Sunteți pe pagina 1din 105

Barcelona Smart City projects

BARCELONA SMART CITY

The vision, focus and projects of the City


of Barcelona in the context of Smart Cities

Barcelona, 15 October 2012

Barcelona Smart City projects

Contents
I. Smart Barcelona Project
II. Network architecture
III. Project map (cross-cutting, vertical, special)
IV. Innovation in SC projects: Urban Lab
V. Global planning of projects
VI. Agreements
VII. Sector analysis: potential partners
VIII. Organization and monitoring methodology
IX. Action Plan
X. Risks
2

Barcelona Smart City projects

I.

Smart Barcelona Project


Strategic Framework

The Smart City Barcelona project is based on three core ideas: promotion, international projection and
projects. In parallel, the BITH Foundation works with companies on the development of specific projects.

Promotion

International
Projection

Projects
BITH
Certifications
Consultancy
SC Projects
Urban Lab pilots
Innovation

Participation at
international events

Smart City Campus


Cluster SC

Barcelona Smart City projects

I. Smart Barcelona Project


Promotion
Smart society for innovative, sustainable cities
Meeting point for companies, governments, businesses and research centres
to share experiences and contribute to the development of the cities of the
future.
November 2012 - FIRA de Barcelona

International body for cooperation between cities with the aim of


sustainable urban development based on e-government.
Its purpose is to share best practices in terms of e-government, efficiency
and administrative transparency and community participation.
Organization composed of 50 member cities

November 2012
2nd General Assembly

International Geomatics Week

March 2012
FIRA de Barcelona

Meeting point for public administrations and private companies to present


business opportunities in the field of geomatics and new applications to improve
the day-to-day lives of ordinary people.
4

Barcelona Smart City projects

I. Smart Barcelona Project


Participation at international events
Barcelona City Council, in the context of smart cities, participates at various international events in order to
advertise the Smart Barcelona Project abroad and also other initiatives under development.
Accordingly, and with the additional aim of acquiring new knowledge related to smart cities in the areas of
technology, society and sustainability, the city has participated or will participate at such events as:

6th Urban Research and Knowledge Symposium


- Rethinking Cities: Framing the future

8-11 October 2012


Barcelona

Over 50 sessions exploring different


issues such as social impact, the
economy, sustainability, governance,
innovation and the limitations of
available space, with the participation of
teaching and business experts from
around the world.

Smart Grids Smart Cities Forum 2012

Smart Cities Conference that will bring


together experts from the public and
private sectors to discuss new
initiatives, successfully implemented
projects and future prospects.

Major Cities of Europe - Annual Conference

4-6 June 2012


Vienna

Conference with speakers from over 30


European cities, gathered together to
discuss the current situation and the
challenges of ICT in cities.

26-28 September 2012


Nice
5

Barcelona Smart City projects

I. Smart Barcelona Project


European Projects
As regards European projects, Barcelona City Council cooperates with various companies with European
projects such as:

Development of the Arrowhead project in the framework of the 2012 European


ARTEMIS Innovation Pilot programme , in the areas of energy and mobility.

European FP7 Smart Cities and Smart Grid project, focusing on energy efficiency.

European LIFE project, an intelligent system for automated urban waste collection.

European BESOS project (Building Energy decision Support Systems fOr Smart
cities), based on a platform designed to support decision-taking on matters of
energy efficiency.
6

Barcelona Smart City projects

I. Smart Barcelona Project


City Protocol
The City Protocol is the whole range of knowledge (open protocols, agreements, good practices,
information) that the cities themselves, supported by the academic world and the industrial sector, are
generating to create, in practice, a global forum for the development of smart cities.

Basic goals
1. To encourage and support a new science of cities.
2. To establish a framework for cooperation between the City Council, universities, companies,
organizations and society itself.
3. To direct and prepare the future of cities.
4. To understand the driving forces of urban evolution and identify and work on continually changing
solutions.
5. To identify synergies and innovative and economic opportunities to obtain products and services
with added value.

Barcelona Smart City projects

I. Smart Barcelona Project


City Protocol Society
The City Protocol Society is a non-profit organization whose main objective is to prepare, lead and
develop the City Protocol.

Parties to the City Protocol Society


The City Protocol Society is comprised by agents from industry, universities/research centres in other
cities around the world and other organizations and companies.

Universities

Companies

Cities

Organisations

Barcelona Smart City projects

I. Smart Barcelona Project


Workshop City Protocol
On 16 and 17 July the first City Protocol workshop was held in Barcelona. Over 150 delegates from cities, academic
institutions, organizations and companies from around the world shared the potential value of constructing a city
protocol. Potential agents who took part are:
Cities
Amsterdam
Barcelona
Boston
Buenos Aires
Busan
Copenhagen
Derby
Dublin
Geneva
Helsinki
Hyderabad
Istanbul
Lima
Lisbon
Livorno
Lyon
Maputo

Medelln
Milan
Moscow
Nairobi
New York City
Nice
Paris
Quito
Rome
San Francisco
Seoul
Taipei
Turin
Uppsala
Venice
Vienna
Yokohama

Organisations
Citizen Housing and Planning Council
NY
Ecocities Builders
Ecocities Emerging
Eurocities
European Commission
European Network of Living Labs
Fundaci Mobile World Capital
Green Building Council
Inter-American Development Bank
Living Labs Global
Major Cities of Europe
Public Technology Institute
Red Espaola de Ciudades Inteligentes
Smart City World Congress
Think Innovation
United Cities and Local Governments

Aenor
Cideu
Citilab
ICLEI
JNNURM
Metropolis

Companies

Universities

Abertis
Accenture
Agbar
Capgemini
CITI
Fujitsu
Grupo Etra
HP
IBM
ITALTEL
INDRA
Microsoft
Oracle
ROS ROCA
Schneider-Telvent
Siemens
Telefnica
OPENTEXT
SAP

Argonne National Laboratory


Barcelona GSE
ESADE
Institute for Advanced Architecture of
Catalonia (IAAC)
IESE
Imperial College Business School
London School of Economics
MIT (Architecture & ICT),
Rutgers University School of Public Affairs
& Administration,
Public Technology Institute
Univ. of Cantabria
Univ. of Albany
Univ. of Chicago
Univ. of Girona
Univ. of Sydney
Univ. of Virginia,
Univ. Politcnica de Catalunya (UPC)
Yonsei University

Gold partners:
9

Barcelona Smart City projects

I. Smart Barcelona Project


City Protocol Workshop
The conclusions can be listed under the concepts Why, What and How.

WHY a City Protocol?


To strengthen cities and the community: dialogue for an agreement on the basic needs of citizens.
Development of a common framework, language and standards.
Inter-sector cooperation: interoperability, sharing tools and technologies.
Improved knowledge sharing and transfer of best practices.
Efficiency and optimisation of services.
Sustainability of innovation through new business models.

WHAT should be included in a City Protocol?


Citizens vision through a prioritized list of the city's problems.
Customizable city model with a portfolio of detailed services.
Indicators and indixes to measure advances and evaluate their condition.
Projects, pilot schemes and new business models.
Workspaces for sharing information and best practices.
Specific thematic areas.

HOW?
Short term: definition of a strategic roadmap with milestones (6 months)
Medium term: preparation of a master plan to define the scope, clarify the value of the proposal, identify and
prioritise specific issues, etc.
10

Barcelona Smart City projects

I. Smart Barcelona Project


Conceptual model of Smart city (I)

11

Barcelona Smart City projects

I. Smart Barcelona Project


City Protocol Agenda
2012
Jul

PHASE 1
Barcelona output 1st C/P
workshop (16 and 17 July)
San Francisco output 2nd C/P
workshop (12 October)
PHASE 2
Construction of agreements on
principles and goals to be
addressed
PHASE 3
Set up working groups to
participate periodically in
workshops

Aug Sept

Oct

2013
Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug Sept

Oct

Nov

Formation of interim secretariat, undertaken by


Barcelona City Council

Choice of CPS organogram

Initial functioning of CPS

Presentation of conclusions

CPS: City Protocol Society

12

Barcelona Smart City projects

I. Smart Barcelona Project


Conceptual model of Smart city (II)
Monitoring
Environment

ICT

Water
Cycle

Matter
Cycle

Energy

Building

Mobility

Nature

Neighbourhood

Social and Community Impact


Education

Health

Security

Tourism

...

