Sub : Techno-commercial Offer for the supply 1 x 17.1 MW Injection type Condensing TG Set.

Dear Sir,
We thank you for your enquiry. Further to the same, we are pleased to submit herewith our
techno-commercial offer for the supply of 1 x 17.1 MW TG set for your kind perusal.
We hope you will find the same in line with your requirements. However, should there be any
clarifications, please feel free to get in touch with us.
Thanking you and assuring you of our best attention at all times.
Yours truly,
for TRIVENI TURBINE LTD.

Ankit Bhuptani
(Sr. Engineer Sales & Marketing)

Sanjay Dewan
(A.G.M Sales & Marketing)

TRIVENI TURBINE LIMITED


12-A, Peenya Industrial Area, Bangalore 560 058, India. Tel: +91-80-2216 4000 Fax: +91-80-22164100 Website: www.triveniturbines.com
Regd. Off: A-44, Hosiery Complex, Phase-II Extn., Noida 201 305, Uttar Pradesh

Dear Customer,

Triveni Turbines is an ISO 9001:2008 and ISO 14001:2004 certified company. As a commitment
to environment we have laid out our environment policy which will be practiced during our
operations, manufacturing and other areas of operation.

All our products will confine to broad guidelines laid out by our environment policy.

For TRIVENI TURBINE LTD.,

Authorized Signatory

ENVIRONMENTAL POLICY
We, at Triveni Turbines, manufacturing Steam Turbines, related products and accessories
commit ourselves to:
Comply will all applicable legal and other requirements related to the environmental
aspects.
Continually improve our Environmental Management System.
Prevent pollution; reduce waste and consumption of resources, especially electrical
energy and oil.
Provide appropriate awareness / training to employees on the Environmental
Management System and the importance of good operating practices.
Create environmental awareness amongst our associates i.e., sub contractors, Suppliers,
Transporters and customers.
Make the policy available to interested parties on their request.
CHIEF EXECUTIVE OFFICER

Page 2 of 52

Why Triveni
Most preferred supplier, with a market share of over 60% in India in the range up
to 30MW
Over 2000 installations across the globe in over 30 countries in all industry
segments
Over 500 turbines in process co-generation plants and nearly 100 turbines in
biomass based IPPs
Industry Bench Mark Delivery time. Helps our customers commission their power
plants faster
Best in class manufacturing plant in Bangalore with fleet of 4 Axis / 5 Axis
machine. Manufacturing capacity of 150 turbines per year
Every turbine is put through a Mechanical Steam Run Test (at factory, before
dispatch) at Full speed to test vibration, safety trip etc.
SCHENK High Speed Vacuum Tunnel balancing for precise dynamic balancing
of large rotors. Ensures operation reliability
24 x 7 Service centers closer to our customers - 13 service offices across India
with over 150 service personnel. We respond within 8 hours of an emergency call
Life time support for spares and services to maximize the return on investment.
Refurbishing solutions offered up to 150 MW for any make of turbine to enhance
efficiency, availability and reliability.
A decade old Research and Development department for continuous
improvement of existing models and development of new models. Associated
with renowned design houses from USA Impact Technologies LLC and
Concepts NREC.

Page 3 of 52

INDEX
SECTION I

TECHNICAL

Chapter 1

Scope of Supply

Chapter 2

Technical Specifications

Chapter 3

Performance Parameters

Chapter 4

Utilities to be provided by Purchaser

Chapter 5

Limits of Tender and Exclusions

Chapter 6

List of sub-suppliers

Chapter 7

List of Tools and Tackles

Chapter 8

Drawing & Documentation Schedule

Chapter 9

QAP

Chapter 10

Recommended Steam Purity chart

SECTION II

COMMERCIAL

Chapter 1

Price, delivery and special terms

Chapter 2

General terms and conditions of sale

Page 4 of 52

SECTION I
CHAPTER 1
SCOPE OF SUPPLY
I. MECHANICAL
Steam Turbine
Multistage, Nozzle governed, Horizontal spindle, two bearings, Impulse/Reaction type
Injection cum Condensing steam turbine (Non API) with:
- Hydraulically operated Stop & Emergency Valve with integral steam strainer for inlet
- Hydraulically operated Throttle/Governing valves for inlet steam flow control.
- In built exhaust hood spray system.
Gearbox
-

Double helical, single reduction Gearbox with hardened & ground gears. The design will be
with a service factor of 1.3 AGMA.

Couplings
-

Non-lubricated, steel laminated flexible type, high-speed coupling and low speed couplings
with coupling guards.

Governing System
-

Electronic governor (Wood ward 505 E) complete with electro-hydraulic actuators and
magnetic speed pick ups
Hydraulic accumulator
Control oil filter
Interconnecting control oil piping

Condensing System
Condensing system comprising of:
- Shell & Tube type, horizontal, divided water box (with sacrificial anodes) type condenser
with integral hot-well
- Steam jet air ejector system complete with:
Twin stage main ejectors (1 working + 1 standby)
Start up ejector (hogging) with silencer
Inter and after condenser
- Vertical Condensate extraction pumps of Canister type(CEP) with motors (2 x 100%
capacity)
- Rupture disc for condenser protection for full flow.
- Expansion bellow with spool piece between turbine exhaust and condenser inlet
- Condensate piping from hot well through CEPs & ejector condensers upto re-circulation
valve with pipe supports, strainers, steam traps, drains, vents and isolation provisions.
- Dry air/vapor line within specified battery limit.
- GVC with complete piping for gland seal and leakage returns to GVC and GVC drains to
nearest drain point along with required steam traps and valves etc.
Page 5 of 52

Lubrication System
Forced feed lubrication system, common for Turbine, Gearbox & Alternator comprising of:
-

Lube oil tank provided with cleaning doors and air breather
Main Oil Pump (MOP) driven by gearbox low speed shaft
A.C. Motor driven auxiliary oil pump (AOP) for flooding the bearings during start-up and
wired through a pressure switch for automatic cut-in and cut-out in the event of main oil
pump not supplying required quantity of oil.
A.C. Motor driven auxiliary Control oil pump (ACOP) (1 working + 1 standby) to supply oil
to Control system.
D. C. Motor driven Emergency lube Oil Pump (EOP) with auto cut-in & cut-out facility
Suction strainers for MOP, AOP & EOP.
Pressure relief valves for discharge of MOP, AOP, and lube oil line
Oil coolers (1 working + 1 standby) with on-line changeover arrangement
Oil filters (1 working + 1 standby) with on-line change-over arrangement
AC motor driven oil mist separator mounted on oil tank
Pressure regulating valve to achieve desired lube oil pressure
Set of complete lube oil piping within the limits of the turbine base frame and sufficient to
meet the requirement of the ordered equipment. (The MOC of lube oil pipe will be SS-304
ERW downstream the filter).
Note: JOP is not required for this rating turbine and hence not considered.

Accessories
-

Motorized barring gear arrangement.


Base plate for turbine and gearbox
Insulation for Turbine hot parts (lagging & cladding)
Set of foundation bolts
Set of commissioning spares
Set of special tools & tackles for maintenance
Vibration monitoring system for high speed train.
GVC with complete piping for gland seal and leakage returns to GVC and GVC drains to
nearest drain point along with required steam traps and valves etc.

Page 6 of 52

II. ELECTRICAL
AC Generator
AC Generator shall be complete with following:
- Brush-less exciter with PMG
- Air coolers (4 x 33%)
- Twin bearings
- AVR cum Excitation panel
- Anti-condensation heaters
- Water leakage detector 1 per cooler
- Lube oil flow regulator 1 per bearing
Auxiliaries for Generator protection and control
- Generator protection (Relay) Panel
- Metering & Synchronizing Panel
- Lightning arrestor, Surge capacitor and Potential transformer (LA, SC & PT) Panel
- Neutral grounding resistor (NGTR) Panel
III. CONTROL & INSTRUMENTATION
The following instruments will be provided on the equipments supplied by Triveni.
Tag No.

Equipment

Application

Location

SI-

Speed indicator

Turbine Speed Indication

Gauge Panel

DPIS

Diff. Press. indicator


cum switch

Diff pr across lube oil filter

Turbine skid

LSH

Level switch

Oil tank level high alarm

Lube Oil Skid

LSL

Level switch

Oil tank level low alarm

Lube Oil Skid

LT

Level transmitter

Oil Tank Level transmitter

Loose supply

MPU

Magnetic pick up

Speed sensing

Field

MPU

Magnetic pick up

Speed sensing

Field

PG

Pr Gauge

Inlet steam Pressure indicator

Gauge panel

PG

Pr Gauge

Exhaust steam Pressure indicator

Gauge panel

PG

Pr Gauge

Injection steam pressure indication

Gauge panel

PG

Pr Gauge

Turbine wheel case pressure


indication

Gauge panel.

PG

Pr Gauge

Sealing steam H.P end pressure


indication

Field

QTY
1
1
1
1
1
1
1
1
1
1
1
1

Page 7 of 52

PG

Pr Gauge

Sealing steam return to GVC

Field

PG

Pr Gauge

Sealing steam L.P end pressure


indication

Field

PG

Pr Gauge

Sealing steam inlet pressure


indicator

Field

PG

Pr Gauge

AOP Discharge

Lube Oil Skid

PG

Pr Gauge

AOP & MOP Discharge line

Lube Oil Skid

PG

Pr Gauge

Lube oil header

Gauge panel

PG

Pr Gauge

EOP Discharge line

Lube Oil Skid

PG

Pr Gauge

MOP Discharge

Lube Oil Skid

PG

Pr Gauge

Control oil Pressure Line

Control Oil skid

PG

Pr Gauge

LP Trip SV-203 Discharge pressure

Control Oil skid

PG

Pr Gauge

ACOP-1 Oil Discharge Pressure

Control Oil skid

PG

Pr Gauge

ACOP-2 Oil Discharge Pressure

Control Oil skid

PG

Pr Gauge

Control oil after LP trip Pressure


indication

Turbine skid

PG

Pr Gauge

Control oil before LP trip Pressure


indication

Turbine skid

PS

Pr Switch

Exhaust Pressure Very high-1

Gauge Panel

PS

Pr Switch

Auto start/stop of AOP

Lube Oil Skid

PS

Pr Switch

Auto start/stop of EOP

Lube Oil Skid

PS

Pr Switch

Lube oil pressure low alarm

Lube Oil Skid

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

PS

Pr Switch

Lube oil pressure very low


alarm/trip

Lube Oil Skid

PS

Pr Switch

Barring gear motor interlock

Lube Oil Skid

PS

Pr Switch

Control oil pr low alarm

Control Oil skid

1
1
1

PS

Pr Switch

Control oil pr very low trip/alarm

Control Oil skid


1

Page 8 of 52

PS

Pr Switch

Auto start/stop of ACOP

Control Oil skid


1

PS

Pr Switch

AOP & ACOP motor interlock

Lube Oil Skid


1

PS
PS

Pr Switch
Pr Switch

LP Trip SV-203 Discharge pressure


Switch

Turbine control
panel.

