KOLTE PATIL DEVELOPERS LTD.

PROJECT : STARGAZE, BAVDHAN.


FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - CLUB HOUSE

Date of Testing : -2/9/14

: - LAYER 1

MDD (g/cc)
OMC (%)

::-

: 2.13
: 14

Core No.
Sr. No.

Discription

8879
5406
3473
1077
2396
1676
3868
2.31
13.00
2.04
95.91

8599
5276
3323
1077
2246
1571
3405
2.17
10.00
1.97
92.53

9594
6442
3152
1077
2075
1451
3374
2.33
11.00
2.09
98.35

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
11
REMARK : -

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

QA/QC ENGG.

SITE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - CLUB HOUSE

Date of Testing : -10/9/14

: - LAYER 2

MDD (g/cc)
OMC (%)

::-

: 2.13
: 14

Core No.
Sr. No.

Discription

9046
5506
3540
1077
2463
1722
3868
2.25
9.50
2.05
96.29

8592
5276
3316
1077
2239
1566
3368
2.15
10.00
1.96
91.81

9124
5963
3161
1077
2084
1457
3368
2.31
11.00
2.08
97.75

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
11
Degree of compaction (F D D/M D D)X100
REMARK : -

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

QA/QC ENGG.

SITE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - CLUB HOUSE

Date of Testing : -18/9/14

: - LAYER 3

MDD (g/cc)
OMC (%)

::-

: 2.13
: 14

Core No.
Sr. No.

Discription

9811
5926
3885
1077
2808
1964
4523
2.30
11.00
2.08
97.42

9376
5410
3966
1077
2889
2020
4587
2.27
11.00
2.05
96.03

9082
5348
3734
1077
2657
1858
4428
2.38
13.00
2.11
99.01

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
11
Degree of compaction (F D D/M D D)X100
REMARK : -

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

QA/QC ENGG.

SITE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - CLUB HOUSE

Date of Testing : -07/11/14

: - LAYER 4 (Plinth level)

MDD (g/cc)
OMC (%)

::-

: 2.13
: 14

Core No.
Sr. No.

Discription

8579
5459
3120
1077
2043
1429
3397
2.38
13.00
2.10
98.79

8563
5335
3228
1077
2151
1504
3613
2.40
14.00
2.11
98.92

9215
5296
3919
1077
2842
1987
4742
2.39
14.00
2.09
98.26

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
11
Degree of compaction (F D D/M D D)X100
REMARK : -

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

QA/QC ENGG.

SITE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - CLUB HOUSE

Date of Testing : -03/12/14

: - Plinth Level (Btn C22,23,19,20)

MDD (g/cc)
OMC (%)

::-

: 1.84
: 14

Core No.
Sr. No.

Discription

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
11
Degree of compaction (F D D/M D D)X100
REMARK : -

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

9263
5743
3520
1077
2443
1708
3441
2.01
11.50
1.81
98.18

QA/QC ENGG.

SITE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - CLUB HOUSE

Date of Testing : -08/12/14

: - Plinth Level (Btn C22,23,11,13)

MDD (g/cc)
OMC (%)

::-

: 1.86
: 14

Core No.
Sr. No.

Discription

9623
6109
3514
1077
2437
1704
3283
1.93
8.00
1.78
95.90

9473
5893
3580
1077
2503
1750
3529
2.02
9.50
1.84
98.99

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
11
Degree of compaction (F D D/M D D)X100
REMARK : -

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

QA/QC ENGG.

SITE ENGG.

2720 PART - 28)

SITE ENGG.

Wt.of cylender
Wt.of tray
Wt.of muroom+ tray
Vs
MDD =
5

4924
2412
5780
1.43
2.13

2720 PART - 28)

Wt.of cylender
Wt.of tray
Wt.of muroom+ tray
Vs
MDD =

9335
6063
3272
1077
2195
1535
3468
2.26
12.00
2.02
94.71

9194
5916
3278
1077
2201
1539
3568
2.32
10.00
2.11
98.94

SITE ENGG.

4924
2412
5780
1.43
2.13

2720 PART - 28)

SITE ENGG.

Wt.of cylender
Wt.of tray
Wt.of muroom+ tray
Vs
MDD =
5

4924
2412
5780
1.43
2.13

2720 PART - 28)

SITE ENGG.

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2126
1.43
2.13

2720 PART - 28)

SITE ENGG.

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2126
1.43
1.84

2720 PART - 28)

SITE ENGG.

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2126
1.43
1.86

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - A wing towards east side

Date of Testing : -9/10/14

:-1

MDD (g/cc)
OMC (%)

::-

: 2.13
: 14

Core No.
Sr. No.

Discription

7887
4622
3265
1077
2188
1530
3438
2.25
9.50
2.05
96.34

7563
4404
3159
1077
2082
1456
3422
2.35
10.00
2.14
100.31

7829
4545
3284
1077
2207
1543
3658
2.37
11.00
2.14
100.25

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
11
REMARK : -

LAB TECHNICIAN

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

QA/QC ENGG.

Sign.
Name

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.

SITE ENGG.

FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - A wing towards west side

Date of Testing : -13/10/14

:-1

MDD (g/cc)
OMC (%)

::-

: 2.13
: 14

Core No.
Sr. No.

Discription

8134
4970
3164
1077
2087
1459
3180
2.18
8.00
2.02
94.72

7139
3813
3326
1077
2249
1573
3504
2.23
8.00
2.06
96.85

7103
3558
3545
1078
2467
1725
3854
2.23
7.00
2.09
98.02

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
11
REMARK : -

LAB TECHNICIAN

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

QA/QC ENGG.

