TRIFED 2010, Ministry of Tribal Affairs, Govt. of India, viewed, December 2011, <http://tribesindia.com/>.
MP Trade and Investment Facilitation Corporation Ltd 2010, Govt. of Madhya Pradesh, Sector Profile:
Forest and Herbal, viewed December 2011,<http://www.mptrifac.org/PotSector/Forest&Herbal.pdf>.
2011, Welfare of Tribals through Small Forest Produce, Central Chronicle, September 14, Bhopal, viewed
December 2011, <http://www.centralchronicle.com/welfare-of-tribals-through-small-forestproduce.html>.
lxii
Municipal Boundary
Ward Boundary
N
Km
0
.25
.5
Main Road
Other Road
ASI Monuments
ASI monument Buffer -100 mts
ASI monument Buffer -300 mts
Fort Wall Buffer -100 mts
Fort Wall Buffer -300 mts
Water Body
Building Footprints
Submitted to: URBAN ADMINISTRATION AND DEVELOPMENT DEPARTMENT, GoMP
Project Coordination: CITY MANAGER'S ASSOCIATION MADHYA PRADESH
Prepared by: INFRASTRUCTURE DEVELOPMENT AND FINANCE CORPORATION
Municipal Boundary
Ward Boundary
N
Km
0
.25
.5
Main Road
Other Road
ASI Monuments
Fort Wall Buffer -100 mts
Fort Wall Buffer -300 mts
Water Body
Building Footprints
300 mts Natural and Cultural
Heritage Conservation Zone
Submitted to: URBAN ADMINISTRATION AND DEVELOPMENT DEPARTMENT, GoMP
Project Coordination: CITY MANAGER'S ASSOCIATION MADHYA PRADESH
Prepared by: INFRASTRUCTURE DEVELOPMENT AND FINANCE CORPORATION
Municipal Boundary
Ward Boundary
N
Km
0
.25
.5
Main Road
Other Road
ASI Monuments
Fort Wall Buffer -100 mts
Fort Wall Buffer -300 mts
Water Body
Building Footprints
100 mts Natural and Cultural
Heritage Conservation Zone
Submitted to: URBAN ADMINISTRATION AND DEVELOPMENT DEPARTMENT, GoMP
Project Coordination: CITY MANAGER'S ASSOCIATION MADHYA PRADESH
Prepared by: INFRASTRUCTURE DEVELOPMENT AND FINANCE CORPORATION
Aalamgir Gate
1.
3. 4. 5.
6.
Bhangi Gate
11.
12. 9.10.
14. 13.
15. 7.
17. 16.
56.
18. 19.
20.
21.
2.
Lohani
28.29.
Gate
23. 24.
25. 26. 27.
22.
8.
30.
31.
32.
33.
34.
55.35.
36.
37. 38.
57.
54.
Songarh
Gate
Jhangirpur
Gate
43.
44.45.
46. 47.
40.
39.
41.
48.
42. Tarapur
Gate
49. 51.
50. 52.
Municipal Boundary
Ward Boundary
Main Road
Other Road
Water Body
53.
N
Km
0
.25
.5
ASI MOUNMENTS
CITY DEVELOPMENT PLAN FOR MANDAV, MADHYA PRADESH
Bhagwania Gate
Heritage Monuments
16.Royal Palace
17.Water Palace
18.Jahaj Mahal
19.Kapoor Talao
20.Taweli Mahal
21.Champa Baodi
22.Lohani Gate
23.Lohani Caves
24.Husang's Tomb
25.Dharmashala
26.Jama Masjid
27.Ashrafi Mahal
28.Tower of Victory
29.Mahmud Khilji Tomb
30.Tomb north west of
Darya Khan
31.Chhappan Mahal
32.Tomb Near Chor Kot
33.Ek Khamba
34.Chor Kot
35.Somvati Kund
36.Darya Khan Tomb
37.Lal Sarai
38.Hathi Mahal
39.Neelkantha
40.Songadh Gate
41.Mosque Near Tarapur Gate
42.Tarapur Gate
43.Caravan Sarai
44.Dai Ki Chothi Behen Ka
Mahal
45.Lal Bagh
46.Malik Muglith Mosque
47.Dai Ka Mahal
48.Jali Mahal
49.Rewa Kund
50.Ruins on Rewa Kund
51.Baz Bahudar Palace
52.Rupmati Palace
53.Bhagwania Gate
54.Jahangirpur Gate
55.Mosque Near Darya Khan
56.Nahar Jahroka
57.Lal Bungalow
1.
Kapur
Talab
Marg
mati
Rani Rup
Munj
Talab
2
Pipilya
Talab
430.
