ACTIVITY
Excavation
EQUIPMENT / TOOLS
Hand tools:
shovels, picks
Power handtools:
Jack hammer
air compressor
Mechanical excavator
Backhoe, Payloader
Dump truck/s
Dewatering pump
RISK INVOLVE
1. Injury due to defective tools
2. Injury due to incompetence of worker
3. Injury due to wrong use of tool
4. Injury due to collapse of excavation
or cave-in.
5. Injury due to fall of personnel into
excavation.
6. Injury due to scattered materials
7. Breakdown of equipment.
8. Injury due to fall of dump truck and .
other heavy equipments into excavation
9. Injury due to accidental hit by
back-tracking equipment
10. Injury due to incompetence of
driver, operator.
11.Injury to personnel and damage to
vehicle due to traffic confusion
12. Injury due to inhalation of fumes
from air compressor.
13. Injury due to ignorance of
personnel in operating the air
compressor and jack hammer.
Page 1 of 10
PREVENTIVE MEASURE
1. All hand tools shall be kept in good
condition. They must be kept clean
and stored properly. Handles shall be
inspected frequently for damages and
shall remain tightly secured. Defective
tools shall be removed from service and
repaired or disposed.
2. Train the personnel on how to handle
and operate the equipments or tools
properly.
3. Provide adequate shoring and
bracing system to protect the wall from
collapsing.Wall shall be sloped when
excavating in an open area.
4.Provide hard barricades around the
excavation site and bar any unwanted
personnel, provide ladder for access
in and out of the excavation. Ladder
shall be extended min.1m. above ground
level.Provide handrail at least on one
side of the ladder.
5. Daily house keeping shall be done.
6. Conduct regular check of equipments
to maintain good operating condition
and avoid breakdown during operation.
7. Barricades the excavation site.
Assign one trained person to lookout
and give signal to operator/driver.
8. Backhoe, dump truck/s payloader,
shall be provided with
RESPONSIBLE
PERSON
Safety Supervisor
Site Supervisor
MEG PROJECT
SN
DETAIL
ACTIVITY
EQUIPMENT / TOOLS
RISK INVOLVE
PREVENTIVE MEASURE
RESPONSIBLE
PERSON
Operation of
Dewatering system
Diesel powered
dewatering pump
Safety Supervisor
Site Supervisor
Scaffolding work
scaffolding materials :
pipes
clamps
wooden planks
spanners
Safety Supervisor
Site Supervisor
Scaffold foreman
Page 2 of 10
MEG PROJECT
SN
DETAIL
ACTIVITY
EQUIPMENT / TOOLS
RISK INVOLVE
PREVENTIVE MEASURE
bracessall be installed at each end of
of the scaffold and at horizontal intervals
not to exceed 30 ft.
5. Fall protection shall be provided for employees erecting or dismantling scaffolds.
6. A safe means of acces shall be provided, such as properly fixed ladders,
shall be provided for employees erecting
or dismantling scaffolds.
7. 100% fall protection to be used when
working 6 ft. or more from an unprotected elevtion.
8. Full body harness with two 6 ft. shock
absorbing lanyards shall be provided for
employees working on top of scaffoldings.
9. Document monthly inspections on fall
protection equipment and system. Conduct visual inspection prior touse. Ensure that the equipments are in good
condition at all times.
10.Make sure that lanyard anchorage shall
be capable of supporting 5000 lbs.
11.Horizontal lifelines shall be designed,
installed and used under the supervision
of a qualified person.
12.Each platform on all working levels of
scaffold shallbe fully planked or decked
between the the uprights and the guard
supports.
13. Barricade shall be provided around the
area where scaffolding work is going on
or where people are working on elevated
platform at any level of the scaffolding.
14. Warning signs shall be posted to caution unwary personnel from entering the
barricaded area.
15. Scaffolds shall be erected, moved,
dismantled or altered only under the su-
Page 3 of 10
RESPONSIBLE
PERSON
MEG PROJECT
SN
DETAIL
ACTIVITY
EQUIPMENT / TOOLS
RISK INVOLVE
PREVENTIVE MEASURE
RESPONSIBLE
PERSON
Rebar work
Lifting
manual handtool:
knipper / wire cutter
bar cutter
power supplied equipment:
bar bending machine
bar cuting machine
equipment:
crane ( if necessary )
Page 4 of 10
Safety Supervisor
Site Supervisor
Rebar Foreman
Rigger
MEG PROJECT
SN
DETAIL
ACTIVITY
EQUIPMENT / TOOLS
RISK INVOLVE
PREVENTIVE MEASURE
not be obstructed.