Control Oil After LP Trip pressure


Switch

Field

1
1

RTD

Resistance temp
detector.

Exhaust hood temperature


Element-1

Field

RTD

Resistance temp
detector.

Exhaust hood temperature


Element-2

Field

RTD

Resistance temp
detector.

Exhaust hood temperature


Element-3

Field

RTD

Resistance temp
detector.

Exhaust hood temperature


Element-4

Field

RTD

Resistance temp
detector.

Turbine journal bearings, steam


end.

Turbine skid

RTD

Resistance temp
detector.

Turbine journal bearings, exhaust


end.

Turbine skid

RTD

Resistance temp
detector.

Control Oil Temperature Before


NRV

Turbine skid

RTD

Resistance temp
detector.

Turbine thrust bearing active top

Turbine skid

RTD

Resistance temp
detector.

Turbine thrust bearing non-active


top

Turbine skid

RTD

Resistance temp
detector.

Gearbox bearings.

Gearbox

RTD

Resistance temp
detector.

Alternator winding

Alternator

RTD

Resistance temp
detector.

Alternator bearing

Alternator

RTD

Resistance temp
detector.

Alternator air temp

Alternator

RTD

Resistance temp
detector.

Lube oil temp before cooler

Turbine skid

RTD

Resistance temp
detector.

Lube oil temp after cooler

Turbine skid

RTD

Resistance temp
detector.

Oil Tank Temperature

Oil tank

SV

Solenoid valve

Turbine tripping

Turbine skid

SV

Solenoid valve

Turbine tripping

Turbine skid

1
1
1
1
1
1
1
1
1
6
4
2
4
1
1
1
1
1

Page 9 of 52

SV

Solenoid valve

Turbine tripping

Turbine skid

TE

Thermocouple

Inlet steam temp indication in


Gauge panel

Field

TE

Thermocouple

Exhaust steam indication in gauge


panel/DCS

Field

TE

Thermocouple

Injection steam temp indication in

Field

TE

Thermocouple

Inlet steam temp indication in


DCS.

Field

TE

Thermocouple

Injection steam temp indication in


DCS.

Field

TG

Temp Gauge

Befor Oil cooler

Turbine skid

TG

Temp Gauge

After oil cooler

Turbine skid

TG

Temp Gauge

After Control oil filter

Turbine skid

TG

Temp Gauge

Gear pinion fore

Turbine skid

TG

Temp Gauge

Gear wheel fore

Turbine skid

TG

Temp Gauge

Gear wheel after

Turbine skid

TG

Temp Gauge

Gear pinion after

Turbine skid

TG

Temp Gauge

Alternator bearing temp

Alternator

TG

Temp Gauge

Alternator air temp

Alternator

TI

Digital Temperature
indicator

Inlet steam

Gauge panel

TI

Digital Temperature
indicator

Exhaust steam

Gauge panel

TI

Digital Temperature
indicator

Injection steam

Gauge panel

DPIS

Diff. Press.
Transmitter

Diff pr Transmitter across lube oil


filter

Field

Diff. Press.
Transmitter

Diff pr Transmitter across Control


oil filter

Field

ZI

Radial Vib
Indicator

Turbine rotor axial movement,


X-axis

ZI

Radial Vib
Indicator

Turbine rotor axial movement,


Y-axis

DPIS

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
TCP
TCP

1
1

Page 10 of 52

XI

Radial Vib
Indicator

Turbine rotor fore bearing


vibration, X-axis

XI

Radial Vib
Indicator

Turbine rotor fore bearing


vibration, Y-axis

XI

Radial Vib
Indicator

XI

Radial Vib
Indicator

XI

Radial Vib
Indicator
Radial Vib
Indicator
Radial Vib
Indicator
Radial Vib
Indicator

XI
XI
XI

Turbine rotor after bearing


vibration, X-axis
Turbine rotor after bearing
vibration, Y-axis
Turbine pinion fore bearing
vibration, X-axis
Turbine pinion fore bearing
vibration, Y-axis
Turbine pinion after bearing
vibration, X-axis
Turbine pinion after bearing
vibration, Y-axis

TCP

TCP

TCP

TCP

TCP

TCP

TCP

TCP

Condensate Instruments
Tag No.

Equipment

Application

Location

I/P

Current to Pres. converter

Hotwell level control

Field

LCV

Level control valve

Hotwell re-circulation line

Field

LCV

Level control valve

Hotwell bypass line

Field

LG

Level Gauge

Hotwell level indication

Field

LSH

Level switch

Hotwell level high

Field

LSHH

Level switch

Hotwell level very high

Field

LSL

Level switch

Hotwell level low

Field

LSLL

Level switch

Hotwell level very low

Field

LT

Level transmitter

Hotwell Level

Loose supply

PG

Pr Gauge

Discharge of CEP-300

Field

PG

Pr Gauge

Discharge of CEP-301

Field

PG

Pr Gauge

Condensate pr after LCV-301

Field

PG

Pr Gauge

Motive steam inlet header

Ejector

Qty.
1

1
1
1
1
1
1
1
1
1
1
1
1

Page 11 of 52

PG

Pr Gauge

Motive steam inlet to hogger


ejector, EJ-400

Ejector

PG

Pr Gauge

Hogger ejector pr

Ejector

PG

Pr Gauge

Motive steam inlet to Ejector,


EJ-401, 403;

Ejector

PG

Pr Gauge

Motive steam inlet to EJ-402,


404.

Ejector

PG

Pr Gauge

Shell pr of ejector condensor,


SSC-400

Ejector

PG

Pr Gauge

Ejector suction header

Ejector

PG

Pr Gauge

Condensate inlet to Ejector


condenser, SSC-400

Field

PG

Pr Gauge

LCV line pr indicator

Field

PS

Pr Switch

Condenser shell pressure


high alarm

Gauge panel

PS

Pr Switch

Condenser shell pressure


very high trip and alarm

Gauge panel

PS

Pr Switch

Auto start of standby CEP

Loose supply

1
1
1
1
1
1
1
1
1
1
1

PT

Pr Transmitter

Condenser Header pr
indicator

Field

TG

Temp Gauge

Hotwell Outlet

Field

TG

Temp Gauge

CEP discharge header

Field

TG

Temp Gauge

Motive steam inlet header


line

Ejector

TG

Temp Gauge

Condensate outlet from


Ejector condenser, SSC-401

Field

AFR-300

Air Filter Regulator

Air supply to CV's

Loose supply

AFR-301

Air Filter Regulator

Air supply to I/P 300

Loose supply

1
1
1
1

Turbine Control Panel


TC Panel shall house electronic governor, alarm annunciator for turbine faults, temperature
scanner for turbine & gearbox bearing oil temperature monitoring, remote controls for all
auxiliary motors of turbine (AOP,ACOP, EOP and barring gear), turbine safety interlocks &
trip logic and turbine speed controls (push buttons).

Page 12 of 52

Turbine Gauge Panel


TG Panel shall house the pressure and temperature gauges for various operating
parameters. Impulse piping with fittings shall be supplied loose for interconnection
between field tap-off points and gauge panel.
DC motor (EOP) starter panel cum DCDB
DC motor starter panel shall house feeder & control circuit for EOP motor.
Local push button station
Local control stations with on/off push buttons for:
AOP motor
EOP motor
Barring Gear motor
CEP-1 & CEP-2
Air Blower motor
Oil mist separator motor
Safety devices
-

Over speed trip:


Type

Eccentric spring loaded oil dump valve

Low lube oil pressure trip:


Type

Spring loaded spool valve combined with LP trip

Low control oil pressure trip:


Type
:

Spring loaded spool valve combined with LP trip

High thrust wear trip:


Type

Through vibration monitoring system

High exhaust pressure trip:


Type
:

Through pressure switch and solenoid trip

Hand trip:
Type
Operation

:
:

Block & dump valve in trip oil line


Local hand lever

Solenoid trip:
Type
Operation

:
:

Solenoid operated block & dump valve


De-energise to open & trip

Page 13 of 52

SECTION - II
CHAPTER 2
TECHNICAL SPECIFICATIONS
I. MECHANICAL
STEAM TURBINE
Design:
Type

Casing split
Rotor type

:
:

Shaft seal
No. of governing valves
Bearing support
Rated power

:
:
:
:

Multistage, impulse/Reaction, nozzle governed


Injection cum condensing type.
Horizontal
Machined out of solid alloy forging rotor with
integral disks.
Labyrinth
Three (Inlet)
Double pedestal
17100 kW

:
:
:

25 kg/cm2g
1.5 Kg/Cm2g
Servo prime ISO VG-46 / 57 / 68

:
:
:
:

22100Liters
10500 Liters (integral)
5 minutes
Carbon steel

Carbon steel

SS-304 ERW

Carbon steel

Main oil pump:


Type
Operating speed
Driver
Material of body
Material of end cover
Material of drive gear

:
:
:
:
:
:

Gear
1500 rpm
Gearbox low speed shaft
CI
CI
EN 36 / EN 40

Auxiliary oil pump :


Type
Operating speed
Driver
Material of body
Material of end cover
Material of drive gear

:
:
:
:
:
:

