Documente Academic
Documente Profesional
Documente Cultură
SCHNEIDER IND
On Site Report
Project Name
Contract No.
PO No.
Scoupe Of Supply
Customer
Days
1
2
Date
Work Carried Out
5/14/2014 - Travel from Jakarta to Timika to Tembagapura
- Arrange Accomodation to Sport hall 68 Camp Office
5/15/2014
- Get camp in Prambanan F16
- Travel from Camp (Prambanan 68) to OB1 for get Safety
induction, get savox & cap lamp
- Travel from OB1 to site DMLZ CV-512
5/16/2014 - Repair support cable tray was broken
- Wiring cable on terminal interface box panel
- Travel site to OB1
- Travel from OB1 to Camp 68
- Travel from Camp (Prambanan 68) to OB1
- Travel from OB1 to site DMLZ CV-512
- Continue repair support cable tray, pipe cable tray was broken
5/21/2014
5/22/2014
10
5/23/2014
11
5/24/2014
12
5/25/2014
13
5/26/2014
14
5/27/2014
15
5/28/2014
15
5/28/2014
16
5/29/2014 -
Time
04.00-18.30
08.00-17.00
05.00-08.00
08.00-08.15
08.15 - 14.15
14.15-14.30
15.00-16.00
04.30-05.30
06.30-07.00
07.00-14.30
14.30-14.45
14.45-15.30
04.30-05.30
06.30-07.00
07.00-14.15
14.15-14.30
14.30-15.30
04.30-05.30
06.30-07.00
07.00-14.15
14.15-14.30
14.30-15.30
04.30-05.30
06.30-07.00
07.00-14.15
14.15-14.30
14.30-15.30
04.30-05.30
06.30-07.00
07.00-14.15
14.15-14.30
14.30-15.30
04.30-05.30
06.30-07.00
07.00-14.15
14.15-14.30
14.30-15.30
04.30-05.30
06.30-07.00
07.00-14.15
14.15-14.30
14.30-15.30
04.30-05.30
06.30-07.00
07.00-14.15
14.15-14.30
14.30-15.30
04.30-05.30
06.30-07.00
07.00-14.15
14.15-14.30
14.30-15.30
04.30-05.30
06.30-07.00
07.00-14.15
14.15-14.30
14.30-15.30
04.30-05.30
06.30-07.00
07.00-14.15
14.15-14.30
14.30-15.30
04.30-05.30
06.30-07.00
07.00-14.15
14.15-14.30
14.30-15.30
PUNCHLIST
Project Name
Contract No.
PO No.
Scoupe Of Supply
Customer
No
1
2
3
HVAC Unit
Silikon just clear
Pipe for Fire System broken
Qty.
1 Unit
1 Unit
Remarks
No.
Description
Picture
After Install/Rectification
Before Install/Rectification
Problem
L connection Pipe
cable loss
L connection Pipe
cable loss
Picture
After Install/Rectification
Before Install/Rectification
No.
Description
Problem
No.
Description
10
Picture
After Install/Rectification
Before Install/Rectification
Problem
10
No.
Description
11
12
13
14
Picture
After Install/Rectification
Before Install/Rectification
Problem
Waiting material
Scoupe of
Freeport
14
No.
Description
15
16
17
18
Cover Gas
Discharge Sign
Lamp broken
Picture
After Install/Rectification
Before Install/Rectification
Scoupe of
Freeport
Problem
2 Pipe Outside
Broken
18
Cover Gas
Discharge Sign
Lamp broken
18
Wall interior
Pending
Action/Status
OK
OK
OK
OK
Action/Status
OK
OK
OK
OK
OK
OK
Action/Status
OK
OK
OK
OK
OK
Action/Status
OK
Waiting material
OK
Scoupe of
Freeport
Scoupe of
Freeport
Action/Status
Handle with
Freeport
OK
OK
OK