8. All protruding rebar ends shall be
protected. Bent bars should be arranged
where the ends are pointed to the ground
9. Crane must be inspected by client prior
to use.
10. Confirm load weights and crane
configuration.
11. Out riggers are to be fully extended,
in the down position and on pads when
on unstable ground. Level crane.
12.Qualified rigger to signal crane operator
using standard hand signals.
13. No one is permitted under loads
14. Tag lines( rope) are to be used to
control loads from swinging.
15. Maintain housekeeping for both
Site and Fabrication shop.
Formworks
Form removal
Page 5 of 10
RESPONSIBLE
PERSON
Safety Supervisor
Site Supervisor
Rebar Foreman
Rigger
Safety Supervisor
Site Supervisor
Carpenter Foreman
MEG PROJECT
SN
DETAIL
ACTIVITY
EQUIPMENT / TOOLS
RISK INVOLVE
PREVENTIVE MEASURE
RESPONSIBLE
PERSON
Concrete pouring
Page 6 of 10
Safety Supervisor
Site Supervisor
Mason Foreman
MEG PROJECT
SN
DETAIL
ACTIVITY
EQUIPMENT / TOOLS
RISK INVOLVE
PREVENTIVE MEASURE
RESPONSIBLE
PERSON
Backfilling work
Paintbrush
Polyurethane coating mat'l.
Payloader
Page 7 of 10
1. Only skilled and properly trained personnel shall be allowed to do the application of the material.
2. Materials shall be stored properly and
released to proper personnel for use.
3.The Material Safety Data Sheet shall be
displayed and available to the site where
the application is going on.
4. Proper cleaning and disposal of waste
and residue shall be followed as recommended by the manufacturer.
5.Application of material shall be as
manufacturer's recommendation.
6.Use proper personal protection equipment when using the material such as
gloves, dust/gas mask, goggles, etc.
1. Only licensed and certified operator
Safety Supervisor
Site Supervisor
Mason Foreman
Safety Supervisor
MEG PROJECT
SN
DETAIL
ACTIVITY
EQUIPMENT / TOOLS
Excavator
Dump truck
Bobcat
plate compactor
Water Tanker
RISK INVOLVE
PREVENTIVE MEASURE
operator
2. Injury to personnel and damage to
equipment due to traffic confusion
2.
3. Breakdown of equipment
4. Injury due to accidental hit by
back-tracking equipment
5. Injury due to incompetence of compac-3.
tor operator.
6. Injury due to fall of compactor when
bringing down and up the excavation. 4.
Page 8 of 10
RESPONSIBLE
PERSON
Site Supervisor
Earthwork Foreman
MEG PROJECT
SN
1
2
DETAIL ACTIVITY
EQUIPMENT / TOOLS
RISK INVOLVE
1. Injury due to defective tools
2. Injury due to loose electical cable
3. Injury due to exposed wirings
4. Injury due to incompetence of
worker
5. Injury due to wrong use of tool
6. Injury due to fall of personnel
working
above 1 meter height
7. Injury due to fall of form
8. Tripping hazard
9. Injury due to scattered materials
PREVENTIVE MEASURE
RESPONSIBLE
PERSON
Safety Supervisor
1. All hand tools shall be kept in good
condition. They must be kept clean
Site Supervisor
and stored properly. Handles shall be
inspected frequently for damages and
shall remain tightly secured. Defective
tools shall be removed from service and
repaired or destroyed.
2. All power equipment and their extension
cords shall be inspected prior to use
and color-coded monthly.
3. Cords shall be protected from
damage.
Any exposed wiring shall be taped
and
insulated adequately.
4. All guards, mechanical and
protective
devices
shallattached
remain and in
devices shall
remain
proper working condition.
5. Personnel must be trained about the
proper usage and handling of tools.
6. All hand tools must be used only for
theintended purpose.
7. Provide scaffolding for every work
above
1 meter in height. Scaffolding shall pass
safety
inspection
prior
to its
use. 6 ft.
Use fall
protection
when
above
high.
8. Personal protection equipment shall
be issued and used properly by
personel.
9. Forms shall be inspected to ensure adequate support and bracing is provided.
10. Use ladder in ascending and
Page 9 of 10
MEG PROJECT
SN
DETAIL ACTIVITY
EQUIPMENT / TOOLS
RISK INVOLVE
PREVENTIVE MEASURE
descending the scaffolding platform.
Ladders shall be extended 3 ft. and be
secured.
11. Arrange forms in order in a manner
that would give free access of personnel
in the worksite. Access shall not be
obstructed. Keep all materials in order.
12. Housekeeping shall be done.
Page 10 of 10
RESPONSIBLE
PERSON