Gear
1440 rpm
AC motor
CI
CI
EN 36 / EN 40

Oil system:
- Oil:
Governing oil pressure
Lube oil pressure
Oil type
Oil quantity for initial fill
and flushing
Oil reservoir capacity
Retention time
Material of oil reservoir
Material of oil piping from
Pumps to filters
Material of oil piping from
Filters to bearings
Material of oil piping from
Bearings to reservoir
-

Page 14 of 52

Main Control oil pump:


Type
Operating speed
Capacity
Driver
Material of body
Material of end cover
Material of drive gear

:
:
:
:
:
:
:

Gear
1440 rpm
200 Liters/minute
A.C. Motor
CI
CI
EN 36 / EN 40

Auxiliary Control oil pump:


Type
Operating speed
Capacity
Driver
Material of body
Material of end cover
Material of drive gear

:
:
:
:
:
:
:

Gear
1440 rpm
200 Liters/minute
A.C. Motor
CI
CI
EN 36 / EN 40

Emergency oil pump:


Type
Operating speed
Capacity
Driver
Material of body
Material of end cover
Material of drive gear

:
:
:
:
:
:
:

Gear
1500 rpm
300 Liters/minute
DC motor (5.5 kW, 110 V, DC)
CI
CI
EN 36 / EN 40

Oil cooler:
Design code
Type
Oil inlet temperature
Oil outlet temperature
Mounting

:
:
:
:
:

HEI
Plate Heat Exchanger
60 0C
46 0C
Saddle support

Lube oil filter:


Element type
Oil filtration Capacity
Mounting

:
:
:

Micro-felt
10 15 microns
Foot

:
:
:

60 m3/hr
AC Motor
Flange

:
:

Tilting pad
White metal with steel Babbitt

Oil Mist Separator:


Capacity
Driver
Mounting

Bearings:
-

Journal Bearings
Type
Material

Page 15 of 52

Thrust Bearings
Type
Material

:
:

Tilting pad
White metal with steel Babbitt

Governing System:
- Governor:
Type
Inputs (critical)
Control range
Control accuracy
Speed droop
Power supply
Accessories

:
:
:
:
:
:
:

Electronic (Wood ward)


2 speeds from MPU-1 & 2
80 to 110% of rated speed
As per NEMA class D
3 to 6% (programmable)
110 V DC
2 Magnetic speed pick-ups (MPU)
1 electro-hydraulic actuator

:
:
:

Bladder
Pre-charged Nitrogen
20 Liters

:
:
:

Micro-felt
200 Liters/minute
10 15 microns

:
:
:
:

Double helical, single reduction


1500 RPM
1.3
Air breather

High Speed Coupling


Type

Flexible element

Low Speed Coupling


Type

Flexible element with shear pins

:
:

Auto disengage
AC motor

90 dB(A)

Hydraulic Accumulator:
Type
Working fluid
Capacity

- Governing oil filter:


Element type
Oil flow Capacity
Oil filtration Capacity
GEARBOX
Design:
Type
Output speed
S.F.
Accessory
COUPLINGS
-

ACCESSORIES
-

Barring gear:
Type
Driver

Noise level

Page 16 of 52

CONDENSING SYSTEM
STEAM SURFACE CONDENSER
Type
Construction
Cleanliness factor
Hotwell retention time
Tube fixing
Tube material
Tube sheet material
Water box & Shell material

:
:
:
:
:
:
:
:

Shell and tube


Divided water box
0.85
2 minutes
Expanded joints
SS 304 ERW (22 Bwg)
IS-2062 Gr.B
IS-2062 Gr.B

Suction medium
System elements

:
:

Accessory
Time to reach 60% vacuum
with start-up ejector
Material of nozzle
Material of shell & diffuser
Material of tubes
Material of tube sheet
Material of silencer

Air / Vapour
Twin stage, 2 x 100% main ejectors
Single stage, 1 x 100% start-up ejector
1 x 100% inter /after condenser
Integral steam strainers

:
:
:
:
:
:

20 minutes
AISI-304
CS
SS-304 ERW
IS-2062
CS

STEAM JET AIR EJECTORS

CONDENSATE EXTRACTION PUMPS


Type
Mounting
Suction pressure
Discharge pressure
Operating speed
Driver
Type of bearings
Type of seal
Type of coupling
Type of lubrication
Material of casing
Material of impeller
Material of shaft
Material of shaft sleeve
EXPANSION BELLOW
Type
Design code
Material of bellows element
Material of liner
Material of flanges

:
:
:
:
:
:
:
:
:
:
:
:
:
:

Centrifugal
Horizontal
Same as condenser pressure
80 MWC
2900 RPM
AC motor (415 V, 3 Phase)
Anti-friction
Mechanical
Flexible
Oil
CI
CF8M
C45
AISI 316

:
:
:
:
:

Rectangular with flow liner


Universal type rectangular expansion joints
SS-304
SS-304
IS-2062
Page 17 of 52

II. ELECTRICAL
AC GENERATOR
Design:
Rated output
Rated Speed
Rated voltage
Rated frequency
Combined variation of
Voltage & frequency
Rated p.f.
No. of phases
No. of terminals
Connection
Rated speed / No. of pole
Short circuit ratio
Ambient temperature
Excitation
Rotor
Cooling method
Mounting
Insulation
Temperature rise
Enclosure
Duty
Rotation
Noise level
Terminal box
Reference standard
Harmonic loading

:
:
:
:

17500 kW
1500 rpm
11 kV +/- 10%
50 Hz + / - 5%

:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:

+ / - 10%
0.8 (lag)
3 phase
3 for phase & 3 for neutral
Star
1500 rpm / 4 pole
More than 0.5
45oC
Brush less
Cylindrical
CACW
Horizontal
Class F (both rotor and stator)
Class B limits (both rotor and stator)
IP-54 (Stator) & IP-54 (Exciter)
Continuous and suitable for parallel operation
To suit driver output
90 dB(A)
To suit HT cables
IS-4722
IEEE 519

Bearings:
Type
Accessory

:
:

Sleeve
Temperature gauge

Lube oil system:


Type
Source

:
:

Forced feed
Turbine lube oil system

Air coolers:
Cooling method
Capacity
Cooler tube material
Mounting

:
:
:
:

CACW
4 x 33%
Admiralty brass
Top

Anti condensation heaters:


Type
Power supply

:
:

Resistance heating
230 V, Single phase

Page 18 of 52

Water leakage detector:


Location
Quantity
AVR CUM EXCITATION PANEL
Design:
Control type
Control modes
Voltage adj. Range
Regulation
Dead time
Features:
-

:
:

Bottom of cooler
1 No. per cooler

:
:
:
:
:

Digital
2 Auto + 1 manual
+/- 10%
+/- 0.5%
Less than 30 mS

Compounding
Auto PF controller
Remote voltage control
Auto-Manual follow-up
Under frequency protection
Field flashing provision

AVR cum excitation panel shall be complete with generator voltmeter, field voltmeter, field
ammeter, PF meter, Auto/Manual selector switch, AC supply & DC supply on /off control
switches, indicating lamps and space heater with thermostat.
GENERATOR RELAY PANEL
Generator relay panel shall house the following:
- Numeric Relay (MICOM-343) for generator protection:
DESCRIPTION
Under voltage protection relay
Reverse active power protection relay
Loss of excitation (Field failure) protection relay
Auxiliary relays & timers for loss of excitation protection
relay

Negative phase sequence protection relay


Voltage controlled over current protection relay
Over voltage protection relay
Timer for over voltage protection relay
PT fuse failure sensing relays
Stator earth fault protection relay
Under & over frequency protection relay
Differential protection relay
Df/dt, Vector surge

TAG NO.
27
32P
40G
40X
27/40G
T1/40G
T2/40G
46
51V
59
2-59
60A
64
81
87
P341

Page 19 of 52

- Discrete Relays:
DESCRIPTION
Voltage balancing Relay-Metering PT
Voltage balancing Relay-Metering PT
DC Supply Supervision Relay
High Speed Trip Relay for Generator
High Speed Trip Relay for Grid
High Speed Trip Relay for Turbine
High Speed Trip Relay Supervision Relay for Generator
High Speed Trip Relay Supervision Relay for Grid
High Speed Trip Relay Supervision Relay for Turbine
-

TAG NO.
60B
60C
80DC
86G
86L
86T
95G
95L
95T

Temperature scanner for monitoring generator winding and bearing temperature


Alarm annunciator for generator fault monitoring
The panel shall be complete with AC supply & DC supply on /off control switches,
indicating lamps and panel space heater with thermostat.
General:
Type
Dimensions in mm (Approx.)
Weight (Approx.)

:
:
:

Simplex, dead front & free standing


1000 (L) x 1000 (D) x 2200 (H)
800 KG

Page 20 of 52

GENERATOR CONTROL (METERING CUM SYNCHRONISING) PANEL


Generator control panel shall house the following:
-

Meters
Type
System
Reference standard
Ammeters
Voltmeter
KW meter
KVA meter
KVAR meter
PF meter
Frequency meter
Trivector meter
Synchronising equipment
Double voltmeter
Double frequency meter
Synchroscope
Check synchronizing
Relay
Aux. relays for
Synchronising scheme
Auto Synchronizer

:
:
:
:
:
:
:
:
:
:
:

Digital
3 phase, 4 wire, unbalanced load
IS-1248
3 Nos.
1 No. with selector switch
1 No.
1 No.
1 No.
1 No.
1 No.
1 No.

:
:
:

1 No.
1 No.
1 No.

1 No.

:
:

1 Set
1 No.

The panel shall be complete with synchronising selector switches, breaker control (T/N/C)
switches, push buttons, AC supply & DC supply on /off control switches, indicating lamps
and panel space heater with thermostat.
General:
Type
:
Desk & free standing
Dimensions in mm (Approx.)
:
1200 (L) x 1100 (D) x 2310 (H)
Weight (Approx.)
:
750 KG
LA, SC & PT PANEL
LA, SC & PT panel shall house the following:
- Lightning arrestor
Discharge current
:
10 kA
Quantity
:
3 Nos. (1 per phase)
-

Surge capacitor
Capacitance per phase
Quantity
Potential transformers
For
Quantity
Protection
3 Nos.
Metering
3 Nos.
Excitation
1 No.

