Sunteți pe pagina 1din 13

Statement of Salary Drawn By Sri k v rajesh

Month&Year
Mar-12
Apr-12
May-12
Jun-12
Jul-12
Aug-12
Sep-12
Oct-12
Nov-12
Dec-12
Jan-13
Feb-13
DA Arrears
1/12 & 02/12

Pay

FPI

DA

Proj. Allow

Medical
Allow

HRA

CUG

Total Rs.

24070

5269

6935

500

4814

150

41738

3521

16849

3688

4855

350

3370

105

29217

2464

24070

5269

5593

500

4814

121

40367

3521

24070

5269

6935

500

4814

150

41738

3521

24070

5269

6935

500

4814

150

41738

3521

24070

6511

6935

500

4814

150

42979.5

3670

25025

6769

6935

500

5005

150

44384

3815

25025

6769

6935

500

5005

150

44383.5

3815

25025

6769

6935

500

5005

150

44383.5

3815

25025

6769

6935

500

5005

150

44383.5

3815

25025

6769

6935

500

5005

150

44383.5

3815

25025

6769

6935

500

5005

150

44383.5

3815

2430

2430

292

1242

1242

149

10396

1056

518145

44605

DA Arrears 7/12
23-4-12
to
4-12

TOTAL

30-

, Designation: AE/CIVIL

7221

294570

1581

77142

79793

150

1444

6000

58914

1726

GPF/EPF

Designation: AE/CIVIL

During 2012-2013
RECOVERIES
co-op
society

TOTAL DED

NET

1000

1625

6406

35332

1000

1625

5349

23868

200

1000

1625

6406

33961

60

200

1000

1625

6406

35332

60

200

1000

1625

6406

35332

60

200

1000

300

1625

6855

36125

60

200

1000

100

1625

6800

37584

60

200

1000

100

1625

6800

37584

60

200

100

1625

5800

60

200

100

1625

5800

60

200

100

1625

5800

60

200

100

1625

5800

GIS

PT

LIC

IT

60

200

60

200

60

SFMS

292
149
1056

720

2400

8000

900

Statement of Salary Drawn By Smt K. RAJANI SESHU, Designation: Assistant Engineer/Civil During 20
Month&Year
Mar-12
Apr-12
May-12
Jun-12
Jul-12
Aug-12
Sep-12
Oct-12
Nov-12
Dec-12
Jan-13
Feb-13

Pay

PG

DA

Proj. Allow

MA

HRA

CUG

Total Rs.

34440
34440
34440
34440
35720
35720
35720
35720
35720
35720
37000
37000
426080

7539
7539
7539
7539
7819
9662
9662
9662
9662
9662
10008
10008
106301

6935
6935
6935
6935
6935
6935
6935
6935
6935
6935
6935
6935
83220

500
500
500
500
500
500
500
500
500
500
500
500

6888
6888
6888
6888
7144
7144
7144
7144
7144
7144
7400
7400
85216

150
150
150
150
150
150
150
150
150
150
150
150
1800

426080

106301

83220

6000

85216

1800

GPF/EPF

GIS

PT

56452
56452
56452
56452
58268
60111
60111
60111
60111
60111
61993
61993
708617

5037
5037
5037
5037
5037
5225
5446
5446
5446
5446
5641
5641
63476

60
60
60
60
60
60
60
60
60
60
60
60
720

200
200
200
200
200
200
200
200
200
200
200
200
2400

708617

63476

720

2400

DA Arrears
1/12 & 02/12
DA Arrears
7/12

TOTAL

ngineer/Civil During 2012-2013


RECOVERIES
LIC

IT

TOTAL DED

1500
1500
1500
1500
1500
1500
1500
1500

12000

7206

56452
56452
56452
56452
58268
60111
60111
52905
60111
60111
61993
61993
701411

12000

7206

701411

7206

Signature

NET

5585

ANDHRAPRADESH POWER GENERATION CORPORATION LIMITED


INCOME TAX STATEMENT FOR THE YEAR 2011-12
(FOR THE ASSESSMENT YEAR 2012-13)
1

Name of the Officer & Designation

(a) Residential Address

(b) PAN No./GIR No.


(a)Total gross Salary Received (From 03/2012 to 02/2013)
(b) ADD: Fair Rental Value ( If Qtr allotted):
TOTAL(a+b):
LESS
Conveyance
Kit
Washing
Roneo
Other allowance (If any) CUG Phone
TOTAL(3a+3b+3c):

i.HRA received
ii HRA paid in excess of 10% of salary
(a) House rent Paid ( Enclosed receipts)
b)10% of Salary (Pay+DA)
c) balance (a - b)
iii 50% gross salary
iv deduct which ever is less
Less Professional Tax(U/S 10(13A))

Less: a) Interest on HBA (U/S 24(i)VI (Enclosed proof

b) C.M. Releaf
c) Other if any
Savings under 80
Less: Deduction U/S 80C and 80CCC to 80 CCD
A. G.P.F/ E.P.F A/C No:69054/
B. LIC Premium paid the year & Policy Nos (The maximum
eligible amount will be 20% of the policy amount of sum assured)
C.Jeevan Suraksha Maximum Rs.10,000/- by LIC of any other
Insurance notified by central Govt.U/S 80cc
D. GIS
E.GSLIS
F.LIC
G.10/15 YEARS POSTAL CTD No (PLI)
H.PPF Deposits
I. unit linked Insurance/Bajaj Allianz

J.NSC- VIII series


K.Tusion fee paid limited to two children
L.Subscription to Mutual fund
M.House Building lone towards principal amount
N.Investments as a term deposit for fixed of not less than 5yrs
O.Others if any.
P.Total savings under colum 7
Q.total aggregte amount of deductions (U/ S 80- C,80-CCC & 80 CCD shoud not exceeded 1 lakh Rs.)
Total
8 Balance Income
9
Less: (a)Medium claim ( Insurance polocy) premium amount
subjected to Max of Rs 100000/- (Sec-80D)
(b) Replacement of Educational loan ( Including Interest) deduction
upto Rs 40000/-U/S80 ( Assessee only)
c. Physically Handicapped.
Max Rs 500000/- not less than 40% upto 70% disability and max
Rs 75000/- 80% or more disability (Sec.80C/80DD)
Subject to production of Medical certificate issued not below the
rank of Govt Civil Syurgen).
TOTAL(9a+9b+9c)
10 Taxable Income Col.8 Col.9
11 Taxable Income (Rounded to Rs 10/12 Income Tax rates
Tax rate

13

S.Citizen

V.S.C
0-500000

Others

Nill

0-250000

10%

250000-500000

----

200000-500000

20%

500000-1000000

500000-1000000

500000-1000000

30%

1000000 & above

1000000& above

0-200000

1000000& above

Tax Payable
Education Cess 3% on income tax ie Col No:13
a) Total Income Tax payable
b) Rounded of to Rs 1/-

14 Tax paid upto 10/2012


15

Tax to be collected in

Nov-12
Dec-12

Jan-13
Feb-13
Total

ENCLOSERS:-

ATION CORPORATION LIMITED


FOR THE YEAR 2011-12
NT YEAR 2012-13)

K.v.rajesh, Assistant Engineer/Civil


d.no.16-1-130,harnadhapuram, nellore.

BRRPK6084K

518145
0
518145

1726

516419
516419

58914
90000
37171
52829
259073
52829
2400

44605
36000

720

463590
461190

81325
379865

900

378965

17896.52

17897
537

2127.5

18433

2127.5

18433
8000
10433
2500
2500
2500
2933
10433

SIGNATURE

S-ar putea să vă placă și