Heat Load Estimation-400kV GIS Building

S.N
O.

EQUIPMENT

Ground Floor - 400kV GIS Building

1.1

400kV GIS ROOM(refer Annexure-III)


Additional load of 20% for fdr. Load current, 5% for Busbar & 5% for
Bus duct inside the GIS hall are considered from the original
requirement.

1.2

Sub total

2
2.1
2.2

Ground Floor - 400kV LCC Room


GIS Local Control Panles (including Future)
Lighting (Refer Annexure - I)

2.3

Sub total

3
3.1

Ground Floor - 400kV Relay Room


400kV Relay Panel

16

3.2

400kV Main-1 Busbar Protection Panel

3.3
3.4
3.5

400kV Main-2 Busbar Protection Panel


400kV Voltage selection Panel
400kV Fault Recorder Panel

3
1
4

3.6
3.7
3.8
3.9
3.10

SCMS Communication Panel


Aux.AC & DC Panels
HVAC Panels
Lighting (Refer Annexure - I)
Misc.other panles

2
3
1
1
5

3.11

Sub total

Basement - 400kV LCC & Relay Room

4.1
4.2

LV & Control cables (Refer Annexure II)


Lighting (Refer Annexure -I)

QTY HEAT LOAD


.
(W)
Per
Tota
Unit

11

7329
.6

7329
.6

11
1

395
3104

4345
3104

7449
06

188.4
38
447.5
4
133
83.73
318.7
5
236
150
250
4878
1500

3015

2237
7
399
83.7
1275

472
450
250
4878
7500

2056
.2

1
1

1
8390

1
8390

4.3
4.4
4.5

Staircase-01 Lighting (Refer Annexure -I)


Staircase-02 Lighting (Refer Annexure -I)
Misc.other panles

4.6

Sub total

3.0

Heat Load Estimation-132kV GIS Building

1
1
1

283
159
500

283
159
500

9333

HEAT LOAD
QTY (W)
.
Per
Tota
Unit

S.N
O.

EQUIPMENT

Ground Floor - 132kV GIS Building

1.1

132kV GIS + LCC ( Future not considered) - (refer AnnexureIV)


Additional load of 20% for fdr. Load current, 5% for Busbar & 5% for
Bus duct inside the GIS hall are considered from the original
requirement.

1.2

Sub total

2
2.1
2.2

132kV Relay Room


132kV Relay Panel
132kV Main-1 Busbar Protection Panel

8
5

2.3
2.4
2.5

132kV Main-2 Busbar Protection Panel


132kV Voltage selection Panel
132kV Fault Recorder Panel

4
1
6

2.6
2.7
2.8
2.9
2.10
2.11

132kV Metering Panels


SCMS Communication Panel
Aux.AC Panels
HVAC Panels
Lighting (Refer Annexure - I)
Misc.other panles

12
3
3
1
1
3

2.12

Sub total

Basement - 132kV GIS + Relay Room

3.1
3.2
3.3

HV Cables & Accessories (Refer Annexure II)


Lighting (Refer Annexure -I)
Staircase-01 Lighting (Refer Annexure -I)

10

2487

2487

269
1120.
54
115
69
219.1
7
250
236
250
250
4830
1500

2152
5602
7
460
69
1315

3000
708
750
250
4830
4500

2363

1
1
1

12064
18630
283

1306
1863
283

3.4
3.5

Staircase-02 Lighting (Refer Annexure -I)


Misc.other panles

1
1

3.6

Sub total

Heat Load Estimation-Control Building

S.N
O.

EQUIPMENT

SCMS Panels (Control Room)

1.1

SCMS Front End & Gateway Panels

1.2
1.3
1.4
1.5
1.6
1.7

SCMS Common Alarm Panels


SCMS Monitors & Printers
AVR,PDMP
FACP
Lighting (Refer Annexure -I)
Misc.other panles

2
1
2
1
1
2

1.8
2

Sub total
Battery Room-1

2.1
2.2
2.3

110V Battery Bank 1 (Refer Annexure - V)


110V DC station Battery 1-DC Fuse Box
Lighting (Refer Annexure -I)

2.4
3

Sub total
Battery Room-2

3.1
3.2
3.3

110V Battery Bank 2 (Refer Annexure - V)


110V DC station Battery 2 -DC Fuse Box
Lighting (Refer Annexure -I)

3.4
4

Sub total
Emergency Battery Room

4.1
4.2
4.3

110V Battery (Refer Annexure - V)


110V DC station Battery-DC Fuse Box
Lighting (Refer Annexure -I)

122
500

122
500

3259

HEAT LOAD
QTY (W)
.
Per
Tota
Unit

424.2
5
40
0
285
250
1990
250

1697

80
0
570
250
1990
500

5087

1
4
1

2840
100
1775

2840
400
1775

5015

1
4
1

2840
100
1775

2840
400
1775

5015

1
1
1

1280
100
851

1280
100
851

4.4
5

Sub total
DC Room

5.1
5.2
5.3
5.4

110V Control & Protection DC System Panels (Refer


Annexure -V)
110V Emergency DC System Panel (Refer Annexure - V)
Lighting (Refer Annexure -I)
UPS

5.5
6

Sub total
LVAC Room

6.1
6.2
6.3
6.4

Non Essential Panel


Essential Board
HVAC Panels
Lighting (Refer Annexure -I)

6.5

Sub total

Telecom Room

7.1
7.2

Telecom Panels
Lighting (Refer Annexure -I)

7.3
8

Sub total
Nitrogen Room-1

8.1
8.2

Nitrogen Equipment
Lighting (Refer Annexure -I)

8.3
9

Sub total
Nitrogen Room-2

9.1
9.2

Nitrogen Equipment
Lighting (Refer Annexure -I)

9.3
10

Sub total
Corridor - Control Building

10.1
10.2
10.3

Corridor-1 Lighting (Refer Annexure -I)


Corridor-2 Lighting (Refer Annexure -I)
Corridor-3 Lighting (Refer Annexure -I)

10.4

Sub total

2231

19592

1959

1
1
1

4124
1762
500

4124
1762
500

2597

1
1
1
1

6000
2500
250
2317

6000
2500
250
2317

1106
.9
12
1

250
1890

3000
1890

4890

1
1

1000
851

1000
851

1851

1
1

1000
788

1000
788

1788

1
1
1

1393
1464
302

1393
1464
302

3158
5

11

Office

11.1

Office Lighting (Refer Annexure -I)

11.2
12

Sub total
WorkShop & Store

12.1

WorkShop & Store Lighting (Refer Annexure -I)

12.2
13

Sub total
Kitchen

13.1
13.2

Kitchen Equipment
Lighting (Refer Annexure -I)

13.4
14

Sub total
Toilet

14.1

Lighting (Refer Annexure -I)

14.2
5
1

Sub total
Heat Load Estimation-Fire Fighting Pump Room
Fire Fighting Pump Room-1

1.1
1.2

Fire Fighting Equipment


Lighting (Refer Annexure -I)

1.3

Sub total

320

320
320

891

891
891

1
1

1500
149

1500
149

1649

150

150
150

1
1

6000
1563

6000
1563

7563