Platform
Network
13

Barcelona Smart City projects

I. Smart Barcelona Project


Goals and scope
To adminster this environment it is necessary to use a unified work structure for developing any service:
The aim of the Barcelona Smart Project is to provide the city with the right conditions, from both a procedural
point of view and as a platform, to accommodate current and future smart city projects in the city.
This environment will allow orderly growth of smart services, both in their conception, implementation and
subsequent operation.
To administer this environment it is necessary to implant a unified work structure for developing services:

Monitoring
Environment

Smart services
Building

Unified monitoring, independent of any service but


bringing together information on all of them.
Smart services developed by different City Council service
departments or service companies operating in the city.
They are independent but work in the same environment.

Neighbourhood
Social impact
Platform of services
Unified network

Unified data management platform. This drives the


work environment.
Unified network covering the entire city and connecting
each services mechanisms.
14

Barcelona Smart City projects

Contents
I. Smart Barcelona Project
II. Network architecture
III. Project map (cross-cutting, vertical, special)
IV. Innovation in SC projects: Urban Lab
V. Global planning of projects
VI. Agreements
VII. Sector analysis: potential partners
VIII. Organization and monitoring methodology
IX. Action Plan
X. Risks
15

Barcelona Smart City projects

II. Network architecture


Goals
1

Provide the City Council with a infrastructure of technology platforms that facilitates the management and
operation of smart cities projects in the city

At the same time, this structure has to allow management of information about the various services in the
city, both cross-cutting (between services) and vertical (including a centre for global supervision).

This structure must be built on open platforms.

The interfaces linking platforms must comply with market standards.

The platforms must include the possibility of scalable growth.

The architecture must allow the integration of current City Council services and platforms.

The proposed architecture must integrate the current philosophy of non-replicated basic information.

The proposed architecture must accommodate the iCity and Open Data projects in particular, responding to
a philosophy of an open platform for non-corporative, third-party use.

The Situation Room, for monitoring the state of the city, both in terms of services and projects.
16

Barcelona Smart City projects

II. Network architecture


Layout
VISTA

BI

Basic
Information

SmartCity
applications

Support services for SmartCity business applications

City
semantics

Analysis

City OS

Events Management
and Repository

BI

Processes

BD

Security
Management

iCity
External
control
centres

Interface standard for inter-operation with the sources of information

Open Data

City Open Apps

OPEN Data +
APPS

Situation Room

Service
applications

SDK external
integration

Area

Centres
Centres
dede
Control centres
control
control

Sensor platform

BD

...
Sensors

Other Scadas
sensor
platforms

...
Sensors

Video
platform

...

IRIS
Mycelium

Sources of
information
about the city

APPS

Cameras
17

Barcelona Smart City projects

Contents
I. Smart Barcelona Project
II. Network architecture
III. Project map (cross-cutting, vertical, special)
IV. Innovation in SC projects: Urban Lab
V. Global planning of projects
VI. Agreements
VII. Sector analysis: potential partners
VIII. Organization and monitoring methodology
IX. Action Plan
X. Risks
18

Monitoratge

Barcelona Smart City projects

Environment

Building

III. Map of cross-cutting projects

Barri

Impacte social
Plataforma de serveis
Xarxa unificada

(a) Situation Room


ONLINE Information

CONTROL CENTRES
Presentation
Situation Room

State of
services
Emergencies
Infrastructures

SITUATION ROOM
INTEGRATION AND SHARING
of information about the city and its services

OFFLINE Information
City Council
Private
companies

Public
companies
19

SR

Barcelona Smart City projects

Environment

Building

III. Map of cross-cutting projects

Barri

Impacte social

BSP
NMN

(a) Situation Room


Situation Room
Goal
Platform for integrating and sharing information
about the city and its services

Scope
Definition (functional level, ICT and organization)
and implementation of a comprehensive platform
for the storage and analysis of meaningful data,
monitoring operations and the evolution of
incidents, and control of the citys strategic
projects.

State
Project being defined. Preparation of draft project

Jordi Cirera

Possible interested partners


Basic information and mapping (IMI):
development of visualization software (VISTA)
SITEP: third-party integration

Next goals
Definition of draft pilot project for approval by the
Management.

Budget 2012
Pending information. Deadline 25 October

20

SR

Barcelona Smart City projects

Environment

Building

III. Map of cross-cutting projects

Barri

Impacte social

BSP
NMN

(b) Urban platform (Barcelona Sensor Platform)


Vertical services
BSP: Storage

Barcelona Sensor Platform


Data storage and processes
Data transport
Data acquisition

Supplies the devices aggregated data to the


applications
BSP: Transport

Provides various mechanisms to send data


from the devices to the data centre (WiFi,
3G).
BSP: Acquisition
It will take into consideration:

NMN

Physical characteristics of the installation


of devices
The protocols used for sending data

21

SR

Barcelona Smart City projects

Environment

Building

III. Map of cross-cutting projects

Barri

Impacte social

BSP
NMN

(b) Urban platform (Barcelona Sensor Platform)


Barcelona Sensor Platform (BSP)
Goal
Cross-cutting technology platform for the
management of telecommunications networks and
infrastructure in the city

Scope
Functional and technological definition of the
platform, considering all the networks and
infrastructures of the New Municipal Network.
Implementation of ICT and SSII, official approval of
suppliers and definition of procedures

State
Project being defined. Preparation of draft project.

Jordi Cirera

Possible interested partners


Opentrends

Next goals
Definition of draft pilot project for approval by
the Management.

Budget 2012
Pending information. Deadline 25 October

22

SR

Barcelona Smart City projects

Environment

Building

III. Map of cross-cutting projects

Barri

Impacte social

BSP
NMN

(c) City OS
Jordi Cirera

23

SR

Barcelona Smart City projects

Environment

Building

III. Map of cross-cutting projects

Barri

Impacte social

BSP
NMN

(d) Telecommunications network (New Municipal Network)

CO- X.TRANSRE
PORT

X. WiFi Ciutad
X.WiFi Corporatiu
(via pblica)
Mesh

XTC
(ADSL)

CPD Adjudicatari

Xarxa IMI
(LAN)

Electrnica

Altres

Semfors

Serveis
3G/4G

Cmeres

Altres

Serveis
Corporatius
Via Pblica

Edificis

WiFi
Pagament

WiFi
Oficines

WiFi
Ciutad

XARXA
ACCS

USUARIS

Coherent and unified layer of networks at the disposal of the layer of services and applications for
users.

Serveis B:SM

Xarxa
FIBRA
PTICA
Ajuntament

Fibra ptica
CPD IMI

CPD Mobilitat

CPD B:SM

New model with several horizontal layers supported by a cross-cutting fibre-optic infrastructure.
24

SR

Barcelona Smart City projects

Environment

Building

III. Map of cross-cutting projects

Barri

Impacte social

BSP
NMN

(d) Telecommunications network (New Municipal Network)


The cross-cutting project for the New Municipal Network of
communications will be implemented in three phases:
1 Integration of fibre-optic networks (IMI Administrative Board), giving consideration to
the corporate network, already maintained by the IMI, the 22@ network, the Mobility
network and the network of the tunnels in BCN.

Expansion of network and exploitation of surpluses, fostering a change to network


architecture with two goals: to integrate all fibre-optic networks in a single network and
increase their capacity so that excess capacity can be put to non-corporate use.

3
FO-WiFi integration, considering a joint operating model, with the possibility of
outsourcing management.

25

SR

Barcelona Smart City projects

Environment

Building

III. Map of cross-cutting projects

Barri

Impacte social

BSP
NMN

(d) Telecommunications network (New Municipal Network)


New Municipal Network (NMN)
Goal
Integration of municipal digital communications
networks

Scope
Integration of fibre-optic network: corporate,
tunnels, mobility and in 22@. Analysis of technical,
business and legal levels

State
Project being defined. Preparation of draft project.