SITE ENGG.

Sign.
Name

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material

: - A wing towards east side


:-

Date of Testing : -17/10/14

Source of Material
Layer No.

:-

MDD (g/cc)
OMC (%)

:-2

: 2.13
: 14

Core No.
Sr. No.

Discription

8955
5563
3392
1077
2315
1619
3734
2.31
10.00
2.10
98.44

8799
5621
3178
1077
2101
1469
3435
2.34
12.00
2.09
98.00

8569
5024
3545
1078
2467
1725
3975
2.30
11.00
2.08
97.45

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
11
Degree of compaction (F D D/M D D)X100
REMARK : -

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

LAB TECHNICIAN

QA/QC ENGG.

SITE ENGG.

Sign.
Name

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - A wing

Date of Testing : -21/11/14

: - plinth lvl (Btwn col 56,79,66 &48)

MDD (g/cc)
OMC (%)

::-

: 2.13
: 14

Core No.
Sr. No.

Discription

11295
7127
4168
1077
3091
2162
4772
2.21
9.00
2.03
95.09

11071
7443
3628
1077
2551
1784
3962
2.221
9.00
2.04
95.66

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
11
Degree of compaction (F D D/M D D)X100
REMARK : -

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

LAB TECHNICIAN

QA/QC ENGG.

SITE ENGG.

Sign.
Name

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - A wing

Date of Testing : -26/11/14

: - plinth lvl (Btwn col 40,67,55,75)

MDD (g/cc)
OMC (%)

::-

: 2.13
: 14

Core No.
Sr. No.

Discription

1
Unit

1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
11
Degree of compaction (F D D/M D D)X100
REMARK : - Retesting required

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

LAB TECHNICIAN

10745
6657
4088
1077
3011
2106
3100
1.47
9.00
1.35
73.41

10673
6429
4244
1077
3167
2215
3613
1.631
12.00
1.46
79.16

15070
10772
4298
1078
3220
2252
3428
1.522
11.00
1.37
74.54

QA/QC ENGG.

SITE ENGG.

Sign.
Name

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - A wing

Date of Testing : -01/12/14

: - plinth lvl (Btwn col 40,67,55,75)

MDD (g/cc)
OMC (%)

::-

: 1.84
: 14

Core No.
Sr. No.

Discription

10839
7037
3802

10725
7035
3690

10517
6467
4050

Unit
1
2
3

Wt. of sand before pouring = (W1)


Wt. of sand after pouring = (W2)
Wt. of sand in hole + cone (W3 = W1 - W2)

gms.
gms.
gms.

4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
11
Degree of compaction (F D D/M D D)X100
REMARK : -

gms.
gms.
cc
gms.
g/cc
%
g/cc
%

LAB TECHNICIAN

1077
2725
1906
3550
1.86
9.50
1.70
92.46

1077
2613
1827
3559
1.95
10.50
1.76
95.80

1078
2972
2078
3997
1.92
11.00
1.73
94.16

QA/QC ENGG.

SITE ENGG.

Sign.
Name

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - A wing

Date of Testing : -03/12/14

: - plinth lvl (Btwn col 29,2,7,31)

MDD (g/cc)
OMC (%)

::-

: 1.84
: 14

Core No.
Sr. No.

Discription

9933
6426
3507
1077
2430
1699

9753
6287
3466
1077
2389
1671

9645
6111
3534
1077
2457
1718

Unit
1
2
3
4
5
6

Wt. of sand before pouring = (W1)


Wt. of sand after pouring = (W2)
Wt. of sand in hole + cone (W3 = W1 - W2)
Wt. of sand in cone (W4)
Wt. of sand in excavated pit ( W5 = W3-W4)
Volume of hole (V = W5/Vs)

gms.
gms.
gms.
gms.
gms.
cc

7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
11
Degree of compaction (F D D/M D D)X100
REMARK : -

LAB TECHNICIAN
Sign.
Name

gms.
g/cc
%
g/cc
%

3312
1.95
8.50
1.80
97.63

QA/QC ENGG.

3336
2.00
10.00
1.82
98.66

3365
1.96
11.00
1.76
95.89

SITE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - A wing

Date of Testing : -10/12/14

: - plinth lvl (Btwn col 11,30,6,LW 7,8&9)

MDD (g/cc)
OMC (%)

::-

: 1.84
: 14

Core No.
Sr. No.

Discription

9163
5939
3224
1077
2147
1501
2862
1.91
8.50
1.76
95.48

9057
5719
3338
1077
2261
1581
3146
1.99
10.00
1.81
98.31

8953
5709
3244
1077
2167
1515
2873
1.90
8.00
1.76
95.41

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
11
REMARK : -

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

QA/QC ENGG.

SITE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - A wing

Date of Testing : -11/12/14

: - plinth lvl (Btwn col 1,2,18,29&28)

MDD (g/cc)
OMC (%)

::-

: 1.84
: 14

Core No.
Sr. No.

Discription

7803
4857
2946
1077
1869
1307
2713
2.08
16.00
1.79
97.25

7685
4688
2997
1077
1920
1343
2666
1.99
10.00
1.81
98.10

8953
5709
3244
1077
2167
1515
2873
1.90
8.00
1.76
95.41

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
11
REMARK : -

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

QA/QC ENGG.

