Using the Tolerance Fences page, you can define the acceptable excess load (tolerance
percentage) for each resource, based on the number of days in advance of the need. Situations
arise when an excess load has to be placed on a resource.
Tolerance percentage is the acceptable excess load for the resource, given the number of days in
advance of the manufacturing capacity need. If the tolerance percentage changes as the number of
days in advance changes, then you can enter as many combinations of days in advance and
tolerance percentage as needed.
Additional Information
Procedure
Step Action
1. Begin by navigating to the Departments page.
Step Action
2. Click the Manufacturing and Distribution Manager link.
Step Action
3. Click the vertical scrollbar.
Step Action
4. Click the Departments link.
Step Action
5. Use the Organizations page to select your organization.
Step Action
6. Click the M1 Seattle Manufacturing list item.
Step Action
7. Click the OK button.
or Press [Alt+O].
Step Action
8. Use the Departments page to find the department that you had already created.
Step Action
9. Click the Departments list item.
Step Action
10. Press [F11].
Step Action
11. Enter the desired information into the Department field. Enter "ASSEMBLY".
Step Action
12. Press [Ctrl+F11].
Step Action
13. Click the Resources button.
or Press [Alt+o].
Step Action
14. Use the Resources page to select a resource.
Step Action
15. Click in the Resource field.
Step Action
16. Click the Tolerance Fences button.
or Press [Alt+o].
Step Action
17. Use the Tolerance Fences page to define the acceptable excess load (tolerance
percentage) for each resource, based on the number of days in advance of the need.
Step Action
18. Click in the Days in Advance field.
Step Action
19. Enter the desired information into the Days in Advance field. Enter "5".
Step Action
20. Click in the Tolerance Percentage field.
Step Action
21. If the tolerance percentage changes as the number of days in advance changes, then
enter as many combinations of days in advance and tolerance percentage as needed.
Step Action
22. Enter the desired information into the Tolerance Percentage field. Enter "10".
Step Action
23. Click in the Days in Advance field.
Step Action
24. Enter the desired information into the Days in Advance field. Enter "10".
Step Action
25. Click in the Tolerance Percentage field.
Step Action
26. Enter the desired information into the Tolerance Percentage field. Enter "15".
Step Action
27. Click in the Days in Advance field.
Step Action
28. Enter the desired information into the Days in Advance field. Enter "15".
Step Action
29. Click in the Tolerance Percentage field.
Step Action
30. Enter the desired information into the Tolerance Percentage field. Enter "20".
Step Action
31. Click the Save button.
Step Action
32. You have completed the Defining Resource Tolerance procedure.