Technical level: Toni Carol


Business level: Paco Rodrguez

Possible interested partners

Cisco
Abertis
Upcoming
goals
Definition project partners: 15 Oct
Presentation draft project: 25 Oct

Budget 2012
Pending information. Deadline 25 October

26

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Goals
The goal of the smart city projects under development in the city of Barcelona is to provide an infrastructure
that guarantees the development of a range of services in order to:
Increase the efficiency of public services
Improve the quality of life
Increase the opportunities offered by the city to individuals and companies
Improve the standard of environmental sustainability
To this end, the setting has been defined, in relation to different service areas, in order to accommodate
current and future smart projects in the city.
Environment

ICT

WATER

ENERGY

Building

MATTER

MOBILITY

NATURE

Neighbourhood

Social and community impact


27

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Organisation (I)
Environment

Smart noise control

ICT

WATER

Neighbourhood
web

Telemanagement of
irrigation

Municipal WiFi
TAP&GO
Tourist flows

Telecontrol of
ornamental
fountains

eGovernment
points

Building

Energy
monitoring

Control of work in
Av. Estatut

ENERGY
Energy
efficiency in
buildings
Urban heating
and cooling
network
Distributed
generation
Smart metering
Lighting
cabinets
Remote control
of escalators
Intell
BEAMS

Energy Selfsufficiency

de
Social & community impact Passeig
Grcia

Acoustics in
interiors

Smart bins and


containers

Sustainable
Urban Planning
Telecare

MOBILITY

MATTER

Orthogonal bus
network
Smart Parking
Tour coach
parking
Sustainable
mobility
Sustainable
Mobility Plan
Monitoring
recharging EV
Electric cars
Travel time
Prioritization of
traffic lights
MOLECULES
Hybrid taxi

Urban Lab

Cultural ring

NATURE
Gateways to
Collserola

Solar Panels

Tourism
management
28

Project under development

Projects in operation

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Environmental projects
OBJECTIVE
Implementation of a solution that will optimize and centralize the collection, integration,
processing and dissemination of information provided by the noise sensors of different suppliers.
SCOPE
Definition of a functional and technological solution to integrate the available 21 sound level
meters, expandable to an ideal target of 5-6 units per district, in order to have approximately 50
sensors distributed throughout the city.
STATE

Project in deployment phase.

Partner

GOALS Person responsible: Arantxa Millas (City Services and Environment)


21 sound meters already operating

Urban sound
meter

The target is 50 operational sound


meters
29

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Environmental projects
OBJECTIVE
To control the noise inside premises using standardized acoustic limiters to ensure noise does not
exceed the established threshold.
SCOPE
They will be used in various establishments depending on the agreed range of action. There are
also hand-held sound level meters, used by technicians from the districts to carry out inspections
and monitor sound levels.
STATE

Project in operation.

GOALS

Partner

Person responsible: Arantxa Millas


(City Services and Environment)

Information pending update

30

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Environmental projects
OBJECTIVE
Remotely record and monitor the environmental impact of the work being done in the Avinguda de
lEstatut, through a system of sensors.
SCOPE
Monitoring and analysis of data relating to the state of the work, submitted by a system consisting
of approximately of 20 sensors.

STATE
Project in operation.

Person responsible: Tomas Gea (Head of


GOALS

Projects and Public Works Dept. of Environment)

20 sensors already installed


and fully operative
31

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

ICT projects
OBJECTIVE
Creation of a neighbourhood WIFI network in Barcelona to share products and services using
integrated information systems and the development of a technological platform compatible with
the network.
SCOPE
Development of the "Whabit" online platform to share resources, objects, spaces, etc.. Available for
computers, tablets and mobile phones.
STATE

Pilot project being deployed in Les Corts neighbourhood.

GOALS Person responsible: Xavier Roca

Information pending update

32

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

ICT projects
OBJECTIVE
Deployment of a WiFi network using public WiFi, which allows access to Internet in municipal
spaces, and WiFi in the streets , forming the municipal network.
SCOPE
Network of 251 public WiFi points and 469 active points making up the WiFi street network,
prioritizing areas with the highest demand in order to improve efficiency and allow the emergence
of new applications.
STATE

Map of WiFi stations in Barcelona

Project in operation.

GOALS

Person responsible: Miriam Alvarado

251 public WiFi points and 469


active points that make up the WiFi
street network

33

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

ICT projects
OBJECTIVE
Progressive introduction of contactless payment using NFC technology for all types of services.
SCOPE
Development and implementation of the first phase, during 2012, of payment by NFC contactless
cards, in order to introduce a second phase, in 2013: payment by mobile phone. Bicing service
payments will be included.
STATE
Project in deployment phase.

Partners

GOALS Person responsible: Sergi Jerez

Information pending update


Presentation of the project TAP & GO: NFC
Barcelona, February 2012
34

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

ICT projects
OBJECTIVE
Development of a solution to detect the whereabouts and area of influence of tourists in the city
of Barcelona, through the roaming service.
SCOPE
Functional and technological definition of the control system, implementation of the solution and
monitoring and analysis of results.
STATE
Pilot project under development.

Partners

GOALS Person responsible: Information pending

Information pending update

ROAMING

35

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

ICT projects
OBJECTIVE
Firm commitment to e-government through the installation of Punt BCN terminals to carry out
procedures in council offices and public spaces.
SCOPE
Installation of innovative self-service electronic terminals to speed up the management of the
commonest municipal procedures and improve access to municipal information and resources.
STATE
Pilot project in operation.

GOALS Person responsible: Information pending

Information pending update

Punt BCN Terminal


36

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Water projects
OBJECTIVE
Installation of a SCADA system for automated centralized telemanagement of irrigation
infrastructures in order to control the duration and frequency of irrigation in each area, depending
on needs.
SCOPE
Development of a sensor system that integrates temperature, salinity and humidity sensors that
make it possible, through an irrigation controller, to send the necessary information to the SCADA
management system.
STATE
Pilot project in Parc Joan Mir under development.

GOALS Persons responsible: Francesc Hernndez - Cristina Vila

Information pending update

Garden with humidity sensor


37

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Water projects
OBJECTIVE
Implementation of a SCADA system for telecontrol of ornamental fountains.
SCOPE

Integration of information from different suppliers in order to manage its operation.


STATE
Project in progress.

Partner

GOALS Person responsible: Francesc Soler


SCADA

Information pending update

38

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Energy-saving projects
OBJECTIVE
Study of municipal buildings to analyze and determine the most suitable model of selfdevelopment of energy services and their economic viability.
SCOPE
Study of 10-15 municipal buildings in the tertiary sector to analyze their energy model and develop
a pilot project in two of the buildings under study to collect data on the technical management of
buildings.
STATE

Partners

Pilot project under development.

GOALS Person responsible: Manel Torrent

Information pending update

39

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Energy-saving projects
OBJECTIVE
Collaboration in the smart management of energy by consumers, designed to raise awareness of
energy consumption, savings and costs.
SCOPE
Collaboration in creating smart clients to promote energy savings and a shift to free-market
mechanisms, also applicable to public buildings.
STATE

Pilot project under development.

Partners

GOALS Person responsible: Cristina Castells

Information pending update

40

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Energy-saving projects
OBJECTIVE
Implementation of an air conditioning system that provides all buildings or centres of consumption
with thermal energy in the form of the hot and/or cold water they need for air conditioning.
SCOPE
Air conditioning system that incorporates improvements in energy efficiency, environmental impact,
management, and economic impact. It is currently installed in the Forum and is being expanded to
the 22@ district and the Zona Franca.
STATE
Pilot project in operation.