:
:

0.25 F
3 Nos. (1 per phase)

Secondary output
110 V
110 V
220 V

Class
3P
0.5
+/- 5 %
regulation
Page 21 of 52

The panel shall be complete with AC supply on /off control switch, illuminating lamp with
limit switch for each PT compartment, indicating lamps and space heater with thermostat.
General :
Type
Terminal box
Material of busbars
Dimensions in mm
Weight

:
:
:
:
:

Simplex, modular & free standing


To suit HT Cables
Aluminium
1800 (L) x 1650 (D) x 2350 (H)
1,000 KG

NEUTRAL GROUNDING RESISTOR PANEL


NGTR panel shall house the following:
-

Resistor
Type
Rated current
Duty rating
Resistor grid type
Temperature rise
Mounting & fixing of
Resistor units

- Neutral isolator
Operation
No. of poles
Limit switches
-

Earth connection
Type
Quantity

:
:
:
:
:

Naturally air cooled


100 A
10 seconds
Punched steel
3750 C over ambient (max.)

Mounted on grid rods; fixed and assembled in tiers


separated by porcelain insulators

:
:
:

Manual.
One
2 Nos. (for on / off positions)

:
:

Porcelain insulated 12 mm terminal studs


Two Nos.

Current transformers
For
Quantity
Secondary output
Class
Differential
6 Nos.
1A
PS
protection
Earth fault
1 No.
1A
5 P 10
protection
Metering
3 Nos.
1A
0.5
Compounding
1 No.
1A
1
The panel shall be complete with AC supply & DC supply on /off control switch,
illuminating lamp with limit switch for each PT compartment, indicating lamps and space
heater with thermostat.
General:
Type
Terminal box
Material of busbars
Dimensions in mm
Weight

:
:
:
:
:

Simplex, dead front & free standing


To suit HT Cables
Aluminium
1500 (L) x 1000 (D) x 1400 (H)
1,000 KG

Page 22 of 52

AC MOTORS
Type
Winding connection
Duty
Enclosure
Cooling
Insulation
Power supply
Speed / No. of poles

:
:
:
:
:
:
:
:

Induction
Delta
Continuous
IP-55
TEFC
Class F
415 V, 3 Phase, 50 Hz
To suit driven equipment

:
:
:
:
:
:
:

Shunt field
Continuous
IP-55
TEFC
Class F
110 V
1440 RPM

DC MOTOR
Type
Duty
Enclosure
Cooling
Insulation
Power supply
Speed
TURBINE CONTROL PANEL
Turbine control panel shall house the following:
Electronic governor with keyed-in operating program
Relay based hard wired turbine safety interlocks and trip logic
Remote controls comprising of selector switches, ammeters, push buttons &
indicating lamps for:
AOP, ACOP motor
EOP motor
CEP-1 & CEP-2 Motor
Barring gear motor
Air blower motor
Oil mist separator motor
Push buttons for turbine speed raise and lower
Turbine remote trip/reset push buttons
Temperature scanner for Monitoring turbine and gearbox bearing temperature
Alarm annunciator for Turbine fault monitoring
The panel shall be complete with AC supply & Dc supply on /off control switches,
indicating lamps and space heater.
TURBINE GAUGE PANEL
Turbine gauge panel shall house the following gauges:
- Pressure gauges for:
Inlet steam
HP Wheel case
Injection Steam
Exhaust steam
Page 23 of 52

Lube oil
Control oil
Temperature gauges for:
Inlet steam
Injection steam
Exhaust steam

GENERAL SPECIFICATIONS OF INSTRUMENTS:


-

Pressure and Temperature Gauges


Dial
:
150 mm circular
Scale
:
270 Deg. arc with black pointer
Type
:
Bourdon (pressure gauge)
Mercury in steel (temperature gauge)
Accuracy
:
+/- 1 %
Over range protection
:
125 %
Accessories
:
Shatter proof safety glass

Pressure Switch
Sensor type
Material of case
Material of bellows

Pressure Transmitter
Type
Input
Output
Material for process
connection internals

:
:
:

Bellows
Die cast aluminium
SS-316

:
:
:

2 wire, capacitance & electronic


Direct
4 20 mA

SS-316

Resistance Temperature Detectors:


Element type
:
PT-100, 3 wire

Solenoid Valve
Power supply
Operation
Type

:
:
:

110 V DC
De-energise to open
2 way, universal ports

Level Switch
Type
Material of body & float
Material of case

:
:
:

Magnetic float
AISI-304
Die cast Aluminium

Level Transmitter
Type

:
:
:

DP transmitter
(2 wire, capacitance & electronic)
0 to 750 mm WC
4 20 mA

SS-316

Input
Output
Material for process
connection internals

Page 24 of 52

Level Control Valve


Type
End connection
Actuator type
Packing material
Plug characteristic
Plug material
Seat ring material
Diaphragm material
Stem material
Yoke material
Action

:
:
:
:
:
:
:
:
:
:
:

Accessory

Single seat and globe


Flanged
Pneumatic diaphragm with spring
PTFE
Equal percentage
SS-316+Stellited
SS-316+Stellited
Neoprene rubber
AISI-304
Cast steel
Air to close (Re-circulation line)
Air to open (By-pass line)
Positioner
Air lock-up relay
Hand wheel

Level Indicating Cum Controller


Type
:
Input
:
Output
:
Input & output display
:
Power supply
:

PID Control
4 20 mA
4 20 mA
Digital bargraph
230 V, AC, Single phase

Current to Pneumatic Converter


Supply
:
Input
:
Output
:
Enclosure
:
Accessory
:

Air at 1.5 Kg/cm2g


4 20 mA
0.2 to 1.0 Kg/cm2g (air)
Die-cast aluminium alloy body
Pressure gauges for supply & output

Temperature Scanner
Power supply
Input
Display

:
:
:

Display mode
Scan rate
Accuracy

:
:
:

Alarm Annunciator
Type
Input protection
Colour of window

:
:
:

Power supply
Fault initiation
Accessories

230 V, AC, Single phase


PT-100, 3 wire RTD
Channel No. & bearing / winding
temperature
Auto / Manual
Programmable
+/- 1 Deg.C

:
:
:

Modular, plug-in cards, interchangeable


Optical isolation provided through opto couplers
Milky white (pre-trip alarm)
Red (Trip alarm)
110 V DC
Make to alarm
Electronic hooter and Push buttons for Test,
Acknowledge & Reset

Page 25 of 52

Air Filter Regulator


Filter element
Element material
Body material

:
:
:

5 microns
Sintered bronze
Cast aluminium

Page 26 of 52

SECTION - I
CHAPTER 3
PERFORMANCE DATA

Please refer the enclosed HMBD


Note:
1.

The above consumption data apply at steady state conditions, with the control valve fully open,
deposit free blading and clean surface of cooling equipment in accordance with the Triveni
performance Test Procedure which is based on the IEC-PART-II code.

2.

This consumption does not include the power and steam requirements of the condensing plant
and auxiliary equipments. Instrumentation tolerance of +or- 3% is allowed as per the
international testing practices.

3.

The data furnished are based on nominal steam parameters at turbine inlet, Injection and exhaust
flange.

4.

Steam quantity should be maintained at inlet and Injection points for guarantee point as
mentioned elsewhere in the bid.

5.

The following are not included in the auxiliary power consumption furnished in Auxiliary power
guarantee.
a) All standby equipment.
b) All electrical actuators and motorized valve
c) Other intermittent equipment

6.

The steam consumption for and auxiliary equipments such as ejector motive steam, gland-sealing
steam etc. is not included in the steam consumption figure for turbine performance.

7.

Auxiliary power consumption indicated is at motor input terminals.

Page 27 of 52

SECTION I
CHAPTER 4
UTILITIES TO BE PROVIDED BY THE PURCHASER
A.

STEAM (SATURATED)
CONSUMER / PURPOSE

INTERMITTENT
DEMAND
300 kg/hr
(during start-up)
600 kg/hr

Turbine gland sealing system at


10 kg/cm2
Ejector system @ 10 kg/cm2g

B.

:
:
:

2.5 kg/cm2g
32 0C
8 0C

CONSUMER / PURPOSE

CONTINUOUS
DEMAND
120 m3/hr
120 m3/hr
Condensate cooled

Turbine oil cooler


Generator air cooler
Gland Vent Condenser
INSTRUMENTATION AIR
1.
D.

For control purpose

10 SCFM at 7.0 kg/cm2

415 V, 50 Hz, TP & N

AC POWER
Power supply
CONSUMER
AOP Motor
Air Blower Motor
Oil mist separator
Motor
Barring Gear Motor
ACOP Motor
ACOP Motor
CEP Motor

Note :

350kg/hr

COOLING WATER (FRESH)


Inlet pressure
Inlet temperature
Temperature rise ( T)

C.

CONTINUOUS
DEMAND
N/A

INTERMITTENT
DEMAND
22 kW
(During start-up & shut-down)
N/A
N/A

CONTINUOUS
DEMAND
N/A

22 kW
(During shut-down)
22 kW
N/A
N/A

N/A

2.2 kW
0.75 kW

N/A
22 kW
DDE

All utility figures mentioned above are indicative only. The actual requirement shall
be furnished during detailed engineering.
Page 28 of 52

SECTION - I
CHAPTER 5
LIMITS OF TENDER & EXCLUSIONS
LIMITS OF TENDER:
The offer is complete within the following limits beyond which Purchaser shall arrange any and
all equipments:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

Inlet flange of Stop and emergency valve of the turbine.


Injection flange (Along with FCV, Strainer, QCNRV, ISV are loose supply)
Re-circulation valve of condensate line.
Inlet and outlet flanges of the cooling water connections of oil cooler, generator air
cooler and surface condenser.
At the inlet of ejector and gland sealing for auxiliary steam.
Turbine drains with drain cocks terminated at nearest drain point.
Instruments, air connections within the battery limit of not more than 5 meters from
the turbine.
Utility / Auxiliary power at the control panel terminals.
At the incoming terminal of Alternator.
At the incoming terminals to each motors.

