Project : KOMATSU Factory Expansion Project @ Oragadam, Tamilnadu

Report No :FB/RS/1

FIELD INSPECTION REPORT

Date :

INSPECTION TYPE : ROLLING SHUTTER INSTALLATION

Work Location :

Sr. no.

Fabriation Factory

Particulars

Grid No. :FE - F3 - F4

Bolt Size Min. Bolt


Torque
(m / N.m.)

Actual
Bolt
Torque

Remarks

(m / N.m.)

(Name & Signature)


For KIRBY

Remarks to be complied

(Name & Signature


For Kajima

Ok / Not Ok

1
2
3
4
(Name & Signature)

Date :
For KIRBY
FINAL TIGHTENING CHECK PROCEDURE
Please ensure the following procedue & standard for Bolt Tightening
1. Marking Rules

2. Final Tightening Check For Final Tightening

(Name & Signature


For Kajima

Reference Photo

Sr. no.

Structural member ID / Part


mark

Bolt Size Min. Bolt


Torque
(m / N.m.)

Actual
Bolt
Torque

Remarks

(m / N.m.)

(Name & Signature)


For KIRBY

Remarks to be complied
1
2
3
4
Date :

(Name & Signature


For Kajima

Ok / Not Ok

(Name & Signature)


For KIRBY

(Name & Signature


For Kajima

Report No :FB/RS/1

Remarks

(Name & Signature)


For Kajima

(Name & Signature)


For Kajima

Reference Photo

Remarks

(Name & Signature)


For Kajima

(Name & Signature)


For Kajima

Inspection Checklist-version-R0

Location : ( For Location / Grid Please refer Plan given on backside of this page)

INSPECTION CHECKLIST FOR MOTORISED ROLLING SHUTTER INSTA

Sr.
No.

Inspection Items

Date / Time of
Checking

1.0

CHECK FOR HEAD PLATES & SAFETY BRACKETS

1.1

Check for Size / Dimension of Rolling


Shutter

1.2

Check for Welding of Head Plates &


Brackets

1.3

Check for Alignment of Drum / Shaft

1.4

Check Drive Endless Chain for Manual


Operation

1.5

Check for Balancing of Rolling Shutter


& adjust if required

1.6

Check for Straighness of Guide Channel

2.0

CHECK FOR CURTAIN

2.1

Check for for Lath / Curtain for Dmage is any

2.2

Check for Endlocks are secured

Inspection Checklist-version-R0

2.3

Check Bottom Rail in S.S.

2.4

Check provision of Rubber Profile @ Bottom

2.5

Check locking devices (if app.)

3.0

ELECTRICAL WORKS CHECK

3.1

Check Motor mounting is secure

3.2

Check and adjust Travel Limits

3.3

Check for Provision of Control Box and Location

3.4

Check for Provision of Push Button and Location


(1.4m from FFL)

P.T.O

(Please Turn Over) for Rolling Shutter Location Elevation

Inspection Checklist-version-R0

RECTIFICATION COMPLIANCE STATUS


Sr.
No.

Inspection Items

Date / Time of
Checking

ELEVATION SHOWING ROLLING SHUTTER LOCATIO Rolling Shutter Type : RS-03 / RS-04

Inspection Checklist-version-R0

Inspection Checklist-version-R0

Date :
Person In-Charge :

OR MOTORISED ROLLING SHUTTER INSTALLATION WORKS

Checking Record

Checking Status

Signature

KIPL
Ok

Ok

Rectfi
cation
Requi
red
Rectfi
cation
Requir
ed

Ok

Rectfi
cation
Requir
ed

Ok

Rectfi
cation
Requir
ed

Ok

Rectfi
cation
Requir
ed

Ok

Ok
Ok

Rectfi
cation
Requir
ed
Rectfi
cation
Rectfi
Requir
cation
ed
Rectfi
Requir
cation
ed
Requir
ed

CECL

Rectfi
cation

Ok

Rectfi
Requir
cation
ed

Ok

Rectfi
Requir
cation
ed

Ok

Rectfi
Requir
cation
ed

Ok
Ok
Ok
Ok

P.T.O

Inspection Checklist-version-R0

Requir
ed
Rectfi
cation
Rectfi
Requir
cation
ed
Rectfi
Requir
cation
ed
Requir
ed
Retesting
Required

(Please Turn Over) for Rechecking / Compliance Status

Inspection Checklist-version-R0

Checking Record

g Shutter Type : RS-03 / RS-04

Checking Status

Signature
CECL

KAJIMA

Rolling Shutter Size : 6mx6m / 8mx6m

Inspection Checklist-version-R0