SITE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - A wing

Date of Testing : -24/12/14

: - plinth level (Btn col C25,33,12,11)

MDD (g/cc)
OMC (%)

::-

: 1.84
: 14

Core No.
Sr. No.

Discription

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
11
REMARK : -

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

12609
8963
3646
1077
2569
1797
3524
1.96
8.00
1.82
98.71

QA/QC ENGG.

SITE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - A wing

Date of Testing : -30/12/14

::: - plinth level (Btn col 48,49,66,67) & near

MDD (g/cc)

: 1.84

OMC (%)

: 14

Core No.
Sr. No.

Discription

12453
9043
3410
1077
2333
1631
3249
1.99
10.00
1.81
98.39

12053
8769
3284
1078
2206
1543
2924
1.90
10.50
1.72
93.22

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
11
REMARK : -

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

QA/QC ENGG.

SITE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - A wing
::-

Date of Testing : -03/01/15

MDD (g/cc)
: - plinth level (Btn col 48,37,31,44) drive waOMC (%)

: 1.84
: 14

Core No.
Sr. No.

Discription

12507
8965
3542
1077
2465
1724
3179
1.84
12.00
1.65
89.49

12417
9137
3280
1078
2202
1540
2969
1.93
10.00
1.75
95.26

12345
9045
3300
1079
2221
1553
3154
2.03
13.00
1.80
97.67

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
11
REMARK : -

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

QA/QC ENGG.

SITE ENGG.

720 PART - 28)

SITE ENGG.

Wt.of cylender
Wt.of tray
Wt.of muroom+ tray
Vs
MDD =
5

4977
2412
5850
1.43
2.13

720 PART - 28)

5
Wt.of cylender
Wt.of tray
Wt.of muroom+ tray
Vs
MDD =

SITE ENGG.

720 PART - 28)

4977
2400
5850
1.43
2.13

5
Wt.of cylender
Wt.of tray
Wt.of muroom+ tray
Vs
MDD =

SITE ENGG.

720 PART - 28)

4977
2407
5850
1.43
2.13

5
Wt.of cylender
Wt.of tray
Wt.of muroom+ tray
Vs
MDD =

4577
2127
5850
1.43
2.13

Wt.of cylender

4577

SITE ENGG.

720 PART - 28)

Wt.of tray
Wt.of muroom+ tray
Vs
MDD =

2127
5850
1.43
1.84

Wt.of cylender
Wt.of tray
Wt.of muroom+ tray
Vs

4577
2127
5850
1.43

SITE ENGG.

720 PART - 28)

MDD =

1.84

SITE ENGG.

720 PART - 28)

4
9469
6017
3452
1077
2375
1661

5
Wt.of cylender
Wt.of tray
Wt.of muroom+ tray
Vs
MDD =

4577
2126
5850
1.43
1.84

2934
1.77
9.00
1.62
88.08

SITE ENGG.

720 PART - 28)

5
Wt.of cylender
Wt.of tray
Wt.of muroom+ tray
Vs
MDD =

SITE ENGG.

4577
2126
5850
1.43
1.84

720 PART - 28)

5
Wt.of cylender
Wt.of tray
Wt.of muroom+ tray
Vs
MDD =

SITE ENGG.

4577
2126
5850
1.43
1.84

720 PART - 28)

5
Wt.of cylender
Wt.of tray
Wt.of muroom+ tray
Vs
MDD =

SITE ENGG.

4577
2126
5850
1.43
1.84

720 PART - 28)

5
Wt.of cylender
Wt.of tray
Wt.of muroom+ tray
Vs
MDD =

SITE ENGG.

4577
2126
5850
1.43
1.84

720 PART - 28)

5
Wt.of cylender
Wt.of tray
Wt.of muroom+ tray
Vs
MDD =

SITE ENGG.

4577
2126
5850
1.43
1.84

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - B wing

Date of Testing : -20/10/14

:-1

MDD (g/cc)
OMC (%)

::-

: 2.13
: 14

Core No.
Sr. No.

Discription

8891
5363
3528
1077
2451
1714
3841
2.24
9.00
2.06
96.52

8665
5049
3616
1077
2539
1776
4247
2.39
12.00
2.14
100.27

9383
5249
4134
1078
3056
2137
5005
2.34
10.50
2.12
99.50

0
0
0
0
0
0
0
0
0
0
0

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
11
REMARK : -

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

QA/QC ENGG.

SITE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - B wing

Date of Testing : -31/10/14

: - 2 nd Layer

MDD (g/cc)
OMC (%)

::-

: 2.13
: 14

Core No.
Sr. No.

Discription

9675
5853
3822
1077
2745
1920
4014
2.09
14.00
1.83
98.17

9569
5813
3756
1077
2679
1873
3981
2.12
10.00
1.93
99.76

9449
5663
3786
1077
2709
1894
3946
2.08
11.00
1.88
97.79

0
0
0
0
0
0
0
0
0
0
0

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
11
Degree of compaction (F D D/M D D)X100
REMARK : -

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

QA/QC ENGG.

SITE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - B wing

Date of Testing : -07/11/14

: - 2 nd Layer

MDD = 1.84
OMC (%)

::-

: 14

Core No.
Sr. No.

Discription

8363
4514
3849
1077
2772
1938
3869
2.00
14.00
1.75
95.15

8933
5107
3826
1077
2749
1922
3846
2.00
12.00
1.79
97.08

8289
4092
4197
1077
3120
2182
4364
2.00
14.00
1.75
95.36

0
0
0
0
0
0
0
0
0
0
0

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
11
Degree of compaction (F D D/M D D)X100
REMARK : -

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

QA/QC ENGG.

