System Process Document

Defining a Resource

Department
Responsibility/Role
File Name 27761593.doc
Revision
Document Generation Date 18/01/2010 09:35:00
Date Modified 1/18/2010 09:35:00 AM
Last Changed by
Status

Defining a Resource
Trigger:

Concept
Use the Resources page to define the resource and the time an assembly spends at an operation
and the cost you incur at the operation. A resource is anything you require to perform, schedule,
or cost, including but not limited to employees, machines, outside processing services, etc. A
resource and usage rate for all scheduled activities is required in a routing.

Before you define resources, you must set up your units of measure and unit of measure
conversion rates, and set the site level profile option BOM: Hour UOM to hold the unit of
measure that represents an hour.

In this topic, you will define a resource.

Required Field(s) Comments

Output - Result(s) Comments

Additional Information

Last changed on: 1/18/2010 09:35:00 AM Page 1


System Process Document
Defining a Resource

Procedure

Step Action
1. Begin by navigating to the Resources page.

Click the vertical scrollbar.

Page 2 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Defining a Resource

Step Action
2. Click the Manufacturing and Distribution Manager link.

Last changed on: 1/18/2010 09:35:00 AM Page 3


System Process Document
Defining a Resource

Step Action
3. Click the vertical scrollbar.

Step Action
4. Click the Resources link.

Page 4 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Defining a Resource

Step Action
5. Use the Organizations page to select your organization.

Last changed on: 1/18/2010 09:35:00 AM Page 5


System Process Document
Defining a Resource

Step Action
6. Click the M1 Seattle Manufacturing list item.

Step Action
7. Click the OK button.

or Press [Alt+O].

Page 6 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Defining a Resource

Step Action
8. Use the Resources page to enter a resource name unique to the organization to
describe the resource.

Last changed on: 1/18/2010 09:35:00 AM Page 7


System Process Document
Defining a Resource

Step Action
9. Click in the Resource field.

Step Action
10. Enter the desired information into the Resource field. Enter "HG_TST_MCH".

Page 8 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Defining a Resource

Step Action
11. Click in the Description field.

Last changed on: 1/18/2010 09:35:00 AM Page 9


System Process Document
Defining a Resource

Step Action
12. Enter the desired information into the Description field. Enter "High Grade Chip
Test Machine".

Step Action
13. Click the Type list.

Page 10 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Defining a Resource

Step Action
14. Use the Type field to select a resource type, such as Amount, Currency (the set of
books currency as defined in Oracle General Ledger), Machine, Miscellaneous, or
Person.

Click the Person list item.

Last changed on: 1/18/2010 09:35:00 AM Page 11


System Process Document
Defining a Resource

Step Action
15. The UOM (unit of measure) field enables you to describe how you measure the
resource.

Click in the UOM field.

Page 12 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Defining a Resource

Step Action
16. Enter the desired information into the UOM field. Enter "HR".

Last changed on: 1/18/2010 09:35:00 AM Page 13


System Process Document
Defining a Resource

Step Action
17. Click the Basis list.

Step Action
18. Use the Basis field to select a basis type by which to charge and schedule the
resource.
• Item: Charge and schedule the resource, where the resource usage quantity is the
amount required per assembly unit you make.
• Lot: Charge and schedule the resource, where the resource usage quantity is the
amount required per job or schedule.

Page 14 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Defining a Resource

Step Action
19. Click the Lot list item.

Last changed on: 1/18/2010 09:35:00 AM Page 15


System Process Document
Defining a Resource

Step Action
20. If the resource is a machine, then enter the supply subinventory. If the routing does
not specify a supply subinventory, then this supply subinventory is used for the
resource.

Step Action
21. Click in the Supply Subinventory field.

Page 16 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Defining a Resource

Step Action
22. Enter the desired information into the Supply Subinventory field. Enter "FGI".

Last changed on: 1/18/2010 09:35:00 AM Page 17


System Process Document
Defining a Resource

Step Action
23. Enable the Costed check box to collect and assign costs to this resource.

Click the Costed option.

Step Action
24. As the resource is Costed, enter an Absorption Account (general ledger account)
used to offset resource charges earned in work in process.

You can compare this account to the resource charges in the general ledger at the
end of the period.

Page 18 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Defining a Resource

Step Action
25. Click in the Absorption Account field.

Last changed on: 1/18/2010 09:35:00 AM Page 19


System Process Document
Defining a Resource

Step Action
26. Enter the desired information into the Absorption Account field. Enter "01-515-
5360-0000-000".

Step Action
27. Click in the Variance Account field.

Page 20 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Defining a Resource

Step Action
28. Enter the desired information into the Variance Account field. Enter "01-515-
5390-0000-000".

Last changed on: 1/18/2010 09:35:00 AM Page 21


System Process Document
Defining a Resource

Step Action
29. Click the Save button.

Step Action
30. You have completed the Defining a Resource procedure.
End of Procedure.