GOALS Person responsible: Information pending

Information pending update

41

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Energy-saving projects
OBJECTIVE
Introduction of electricity meters in the home in order to rationalize domestic energy consumption
patterns.
SCOPE
Boosting the installation of meters at affordable prices that display power consumption, allowing
residents to know their consumption and adopt good practices in relation to the consumption of
electricity at home.
STATE
Pilot project in operation.

GOALS Person responsible:

Information pending update

42

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Energy-saving projects
OBJECTIVE
Replacement of the current connections through the radio network in lighting cabinets with WiFi
or fibre-optic connections.
SCOPE
Solution that will allow the integration of different types of services and the expansion of the
existing ones, opening the door to the integration of different smart services.

STATE
Project under development.

Partners

GOALS Person responsible: Josep M. Berengueres

Information pending update

43

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Energy-saving projects
OBJECTIVE
Telecontrol of escalators and lifts using a SCADA system allowing the integration of information
from different suppliers of control devices.
SCOPE
Integration and control of information from different providers that currently work with Barcelona
City Council in order to manage operation.
STATE
Project in deployment phase.

Partners

Person responsible: Felipe Linares (Dept.

GOALS Road Serviceability)

Information pending update

44

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Energy-saving projects
OBJECTIVE
Installation of smart lighting to enhance lighting levels, uniformity and energy efficiency in the city.
SCOPE
Lighting system consisting of LEDs with sensors to regulate the intensity of lighting as required
STATE
Pilot project in deployment phase in streets in Les Corts neighbourhood and in Avinguda Josep
Tarradellas.

GOALS Person responsible:

Information pending update

45

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Energy-saving projects
OBJECTIVE
(Building Energy Advanced Management Systems). Development of an advanced system of
integrated management that favours energy efficiency in buildings and special infrastructures from
a holistic perspective, taking into account the interior of areas in public spaces and the urban
network beyond.
SCOPE
Development of a portal with open interoperability that allows the management of diverse and
heterogeneous systems, some of them in public spaces (lighting, ventilation, air conditioning) and
some other emerging ones such as the electric vehicle.
STATE
Project under development

Partners

GOALS Person responsible: Information pending

Information pending update

46

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Waste matter projects


OBJECTIVE
Introduction of ultrasonic sensors and radio frequency identification devices (RFID) in bins and
containers to create a cheaper and more sustainable system of waste collection.
SCOPE
Solution that will monitor and optimize collection routes and (potentially) adapt them dynamically
to needs. This new system will allow customisable management of waste collection in large
shopping precincts with Pay As You Throw (PAYT) models.
STATE
Project in operation.

GOALS Person responsible: Information pending

Information pending update

47

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Mobility projects
OBJECTIVE
Implementation and development of ICT solutions and applications that serve the public through
the orthogonal bus network.
SCOPE
Definition and implementation of ICT applications and smart services applicable to the various
bus-stops that make up the orthogonal network, including services related to the bus service or
using the bus-stop infrastructure to provide other public services.
STATE
Pilot project under development.

GOALS Person responsible: Frederic Pijoan

Information pending update

Orthogonal Bus Network


48

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Mobility projects
OBJECTIVE
Development of a system to provide information about the location and status (free/in use) of
parking spaces.
SCOPE
Definition and implementation of the system in the 22@, combining parking for neighbours only,
pay and display parking and public underground parking, with the aim of introducing the system
throughout the city to create new services and business models.
STATE
Pilot project under development

GOALS Person responsible: Information pending

Information pending update

49

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Mobility projects
OBJECTIVE
Development of smart mobility solutions, associated with the electric mobility infrastructure being
promoted by the City Council.
SCOPE
Identification of needs and available resources, definition of mobility strategic objectives and
implementation of the most suitable projects.
STATE
Pilot project under development.

Partners

GOALS Person responsible: Adri Gomila

Information pending update

50

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Mobility projects
OBJECTIVE
Control and management of tourist coaches wishing to park in the area of the Sagrada Famlia,
through telemanagement of special parking places for this type of vehicles.
SCOPE
Development of a pilot project in the area of the Sagrada Famlia with the possibility of applying it in
other tourist areas
STATE
Pilot project in operation.

Partners

GOALS Person responsible: Eduard Ramia

Information pending update

51

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Mobility projects
OBJECTIVE
Monitoring in the Mobility Network Operations Centre (NOC) of the status of electric vehicle
charging stations.
SCOPE
Supervision and monitoring of charging stations, both those operated by private companies and by
the Department of Mobility of Barcelona City Council
STATE
Project in operation.

GOALS Person responsible: Information pending

Information pending update

52

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Mobility projects
OBJECTIVE
To boost the introduction, promotion and development of electric mobility in the city using private
electric vehicles, and the gradual conversion of the municipal fleet to electric vehicles.
SCOPE
Live is a platform that promotes electric vehicles in the city as an opportunity to position
Barcelona as a world centre for innovation in electric mobility. Its implementation will help to
reduce exhaust emissions and improve air quality, and reduce noise pollution.
STATE
Project in operation.

Partners

GOALS Person responsible: Information pending

Information pending update

53

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Mobility projects
OBJECTIVE
Development of solutions for sustainable mobility with the aim of promoting the development of
electric cars and improving mobility in the city.
SCOPE
Identification of solutions to promote the introduction of mechanisms related to electric vehicles
and favour the implementation of solutions that improve mobility in the city.
STATE
Pilot project under development.

Partners

GOALS Person responsible: Adri Gomila

Information pending update

54

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Mobility projects
OBJECTIVE
Deployment of a system of sensors to estimate the travel time associated with different routes
around the city.
SCOPE
Detection of the degree of traffic congestion in different areas of the Eixample district through a
system of 50 sensors, in order to announce through various channels (information boards, web,
mobile app) the estimated travel times for different routes.
STATE
Pilot project in operation.

Partners

GOALS Person responsible: Information pending

Information pending update

55

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Mobility projects
OBJECTIVE
Introduction of ICT solutions in the management of traffic lights to enhance mobility of emergency
vehicles (fire, ambulance, police...)
SCOPE
Analysis, coordination and implementation of new dynamic tools (and improvement of existing
ones) for traffic light management in streets of specific importance.
STATE
Pilot project under development

GOALS Person responsible: Information pending

Information pending update

56

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Mobility projects
OBJECTIVE
Development of three large-scale pilot projects in Barcelona, Berlin and Paris Grand aimed at using
ICT services to help achieve the integration of solutions for intelligent electromobility as part of an
integrated system that respects the environment.
SCOPE
Pilot project with three basic ideas: 1) public service of electric motorcycles, 2) unification of public
mobility services and electric motorcycle service in the tourist sector, and 3) deployment of an
electric vehicle fleet for municipal maintenance services
STATE
Pilot project under development.

Partners

GOALS Person responsible: Information pending

Information pending update

57

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Mobility projects
OBJECTIVE

Initiative of the Catalan company Radio Taxi 033, addressed to citizens with a commitment to
caring for the environment
SCOPE

400 eco-friendly hybrid vehicles (vehicles that use alternative energy: LPG, Natural Gas and
electricity)
STATE
Project in operation.

GOALS Person responsible: Information pending

Information pending update

58

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Nature projects
OBJECTIVE
Application of smart city solutions for improving and managing the transition from the city to the
Sierra de Collserola.
SCOPE
Implementation and integration of ICT platforms and applications for the management of
transitional open spaces between the urban and natural environment, and for the definition and
location of neighbourhood amenities between the city and the park.
STATE
Pilot project under development.

GOALS Person responsible: Information pending

Information pending update

59

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Building and neighbourhood projects


OBJECTIVE
Creation of energy self-sufficient blocks in order to improve practices related to consumption and
production of energy.
SCOPE
Study and definition of practices to improve energy production and consumption through the
development of a pilot project in 2 buildings.
STATE
Pilot project under development.

Partners

GOALS Person responsible: Josep M. Berengueres

Information pending update

49

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Building and neighbourhood projects


OBJECTIVE
Monitoring of municipal buildings in order to define actions to reduce energy consumption by
20%, as well as monitoring of solar panel energy production
SCOPE
Monitoring of electricity and natural gas consumption and temperature in 31 additional buildings,
as well as the 23 already monitored, in order to define possible measures to reduce consumption.
STATE
Project in deployment phase.