SITE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - B wing

Date of Testing : -14/11/14

: - Plinth Level ( Bet'n C 26, 52, 49, 12)

MDD (g/cc)
OMC (%)

::-

: 1.84
: 14

Core No.
Sr. No.

Discription

7823
3787
4036
1077
2959
2069
3838
1.85
9.00
1.70
92.48

7697
3738
3959
1077
2882
2015
3213
1.59
10.50
1.44
78.41

7453
3123
4330
1077
3253
2275
3909
1.72
9.00
1.58
85.68
85.52

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
11
Degree of compaction (F D D/M D D)X100
12
Average
REMARK : - recompaction required.

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%
%

QA/QC ENGG.

SITE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - B wing

Date of Testing : -18/11/14

: - Plinth Level ( Bet'n C 26, 52, 49, 12)

MDD (g/cc)
OMC (%)

::-

: 1.84
: 14

Core No.
Sr. No.

Discription

7327
1576
5751
1077
4674
3269
5168
1.58
12.00
1.41
76.72

7033
2333
4700
1077
3623
2534
4214
1.66
14.00
1.46
79.29

6817
2248
4569
1077
3492
2442
4053
1.66
12.00
1.48
80.54
78.85

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
11
Degree of compaction (F D D/M D D)X100
12
Average
REMARK : - Recompaction required

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%
%

QA/QC ENGG.

SITE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - B wing

Date of Testing : -19/11/14

: - Plinth Level ( Bet'n C 26, 52, 49, 12)

MDD (g/cc)
OMC (%)

::-

: 1.84
: 14

Core No.
Sr. No.

Discription

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
11
Degree of compaction (F D D/M D D)X100
12
Average
REMARK : -

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%
%

6605
3004
3601
1077
2524
1765
3065
1.74
10.50
1.57
85.41
85.41

QA/QC ENGG.

SITE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - B wing

Date of Testing : -01/12/14

: - Plinth Level ( near LW4,5,6)&C 6,9 ,47)

MDD (g/cc)
OMC (%)

::-

: 1.84
: 14

Core No.
Sr. No.

Discription

10640
6423
4217
1077
3140
2196
3977
1.81
12.00
1.62
87.89

10521
7049
3472
1077
2395
1675
3021
1.80
11.50
1.62
87.92

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
11
Degree of compaction (F D D/M D D)X100
12
Average
REMARK : -

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%
%

87.90

QA/QC ENGG.

SITE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - B wing

Date of Testing : -04/12/14

: - Plinth Level ( near LW1,2,3& C37,6,7))

MDD (g/cc)
OMC (%)

::-

: 1.84
: 14

Core No.
Sr. No.

Discription

9149
5081
4068
1077
2991
2092
4098
1.96
9.50
1.79
97.24

0
0
0
0
0
0
0
0.00
0.00
0.00
0.00

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
11
Degree of compaction (F D D/M D D)X100
12
Average
REMARK : -

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%
%

0.00

QA/QC ENGG.

SITE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - B wing

Date of Testing : -05/12/14

: - Plinth Level ( near LW4,5,6 & C82,88,54))

MDD (g/cc)
OMC (%)

::-

: 1.84
: 14

Core No.
Sr. No.

Discription

8849
4575
4274
1077
3197
2236
4491
2.01
11.50
1.80
97.91

8533
4618
3915
1077
2838
1985
3899
1.96
11.00
1.77
96.19

8199
5057
3142
1077
2065
1444
2828
1.96
11.00
1.76
95.89
96.66

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
11
Degree of compaction (F D D/M D D)X100
12
Average
REMARK : -

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%
%

QA/QC ENGG.

SITE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - B wing

Date of Testing : - 08/12/14

: - Plinth Level ( Near C57,60,92,95)

MDD (g/cc)
OMC (%)

::-

: -1.84
: 14

Core No.
Sr. No.

Discription

10119
6673
3446
1077
2369
1657
3358
2.03
10.50
1.83
99.69

9979
6127
3852
1077
2775
1941
3749
1.93
11.00
1.74
94.59

9773
6101
3672
1077
2595
1815
3525
1.94
10.50
1.76
95.54
96.61

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
11
Degree of compaction (F D D/M D D)X100
12
Average
REMARK : -

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%
%

QA/QC ENGG.

SITE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - B wing
::-

Date of Testing : - 11/12/14

MDD (g/cc)
: - Plinth Level ( C13-17& C22-32,C62-64& C74 OMC (%)

: -1.84
: 14

Core No.
Sr. No.

Discription

8755
5304
3451
1077
2374
1660
2918
1.76
10.00
1.60
86.84

8617
4812
3805
1077
2728
1908
2961
1.55
9.50
1.42
77.04

8333
4967
3366
1077
2289
1601
2917
1.82
8.00
1.69
91.70
85.19

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
11
12
Average
REMARK : - retesting required

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%
%

QA/QC ENGG.

SITE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - B wing
::-

Date of Testing : - 12/12/14

MDD (g/cc)
: - Plinth Level ( C13-17& C22-32,C62-64& C74 OMC (%)

: -1.84
: 14

Core No.
Sr. No.