EXCLUSIONS:
The following items are not included in sellers scope of supply and shall be arranged by
purchaser:
1.
2.
3.

4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.

Steam and cooling water piping.


Any piping and valves outside the above limits.
Platforms, ladders of floor/platforms, foundation or civil work, supply of
embedments, inserts (other than foundation bolts for STG) of any nature including
their design. Routing design for piping and supports.
Routing design for piping and supports
Grouting and grouting material.
All HT, LT power, control and instruments cables along with cable termination kits,
glands, lugs etc and cable trays for same.
Bus Duct.
Utility/Auxiliary & emergency power and air supply.
Inlet isolation valve and PRDS for auxiliary steam supply.
Electrical distribution system, outdoor switch yard & associated equipments.
MCC, PLC panels & PLC based instruments and UPS for panels
De-aerator, Cooling Tower, related instruments and piping.
Oil centrifuge
Battery & Battery charger cum DC Distribution Panel
Blanking Device for steam blowing
Vacuum breaker valve
Any Valves, instruments other than the list mentioned in scope of supply
Centralized oil storage system along with Tanks, piping, Transfer pumps etc.
VCB Panel
Co2 Fire extinguisher for Generator (Only provision shall be provided).
Page 29 of 52

21.
22.
23.
24.
25.
26.
27.

Fire detection, alarm and protection system.


Crane gantry.
Complete earthing and earth pits.
First fill of oil and Flushing oil
All/any statutory approvals.
Unloading of turbine, gear box, alternator and other auxiliaries at site
Any item not specifically mentioned in our offer.

Page 30 of 52

SECTION - I
CHAPTER 6
LIST OF TOOLS AND TACKLES
Sl.No

Description

qty

ALLEN-KEY-SET-1.5TO19 MM(13NOS)

ALLEN KEY- SIZE - 3 / 32"

ALLEN KEY- SIZE - 1 / 8"

DOUBLE-END-SPANNER-27 X 32

DOUBLE-END-SPANNER-14 X 15

DOUBLE-END-SPANNER-18 X 19

DOUBLE-END-SPANNER-24 X 26

DOUBLE-END-SPANNER-24 X 27

DOUBLE-END-SPANNER-30 X 32

10

DOUBLE-END-SPANNER-36 X 41

11

DOUBLE-END-SPANNER-41 X 46

12

SINGLE-END-SPANNER-85 MM

13

SINGLE-END-SPANNER-60 MM

14

SINGLE-END-SPANNER-70 MM

15

SINGLE-END-SPANNER-80 MM

16

RING SPANNER-24 X 27

17

RING-SPANNER-30 X 32

18

RING-SPANNER- 41X46

19

SINGLE-END-SPANNER-50 MM

20

ADJUSTABLE SPANNER-6"

21

SCREW DRIVER 6" NO:925

22

SCREW DRIVER 12" NO: 929

23

SPANNER- HEAVY DUTY SLEDGERING 65MM

24

SPANNER- HEAVY DUTY SLEDGERING 36MM

25

DOUBLE-END-SPANNER-32 X 36

26

OVER SPEED TRIP CAP REMOVAL BOLT

Page 31 of 52

SECTION -I
CHAPTER - 7
LIST OF SUB-VENDORS
ITEM

Air filter regulator


Couplings
DP Gauge with switch
Hydraulic Accumulator
Instrument Isolation Valves
I-P converters
Level gauge & Level switches
Level Indicator cum controller
Oil Coolers
Oil Filters
Oil Pumps-Gear type
Oil Pumps-screw type
Pressure & Temp. Gauges
Pressure Relief Valves
Pressure switches
Pressure, Level, and DP/Flow
Transmitters
RTD & Thermocouple
Solenoid valve
Temperature Scanner
Vapour Extractor
AC Motors
Flow Relief Valves
High pressure valves
Level control valves
Low pressure valves
Steam traps
Strainers
AC Generator HT
AC Generator LT
ACB Panel
ACDB Panel
AVR- Analog
AVR-Digital
Battery
Battery Charger
BBT-HT
BBT-LT

MAKE / VENDOR

Shavo norgren / Placka


Euroflex /Rathi turbo flux
Switzer
Fawcett / EPE Process / Hydex make
Kaushik Enterprise
ABB/ MTL
Chemtrol/V Automat/Levcon Plata
ABB
ALFA LAVAL / Eskay / Mazda /Positron/ Southern
Lubricants /
Industrial Enterprises / Micro Pour/ Inter norman
Delta /
Alecton/Tusaco
GIC / Forbes Marshall / Waree
RK Controls /ASVIN/Nirmal
Switzer
Yokogawa / Rosemount/ABB/Tata Honeywell
GIC / Detriv
ASCO
Accsys
Emvee /Laxmi
KEC / Compton /Siemens / ABB
Fainger
Steel Strong
MIL/
Forbes
marshall/
Dembla/
Mazda
(Circor
flow)/Chemtrols
Steel Strong
Spirax Marshall / Pennant
Procedyne/Valtech/precision/pennant/Gujarath Auto Filt
VA TECH/TDPS/WEG
MARELLI/BHEL/KEC/AVK/WEG/LEROY SOMER
Square Automation, Mumbai/ Vee Vee Controls, Bangalore
Vee Vee controls , Bangalore/ Sqaure Automation,Mumbai
SANELEC Bangalore
SANELEC -Bangalore(Basler-Make)/ABB- Bangalore
Amaraja, Thirupathi /Exide /HBLnife ,Secundrabad
Amararaja, Tirupathi/ Universal , Bangalore/HRL Nife
Enpro Engineering, Chennai /Vee Vee Controls
Square Automation, Mumbai/ Enpro Engineering, Chennai/
Vee Vee Controls
Page 32 of 52

ITEM

Cables- HT
Cables-LT (POWER & CONTROL
CABLES)
Cables-LT (SIGNAL CABLES)
Switch Gear Components-Make
DC Motor Starter Panel
Flow Nozzle & Orifice
LA, SC & PT panel

MAKE / VENDOR

CCI / Universal / GLOSTER


CCI / SBEE/Thermo Cables

Lightning Arrestors-Make
MCC Panel
Metering and Synchronising panel
Meters-Make
NGR panel

Thermo pads /SBEE


SIEMENS / TELEMECHANIQUE/ L&T/ ABB/ SCHNEIDER
Vee Vee controls , Bangalore /Sqaure Automation,Mumbai
Micro Precision Delhi/Symphony/GIL-Minco
Vee Vee control, Bangalore/Enpro Engineering, Chennai ,
/Sqaure automation
OBLUM/IGE / EPROM
Vee Vee controls , Bangalore / Square Automation,Mumbai
Vee Vee controls , Bangalore /Square Automation,Mumbai.
AE/IMP/Rishabh /Enercon/Meco
Amp Control, Pune /Vee Vee control, Bangalore

PLC SYSTEM-Make

ALLEN BARDLEY /MODICON/ SIEMENS

PT's and CT's-Make


Relay Panel
Relays- Make
Surge capacitor-Make
Turbine Control Panel &Turbine
Gauge cum Pressure Switch cum
Transmitter Panel
Breaker
Cable trays
LPBS/JUNTION BOX
C E Pumps (For WCC application)
Condenser (For WCC application)
Ejector (For WCC application)
Expansion bellow (For WCC
application)
First Fill Oil
PIPES & FITTINGS
TURBINE/PIPING INSULATION
GVC
Oil Centrifuge
PRDS & Control valves
Rupture disc (For WCC application)
Governor
QCNRV
Actuator
Vibration Monitor

Kalpa / Instrans
Areva T&D, Chennai / Easun Reyrolle/ ABB /Vee Vee Control
Areva/Easun Reyrolle / ABB /GE Multilink/ Siemens
Madhav
Syspro Automation, Chennai

Seimens/Areva T&D /ABB (Vee Vee Controls)


Patny Systems, Hyderabad/ Inno Spacer
Alakh Enterprises, Bangalore
KSB / FLOWSERVE/JOHNSON
Chem Processing/ Laxmi Engineering /Mazda / GEI Godavari
Mazda / Chem Process
Lonestar/ Madras Hydraullics Hoses

ELF Brand
Southern Engg., Chennai / Champak Steel
Lloyds Insulation
Eskay / Chem Process/ Mazda
Alfa Laval
Forbes Marshall / Mazda (Circor Flow Tech)/ Chemtrols Inds.
BS&B
Woodward
Sea Land Engg. U.K.
Voith/ Moog Controls
Shinkawa / Bently Nevada/ IRD/ Allen Bradley/ Bruel & Kjaer
Vibro GMBH (PCI)
Note: The aforesaid list is for indicative purpose only. TTLs scope of supply is as per the
Chapter I Scope Of Supply of this offer document.
Page 33 of 52

SECTION - I
CHAPTER 8
DRAWING AND DOCUMENTATION SCHEDULE

DRAWING / DOCUMENTATION
DESCRIPTION

INFORMATION (I)
/ APPROVAL (A)

FINAL

P&I diagrams:
Steam, Condensate & ejector system
Governing & lube oil system
Cooling water system, Turbo visory
scheme.
Foundation Block Plan
Power House Lay-out
Electrical Single line diagram
GA Drawing of Turbine
GA Drawing of Alternator
GA & Schematics of AVR Panel
GA & Schematics of LAPT & NGR Panels
GA & Schematics of Relay Panel
GA & Schematics of MCS Panel
GA & Schematics of TCP & TGP
GA & Schematics of TG Aux. MCC
GA & Schematics of DC Motor starter
GA & Schematics of Battery charger
Performance curve
Electronic governor program chart
Relay setting chart
Cable Schedule
Maintenance manuals

2 sets (A)

4 sets

2 sets (A)
2 sets (A)
2 sets (A)
2 sets (I)
2 sets (I)
2 sets (I)
2 sets (I)
2 sets (I)
2 sets (I)
2 sets (I)
2 sets (I)
2 sets (I)
2 sets (I)
------

4 sets
4 sets
4 sets
4 sets
4 sets
4 sets
4 sets
4 sets
4 sets
4 sets
4 sets
4 sets
4 sets
4 sets
4 sets
4 sets
4 sets
4 sets

NOTE :
1. Drawings shall be submitted for information / approval within 8 to 12 weeks from date of
receipt of technically & commercially clear purchase order/LOI along with advance. You
shall approve all drawings submitted for approval within a period of 15 days of submission
failing which our delivery will get affected.