Partners

SIGE, WIT,

GOALS Person responsible: Manel Torrent

Information pending update

49

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Building and neighbourhood projects


OBJECTIVE
Integration of expectations/perceptions/uses of residents in the construction of scenarios for the
conditioning of a neighbourhood in need of renewal /redevelopment.
SCOPE
The integration of this information makes it possible to:
Improve the way the redeveloped district meets the needs of its inhabitants.
Associate and share environmental (through nature itself) and social practices in a neighbourhood
and enhance participation and dialogue with the residents.
STATE
Pilot project under development.

Partners

GOALS Person responsible: Information pending

Information pending update

62

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Building and neighbourhood projects


OBJECTIVE
To monitor the operation of solar panels and their energy production
SCOPE
Monitoring of approximately 59 solar power stations
STATE
Pilot project in deployment phase.

Person responsible: Manel Torrent


GOALS (Energy Agency)

Information pending update

63

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Projects with social and community impact


OBJECTIVE
Introduction of telematic devices for especially vulnerable groups, for monitoring and control.
SCOPE
Implantation of various services such as telecare for the elderly with difficulties (50,000 users), in
order to communicate any problem, incident or fall to a round-the-clock rescue centre. Peripheral
devices installed in homes and also connected to the centre to warn of gas escapes or fire, report
user activity, etc..
STATE
Project in operation.

GOALS Person responsible: Information pending

Information pending update

64

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Projects with social and community impact


OBJECTIVE
Development of a digital infrastructure that links up installations and cultural facilities to promote
exchange, knowledge, innovation and ICT in the cultural field.
SCOPE
Development of a network of cultural facilities that, based on an intensive use of the possibilities
offered by second generation Internet, activates the exchange of content and online coproduction
of events, and encourages research on new uses of the web.
STATE
Pilot project in operation.

GOALS Person responsible: Information pending

Information pending update

65

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Projects with social and community impact


OBJECTIVE
Redistribution of tourist flows around the city.
SCOPE
Implementation of ICT applications that encourage and facilitate the movement of tourists to
different areas around the city through their promotion, offering alternatives and clearing the most
popular spots.
STATE
Pilot project under development

GOALS Person responsible: Information pending

Information pending update

66

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Projects with social and community impact


OBJECTIVE
Use of the postal service resources as a 2.0 channel for learning about the needs of the city.
SCOPE
Definition and implementation of procedures to optimize the value of the assets of the postal
service, facilitating the integration of tools for mobility in public ICT platforms around the city.
STATE
Pilot project under development.

GOALS Person responsible: Information pending

Information pending update

67

SR

Barcelona Smart City projects

Environment

Building

III. Map of vertical projects

Barri

Impacte social

BSP
NMN

Projects with social and community impact


OBJECTIVE
The city council is finalizing the main points of the reform to be carried out in Passeig de Grcia. As
part of this reform, the plan to develop a number of smart projects should be noted.
SCOPE
1. Mobile application for taxi drivers indicating available space in taxi ranks
2. Mobile application for loading/unloading zones
3. Queue-counting system at tourist attractions
STATE
Pilot project under development

Partners

GOALS Persons responsible: Eduard Ramia, Toni Roig, Xavier Sunyer

Information pending update

68

Barcelona Smart City projects

III. Map of vertical projects


Special project- Passeig de Grcia
The city council is finalizing the main points of the reform to be carried out in Passeig de Grcia. As
part of this reform, the plan to develop a number of smart projects should be noted.

Strengthening the municipal network

HD cameras

Mobile phone apps


Mobile application
for taxi drivers
indicating available
space in taxi ranks
Mobile application for
controlling parking time
in loading/unloading
zones

Expansion of
WiFi coverage

Expansion of FO network
with pre-installation of
multiservice lamp posts

Mobile application to
promote shopping
and tourism
69

Barcelona Smart City projects

IV. Innovation in Smart City Projects


Urban Lab
Testing space to accommodate projects that provide benefits to citizens and solve
unresolved needs in different areas.

Integrated Urban Infrastructure Solution (SIIUR): System of LED lighting technology


equipped with sensors that detect and process environmental information about presence,
temperature, humidity, noise and pollution. It also includes other features such as Wi-Fi access
points, point of information, etc..

Noise pollution
Telematic reading of gas, electricity and water meters
Sustainable mobility: Deployment of the infrastructure necessary to install charging
stations for electric vehicles (posts)
Traffic control cameras
Sensor systems: Installation of level sensors in waste containers, sensors that
communicate use of parking spaces, etc.

70

Barcelona Smart City projects

Contents
I. Smart Barcelona Project
II. Network architecture
III. Project map (cross-cutting, vertical, special)
IV. Innovation in SC projects: Urban Lab
V. Global planning of projects
VI. Agreements
VII. Sector analysis: potential partners
VIII. Organization and monitoring methodology
IX. Action Plan
X. Risks
71

Barcelona Smart City projects

IV. Innovation in Smart City Projects


iCity: Access to public infrastructures

72

Barcelona Smart City projects

IV. Innovation in Smart City Projects


Data access in the public sector
Barcelona OpenData project provides large amounts of semantically normalized public
information to businesses and individuals, so that they can create services for use in the public
and/or private sphere.
The project focuses on the most important
information
obtained
through
the
management of public space in the city; it
is of use to companies and individuals who
receive standard formats that facilitate and
universalize use.

DOCUMENTS

POPULATION

DISTRICTS

URBAN
ENVIRONMENT

INFORMATION
MANAGEMEN
T AND
PROCESSING
73

Barcelona Smart City projects

Contents
I. Smart Barcelona Project
II. Network architecture
III. Project map (cross-cutting, vertical, special)
IV. Innovation in SC projects: Urban Lab
V. Global planning of projects
VI. Agreements
VII. Sector analysis: potential partners
VIII. Organization and monitoring methodology
IX. Action Plan
X. Risks
74

Barcelona Smart City projects

V. Global planning of projects


Approximate schedule
Activity plan
NEW MUNICIPAL NETWORK
Preliminary analysis and draft project
Budget allocation and planning
Audit and asset inventory
Phase 0
Phase 1
Phase 2
BARCELONA SENSOR PLATFORM
Preliminary analysis and draft project
Budget allocation and planning
Phase 0
Phase 1
Phase 2
SITUATION ROOM
Preliminary analysis and draft project
Budget allocation and planning
Phase 0
Phase 1
Phase 2
Vertical SERVICES

2012
May June July

Aug

Sept Oct

2013

2014

2015

Nov Dec
Decision-taking
Resolution of tendering process Award

Decision-taking
Project planning

Decision-taking
Project planning

Pending development with the respective service areas


75

Barcelona Smart City projects

Contents
I. Smart Barcelona Project
II. Network architecture
III. Project map (cross-cutting, vertical, special)
IV. Innovation in SC projects: Urban Lab
V. Global planning of projects
VI. Agreements
VII. Sector analysis: potential partners
VIII. Organization and monitoring methodology
IX. Action Plan
X. Risks
76

Barcelona Smart City projects

VI. Agreements
Public-private partnership

Barcelona has developed a collaborative company-City Council model for


companies wishing to carry out research on the provision of services and
the smart management of urban space.

The City Council provides human and material resources that depend on

the companys nature, scope and contribution, and the importance of the
proposal.

Objectives

To

collaborate with companies to develop new, clearly innovative


products aimed at improving urban management.

Benefits

The contribution of municipal knowledge in the generation of the product.


The possibility of generating patents on cutting-edge commercial
products tested and validated by a city.