Discription

7593
4581
3012
1077
1935
1353
2606
1.93
9.50
1.76
95.59

7673
4570
3103
1077
2026
1417
2876
2.03
11.00
1.83
99.39

7833
4867
2966
1077
1889
1321
2617
1.98
10.00
1.80
97.88
97.62

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
11
12
Average
REMARK : -

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%
%

QA/QC ENGG.

SITE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - B wing

Date of Testing : - 15/12/14

: - Plinth Level ( C60,62,96,102)

MDD (g/cc)
OMC (%)

::-

: -1.84
: 14

Core No.
Sr. No.

Discription

13193
9675
3518
1077
2441
1707
3303
1.93
9.50
1.77
96.04

13119
9853
3266
1077
2189
1531
3017
1.97
11.50
1.77
96.07

13029
9843
3186
1077
2109
1475
2917
1.98
9.50
1.81
98.17
96.76

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
11
12
Average
REMARK : -

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%
%

QA/QC ENGG.

SITE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - B wing

Date of Testing : - 20/12/14

: - Plinth Level ( C75,76,103,104)

MDD (g/cc)
OMC (%)

::-

: -1.84
: 14

Core No.
Sr. No.

Discription

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
11
12
Average
REMARK : -

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%
%

12347
8275
4072
1077
2995
2094
4117
1.97
9.50
1.80
97.56
97.56

QA/QC ENGG.

SITE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - B wing

Date of Testing : - 27/12/14

: - Plinth Level ( C55,56,41,42)

MDD (g/cc)
OMC (%)

::-

: -1.84
: 14

Core No.
Sr. No.

Discription

12831
9682
3149
1077
2072
1449
2875
1.98
10.50
1.80
97.59

12718
9411
3307
1077
2230
1559
3144
2.02
11.00
1.82
98.71

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
11
REMARK : -

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

QA/QC ENGG.

SITE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - B wing

Date of Testing : - 07/01/15

: - Plinth Level ( C33, 34, 40,41)

MDD (g/cc)
OMC (%)

::-

: - 1.84
: - 14

Core No.
Sr. No.

Discription

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
11
REMARK : -

LAB TECHNICIAN

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

12099
8703
3396
1077
2319
1622
2802
1.73
9.00
1.59
86.15

QA/QC ENGG.

Sign.
Name

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.

SITE ENGG.

FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - B wing

Date of Testing : - 15/01/15

: - Plinth Level ( C7 to 16)

MDD (g/cc)
OMC (%)

::-

: - 1.84
: - 14

Core No.
Sr. No.

Discription

12395
9013
3382
1077
2305
1612
3142
1.95
12.00
1.74
94.59

12283
9363
2920
1078
1842
1288
2568
1.99
10.00
1.81
98.50

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
11
Degree of compaction (F D D/M D D)X100
REMARK : -

LAB TECHNICIAN

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

QA/QC ENGG.

SITE ENGG.

Sign.
Name

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material

: - B wing
:-

Date of Testing : - 20/01/15

Source of Material
Layer No.

:-

MDD (g/cc)
OMC (%)

: - Plinth Level ( C5 to 11)

: - 1.84
: - 14

Core No.
Sr. No.

Discription

11479
7923
3556
1077
2479
1734
3351
1.93
9.00
1.77
96.38

11369
7813
3556
1078
2478
1733
3290
1.90
8.00
1.76
95.54

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
11
REMARK : -

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

QA/QC ENGG.

SITE ENGG.

T - 28)

TE ENGG.

Wt.of cylender
Wt.of tray
Vs
MDD =

5
0
0
0
0
0
0
0
0
0
0
0

4461
2407
1.43
2.13

T - 28)

TE ENGG.

Wt.of cylender
Wt.of tray
Vs
MDD =

5
0
0
0
0
0
0
0
0
0
0
0

4461
2126
1.43
2.13

T - 28)

TE ENGG.

Wt.of cylender
Wt.of tray
Vs
MDD =

5
0
0
0
0
0
0
0
0
0
0
0

4461
2130
1.43
1.84

T - 28)

TE ENGG.

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2117
1.43
1.84

T - 28)

TE ENGG.

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2127
1.43
1.84

T - 28)

TE ENGG.

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2127
1.43
1.84

T - 28)

TE ENGG.

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2127
1.43
1.84

T - 28)

TE ENGG.

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2127
1.43
1.84

T - 28)

TE ENGG.

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2127
1.43
1.84

T - 28)

TE ENGG.

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2126
1.43
1.84

T - 28)

TE ENGG.

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2126
1.43
1.84

T - 28)

TE ENGG.

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2126
1.43
1.84

T - 28)

TE ENGG.

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2126
1.43
1.84

T - 28)

TE ENGG.

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2126
1.43
1.84

T - 28)

TE ENGG.

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2126
1.43
1.84

T - 28)

TE ENGG.

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2126
1.43
1.84

T - 28)

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2126
1.43
1.84

Wt.of cylender
Wt.of tray
Vs

4577
2126
1.43

TE ENGG.

T - 28)

TE ENGG.

MDD =

1.84

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.
Sr. No.

: - C wing

Date of Testing : -03/12/14

: - LAYAER 1 ( C17,41,42,8 )

MDD (g/cc)
OMC (%)

::-

Discription

Core
No.

: 1.84
: 14

10415
7099
3316
1077
2239
1566
3117
1.99
9.50
1.82
98.81

10325
7073
3252
1077
2175
1521
2762
1.82
8.50
1.67
90.96

10213
6869
3344
1078
2266
1585
3235
2.04
11.00
1.84
99.96

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
11
REMARK : -

LAB TECHNICIAN

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

QA/QC ENGG.