Ek Khamba
Talab
P
Doodhai
Talab
Tarapur
Talab
Km
.25
Ranglav
Talab
Lal bangla
Singori Talab
Talab
13
15
14
12
N
0
Somvati
kund
Marg
Doodh Talai
Talab
Sagar
Talab
Samad
Talab
mati
Rani Rup
10
Lamba
Talab
.5
BASE MAP
CITY DEVELOPMENT PLAN FOR MANDAV, MADHYA PRADESH
11
Rewa
Kund
Municipal Boundary
Ward Boundary
WardNumber
Main Road
Other Road
Water Body
Building Footprints
Heritage Monuments
13.
2
4
6
5
7
13
10
14
12
9
N
Km
0
.25
.5
EXISTING LANDUSE
CITY DEVELOPMENT PLAN FOR MANDAV, MADHYA PRADESH
11
Municipal Boundary
Ward Boundary
WardNumber
Residential
Public
Mixed Use
Heritage Monuments
Agriculture Land
Park/Green spaces
Uncultivated Land/Forest
Water Body
Transport
Tourist infrastructure
Munj
Talab
Kapur
Talab
2
Pipilya
Talab
4
Ek Khamba
Talab
Doodhai
Talab
Lamba
Talab
Samad
Talab
Somvati
kund
Ranglav
Talab
Singori
Talab
Lal bangla
Talab
13
10
Doodh Talai
Talab
15
14
Sagar
Talab
12
Tarapur
Talab
11
6
Rewa
Kund
Municipal Boundary
Ward Boundary
WardNumber
Residential
Water Body
Catchment Area
Km
0
.25
.5
Munj
Talab
Kapur
Talab
2
Pipilya
Talab
4
Ek Khamba
Talab
Doodhai
Talab
Lamba
Talab
Samad
Talab
Somvati
kund
Ranglav
Talab
Singori
Talab
Lal bangla
Talab
13
10
Doodh Talai
Talab
15
14
Sagar
Talab
12
Tarapur
Talab
11
6
Rewa
Kund
Municipal Boundary
Ward Boundary
WardNumber
Residential
Water Body
Km
0
.25
.5
WATERBODIES
CITY DEVELOPMENT PLAN FOR MANDAV, MADHYA PRADESH
Municipal Boundary
Ward Boundary
Main Road
Other Road
Water Body
Building Footprints
Proposed Cafe and Garden
Proposed Poultry and Dairy
Farm
Zone 1-Royal
Enclave
Zone 2
Transport
Hub
Proposed Extended
Road till SH-31
Zone 3
Proposed
Poultry Farm
Zone 4
Proposed
Warehouse
and Drying shed
Proposed
Parking area
Zone 5
N
Km
0
.25
.5
PROPOSALS
CITY DEVELOPMENT PLAN FOR MANDAV, MADHYA PRADESH
Proposed Haat
Proposed Interpretation and
Resource Centre
Proposed Green Buffer/
Afforestation
Proposed Camping Ground
Proposed Constructed
Wetlands
Proposed Dhalao
Proposed Community
Toilets
Proposed Pedestrian
Route to Boorhi Mandav
Zone 1-Royal
Enclave
Zone 2
Transport
Hub
Proposed Road
Connectivity to NH3
Zone 3
Proposed Pedestrian
Route to Songarh Fort
Zone 4
Proposed
Parking area
Zone 5
Km
0
.25
Municipal Boundary
Main Road
Other Road
Heritage Monuments
Proposed Transport Hub
Proposed Tourist Trolley
Routes
Halting Points for Tourist
Trolley
Parking Area Near Tourist Trolley
Proposed Pedestrian way
Parking Area
Proposed Tourist zones
.5
TRANSPORT-PROPOSAL
CITY DEVELOPMENT PLAN FOR MANDAV, MADHYA PRADESH
Proposed WTP
Proposed Water Supply
line from Mallipura Talab
Existing OHT
Proposed OHT
Zone 1-Royal
Enclave
Zone 2
Proposed Extended
Road till SH-31
Zone 3
Zone 4
.25
Zone 5
Km
Municipal Boundary
.5
Heritage Monuments
WATER SUPPLY-PROPOSAL
CITY DEVELOPMENT PLAN FOR MANDAV, MADHYA PRADESH
Planning Boundary
Municipal Boundary
Ward Boundary
PRLANNING BOUNDARY
CITY DEVELOPMENT PLAN FOR MANDAV, MADHYA PRADESH
c
s
c
c
c
c
c
Proposed Drainage
along Road
S
Km
0
.25
Proposed Sulabh
suchalaya
Municipal Boundary
Ward Boundary
Main Road
Other Road
Water Body
Building Footprints
Proposed Community
Toilets
Proposed Composting Sites
Proposed Dhalao
Proposed Grating
alongside Road
.5
DRAINAGE,SEWARAGE,SANITATION-PROPOSAL
CITY DEVELOPMENT PLAN FOR MANDAV, MADHYA PRADESH