77

Barcelona Smart City projects

VI. Agreements
Agreement with Cisco
Initial goals of the contract ...
Development of pilot projects:
Urban Platform
Pay per light
Monitoring of public buildings
Energy self-sufficiency
Better use of groundwater and rainwater
Smart bus network
Smart parking
Neighbourhood Internet

... final goals


To become a strategic partner in the
Smart Barcelona Project by supporting
and advising the City Council on all smart
projects.
To make a direct contribution to the
development of the Barcelona Sensor
Platform (BSP) and the design of the
network.
To carry out a study of urban projects
(using 8 projects developed in Barcelona)
as a basic methodology to be included in
the City Protocol.
Development of a R&D centre in
Barcelona.

78

Barcelona Smart City projects

VI. Agreements
Agreement with GDF Suez
Pilot projects to be developed as part of the contract
develop:
Analysis of energy alternatives and feasibility of a district heating & cooling network in Sagrera
Heating and
cooling
networks

Feasibility study for the use of new energy sources, and better use of existing ones
Identification of areas likely to install new heating and cooling networks
Dissemination of heating and cooling network technology and benefits

Decentralised
production

Creation of smart clients


Near zero energy balance
Promotion of on-site generation

Energy supply

Definition of a tendering and contract model that allows outsourcing of energy services

Sustainable
mobility

Diagnosis and optimisation of the City Council vehicle fleets


Test of fuel cell / electric vehicle coupling
Modelling of static and dynamic transport
Sharing of different types of electric vehicles
Micro management platform for merchandise

Dashboard

Installation of a special dashboard for the city

Sustainable
urban planning

Construction of scenarios based on the expectations / uses of residents


Environmental optimisation of scenarios of urban redevelopment
Adaptation of the City Council for the management of energy resources
Evaluation of the impact of energy use on water resources, and its evolution
79

Barcelona Smart City projects

VI. Agreements
Agreement with Schneide Telvent
Proposals included in the agreement for cooperation:
Smart Mobility
Plan

Creation of a working group with the aim of identifying needs and available resources,
defining the strategic objectives of mobility and developing Smart Mobility projects and
services that cover the identified technological needs.

ICM Platform

Development of an Smart City platform for integrated city management, which will be
proposed for evaluation in Barcelona. All aspects related to smart mobility will be
developed in the first stage .

Smart Grids

Centre for
Excellence

Development of a pilot project for saving energy in 2 buildings.

Creation of the Smart City Centre of Excellence in Barcelona to promote the knowledge
and development of technologies for smart, integrated management of the city.

A working group will be set up to define the projects to be developed in each case.
The current agreement focuses on mobility projects. The completion of a workshop on energy efficiency and
building projects is pending.
80

Barcelona Smart City projects

VI. Agreements
Other agreements for cooperation

Telefnica and Abertis have both signed agreements with Barcelona City Council
without specifying the precise projects to be developed, but in both cases posing
collaboration in the process of integration of municipal networks as the main
objective, as well as the development of a sensor platform (BSP).

Indra is working with Barcelona City Council to reach an agreement for cooperation
in the development of the Arrowhead project within the framework of the 2012
European ARTEMIS Pilot Innovation Programme in the areas of energy and mobility,
so far without specifying the pilot projects to be developed.

81

Barcelona Smart City projects

Contents
I. Smart Barcelona Project
II. Network architecture
III. Project map (cross-cutting, vertical, special)
IV. Innovation in SC projects: Urban Lab
V. Global planning of projects
VI. Agreements
VII. Sector analysis: potential partners
VIII. Organization and monitoring methodology
IX. Action Plan
X. Risks
82

Barcelona Smart City projects

VII. Analysis of the sector


Map of potential partners
Situation Room
Environment
ICT

WATER

ENERGY

MATTER

NATURE

MOBILITY

Building
Social and community impact

Sensor Platform
New Municipal Network

Technical

Business

Legal
83

Barcelona Smart City projects

VII. Analysis of the sector


Map of potential local partners
Situation Room
Environment
ICT

WATER

ENERGY

MATTER

NATURE

MOBILITY

Building
Social and community impact
Sensor Platform
New Municipal Network

Technical

Business

Legal
84

Barcelona Smart City projects

VII. Analysis of the sector


Map of partners
Situation Room
Environment
ICT

WATER

ENERGY

MATTER

NATURE

MOBILITY

Head of project
Global
Assessment

Building
Social and community impact

Under
development

Sensor Platform
New Municipal Network

Technical

Business

Legal

Apart from external partners, IMI will act as a technology consultant in the different business areas
of a cross-cutting nature in the setting of smart cities, engineering the design phases and
supporting the phases of deployment and operation.
85

Barcelona Smart City projects

Contents
I. Smart Barcelona Project
II. Network architecture
III. Project map (cross-cutting, vertical, special)
IV. Innovation in SC projects: Urban Lab
V. Global planning of projects
VI. Agreements
VII. Sector analysis: potential partners
VIII. Organization and monitoring methodology
IX. Action Plan
X. Risks
86

Barcelona Smart City projects

VIII. Organisation and monitoring methodology


Creating the project office
The definition, deployment and management of Smart Barcelona projects implies the need to organize a
wide range of actions in a multidisciplinary, complex and technologically innovative environment, which
includes a variety of activities and multiple agents. This requires comprehensive coordination by a Project
Management Office (PMO), which acts as point of reference for the project.
Altres...

Partners
Municipal Institute of
Computing (IMI)

Other providers

Municipal service user


areas

PMO

Environment
Alignment of strategies
Coordination of activities
Project management
Evaluation and recommendations
Quality and improvement plan
Documents and reports
Adjustments and solution of
contingencies

TMB
BSM
...

Smart Barcelona Actions

87

Barcelona Smart City projects

VIII. Organisation and monitoring methodology


Project coordination
The mission of the project coordination office headed by Doxa Consulting will be to:
Situate the different smart projects in Barcelona in line with the City Councils strategic vision.
Centralise information on the progress of the various projects.
Inform the Management Committee of the evolution of the projects, using global dashboards.
Coordinating
Office

Reporting

Project Management
Committee

Supervisio
n
Environment

City Council
smart cities
Strategy

ICT

WATER

ENERGY

Building

MATTER

MOBILITY

NATURE

Neighbourhood

Social and community impact


88

Barcelona Smart City projects

VIII. Organisation and monitoring methodology


Organisation and model of relations
Model of organization of the project work team and the model of relations and communication between
Barcelona City Council and Doxa Consulting.

Doxa Strategic Management

General management - Barcelona C.C.

Josep Grau, Pedro Lisbona

Toni Vives, Manel Sanrom, Josep Ramon


Ferrer

Doxa Project Management

Project Management - Barcelona C.C.

Jordi Sala, Javier Ramrez

Paco Rodrguez

Doxa Multidisciplinary Work Team

Barcelona C.C. Project Team

Daniel Martnez, Montse Costa

Jordi Cirera, Toni Carol

89

Barcelona Smart City projects

VIII. Organisation and monitoring methodology


Monitoring methodology
The following monitoring methodology is proposed for Project management phase.

Executive Committee
(strategic
management)

Periodicity

Documentation and monitoring tools

Three-monthly /
Ad-hoc

Smart Barcelona Executive Committee report


Smart Barcelona dashboard
Smart Barcelona project management dashboard

Monitoring
Committee
(project
management)

Monthly

Smart Barcelona monitoring report


Specific monitoring reports
Smart Barcelona dashboard
Special dashboards

Working Committee

Weekly

Project status report


Special dashboards

Risk Committee

Ad-hoc

Risk analysis
Contingency plans

90

Barcelona Smart City projects

Contents
I. Smart Barcelona Project
II. Network architecture
III. Project map (cross-cutting, vertical, special)
IV. Innovation in SC projects: Urban Lab
V. Global planning of projects
VI. Agreements
VII. Sector analysis: potential partners
VIII. Organization and monitoring methodology
IX. Action Plan
X. Risks
91

Barcelona Smart City projects| 25 de Juny de 2012

IX. Action plan


Short-term actions (I)
Short-term action plan for cross-cutting projects

Conclusion of
functional analysis

Technical analysis

Internal meetings with


representatives of the
IMI for the joint
identification and
definition of functional
requirements

Identification and
creation of working
group with ICT
suppliers to analyse
possible solutions and
technology platforms