Sign.
Name

KOLTE PATIL DEVELOPERS LTD.

SITE ENGG.

PROJECT : STARGAZE, BAVDHAN.


FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.
Sr. No.

: - C wing

Date of Testing : -15/12/14

: - LAYAER 2( c17,41,42,8)

MDD (g/cc)
OMC (%)

::-

Discription

Core
No.

: 1.84
: 14

12679
9667
3012
1077
1935
1353
2643
1.95
8.00
1.81
98.29

12563
9369
3194
1077
2117
1480
2860
1.93
8.50
1.78
96.77

12457
9495
2962
1078
1884
1317
2614
1.98
10.00
1.80
98.03

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
11
REMARK : -

LAB TECHNICIAN

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

QA/QC ENGG.

Sign.
Name

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.

SITE ENGG.

FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.
Sr. No.

: - C wing

Date of Testing : -13/01/15

: - Near Retaining Wall

MDD (g/cc)
OMC (%)

::-

Discription

Core
No.

: 1.84
: 14

12243
9379
2864
1077
1787
1250
2470
1.98
8.00
1.83
99.46

12167
9143
3024
1077
1947
1362
2705
1.99
9.50
1.81
98.61

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
11
Degree of compaction (F D D/M D D)X100
REMARK : -

LAB TECHNICIAN

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

QA/QC ENGG.

SITE ENGG.

Sign.
Name

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)

Location
Type of Material
Source of Material
Layer No.

: - C wing

Date of Testing : -27/01/15

:-

MDD (g/cc)
OMC (%)

::-

Sr. No.

Discription

Core
No.

: 1.84
: 14

10897
7925
2972
1077
1895
1325
2157
1.63
11.00
1.47
79.70

10783
7991
2792
1077
1715
1199
2359
1.97
12.00
1.76
95.45

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
11
REMARK : -

LAB TECHNICIAN

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

QA/QC ENGG.

SITE ENGG.

Sign.
Name

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material

: - C wing
:-

Date of Testing : -2/02/15

Source of Material
Layer No.

:-

MDD (g/cc)
OMC (%)

: - plinth level,C3,4,8,26,30,14

Sr. No.

Discription

Core
No.

: 1.84
: 14

10093
6957
3136
1077
2059
1440
2629
1.83
9.00
1.68
91.04

9989
7209
2780
1077
1703
1191
2177
1.83
10.50
1.65
89.91

9955
6843
3112
1078
2034
1422
2407
1.69
11.50
1.52
82.48

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
11
REMARK : -Retesting required.

LAB TECHNICIAN

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

QA/QC ENGG.

SITE ENGG.

Sign.
Name

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - C wing

Date of Testing : -04/02/15

: - Plinth level,C3,4,8,26,30,14

MDD (g/cc)
OMC (%)

::-

: 1.84
: 14

Sr. No.

Discription

Core
No.

10003
6957
3046
1077
1969
1377
2729
1.98
8.50
1.83
99.28

10889
8209
2680
1077
1603
1121
2213
1.97
9.00
1.81
98.43

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
11
REMARK : -Retesting found ok.

LAB TECHNICIAN

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

QA/QC ENGG.

SITE ENGG.

Sign.
Name

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.
FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720 PART - 28)
Location
Type of Material
Source of Material
Layer No.

: - C wing
::-

Date of Testing : -05/02/15

MDD (g/cc)
: - plinth level LW6, 47, 60, 57, 56, 45, OMC (%)

: 1.84
: 14

Sr. No.

Discription

Core
No.

9597
6785
2812
1077
1735
1213
2344
1.93
9.00
1.77
96.33

9435
6783
2652
1077
1575
1101
2084
1.89
8.50
1.74
94.78

Unit
1
Wt. of sand before pouring = (W1)
2
Wt. of sand after pouring = (W2)
3
Wt. of sand in hole + cone (W3 = W1 - W2)
4
Wt. of sand in cone (W4)
5
Wt. of sand in excavated pit ( W5 = W3-W4)
6
Volume of hole (V = W5/Vs)
7
Wt.of soil from pit (W6)
8
Wet density of soil Vd = W6/V
9
Moisture from R M M reading
10
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
11
REMARK : -

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

QA/QC ENGG.

SITE ENGG.

ART - 28)

TE ENGG.

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2126
1.43
1.84

ART - 28)

TE ENGG.

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2126
1.43
1.84

ART - 28)

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2126
1.43
1.84

Wt.of cylender

4577

TE ENGG.

ART - 28)

Wt.of tray
Vs
MDD =

2126
1.43
1.84

Wt.of cylender
Wt.of tray
Vs

4577
2126
1.43

TE ENGG.

ART - 28)

MDD =

1.84

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2126
1.43
1.84

TE ENGG.

ART - 28)

TE ENGG.

ART - 28)

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2126
1.43
1.84

TE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.

FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 272


Location
Type of Material
Source of Material
Layer No.

: - D wing

Date of Testing : -17/12

: - LAYAER 1

MDD (g/cc)
OMC (%)

::-

Sr. No.

Discription

Core
No.

: 1.86
: 14

Unit
1
2
3
4
5
6
7
8
9
10
11
REMARK

Wt. of sand before pouring = (W1)


Wt. of sand after pouring = (W2)
Wt. of sand in hole + cone (W3 = W1 - W2)
Wt. of sand in cone (W4)
Wt. of sand in excavated pit ( W5 = W3-W4)
Volume of hole (V = W5/Vs)
Wt.of soil from pit (W6)
Wet density of soil Vd = W6/V
Moisture from R M M reading
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
:-

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

LAB TECHNICIAN

12625
8673
3952
1077
2875
2010
3878
1.93
8.00
1.79
96.02

QA/QC ENGG.