2.

Final drawings and documents shall be submitted along with supply of equipment.

Page 34 of 52

SECTION - I
CHAPTER 9
Q A PLAN

EQUIPMENT DESCRIPTION

Complete assembled turbine

TESTS

1.
2.
3.
4.
5.

Complete assembled generator

LAPT panel / NGR panel /AVR


panel / Relay panel / Met. cum
synch. panel / TCP / Battery charger
panel / Aux. MCC
Turbine Gauge Panel
Instruments

NOTE :

1.
2.
3.
4.
5.
6.
7.
8.
1.
2.
3.
4.
1.
2.
1.
2.
3.

Visual & dimensional checks


No-load run test & functional check on safety
devices
Vibration check
Noise level check
Open inspection & dynamic rotor balancing
(after no-load run test)
Visual & dimensional checks
OCC & SCC test
Over speed test
Vibration check
Noise level check
HV test
Measurement of winding resistance and
insulation resistance
Measurement of shaft voltage
Visual & dimensional checks
Operational & functional tests
HV test
Measurement of insulation resistances
Visual & dimensional checks
Range calibration
Visual & dimensional checks
Operational & functional tests
Range calibration

1. Material test certificates from manufacturers shall be submitted for major


components of turbine and other bought-out items along with supply.
2.

We have not envisaged any customer hold point in QAP and delivery & price
quoted are on the same basis.

Page 35 of 52

SECTION-I
CHAPTER 10
RECOMMENDED STEAM PURITY
Technically pure steam is of such quality, that it does not cause deposits in the steam preheaters, in the fittings, heaters as well as in the turbine, which might require the intentional
shut-down of the boiler or some part of the equipment, for their cleaning, outside of the normal
equipment maintenance program.
The recommended or limit values of the purity of steam are stated in the following table. The
values are given in the maximal allowable day average concentrations. The concentration of the
chlorine ions may be max. 3 g.l-1.
IDENTIFIER
Unit
Recommended values
o
1)
-1
0.3
Specific electrical conductivity at 25 C
S.cm
-1
Silicon dioxide (SiO2)
20
g.l
Sodium and potassium (Na+ + K+)
10
g.l-1
Total Fe contents (Fe)
20
g.l-1
-1
Ammonia (NH3)
mg.l
1
Copper-total Cu
3
g/kg
1)
Measured after the flow through strong acidic H-katex.
NOTE:

Limit values
1
35

The measurement of the electrical conductivity at 250 C ( S/cm-1) must be done


without the presence of operational chemical agents, e.g. ammonia or hydrazine,
which tends to increase the conductivity. This is why the measurement of
specific electrical conductivity has to be done after the flow of the sample
through the strong acidic H-katex, which is the filter that keeps all cations of the
chemical compounds. By the filtration chemically pure water can be obtained.

RECOMMENDED STEAM PURITY LIMITS


Continuous

Start UP

Conductivity
Micro-Ohms/cm at 25 0c
Drum
Once through
SiO. ppb, max.
Fe. ppb, max.
Cu. ppb, max.

0.3
0.2
20
20
3

1.0
0.5
50
50
10

Na + K, ppb, max.
Upto 800 PSIG
801 to 1450 PSIG
1451 to 2400 PSIG
Over 2400 PSIG

20
10
5
3

20
10
5
3

NOTE : THE ABOVE DATA IS ADAPTED FROM NEMA STANDARD PUBLICATION


NO. SM23 (1985) PAGE 40 SECTION 10.7
Page 36 of 52

SECTION-II
CHAPTER-1
SPECIAL COMMERCIAL TERMS & CONDITIONS OF SALE

THIS OFFER IS SUBJECT TO THE CONDITIONS MENTIONED


HEREUNDER:
Table of Clauses
1. Tender Price
2. Terms of Delivery
3. Terms of Payment
4. Validity
1. Tender Price
a) For Supply
Ex-works price for the supply of one number of 17.1 MW TG set is
INR 15, 500,000/- (Rupees Fifteen Crore and Fifty Lakhs Only).
This ex-works price is for delivery of packed material at our/our subsuppliers works and subjected to our scope of supply, Battery limits and
list of deviations furnished else-where in the bid.
b) For Supervision of erection and Commissioning
Lump sum price for the Supervision of Erection and Commissioning of
the offered one number TG is INR 15, 00, 000/- (Rupees Fifteen lakhs
only).
The above prices are for scope of supply of equipment and services as
described in Section-I and will be confined to the limits defined therein
read in conjunction with the exclusions attached hereto.
The above quoted prices shall be firm for completion of supplies and of
erection and commissioning within the schedules agreed in the Contract,
reckoned from the effective Date of the Contract. If either the supplies
or/and the erection and commissioning works are delayed beyond the
schedules agreed in the Contract, then the above quoted prices are subject
to escalation, the quantum of escalation to be mutually discussed and
agreed upon.
The above prices are on the basis that the Supplier gets all the inputs from
the Purchaser in time for carrying out E & C activity uninterruptedly, after
the first mobilization. In case if the Supplier has to de-mobilise the
erection resources for reasons attributable to the Purchaser, then remobilisation will be at extra cost, which will be discussed and mutually
agreed.

Page 37 of 52

2. Terms of Delivery
The equipment shall be delivered on ex-works basis within 12 months
reckoned from the effective date of the Contract.
The equipment shall be delivered, erected and commissioned within 18
months reckoned from the effective date of the Contract provided all
inputs of the Purchaser are made available for carrying out uninterrupted
erection and commissioning work.
The effective date of the Contract is the date on which the first advance
payment is received by the Supplier, subsequent to the receipt of a
technically and commercially clear contract.
Above delivery, supervision of erection and commissioning schedules are
subject to the following:
(a) The Purchaser meets his obligations as provided in the contract.
(b) The Purchaser makes timely payments as per the Contract.
(c) Force Majeure conditions as detailed in the Contract.
3. Terms of Payments
a) For Supply
10% of the purchase order value shall be paid as advance along with LOI
or the purchase order.
10% of the purchase order value shall be paid within 7 days of submission
of GA drawing of Turbine, Gear Box, Alternator and standard PID.
10% of the Purchase order value within 7 days of submission of unpriced
purchase order copy for generator, gearbox and condenser.
10% of the Purchase order value 7 days before the start of assembly of
turbine
Balance 60% of the total purchase order value along with 100% taxes and
duties within 7 days of submission of proforma invoice on pro-rata basis
before dispatch.
The delivery schedules agreed upon are subject to the payments being received
as per the above schedule and as per the mutually agreed billing schedule.
Page 38 of 52

b) For erection and Commissioning


20% of the purchase order value shall be paid as advance along with LOI
or the purchase order.
20% of the purchase order value shall be paid within 7 days from the date
of site mobilization.
60% of the purchase order value shall be paid along with 100% of
applicable taxes, etc within 7 days against completion of mutually agreed
milestone on prorata basis.

4. Validty
The above quoted prices are valid up to 30 days from the date of this quotation,
for your acceptance and placement of technically and commercially clear order
for the entire scope of supply and services covered in this tender, together with
the initial advance payment. Beyond this date these are subject to our
confirmation.
The prices quoted above are firm for completion of supply and erection and
commissioning,

In case the completion of supply or the commencement of the erection


work or the completion of the commissioning are delayed for reasons not
attributable to the Supplier, these prices have to be enhanced at a rate to be
agreed upon during the course of execution of the contract
**********

Page 39 of 52

Section II

Chapter 2

General terms and Conditions


Table of Clauses
1. Taxes and Duties
2. Transportation, Unloading and Storage at site
3. Insurance
4. Storage prior to despatch
5. Variation Orders
6. Purchasers General Obligations
7. Suppliers General Obligations
8. Inspection and Testing
9. Warranty
10. Commissioning and Taking over
11. Performance Guarantee Tests
12. Liquidated Damages (LD)
13. Limitation of Liabilities
14. Force majeure
15. Suspension
16. Termination of Contracts
17. Title of goods
18. Confidentiality
19. Patent Indemnity
20. Arbitration
21. Jurisdiction
22. Bankruptcy
1. Taxes and Duties
The above quoted prices are exclusive of excise duty, sales tax, service tax,
educational cess, octroi, entry tax, VAT, turn over Tax, works contract tax and
any other taxes, duties and levies which may be imposed by Govt.
Authorities from time to time. All such taxes, duties and levies and any kind
of cess etc shall be paid by the Purchaser at actual, as applicable at the time of
dispatch.
Any statutory variations, shall be payable by the Purchaser at actual, subject
to the condition that the Supplier has submitted documentary proof of such
statutory variations.
All Taxes, duties, levies, octroi, entry taxes, etc on free supplies, if any, shall
be reimbursed by the Purchaser at actual.
Page 40 of 52

Concessional rate of sales tax wherever applicable will be considered and


charged. Purchaser shall provide valid declaration forms. In the absence of
declaration forms, the Purchaser will have to pay full sales tax.

2. Transportation, Unloading and Storage at site


The delivery of the equipment shall be taken at the Suppliers or their sub-suppliers
works.
All material will be despatched on freight to pay basis through the transport
arranged by the Purchaser for conveying the consignments to the Purchasers site.
Receiving of the consignment, unloading and proper storing, at site shall be
arranged by the Purchaser unless specified otherwise. Proper storage facilities, tools
and tackles, crane, lifting ropes, in-plant transportation etc. required for unloading
and storage shall be arranged by the Purchaser at his cost. If unloading is delayed,
demurrage charges etc. shall be borne and settled directly with the transporter by the
Purchaser.

