I. Company Details
1.
2.
3.
4.
5.
6.
Status /Information
7.
8.
2.
3.
A
B
C
4.
5.
Total Land
Acquired
Possessed
Status of Land to be acquired like date
of Notification for and date of
acquisition etc (Attach a Copy of deed
of Sale agreement for private land).
Details of Nearest Substation
i)EHT SS(220/132/33KV or 132/33 KV)
Distance in KM
ii)33/11 KV SS
Distance in KM
Name of the manufacturer with Address
Total Land
6.
7.
for
supply,
Installation
and
commissioning of the Power Generation
System, if identified.
Expected Date of commissioning
Power Plant Proposed to be setup for
a) Captive Use
b) Sale of Energy to APDISCOMs under
REC Mechanism
c) Third party sale
2.
4.
V. FINANCIAL DETAILS
1.
2.
VII. DECLARATION
i)
I/We certify that all the information furnished is true to the best of
our knowledge.
ii)
iii)
I/We shall not have any dispute with Govt of AP/APERC/ NREDCAP/
NVVN/MNRE for non-allotment of the project.
iv)
v)
Place:
(Signature)
Name of the Representative
Designation
Date:
2.
3.
4.
5.
6.
Certificate from the Charted Accountant showing the Net Worth of the
company.
7.
Deposit,
which
will
be
refunded
if
the
project
is
As per IEGC code 2010, the developer has to provide necessary Data
Acquisition system and communication system before synchronization of
plant.
9.
Time lines:
1.
The Solar Power developer shall enter draft PPA/Agreement with APEPDCL
within 45 days from the date of receipt of technical feasibility subject to
receipt of approval from NREDCAP.
2.
The Solar power developer shall inform the status of the financial closure
within 6 months from the date of entering Draft PPA.
3.
The Solar power developers have to furnish a Half Yearly Progress report
from the date of entering draft PPA/Agreement to APEPDCL.