Sign.
Name

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.

FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 272


Location
Type of Material
Source of Material
Layer No.
Sr. No.

: - D wing

Date of Testing : -30/12

: - LAYAER 2

MDD (g/cc)
OMC (%)

::-

Discription

Core
No.

Unit
1

Wt. of sand before pouring = (W1)

gms.

12067

: 1.84
: 14

2
3
4
5
6
7
8
9
10
11
REMARK

Wt. of sand after pouring = (W2)


Wt. of sand in hole + cone (W3 = W1 - W2)
Wt. of sand in cone (W4)
Wt. of sand in excavated pit ( W5 = W3-W4)
Volume of hole (V = W5/Vs)
Wt.of soil from pit (W6)
Wet density of soil Vd = W6/V
Moisture from R M M reading
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
:-

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

8559
3508
1077
2431
1700
3262
1.92
7.00
1.79
97.46

QA/QC ENGG.

PERS LTD.

AVDHAN.

MENT METHOD (IS 2720 PART - 28)

Date of Testing : -17/12/14

MDD (g/cc)
OMC (%)

: 1.86
: 14
2

12563
9341
3222
1077
2145
1500
2880
1.92
8.50
1.77
95.14

12467
9065
3402
1078
2324
1625
3285
2.02
9.50
1.85
99.24

QC ENGG.

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2126
1.43
1.86

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2126
1.43
1.84

SITE ENGG.

PERS LTD.

AVDHAN.

MENT METHOD (IS 2720 PART - 28)

Date of Testing : -30/12/14

MDD (g/cc)
OMC (%)

: 1.84
: 14
2

12007

11931

QC ENGG.

8921
3086
1077
2009
1405
2782
1.98
8.50
1.83
99.19

8513
3418
1078
2340
1636
3229
1.97
8.00
1.83
99.30

SITE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.

FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720


Location
Type of Material
Source of Material
Layer No.

: - E wing

Date of Testing : - 27/01/1

: - LAYAER 1

MDD (g/cc)
OMC (%)

::-

Sr. No.

Discription

Core
No.

: 1.84
: 14

Unit
1
2
3
4
5
6
7
8
9
10
11
REMARK

Wt. of sand before pouring = (W1)


Wt. of sand after pouring = (W2)
Wt. of sand in hole + cone (W3 = W1 - W2)
Wt. of sand in cone (W4)
Wt. of sand in excavated pit ( W5 = W3-W4)
Volume of hole (V = W5/Vs)
Wt.of soil from pit (W6)
Wet density of soil Vd = W6/V
Moisture from R M M reading
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
:-

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

LAB TECHNICIAN

11023
7747
3276
1077
2199
1538
2917
1.90
8.00
1.76
95.46

QA/QC ENGG.

Sign.
Name

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.

FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720


Location
Type of Material
Source of Material
Layer No.
Sr. No.

: - E wing

Date of Testing : - 04/02/1

: - LAYAER 2

MDD (g/cc)
OMC (%)

::-

Discription

Core
No.

Unit
1

Wt. of sand before pouring = (W1)

gms.

9887

: 1.84
: 14

2
3
4
5
6
7
8
9
10
11
REMARK

Wt. of sand after pouring = (W2)


Wt. of sand in hole + cone (W3 = W1 - W2)
Wt. of sand in cone (W4)
Wt. of sand in excavated pit ( W5 = W3-W4)
Volume of hole (V = W5/Vs)
Wt.of soil from pit (W6)
Wet density of soil Vd = W6/V
Moisture from R M M reading
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
:-

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

6895
2992
1077
1915
1339
2582
1.93
7.50
1.79
97.48

QA/QC ENGG.

OPERS LTD.

AVDHAN.

MENT METHOD (IS 2720 PART - 28)

Date of Testing : - 27/01/14

MDD (g/cc)
OMC (%)

: 1.84
: 14
2

10969
7693
3276
1078
2198
1537
3006
1.96
9.00
1.79
97.51

11089
7875
3214
1079
2135
1493
2955
1.98
10.00
1.80
97.79

/QC ENGG.

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2126
1.43
1.84

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2126
1.43
1.84

SITE ENGG.

OPERS LTD.

AVDHAN.

MENT METHOD (IS 2720 PART - 28)

Date of Testing : - 04/02/15

MDD (g/cc)
OMC (%)

: 1.84
: 14
2

9823

9703

/QC ENGG.

6859
2964
1078
1886
1319
2524
1.91
8.00
1.77
96.30

6669
3034
1079
1955
1367
2614
1.91
8.50
1.76
95.77

SITE ENGG.

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.

FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720


Location
Type of Material
Source of Material
Layer No.

: - F wing

Date of Testing : -9/1/201

: - LAYAER 1

MDD (g/cc)
OMC (%)

::-

Sr. No.

Discription

Core
No.

: 1.84
: 14

Unit
1
2
3
4
5
6
7
8
9
10
11
REMARK

Wt. of sand before pouring = (W1)


Wt. of sand after pouring = (W2)
Wt. of sand in hole + cone (W3 = W1 - W2)
Wt. of sand in cone (W4)
Wt. of sand in excavated pit ( W5 = W3-W4)
Volume of hole (V = W5/Vs)
Wt.of soil from pit (W6)
Wet density of soil Vd = W6/V
Moisture from R M M reading
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
:-

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

LAB TECHNICIAN

12563
9230
3333
1077
2256
1578
2993
1.90
6.00
1.79
97.27

QA/QC ENGG.