However if inland freight is exceptionally arranged by the Supplier at the


request and on behalf of the Purchaser through the Suppliers regular
transporters, the Purchaser shall pay the costs prior to the dispatch of each
consignment.

3. Insurance
The Purchaser at his expense shall arrange, secure and maintain
comprehensive insurances covering inland transit, unloading, handling at
site, storage, erection & commissioning at site, including third party risks.
Copy of the Insurance policy taken shall be provided to supplier
The Purchaser shall place a separate Purchase Orders on the Supplier for
repair and / or replacement of the parts damaged or lost. If such a repair or
replacement is prolonged, consequential extension to the time for completion
together with extra costs shall be agreed to by the Purchaser.
4. Storage prior to despatch
The Purchaser shall issue final despatch instructions as per the contract.
However, if the Supplier does not receive the despatch instructions as
provided in the contract or if the Purchaser does not take delivery of the
goods within 7 days of notification of readiness of the goods for despatch, the
Supplier is entitled to move the goods into a storage at the risk and cost of the
Purchaser. In such an event the Purchaser shall pay Storage charges @ 2 % per
month or part thereof of the contract Price, until the goods are released for
Page 41 of 52

despatch from the storage. Risk shall pass on to the Purchaser on storage, but
title shall only pass on in accordance with the provision of Title of Goods
clause.
5. Variation Orders

The Purchaser may instruct the Supplier in writing to perform variations or


carry out additional works. If so agreed by the Supplier in writing, such
additional works or performance of variations shall be carried out as though
these variations or additional works were incorporated in the Contract.
If such variations or additional works entail additional costs and/or time, the
same shall be intimated by the Supplier to the Purchaser. Accordingly the
Contract price and/or time schedule shall be amended by the Purchaser
before such variation orders and additional works are carried out by the
Supplier.
6. Purchasers Obligation:
a. The Purchaser shall provide to the Supplier, on time, all inputs such as but
not limited to any approval, instruction, technical and commercial data,
material, civil works, access to site or other thing which are not expressly
stated to be the Suppliers responsibility but are essential for the
performance of the Suppliers obligations
b. The Purchaser shall obtain and provide to the Supplier if required, any
authorization, license or approvals from any regulatory authority for
which the Supplier is not expressly made responsible in the contract.
c. The Purchaser shall handover to the Supplier completed STG building
including overhead crane by completing all civil works atleast 90 days
prior to the contractual commissioning date to the Supplier.
d. The Purchaser shall provide to the Supplier for his exclusive use under his
custody a secured and lockable storage space at site to store the Suppliers
own equipments, tools and tackles etc. and office rooms with all facilities
like electricity, water, telephone, fax, internet etc. for the Suppliers site
operations free of cost. The purchaser shall also provide a leveled
compacted open space to carry out pre-erection work.
e. The Purchaser shall provide free boarding and lodging facilities to the
Suppliers Engineers / Supervisors and space for labor colony.
f. The Purchaser shall obtain any necessary essentiality certificate / EPCG
license / invalidation letter, wherever relevant and shall give all
reasonable assistance to the Supplier in obtaining any work permit, visa or
Page 42 of 52

similar document which the Supplier may require, at no cost to the


Supplier.
g. The Purchaser shall issue Form 5 in the name of Supplier / Suppliers
contractor for obtaining Labor license before start of Erection.
h. The Purchaser shall pay to the Supplier the sums due to the Supplier as
provided in the contract without any demur. If payment of any sum
payable under the contract is delayed, the Supplier shall be entitled to
receive, during the period of delay, interest on unpaid amount. The
interest shall be at the rate of 4% per annum above the average of base
lending rates of the Bangalore clearing banks from time to time. The
Supplier shall be entitled to interest without formal notice and without
prejudice to any other right or remedy. If the Purchaser fails to make any
payment as provided in this clause or elsewhere in the contract the
Supplier shall be entitled to stop work until the failure is remedied, by
giving 7 days notice to the Purchaser, in which event additional cost to the
Supplier occasioned by the stoppage and the subsequent resumption of
work shall be added to the contract price, and/or, to terminate the
contract by giving 30 days notice to the Purchaser. In addition, the
Purchaser shall grant an extension of time to the Supplier if the
Purchasers default delays performance of this contract.
The Purchaser shall make available all work fronts, facilities, required
manpower and other inputs like steam, water etc, to the Supplier for carrying
out uninterrupted erection and commissioning work. The Purchaser shall
make available steam at rated parameters at the Turbine inlet valve 21 days
prior to the scheduled commissioning date duly completing the steam
blowing.
7. Suppliers obligations
The Supplier shall design, manufacture (including associated purchases
and/or subcontracting) install and commission and conduct guarantee tests
with due care and diligence in accordance with the Contract.
The Supplier shall acquire in its name all permits, approvals and/or licenses
that are necessary for the performance of the Suppliers responsibility under
the Contract
The Supplier shall comply with all laws in force in the country where the
equipment are installed and shall indemnify the Purchaser against any and
all liabilities, damages, claims, fines and expenses arising or resulting from
the violation of such laws by the Supplier.
8. Inspection and Testing
Page 43 of 52

The products manufactured at the Suppliers works are subject to careful


inspection and testing at the works, according to the Suppliers standard
inspection and testing practices. Only when the products pass through
successfully such inspection and tests, the products are kept ready for
dispatch. Suppliers standard testing practise includes MRT
(Mechanical Steam Run Test) of turbine at factory before dispatch.
In case the Purchaser indicates at the time of signing of the contract his desire
to attend any of these tests or any other additional tests if provided in the
contract, the Supplier shall notify the Purchaser 7 days in advance of
conducting these tests.
If the purchaser expresses his willngness to witness MRT, the
purchaser shall pay an additional cost of Rs. 6,00,000.00/- (INR Six
Lakhs Only).
In the event of any delay on the Purchasers part in attending such tests after
seven days notice from the Suppliers side, the Purchasers absence shall
constitute a Waiver and the tests will proceed in the Purchasers absence.
The certificates given by the Supplier shall be conclusive evidence of such
tests. All such tests will be deemed to have been approved by the purchaser.
Thereafter the products will be released for packing and forwarding.
Repetition of any of these tests is subject to the Suppliers confirmation and
will entail additional costs and time extension.
9. Warranty
The equipment supplied is warrantied for a period of twelve calendar months
from the date of commissioning of the equipment or eighteen calendar
months from the date of dispatch whichever occurs earlier. During this
warranty period should any defect be found in design, material or
workmanship in goods of our own manufacture, the Suppliers shall
promptly remove the defects and at its cost repair, replace or otherwise make
good at the Suppliers sole discretion. The Supplier shall not be responsible
for repair, replacement or making good of any defects or any damage to the
equipments arising out of or resulting from any of the following causes;
a. Improper movement of material, handling at site, installation,
commissioning, operation and maintenance not according to the Suppliers
advice by the Purchaser
b. Operation of the equipment outside the specifications provided in the
Contract
c. Normal wear and tear.

Page 44 of 52

The Suppliers obligation shall not extend to failures caused by fair wear and
tear, designs and specifications and items which are outside the Suppliers
scope of supply (whether commented on by the Supplier or not), accidents,
misuse, neglect, or repairs or modifications to the goods which have been
made without the Suppliers approval and / or omissions / commissions
attributable to purchaser. The Suppliers obligation is subject to the Supplier
being given prompt notice by the Purchaser of the appearance of the defect
and a reasonable opportunity to investigate it.
Unless otherwise agreed in writing the Supplier shall have no liability for the
costs of dismantling, transportation, re-assembly and re-installation of any
goods affected under this warranty or undertaking or for the costs of
transportation. These costs shall be borne by the Purchaser or reimbursed to
the Supplier on presentation of its invoice.
The Suppliers liabilities and the Purchasers remedies in respect of defects in
the goods or services and any damage to the goods resulting there from
whether arising from breach of contract or warranty, negligence or otherwise
are solely and exclusively as stated in this Suppliers warranty clause, and the
Supplier shall have no liability of any kind for any such defects or damage
which appear after expiry of the warranty period described above.
Items, which are replaced during the warranty period shall become the
property of the Supplier and the Purchaser shall promptly return to the
Suppliers works, at his cost. The warranty for the replaced item shall expire
along with the contractual warranty period.
The Purchaser shall afford the Supplier access necessary access to the
equipment and the site to enable the Supplier to perform its obligations under
this clause without any cost to the Supplier.
10. Commissioning and Taking over
No sooner the charging of the Generator breaker with the available plant load
is demonstrated, commissioning is deemed to have been completed.
Thereafter, the Purchaser shall take over the plant for commercial operation
relieving the Supplier from the contractual obligation with respect to
commissioning
In the event the STG set is not commissioned due to reasons not attributable
to the Supplier, within 3 months from the date of last major dispatch (Turbine
or Generator), the STG set will be deemed to have been commissioned.
11. Performance Guarantee Tests

Page 45 of 52

On completion of commissioning, Supplier shall mobilize its team and


intimate the readiness to carry out the performance test. Purchase shall make
available the steam parameters, load and other utilities, manpower as
required to carry out the test. The test shall be carried out for 4 hrs.
If the purchaser is not able to provide the necessary inputs required for
conducting guarantee test, the Supplier shall de-mobilise. Re-mobilisation of
the team to carry out performance test shall be at purchasers expenses.
In the event the performance test is not carried out due to reasons not
attributable to the Supplier, within 3 months from the date of commissioning,
the performance test shall deemed to be carried out and the Supplier shall be
relieved of its contractual liabilities.
12. Liquidated Damages (LD)
a) LD for Delay
LD for delay becomes applicable only after providing 2 months grace period
to the contractual delivery schedule or mutually agreed extensions thereof. If
the delivery is delayed beyond the above grace period from the contractual
delivery schedule or mutually agreed extensions thereof, for reasons solely
attributable to the Supplier and only if the Purchaser has suffered a proven
loss exclusively attributable to the delay, then the Supplier shall be liable to
pay as Liquidated Damages, and not as penalty, a sum calculated at the rate
of 0.5 % of ex-works price of the delayed portion of supply, for each week of
delay, or part thereof, up to a maximum limit of 5% of the ex-works price for
supply.
LD for delay in delivery can only be enforceable if the Purchaser has
provided in time all technical and commercial inputs as elaborated in the
contract.
LD for delay shall be applicable separately, unit-wise. LD is not applicable for
the spare parts if covered in the scope of delivery.
b) LD for Shortfall in Performance
If the guaranteed Gross Power Output at the generator terminals has not been
demonstrated by the Supplier as specified in the Contract, for reasons
attributable solely to the Supplier, then the Supplier shall be liable to pay as
Liquidated Damages, at the rate of 0.5 % of ex-works contract price, for every
1 % shortfall or part thereof in gross Power Output, up to maximum limit of 5
% of ex-works contract price.

