System Process Document

Defining Resource Tolerance

Department
Responsibility/Role
File Name 27761784.doc
Revision
Document Generation Date 18/01/2010 09:35:00
Date Modified 1/18/2010 09:35:00 AM
Last Changed by
Status

Defining Resource Tolerance


Trigger:

Concept
Using the Tolerance Fences page, you can define the acceptable excess load (tolerance
percentage) for each resource, based on the number of days in advance of the need. Situations
arise when an excess load has to be placed on a resource.

Tolerance percentage is the acceptable excess load for the resource, given the number of days in
advance of the manufacturing capacity need. If the tolerance percentage changes as the number of
days in advance changes, then you can enter as many combinations of days in advance and
tolerance percentage as needed.

In this topic, you will define resource tolerance.

Required Field(s) Comments

Output - Result(s) Comments

Additional Information

Last changed on: 1/18/2010 09:35:00 AM Page 1


System Process Document
Defining Resource Tolerance

Procedure

Step Action
1. Begin by navigating to the Departments page.

Click the vertical scrollbar.

Page 2 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Defining Resource Tolerance

Step Action
2. Click the Manufacturing and Distribution Manager link.

Last changed on: 1/18/2010 09:35:00 AM Page 3


System Process Document
Defining Resource Tolerance

Step Action
3. Click the vertical scrollbar.

Step Action
4. Click the Departments link.

Page 4 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Defining Resource Tolerance

Step Action
5. Use the Organizations page to select your organization.

Last changed on: 1/18/2010 09:35:00 AM Page 5


System Process Document
Defining Resource Tolerance

Step Action
6. Click the M1 Seattle Manufacturing list item.

Step Action
7. Click the OK button.

or Press [Alt+O].

Page 6 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Defining Resource Tolerance

Step Action
8. Use the Departments page to find the department that you had already created.

Last changed on: 1/18/2010 09:35:00 AM Page 7


System Process Document
Defining Resource Tolerance

Step Action
9. Click the Departments list item.

Step Action
10. Press [F11].

Page 8 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Defining Resource Tolerance

Step Action
11. Enter the desired information into the Department field. Enter "ASSEMBLY".

Last changed on: 1/18/2010 09:35:00 AM Page 9


System Process Document
Defining Resource Tolerance

Step Action
12. Press [Ctrl+F11].

Step Action
13. Click the Resources button.

or Press [Alt+o].

Page 10 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Defining Resource Tolerance

Step Action
14. Use the Resources page to select a resource.

Last changed on: 1/18/2010 09:35:00 AM Page 11


System Process Document
Defining Resource Tolerance

Step Action
15. Click in the Resource field.

Step Action
16. Click the Tolerance Fences button.

or Press [Alt+o].

Page 12 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Defining Resource Tolerance

Step Action
17. Use the Tolerance Fences page to define the acceptable excess load (tolerance
percentage) for each resource, based on the number of days in advance of the need.

Last changed on: 1/18/2010 09:35:00 AM Page 13


System Process Document
Defining Resource Tolerance

Step Action
18. Click in the Days in Advance field.

Step Action
19. Enter the desired information into the Days in Advance field. Enter "5".

Page 14 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Defining Resource Tolerance

Step Action
20. Click in the Tolerance Percentage field.

Last changed on: 1/18/2010 09:35:00 AM Page 15


System Process Document
Defining Resource Tolerance

Step Action
21. If the tolerance percentage changes as the number of days in advance changes, then
enter as many combinations of days in advance and tolerance percentage as needed.

Step Action
22. Enter the desired information into the Tolerance Percentage field. Enter "10".

Page 16 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Defining Resource Tolerance

Step Action
23. Click in the Days in Advance field.

Last changed on: 1/18/2010 09:35:00 AM Page 17


System Process Document
Defining Resource Tolerance

Step Action
24. Enter the desired information into the Days in Advance field. Enter "10".

Step Action
25. Click in the Tolerance Percentage field.

Page 18 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Defining Resource Tolerance

Step Action
26. Enter the desired information into the Tolerance Percentage field. Enter "15".

Last changed on: 1/18/2010 09:35:00 AM Page 19


System Process Document
Defining Resource Tolerance

Step Action
27. Click in the Days in Advance field.

Step Action
28. Enter the desired information into the Days in Advance field. Enter "15".

Page 20 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Defining Resource Tolerance

Step Action
29. Click in the Tolerance Percentage field.

Last changed on: 1/18/2010 09:35:00 AM Page 21


System Process Document
Defining Resource Tolerance

Step Action
30. Enter the desired information into the Tolerance Percentage field. Enter "20".

Step Action
31. Click the Save button.

Page 22 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Defining Resource Tolerance

Step Action
32. You have completed the Defining Resource Tolerance procedure.
End of Procedure.