OPR Designer
To do what?
OPR Designer has been developed to ease the life of the persons in
charge of implementing Lightning Protection Systems using mainly ESE
lighting rods.
This software is made to find the most optimized solution in the shortest
time possible.
We can get the bill of material at any time of the selection or editable in
excel file.
ABB Group
July 9, 2012 | Slide 2
. Certificates
OPR Designer
Settings : located in the bar menu go to help
Language selection
Address where projects
will be saved.
Open generated files
automatically
Address that will appear in
the drawings title block.
ABB Group
July 9, 2012 | Slide 3
OPR Designer
Create a project
ABB Group
July 9, 2012 | Slide 4
OPR Designer
Within one project, several quotations may be created. One project may be the protection
of a complete industrial site, and there is may be several quotations corresponding to
each building of this particular site.
first step is then to create a quotation within the project using the button Add and
naming it.
Conductor may be chosen for the whole quotation (eg tinned copper in this case)
ABB Group
July 9, 2012 | Slide 5
OPR Designer
Duplicate : can be used to copy an existing quotation in order to re use it. In this case it is
advised to update the revision number.
ABB Group
July 9, 2012 | Slide 6
OPR Designer
ABB Group
July 9, 2012 | Slide 7
OPR Designer
When starting a new quotation :
ABB Group
July 9, 2012 | Slide 8
All others geometrical forms created after and placed on top of the
first one will increment its high.
OPR Designer
Definition of each element
Structure designation and possibility to secure it. When this box
is ticked the structure cannot be moved by mistake later on,
when adding other structure.
Structure dimensions. Length and width to be defined only
when creating drawing without inserting ground layout if not
calculated automatically in regard to the first dimension given
when inserting the ground layout.
Indicate level of protection.
Indicate also if any interdiction to place ESE or even regular
lightning rods on some parts of the building or on the complete
structure.
ICPE is only used in France for specific sites that refers to a
specific regulation.
ABB Group
July 9, 2012 | Slide 9
OPR Designer
Launch automatic calculations
ABB Group
July 9, 2012 | Slide 10
OPR Designer
Setting lightning rod fixations
OPR Designer
Earthing definition
Define on what type of structure the lighting rod will
be fixed.
Possibility to select preferred earthing system (duck
foot, triangular or grid)
OPR Designer
Delete function
Possibility to remove
manually earthing
systems and
equipotential bonding
given in automatic by
the soft.
ABB Group
July 9, 2012 | Slide 13
OPR Designer
Manual selection
You may also use this software in a manual mode meaning that
instead of using the red button that launches the automatic mode of
selection you may implement yourself the required ESE at the place
you think it is necessary using the following icons :
Add simple rod
Add OPR 30
Add OPR 60
ABB Group
July 9, 2012 | Slide 14
First select the element where you want to install the rod and then
click on the above button and if necessary move the rod using the
mouse, or even delete it if not as you wish using the bin icon.
OPR Designer
Manual selection
ABB Group
July 9, 2012 | Slide 15
OPR Designer
Manual selection
If a yellow arrow appears that means that a small zone that is not
possible to see clearly on the screen it not covered completely.
ABB Group
July 9, 2012 | Slide 16
OPR Designer
Icons definition
Back to quotation
list
Scale
setting
Reset of current
quotation
Generate
PDF file
ABB Group
July 9, 2012 | Slide 17
Display bill
of
material
Export bill of
material in
Excel format
Redo
Undo
Get a grid
Import
ground
layout
OPR Designer
Icons definition
Duplicate
selected
elements
Delete
Zoom
selected
elements
Group
selected
elements
ABB Group
July 9, 2012 | Slide 18
Ungroup
selected
elements
Set layout
order
Find solution
in automatic
mode
ESE Localization
by setting points
of reference on
the drawing
OPR Designer
Icons definition
Add polygonal shape
Add rectangular shape
Add round or elliptical shape
Add forbidden areas
Add simple rod
Add OPR 30
Add OPR 60
Add earthing system
Add an Equipotential bonding conductor
ABB Group
July 9, 2012 | Slide 19
OPR Designer
Hide structure selection
ABB Group
July 9, 2012 | Slide 20
OPR Designer
Open past quotations
ABB Group
July 9, 2012 | Slide 21
OPR Designer
ESE positioning on the drawing
A point of reference on the drawing in given to facilitate future
installation. You have the choice to modify it and take the reference
point from where you whish on the drawing. The length in meters will be
given to you in the pdf file. Access and quite this mode with
In the software
ABB Group
July 9, 2012 | Slide 22
ABB Group
July 9, 2012 | Slide 23