Beginning of October

End of October

Definition of draft
project

Decision-taking

Definition of draft
technical project and
preparation of
provisional schedule
and provisional budget

Strategic analysis and


decision-taking by City
Council management

End of October

Middle of November

92

Barcelona Smart City projects

IX. Action plan


Short-term actions (II)
Short-term action plan for vertical projects (services)

Functional definition

Meetings with City


Council departments /
internal clients to
identify needs and
jointly define
objectives, scope and
functional
requirements
October

Technical analysis

Definition of draft
project

Decision-taking

Identification and
creation of a working
group with ICT
suppliers to analyse
possible solutions and
technology platforms

Definition of draft
technical project and
preparation of
provisional schedule
and provisional budget

Strategic analysis and


decision-taking by City
Council management

End of October

End of November

Middle of December

93

Barcelona Smart City projects

IX. Action plan


Meeting track record (II)
Date

Area

Participants

Partners

30/05/2012

SmartBCN

Paco Rodrguez (IMI)


Jordi Cirera (IMI)

Kick off

04/06/2012

SmartBCN

Josep Ramon Ferrer


Paco Rodrguez (IMI)

Planning

05/06/2012

NMN

Toni Carol (IMI)

Network integration / Infrastructures

07/06/2012

Situation Room
Urban Platform

Jordi Cirera (IMI)


Glria Grau (TESEM)

State/ progress Urban Platform


Key ideas Situation Room
Other projects integratable in Smart City

07/06/2012

NMN

Toni Carol (IMI)

Current state of NMN and lines to follow

08/06/2012

SmartBCN

Paco Rodrguez (IMI)

Executive monitoring of project

08/06/2012

Situation Room

Arturo Gaviln (IBM)


Francisco Romero (IBM)
Jordi Cirera (IMI)
Marc Garriga (IMI)

11/06/2012

Vertical services

11/06/2012

Monitoring

11/06/2012

SmartBCN

12/06/2012

SmartBCN

Paco Rodrguez
Ramon Segarra (22@)
Josep Ramon Ferrer
Paco Rodrguez (IMI)
Josep Ramon Ferrer
Paco Rodrguez (IMI)
Josep Ramon Ferrer
Paco Rodrguez (IMI)

IBM

Order of Business

IOC Platform developed by IBM


for Situation Room

Situation of SmartCity vertical projects


Executive meeting for monitoring
Smart proposals Passeig de Grcia
Smart Passeig de Gracia

94

Barcelona Smart City projects

IX. Action plan


Meeting track record (III)
Date

Area

13/06/2012

BUP

13/06/2012

Situation Room

14/06/2012

Network

15/06/2012

Energy

18/06/2012

Vertical services

18/06/2012

Situation Room

18/06/2012

Energy

18/06/2012

Energy

Participants
David Clavera (HP)/Xavier Gonzalo (HP)
Fernando Pulido (HP)/Guido Fezzini (HP)
Gloria Grau (TESEM)
Frederic Lompart (Barcelona City Council)

Partners

Order of Business

HP

Urban Platform
Big Date
Security

Jordi Cirera (IMI)


Gloria Grau (IMI)

Organisation Situation Room

Mariano Lamarca (IMI)


Josep Ramon Ferrer
Paco Rodrguez (IMI)
Gil Soto Tolosa (Philips)
Paco Rodrguez (IMI)
Sergi Jerez (IMI)
Alberto Cceres (Clear Channel)
Jordi Sez (Clear Channel)
Josep Ramon Ferrer
BCN City Council - Cartography
Rom Llagostera (Manager Envr.) /
Jordi Cirera (IMI) / Ramon Sagarra (22@)
Cristina Castells (Dir. Energy and Envr.)
Josep Maria Berengueras (Energy and
Envr.)
Rom Llagostera (Manager M.A) /
Jordi Cirera (IMI) / Ramon Sagarra (22@)
Cristina Castells (Dir. Energy and Envr.)

Networks Pilot Projects in operation


Philips

Smart lighting

Clear Channel

Wifi innovation

Tool
Smart Cities services / agreements
(Environment)

Smart Cities services / agreements


(Environment)

95

Barcelona Smart City projects

IX. Action plan


Meeting track record (IV)
Date

Area

Participants

18/06/2012

Energy

Rom Llagostera (Manager Envr. ) / Jordi


Cirera (IMI) / Ramon Sagarra (22@)
Manel Torrent (Energy Agency BCN - Envr.)

Smart Cities services / agreements


(Environment)

18/06/2012

Water

Smart Cities services / agreements


(Environment)

19/06/2012

Water

19/06/2012

Monitoring

21/06/2012

Mobility

Rom Llagostera (Manager Envr.) / Jordi


Cirera (IMI) / Ramon Sagarra (22@)
Cristina Vila (Water cycle, Envr.)
Josep Ramon Ferrer
Paco Rodrguez (IMI)
Cristina Vila (Water Cycle, Envr.)
Ramon Dern (Better Consultants)
Josep Ramon Ferrer
Paco Rodrguez (IMI)
Maite Rodrguez Manzano
Paco Rodrguez (IMI)
Jordi Cirera (IMI) / Mariano Lamarca (IMI)
Adri Gomila (Dir. Mobility Services)

22/06/2012

Vertical services

25/06/2012

Monitoring

27/06/2012
28/06/2012

SmartBCN

Josep Ramon Ferrer


Paco Rodrguez (IMI)
Others
Josep Ramon Ferrer
Paco Rodrguez (IMI)
Josep Ramon Ferrer
Paco Rodrguez (IMI)
Ramon Sagarra (22@)

Partners

Order of Business

Sewer system

Executive meeting for monitoring

Smart Cities services / agreements

GDF Suez

Meeting preparation of agreements

Executive meeting for monitoring


IBM

Workshop IBM

96

Barcelona Smart City projects

IX. Action plan


Meeting track record (V)
Date

Area

28/06/2012

Vertical services

29/06/2012

Situation Room

02/07/2012

Situation Room

03/07/2012

Energy

04/07/2012

04/07/2012
04/07/2012

05/07/2012
06/07/2012

Participants
Jordi Cirera (IMI)/ Toni Carol (IMI)
TMB
Paco Rodrguez (IMI) / Jordi Cirera (IMI)
Eduard Martin (IMI)Javier Gil (IBM) / Artur
Gabiln (IBM) / Francisco Romero (IBM) /
Siddharth N Purohit (IBM) / Steven
Degennaro (IBM)
Jordi Cirera

Paco Rodrguez (IMI)


Cristina Castells (Dir. Energy and Envr.)
Gil Soto Tolosa (Philips)
Energy - Dept. Street Josep M Berengueres
Lighting
Begoa Tomas
Roberto Frago (TESYSE)
SmartBCN
Paco Rodriguez (IMI)
Joan Batlle
Waste
Josep Ramon Ferrer
Paco Rodriguez (IMI)
Csar Gil (Ros Roca)
Monitoring
Josep Ramon Ferrer
Paco Rodriguez (IMI)
Vertical services Jordi Cirera (IMI)
Carmen Marzo (Urban Planning), Adolf Creus
(Urban Planning)
Carlos Alonso (TMB), JuanManel
Morales(TMB), Raquel Ullate (TMB)

Partners

Order of Business
TMB network bus shelters

IBM

Philips

IOC platform developed by IBM

Analysis state of pilot projects


Situation Room
Smart lighting
workshop
Project definition- Pay per light

RosRoca

Redefine Metropolis subsidy CISCO


agreement
Waste collection

Executive meeting for monitoring


TMB

Bus stops

97

Barcelona Smart City projects

IX. Action plan


Meeting track record (VI)
Area

Participants

Partners

Order of Business

06/07/2012

Date

NMN

Paco Rodriguez (IMI)


Juan Blanco (CISCO)/ Joan Rodriguez (CISCO)
Jordi Alviny (ABERTIS)/ Antoni Liria
(ABERTIS)

Cisco
Abertis

Integration of infrastructures

06/07/2012

Vertical services

Josep Ramon Ferrer


GDF Suez
Francisco Rodrguez (IMI)
Ramon Sagarra (22@)/ Cristina Castells
(M.A)/ Cristina Vila (Water Cycle)/ Joan Batlle
(International Coop. ) / Enric Lambies (Legal
Dept. Urban Habitat)
GDF SUEZ: Bernard Archilla/ Xavier PUYAL/
Bertrand MARTIN/David SERRANO/Carlos
Moreno/ Isabel Tejero

09/07/2012

Vertical services

Cristina Vila (Water Cycle, Envr.)