Sign.
Name

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.

FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720


Location
Type of Material
Source of Material
Layer No.
Sr. No.

: - F wing

Date of Testing : -19/1/20

: - LAYAER 2

MDD (g/cc)
OMC (%)

::-

Discription

Core
No.

Unit
1

Wt. of sand before pouring = (W1)

gms.

12003

: 1.84
: 14

2
3
4
5
6
7
8
9
10
11
REMARK

Wt. of sand after pouring = (W2)


Wt. of sand in hole + cone (W3 = W1 - W2)
Wt. of sand in cone (W4)
Wt. of sand in excavated pit ( W5 = W3-W4)
Volume of hole (V = W5/Vs)
Wt.of soil from pit (W6)
Wet density of soil Vd = W6/V
Moisture from R M M reading
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
: - Recompaction required.

gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

LAB TECHNICIAN

9033
2970
1077
1893
1324
2584
1.95
8.50
1.80
97.78

QA/QC ENGG.

Sign.
Name

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.

FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720


Location
Type of Material
Source of Material
Layer No.
Sr. No.

: - F wing

Date of Testing : -20/1/20

: - LAYAER 2

MDD (g/cc)
OMC (%)

::-

Discription

Core
No.

Unit
1
2
3
4
5
6
7
8
9
10
11
REMARK

Wt. of sand before pouring = (W1)


Wt. of sand after pouring = (W2)
Wt. of sand in hole + cone (W3 = W1 - W2)
Wt. of sand in cone (W4)
Wt. of sand in excavated pit ( W5 = W3-W4)
Volume of hole (V = W5/Vs)
Wt.of soil from pit (W6)
Wet density of soil Vd = W6/V
Moisture from R M M reading
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
: - Retesting done found ok.

LAB TECHNICIAN

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

11537
8233
3304
1077
2227
1557
3194
2.05
11.50
1.84
99.97

QA/QC ENGG.

: 1.84
: 14

Sign.
Name

KOLTE PATIL DEVELOPERS LTD.


PROJECT : STARGAZE, BAVDHAN.

FIELD DRY DENSITY BY SAND REPLACEMENT METHOD (IS 2720


Location
Type of Material
Source of Material
Layer No.
Sr. No.

: - F wing

Date of Testing : -29/1/20

: - UGWT Tank Layer 1

MDD (g/cc)
OMC (%)

::-

Discription

Core
No.

Unit
1
2
3
4
5
6
7
8
9
10
11
REMARK

Wt. of sand before pouring = (W1)


Wt. of sand after pouring = (W2)
Wt. of sand in hole + cone (W3 = W1 - W2)
Wt. of sand in cone (W4)
Wt. of sand in excavated pit ( W5 = W3-W4)
Volume of hole (V = W5/Vs)
Wt.of soil from pit (W6)
Wet density of soil Vd = W6/V
Moisture from R M M reading
F D D = Vd/(1+W)
Degree of compaction (F D D/M D D)X100
:-

LAB TECHNICIAN
Sign.
Name

gms.
gms.
gms.
gms.
gms.
cc
gms.
g/cc
%
g/cc
%

10627
7903
2724
1077
1647
1152
2264
1.97
9.00
1.80
98.01

QA/QC ENGG.

: 1.84
: 14

OPERS LTD.

AVDHAN.

MENT METHOD (IS 2720 PART - 28)

Date of Testing : -9/1/2015

MDD (g/cc)
OMC (%)

: 1.84
: 14
2

12213
8857
3356
1077
2279
1594
3138
1.97
7.50
1.83
99.54

12369
9193
3176
1078
2098
1467
2859
1.95
9.50
1.78
96.72

/QC ENGG.

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2126
1.43
1.84

Wt.of cylender
Wt.of tray
Vs
MDD =

4577
2126
1.43
1.84

SITE ENGG.

OPERS LTD.

AVDHAN.

MENT METHOD (IS 2720 PART - 28)

Date of Testing : -19/1/2015

MDD (g/cc)
OMC (%)

: 1.84
: 14
2

11893

11767

8083
3810
1077
2733
1911
3159
1.65
8.00
1.53
83.18

8458
3309
1078
2231
1560
2939
1.88
10.00
1.71
93.07

/QC ENGG.

SITE ENGG.

OPERS LTD.

AVDHAN.

MENT METHOD (IS 2720 PART - 28)

Wt.of cylender
Wt.of tray
Vs
MDD =

Date of Testing : -20/1/2015

MDD (g/cc)
OMC (%)

: 1.84
: 14
2

11583
8191
3392
1077
2315
1619
3207
1.98
10.00
1.80
97.88

/QC ENGG.

SITE ENGG.

4577
2126
1.43
1.84

OPERS LTD.

AVDHAN.

MENT METHOD (IS 2720 PART - 28)

Wt.of cylender
Wt.of tray
Vs
MDD =

Date of Testing : -29/1/2015

MDD (g/cc)
OMC (%)

: 1.84
: 14
2

10575
7573
3002
1077
1925
1346
2582
1.92
7.50
1.78
96.97

/QC ENGG.

SITE ENGG.

4577
2126
1.43
1.84