Measures
When an abnormal sound is heard, immediately stop the
operation and inspect the purifier and identify the cause.
Vibration
Start-up time
1.
2.
3.
4.
5.
6.
7.
Starting operation
1.Start the D/G L.O. purifier and check the motor condition, abnormal
sound, vibration etc.
2. After the revolution settles, check the electric current or if there is any
abnormality
3. When all is clear from any abnormality, push the start button at the
control panel and automatically it will perform the necessary
operation
4. Set the temperature controller to 85 C ~ 95 C
5. Check the sludge discharge side and water flow relay alarm box if
there is no abnormality
6. Adjust the flow rate by manipulating the bypass valve
7. Carry out general check up after the completion of starting operation
procedure; stop the machine immediately if any abnormality has been
found.