Jos Miguel Guilln (SSII Water Cycle)
Ramon Sagarra (22@)

09/07/2012

Vertical services

Olga Pallas (Pers.Resp. SSII of Urban Habitat )

09/07/2012

Vertical services

09/07/2012

Monitoring

11/07/2012

Situation Room

Jordi Cirera (IMI)


Jose Miguel Guillen/ Izaskun Marti
Josep Ramon Ferrer
Paco Rodriguez (IMI)
Paco Rodriguez (IMI)
Jordi Cebrian (IMI)/J. Linares (IMI)

Monitoring pilot project development GDF Suez

Water cycle

SSII in Urban Habitat


Solution for park enclosure
Executive meeting for monitoring
VISTA

98

Barcelona Smart City projects

IX. Action plan


Meeting track record (VII)
Date

Area

11/07/2012

Situation Room

12/07/2012
12:00

SmartBCN

12/07/2012
14:00

SmartBCN

Partners

Order of Business

Paco Rodrguez (IMI)


Jordi Cebrin /J. Linares
Arturo Gavilan (IBM)/
Francisco Romero (IBM)

Participants

IBM

smart Barcelona - IOC IBM IMI

Josep Ramon Ferrer


Paco Rodrguez (IMI)
Jaume Bordell (BSM)
Toni Roig (BSM)
Josep Ramon Ferrer
Paco Rodrguez (IMI)

BSM

Smart Passeig de Grcia

Telvent

Monitoring of City Protocol

13/07/2012

Vertical services

Manel Torrent (Technical Dir. Energy


Agency)
Emma Santacana

16/07/2012
17/07/2012
18/07/2012

SmartBCN
Vertical services

Josep Mirabent

18/07/2012

Vertical services

Cristina Vila (Water Cycle, Envr.)


Jordi Cirera
Ferran Fort (PAYMACOTAS)
Aleix Parra (Iberfluid)

Energy in municipal buildings


AEB Monitoring
City Protocol sessions
Elecnor
Deimos

Smart projects in BCN

Irrigation telemanagement

99

Barcelona Smart City projects

IX. Action plan


Meeting track record (VIII)
Date

Area

Participants

20/07/2012

Smart BCN

20/07/2012
10:00

Vertical services

20/07/2012
12:30
23/07/2012

Smart BCN
Vertical services

Josep Ramon Ferrer


Paco Rodrguez (IMI)

24/07/2012
24/07/2012

Vertical services
Smart BCN

Cristina Vila (Water Cycle)


Vicen Castanyo (Telvent)

26/07/2012

Smart BCN

Toni Roig (BSM)


Xavier Sunyer (Tourism)
Vicen Castanyo (Telvent)

27/07/2012

Vertical services

Josep Ramon Ferrer


Paco Rodrguez (IMI)
Others (GDF Suez)

27/07/2012

Situation Room

Paco Rodrguez (IMI)


Juan Manuel Miras, rep. (SITEP)
ngel Casquero, technician (SITEP)
Absent: Ermengol Casanovas (SITEP)

Partners

Josep Ramon Ferrer


Reuni TMB IMI Urban Planning
Jordi Cirera (IMI) /Carmen Marzo (Urban
Planning)/ Adolf Creus (Urban Planning)
Carlos Alonso (TMB)/ Juan Manel Morales
(TMB)/Raquel Ullate (TMB)
Paco Rodrguez (IMI)

Order of Business
Executive meeting for monitoring

TMB

Bus shelters - Tender for new bus stops

Monitoring of smart projects


Pilot Projects Smart City

Telvent

Irrigation telemanagement
Projects Telvent agreement

Telvent

Smart Passeig de Grcia

GDF Suez

GDF Suez agreement

SITEP

Presentation model Situation Room

100

Barcelona Smart City projects

IX. Action plan


Meeting track record (IX)
Date

Area

27/07/2012

Vertical services

27/07/2012
13:00

NMN

30/07/2012
11:00

Vertical services

07/08/2012

Vertical services

06/09/2012

Vertical services

06/09/2012

NMN

06/09/2012

Vertical services

07/09/2012

Situation Room
BSP
vertical

12/09/2012

NMN

12/09/2012

Smart Barcelona

14/09/2012

Vertical services

Participants
Cristina Castells (Dir. Energy and Envr.)
Joan Batlle (Internacional cooperation)
Paco Rodrguez (IMI)
Francesc Bert (CISCO)
Antoni Liria (ABERTIS)
Frederic Pijoan (TMB)
Jorge Carles-Tolra Hjorth-Andersen (TMB)
Paco Rodrguez (IMI)
Jordi Saez (Clear Channel)
JR Ferrer (IMI), Paco Rodrguez (IMI),
Cristobal Escoda (NAE)
Paco Rodrguez (IMI), Toni Carol (IMI), Toni
Liria (Abertis), Joan Rodrguez (Cisco)
JR Ferrer, Paco Rodrguez (IMI)
JR Ferrer, Paco Rodrguez (IMI)
Elisa Martn (IBM)

Partners

Order of Business
Smart energy projects

Abertis
CISCO

Monitoring of integrated network


management

TMB

Orthogonal network

Clear Channel

Smart project proposal

NAE

Mail group collaboration

Cisco
Abertis

Monitoring of integrated network


management
Passeig de Grcia

IBM

IBM collaboration

Toni Carol (IMI)

State of project

JR Ferrer, Paco Rodrguez (IMI)

Monitoring and planning of projects


GDF Suez

Smart Barcelona - GDF

101

Barcelona Smart City projects

IX. Action plan


Meeting track record (X)
Date

Area

14/09/2012

Vertical services

14/09/2012

Vertical services

Participants

Partners

- AgBar: Josep Maria Callis, Jordi Pujades,


AgBar
Xavier Fuente
Farell/Nettek
- Farell: Joan Valls
Samcla
- Urban Habitat: Olga Palls
- Water Cycle: Cristina Vila, Paco Hernndez
- IMI: Jordi Cirera
Toni Carol (IMI), Miriam Alvarado (IMI)

Order of Business
Irrigation telemanagement

Passeig de Grcia

102

Barcelona Smart City projects

IX. Action plan


Pending meetings
There are currently various meetings pending in order to monitor the various lines of work. These will
involve:

AGBAR
ETRA
Endesa
Philips
Clear Channel
Schneider (Organisation of sessions)
Ros Roca
Correus

Urban Lab
Telefnica
Qualcom
Better
Barcelona Digital
Dept. Mobility

103

Barcelona Smart City projects

Contents
I. Smart Barcelona Project
II. Network architecture
III. Project map (cross-cutting, vertical, special)
IV. Innovation in SC projects: Urban Lab
V. Global planning of projects
VI. Agreements
VII. Sector analysis: potential partners
VIII. Organization and monitoring methodology
IX. Action Plan
X. Risks
104

Barcelona Smart City projects

X. Risks

Problems of adaptation to the model of partnership in the case of


companies in the sector that usually work on agreements rather than the
City Councils usual model of client-supplier relations.
Need to provide the IMI with the necessary resources to assume its new
responsibilities as sole supplier of the network and need to be able to offer
continuous service to departments during the operational phase of Smart
City projects (department demands).
Lack of awareness/involvement on the part of the different City Council
departments with regard to the strategic and cross-cutting vision of the
Smart Barcelona project.
Problems of coordination with other public organisations/institutions
promoting smart city actions around the Barcelona metropolitan area.

105