Page 46 of 52

If the guaranteed Specific steam consumption has not been demonstrated by


the Supplier as specified in the Contract, for reasons attributable solely to the
Supplier, then the Supplier shall be liable to pay as Liquidated Damages, at
the rate of 0.5 % of ex-works contract price, for every 1 % increase or part
thereof in specific steam consumption, up to maximum limit of 5 % of exworks contract price.
The guaranteed parameters are valid only for steady state conditions, at fully
open control valves, deposit free turbine blades, and a clean surface on the
cooling equipment, in accordance with the rules given in Purchaser
performance Test Procedure which is based on the ASME - PTC 6 code / DIN
1943.
The Supplier is not liable to pay any LD for shortfall in performance if any of
the required inputs from boiler and other auxiliaries to the TG set as specified
in Technical Specification have not been provided by the Purchaser or there is
no conclusive evidence that the shortfall is exclusively due to the deficiency
in the TG performance.
The combined maximum ceiling of LD on account of delay in delivery and
shortfall in performance will be 7.5 % of the contract ex-works supply price.
13. Limitation of Liability
The Supplier shall not be liable to the Purchaser, whether in contract, tort
(including but not limited to negligence), or otherwise, for any indirect or
consequential loss or damage, loss of use, loss of production, or loss of profits or
interest costs, loss of contracts, provided that this shall not apply to any
obligation of the Supplier to pay liquidated damages to the Purchaser.
14. Force Majeure
Definition of force majeure and effect on Delivery
If, despite all efforts and measures considered reasonable, either Party is prevented
from fulfilling his contractual obligations within the period agreed on, owing to a
reason beyond his control and which could not be foreseen when the Contract was
signed, the date by which the contractual obligations have been scheduled to be
fulfilled shall be postponed by a period equal in length to that during which the
reason concerned and its direct consequences demonstrably continue to affect.
Examples of force majeure
Strike with considerable effects, not brought about by either Party, fire, not resulting
from neglect as regards fire protection, war, unforeseen measures by authorities
independent of the Parties, mobilization or other unexpected call-ups of armed
forces of the corresponding magnitude, requisition, confiscation, currency
restrictions, export and import embargoes, riots and insurrection, breakdown of
public traffic, restrictions in the use of power or other corresponding event meeting
the above requirements, shall be considered force majeure.
Page 47 of 52

Sub-suppliers
Delayed or defective delivery by a sub-supplier shall not be considered force
majeure unless the sub-supplier meets the requirements referred to above in respect
of force majeure.
Additional costs
Each Party shall meet the additional expenses incurred by him as a result of force
majeure. The Parties shall act in a manner aimed at causing as little loss as possible
to the other Party.
Obligation of notification
When force majeure occurs, the Party shall promptly notify the other Party in
writing. Such notification shall include information on the prevailing circumstances
and an estimate of the effects of the circumstances as regards the Partys possibilities
of meeting his contractual obligations, and information on the estimated period
within which he will be able to meet these obligations. The necessary evidence shall
be enclosed with the notification or be supplied within a reasonable period of time.
When the force majeure event referred to above ceases to exist, the Party shall notify
without delay the other Party in writing. The notification shall indicate the time by
which the contracting party concerned estimates to be able to meet his contractual
obligations.
If a Party neglects the notification to the other Party in accordance with the above or
fails to notify promptly, he shall compensate the losses suffered by the other Party
owing to such neglect or delay.

15. Suspension
If purchaser fail to make any payment when due or perform on time any of
purchasers other obligations under the contract, supplier shall be entitled to
suspend performance of the contract until the failure is remedied. The time
for performance of the contract by supplier shall be extended accordingly and
any cost (including financial costs, storage and demurrage or any other
charges) thereby incurred by supplier shall be paid by purchaser.
If performance of the contract is for any reason suspended by purchaser and
such suspension continues for more than 3 months, supplier shall be entitled
at any time during that continued suspension by not less than 30 days'
written notice to terminate the contract forthwith, in which event the
provisions of the Termination Clause shall apply.
In all cases where delay of failure in performance of the contract is due to
force majeure, then in such case supplier shall be entitled to an extension of
time for performance of this contract for a period corresponding to the period
of delay by or in consequence of the operation (in whole or in part).
16. Termination of Contract
Purchaser may at any time terminate the contract, in whole or in part by
giving written notice to supplier. The notice of termination shall specify that
termination is for Purchaser's convenience, the extent to which performance
Page 48 of 52

of work under the contract is terminated, and the date upon which such
termination becomes effective.
Equipment, which is complete and ready for dispatch within 30 days after
supplier acknowledge receipt of the notice of termination shall be purchased
by Purchaser at the stated contract prices and subject to contract terms.
For the remaining goods purchaser may cancel the contract and pay to
supplier an agreed amount for partially completed goods and for materials
and parts previously procured by supplier for the purpose of the contract,
together with a reasonable allowance for overhead and profit and a
reasonable compensation, based on mutual discussions, for the financial
commitments made by supplier for fulfilling their obligations under this
contract including for example commitments already made with subsuppliers.
In the event of cancellation Purchaser shall not have any claim on designs and
drawings lying ready with supplier and will remain supplier's property.
17. Title of Goods
Title of the goods will automatically get transferred to purchaser as soon as
the goods leave suppliers works / suppliers sub-vendors works and the
documents evidencing the title and the dispatch are transferred in purchaser
favor. However suppliers obligations will cease only on the commissioning
of the equipment.
The components will get dispatched ex-works in convenient transportable
units as manufactured; depending upon the sequence, size, transportation
facilities etc., and each such component shall be treated as contracted goods
and payment for the goods made pro-rata.

The Title (legal and beneficial ownership) in the goods shall not pass to the
Purchaser until the Supplier has been paid the contract price in full. All risks
of loss or damage to the goods shall nevertheless continue to be with the
Purchaser on delivery.
18. Confidentiality
All designs, drawings and other technical information relating to the goods or
services, including the software provided by the Supplier under the contract,
and the intellectual property rights therein made or acquired by the Supplier
prior to or during the preparation of the proposal or tender or in the course of
work on the contract shall be and remain the property of the Supplier or the
original software providers.
Page 49 of 52

Such technical information shall be kept confidential by the Purchaser, its


employees, agents or subcontractors, shall not be copied, modified or
disclosed by any of them and shall not be used by them for purposes other
than operation and maintenance of the goods. In the event that the Purchaser
does not accept the Suppliers tender it shall return to the Supplier all
technical information supplied by the Supplier together with any copies
made.
From the effective date of the contract, the Supplier grants to the Purchaser
the non-exclusive and non-transferable right to use the technical information,
including software, provided by the Supplier for the life of the goods
supplied under the contract for the purposes of their operation and
maintenance and for no other purpose.
19. Patent Indemnity
In the event of any claim being made or action being brought against the
Purchaser in respect of infringement of patents by the Supplier for goods
supplied to the Purchaser hereunder, the Purchaser shall notify the Supplier
immediately. The Supplier shall be at liberty, with the Purchasers assistance,
if required, but at the Suppliers own expense, to conduct all negotiations for
the settlement of the same or any litigation that may arise there from. The
Supplier shall indemnify the Purchaser in respect of any such claim. Such
indemnity shall not cover any use of the equipment or any part for the
purpose other than what is indicated in the Contract or to be reasonably
inferred from the Contract, any infringement resulting from the use of the
equipment or any part thereof, or any products produced thereby in
association or combination with any other equipment or material not
supplied by the supplier, pursuant to the Contract.
In a similar way, the Purchaser shall indemnify the Supplier and hold
harmless the Supplier from and against any claim being made or action being
brought against the Supplier in respect of infringement of patents by the
Purchaser arising out of or in connection with any design, data, drawing,
specification or other documents or materials provided or designed by or on
behalf of the Purchaser.
20. Arbitration
All disputes, or difference whatsoever arising between us and yourselves, in
connection with the contract, which cannot be settled through mutual
negotiations in good faith, either of us may give the other notice in writing of
the existence of such question, dispute or difference.

Page 50 of 52

The same shall be settled in accordance with the provisions of Indian


Arbitration Act. The arbitrator shall be a person qualified to be appointed as
an arbitrator, under the provision. The award of the arbitrator shall be final
and binding on the parties and the persons claiming under them. Work under
the contract shall continue, so far, as may be reasonably practical, during the
arbitration proceedings, and no payments which may or shall become due
shall be withheld on account of such proceedings. The venue for arbitration
shall be Bangalore.
21. Jurisdiction
The contract shall in all respects be construed and be deemed to be governed
by the provisions of the Indian Contract Act and Sale of Goods Act as may be
in force at the time of execution of the contract. The contract shall be taken to
have been made in our office and all proceedings, which either party to the
contract might be entitled to make against the other under the contract shall
be instituted in a court at Bangalore

22. Bankruptcy
If the Purchaser becomes bankrupt or insolvent or makes any agreement with
its creditors compounding debts or if, being a limited company, any
proceedings are begun in respect of it applying for the appointment of a
liquidator, administrator, receiver or similar official for it or all or any
substantial part of its assets or seeking an order of relief against it as debtor or
under any law relating to insolvency, readjustment of debt, reorganization,
administration or liquidation, the Supplier may if legally possible at any time
by written notice terminate the contract forthwith, in which event the
provisions of termination clause shall apply.