You can calculate manufacturing lead times for one item, a range of items, or a category of items.
The calculation updates the lead time attributes of all manufacturing items that you include,
regardless of whether you manually maintain an item's lead times. Leadtime for items with
network routings is calculated using only resources on the primary path.
• You must define a bill of material for the parent item and its member items for which
lead time is to be calculated.
• You must define a routing for each item that will be used in the lead time calculation.
• You must define a lead time lot size for the parent item for which lead time is to be
calculated.
Additional Information
Procedure
Step Action
1. Begin by navigating to the Calculate Lead Times page.
Step Action
2. Click the Manufacturing and Distribution Manager link.
Step Action
3. Click the vertical scrollbar.
Step Action
4. Click the Lead Times link.
Step Action
5. Use the Organizations page to select your organization.
Step Action
6. Click the M1 Seattle Manufacturing list item.
Step Action
7. Click the OK button.
or Press [Alt+O].
Step Action
8. Use the Submit a New Request page to enter either a single request or a set.
Step Action
9. Click the OK button.
or Press [Alt+O].
Step Action
10. Use the Calculate Lead Times page to enter the request name.
Step Action
11. Click in the Name field.
Step Action
12. Enter the desired information into the Name field. Enter "Calculate
Manufacturing Lead Times GUI".
Step Action
13. Click in the Parameters field.
Step Action
14. Use the Parameters page to enter the parameters for calculating manufacturing
lead times of the item.
Step Action
15. Click in the Item field.
Step Action
16. Use the System Items page to enter the name of the item.
Step Action
17. Click in the Item field.
Step Action
18. Enter the desired information into the Item field. Enter "RT_Routing".
Step Action
19. Click the OK button.
or Press [Alt+O].
Step Action
20. Click in the Date field.
Step Action
21. Enter the desired information into the Date field. Enter "04-DEC-2004 10:16:26".
Step Action
22. Click the OK button.
or Press [Alt+O].
Step Action
23. Click the Submit button.
Step Action
24. Use the Decision page to note the request ID and you can also submit another
request.
Step Action
25. Click the No button.
or Press [Alt+N].
Step Action
26. Use the Navigator page to navigate to the Find Requests page.
Step Action
27. Click the View menu.
or Press [Alt+V].
Step Action
28. Click the Requests menu.
Step Action
29. Use the Find Requests page to enter the request Id.
Step Action
30. Click the Specific Requests option.
Step Action
31. Click in the Request ID field.
Step Action
32. Enter the desired information into the Request ID field. Enter "5596472".
Step Action
33. Click the Find button.
or Press [Alt+i].
Step Action
34. Use the Requests page to view the status of the request ID that you had submitted.
Step Action
35. Click the View Details... button.
or Press [Alt+s].
Step Action
36. Click the OK button.
Step Action
37. Click the View Log button.
Step Action
38. You have completed the Calculating Lead Times procedure.