Staying Involved
For more information, visit
www.anacostiawaterfront.org/SouthCapitolStreetCorridor
www.southcapitoleis.com
Gateway Study
2003
2004
Screening
1
Scoping Meetings
Design Workshop #1
2005 August
Design Workshop #2
2005 December
2008 March
Consideration of Agency
and Public Comments
2008 March
PA
FEIS Public/Agency Review/Public Meetings
PA
Navigation Study
Preliminary Engineering
RPA
Public Meeting
2013 July
2014 Fall
Revised
RPA Preferred
Alternative
2015 Winter
Record of Decision (ROD) by FHWA
2015 Spring
2015 Fall
Additions
to FEIS
Study Area
Proposed bridge
Fixed (no longer moveable)
42 foot clearance
Parallel alignment (30 feet to
South) to existing bridge
Ramp D
Historic Properties
Impacts and Mitigation
Expanded Area of Potential Effect (APE)Viewshed
and utilities
Determination of Eligibility for Skyline Hotel as
Historic Resource
Adverse Effect on Lenfant Plan for the City of Washington
Restoration of Reservation 245 as green space
Monitor noise and vibration during construction
Wetlands
Construction of
bridge piers
Land Use
Acquisition of right
of way
Operation of fuel pier
Hazardous Materials
Contaminated soils and
groundwater
Unexploded ordinances
Traffic
Mobility during
construction
Image source:
Washington Post
Angled alignment
Parallel alignment
Traffic oval
Avoids use of
JBAB property